HomeMy WebLinkAboutS-602 - TYPICAL DETAILS1 12' RIGID INSULATION
1' AIR GAP
SHEATHING NAILED TO STUD,
SEE WALL SCHEDULE
WOOD STUD WALL,
SEE PLAN
BATT INSULATION, —�
SEEARCH.
FLUID APPLIED
WEATHER BARRIER
BRICK VENEER,
SEEARCH.
(3)8D NAILS @ 4" SPACING —
AT EACH STUD (SHEATHING
MUST BE CONTINUOUS
ACROSS FLOOR SYSTEM)
OR (1) SIMPSON MSTAM36
@48'O.C. W/ (7)-10tl NAILS.
(FOR UPLIFT ONLY)
STONE VENEER, —
SEEARCH.
STONE MORTAR BED,
SEEARCH.
CONTROL JOINT
2' - 6"
io
INSERT #4 HOOK BAR @ KEYWAY
8 FILL WITH GROUT
2X BLOCKING
5/8" TYPE X GYPSUM WALL BOARD
/F
PT 2x SILL PLATE w/ 1/2"B EXP
FANCHORS @ 48'O. C., 3 12' EMB, AT
SHEAR WALLS SEE SHEAR WALL
SCHEDULE FOR CONNECTION TO
SECOND FLOOR
/-900 BEND W/ACI STD. HOOK TYP.
INSERT #4 HOOK BAR @ KEYWAY
R FILL WITH GROUT
2" CONCRETE TOPPING TOP OF FLOOR
ELEV. SEE PLAN
SECTION 01
SCALE 12'-1'-0' zm.z aeon
EMB. STEEL PL @ 48'O.C. BY
PRECAST MANUFACTURER (TYP.)
TYP
714
)LLOW CORE, SEE PLAN
#5 BAR CONT.
MIN BRG. (TYP.)
= WALL, SEE PLAN
I' TYPE X GYPSUM WALLBOARD
MIN BRG. TYP.)
MIN BRG. (TYP.)
SECTION 05
SCALE m.z esm
oI
I 40
��INSERT #4 HOOK BAR@KEYWAY INSERT #4 STRAIGHT BAR @KEYWAY
8 FILL WITH GROUT AND FILL WITH GROUT. HORIZONTAL IN
5/8" TYPE X GYPSUM CORE ONE PER PLANK.
SHEATHING NAILED TO STUD, 5/8" TYPE X GYPSUM WALL BOARD WALL BOARD BATT INSULATION,
SEE WALL SCHEDULE 12' RESILIENT CHANNEL 2X BLOCKING SEEARCH.
2X BLOCKING 1/2" OSB SHEATHING
WOOD STUD WALL, BATT INSULATION, 2X BLOCKING WOOD WALL, SEE PLAN 5/8" TYPE X GYPSUM
SEE PLAN PT 2x SILL PLATE w/ 1/2'B EXP ANCHORS SEE ARCH. WALL BOARD
@ 48'oc, 3 1/2' EMB, AT SHEAR WALLS 5/8" TYPE X GYPSUM WALL BOARD
BATT INSULATION, SEE SHEAR WALL SCHEDULE FOR WOOD STUD WALL, PT 2x SILL PLATE w/ 1/2'B EXP ANCHORS 12" OSB SHEATHING
SEE ARCH. CONNECTION TO SECOND FLOOR SEE PLAN @ 48"O.C., 3 1/2" EMB, AT SHEAR WALLS 12" RESILIENT CHANNEL
FLUID APPLIED 90° BEND W/ACI STD. HOOK TYP. (3)8D NAILS @ 4" SPACING SEE SHEAR WALL SCHEDULE FOR TRUSS GVPCRETE TOPPING
WEATHER BARRIER AT EACH STUD (SHEATHING
CONNECTION TOSECOND FLOOR BOTTOM
NAILS @OEACH TRUSS CONNECTION pLVWOOD, SEE WOOD
(3)BD NAILS @4'SPACING INSERT #4 HOOK BAR @KEYWAY MUST BE CONTINUOUS INSERT#4 STRAIGHT BAR @KEYWAY DIAPHRAGM SHEATHING
AT EACH STUD (SHEATHING R FILL WITH GROUT ACROSS FLOOR SYSTEM) AND FILL WITH GROUT. HORIZONTAL IN SCHEDULE
MUST BE CONTINUOUS OR (1) SIMPSON MSTAM36 CORE ONE PER PLANK.
