Loading...
HomeMy WebLinkAboutS-103 - SCHEDULESWALL FOOTING SCHEDULE SIZE MARK TYPE REBARS REMARK TOP ELEV. WIDTH THICKNESS TIE 0'-It" 0'-8" (1)fF5 BAR CONT. THICKENED SLAB EDGE 0'-0"INT. TF2.0 2' -0" 3' -0" .. 140 #5 @ 12" O.C. BOTT. BAR TRENCH FOOTING SEE PLAN FOR (1) #5 SFR ON EACH FACE ELEVATION ' 2-0• Y TF3.0 3'-0" 3' -0" V... #5 @ 12" O.C. BOTT. BAR TRENCH FOOTING SEE PLAN FOR (1) #5 SFR ON EACH FACE ELEVATION T-0' , IV TF4.0 4' -0' T-0' . - 4 #5 @ 12" O.C. BOTT. BAR TRENCH FOOTING SEE PLAN FOR AV n (1) #5 SFR ON EACH FACE ELEVATION F, v • TF4.5 4' -6" 3' -O" V #5 @ 12" O.C. BOTT. BAR TRENCH FOOTING SEE PLAN FOR - (1) #5 SFR ON EACH FACE ELEVATION A 4'-6"Ap TF4.5A 4'-6" 4'-0" o #5 @ 12" O.C. BOTT. BAR TRENCH FOOTING SEE PLAN FOR (1)#5 SFR ON EACH FACE ELEVATION -a' a 4 TF65 F - 6" 3' -0" _ - #5 @ 12" O.C. BOTT. BAR TRENCH FOOTING SEE PLAN FOR (1) #5 SFR ON EACH FACE ELEVATION a. - W-60 AA 14 t. TF6.5A 6'-6" 4'-0" ' 9 > #5 @ 12" O.C. BOTT. BAR TRENCH FOOTING SEE PLAN FOR • (1) #5 SFR ON EACH FACE ELEVATION aIV 6-6 NOTE: 1. ADJACENT GRADE ASSUMED TO BE(-) U-6", CONTRACTOR FIELD VERIFY. 2. REGARDLESS OF TOP OF FOOTING ELEVATIONS SHOWN IN THE SCHEDULE ABOVE, ALL EXTERIOR WALL OR PAD FOOTINGS SHALL BE LOCATED SUCH THE MINIMUM OF T-0" OF FILL EXISTS BETWEEN BOTTOM OF FOOTING AND FINAL GRADE ELEVATION. 3. SHOULD THE CONTRACTOR DECIDE TO POUR THE INTERIOR WALL FOOTINGS AS A STEM WALL FOUNDATION, THE CONTRACTOR SHALL ADJUST THE TOP OF FOOTINGS ACCORDINGLY. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City d Camel ((�� �vm�tlenrklDAaL x DATE: 07/22/19 PAD FOOTING SCHEDULE SIZE MARK TYPE REBARS REMARK TOP ELEV. LENGTH WIDTH THICKNESS a #5 @ 10" O.C. BAR ELEVATOR FOOTING SEE PLAN FOR EF 22'-6' 1V-6' 1'-4- - TOP 8BOTT. EACH SUMP PIT ELEVATION WAY < • .• .. 2T 6" COLUMN FOOTING SCHEDULE SIZE MARK TYPE REBARS TOP ELEV. LENGTH WIDTH THICKNESS 1. #5@12"O.C. BAR SEE PLAN FOR CF2.0 TV TV0" 1'-0" - - Q BOTT. EACH WAY ELEVATION CF4.0 4'-0" 4'-0" 1'-4" ° :. _ a #5@12"O.C. BAR SEE PLAN FOR ,' ,_ - . ; f BOTT. EACH WAY ELEVATION 4-0" t #5 @10" O.C. BAR SEE PLAN FOR CF5.5 5'-8" 5'-8" 1'-8" - BOTT. EACH WAY ELEVATION 5-5 1.4 , V I CF7.0 T-0" T-0" 1'-8" 45@8"O.C. BAR SEE PLAN FOR BOTT. EACH WAY ELEVATION 4 7-0 CF8.0 10'-0" 8'-0. 2'-0' VA 6 1- r_Q O.C.#6@10"BAR SEE PLAN FOR t 41 a BOTT. EACH WAY ELEVATION BAS E4 BASE4 2901 CLINT MOORE ROAD, #114 BOCA RATON, FLORIDA 33496 888.901.8008 www.base4.Gom RICARDO J. MUNIZ-GUILLET,AIA 5453 NW 106TH DR CORAL SPRINGS, FL 33076 Seal: Gil Cr: p\Si Eq .S,aB �•e" Fd��9c NO. 11 OZ 0]`96 9y/SATE./: ol✓ OF � J. ANP,.� `2 SSS/ONAL B� ADAM GINSBURG, PE anw.y Owner: t, If THE WITNESS GROUP 600 ENTERPRISES DRIVE LEWIS CENTER, OH 513.623.9430 HOME SUITES BY HILTON CARMEL,INDIANA PROTOTYPE VERSION-V2.22016 REVISION: MAY 2016 I NSOUE DELTADESCRIPTION DELTA DATE 1 SO 2019.03.04 ISSUED FOR PERMIT CURRENT ISSUE ISSUED FOR PERMIT CURRENT ISSUE GATE 2019.03.04 DRAWN BY Ti CHECKED BY AJG PROJECT NO B4-134-1705 SHEET NAME SCHEDULES DRAWINGS NO. S-103