2" CONCRETE TOPPING 1
ACROSS FLOOR SYSTEM) @48•O.C. W/ (7)-0 d NAILS
OR (1) SIMPSON MSTAM36 TOP OF FLOOR (FOR UPLIFT ONLY) 2" CONCRETE TOPPING
@48.O.C. W/ (7)-10d NAILS. - ELEV. SEE PLAN TOP OF FLOOR 2X70'S
(FOR UPLIFT ONLY) 'I r O(�.Yll l,Tl• ----- - - ----- ELEV. SEE PLAN 7BOARD
ESILIENT CHANNEL
---------- - ------ PEXGYPSUMHOLLOW CORE, SEE PLAN JHOLLOW CORE, SEE PLANA TOP FLANGE
(2)#5 BAR CONT. (3)#5 BAR CONT. 12" RESILIENT CHANNEL HANGER BY SIMPSON
5/8" TYPE X GYPSUM BOARD (2)2X TOP PLATE
ICF WALL, SEE PLAN 3" MIN ERG. (TYP.) 3" MIN BRG. (TYP.) W/(2)16d TOE NAILS@
SECONDARY POUR OPEN WEB TRUSS, SEE PLAN EACH TRUSS
ICF WALL, SEE PLAN WOOD WALL,
5/8" TYPE X GYPSUM WALL BOARD 2X BLOCKING SEE PLAN
5/8" TYPE X GYPSUM WALL BOARD
SECTION 04
SCALE 12"-1'-0"
I
SECTION 02
SCALE 12'-1'-0' zm.z aeon
O5/8- TYPE X
GYPSUM WALL BOARD
BATT INSULATION, SEE ARCH. 2X BLOCKING
CONCRETE TOPPING WOOD STUD WALL, SEE PLAN
TOP OF FLOOR SHEATHING NAILED TO STUD, I12"GVPCRETE TOPPING
ELEV. SEE PLAN SEE WALL SCHEDULE
FLUID APPLIED WEATHER BARRIER SEE WOOD DIAPHRAGM
A SHEATHING SCHEDULE
(3)8d NAILS @ 4- SPACING AT
EACH STUD(SHEATHING MUST TOP OF FLOOR
BE CONTINUOUS ACROSSp
ELEV. SEE PLAN WALL STUDS, SEE
)LLOW CORE, SEE PLAN FLOOR SYSTEM) OR (1) SIMPSSCHEDULE (TYP).
MSTAM36 @48"O.C.ALIGN WALL STUDS
W/ (7)-10d NAILS. (FOR UPLIFT ABOVE 8 BELOW
EEL BEAM, SEE PLAN FLOOR AND WITH
TRUSSES AS SHOWN
BOTTOM PLATE TO
TRUSS CONNECTIONMULTIPLE STUDS ONLY AT —
W/(4)16d NAILS @ EACH TRUSLIENT CHANNEL LOCATIONS INDICATED IN
WALL STUD SCHEDULE (TYP),
X GYPSUM BOARD WHERE BEARING STUDS AND
RIM JOIST TRUSSES DO NOT ALIGN ADD
EB TRUSS, SEE PLAN ADDITIONAL 2x6 BEARING
2X BLOCKING STUD AND CONTINUE DOWN
TOE(2j2ILS@ EACH
TRUSS
TO FOUNDATION.
TOE NAILS@ EACH TRUSS
PROVIDE ADDITIONAL
STUD FOR ATTACHMENT
SECTION D6 OF SHEATHING 8 ILL
RATING
SCALE 12'-1'-T ws+ sax
1 12" GYPCRETE TOPPING
SEE WOOD DIAPHRAGM
SHEATHING SCHEDULE
TOP OF FLOOR
[ELEV. SEE PLAN]
2X1YS
12" RESILIENT CHANNEL
5/8' TYPE X GYPSUM BOARD
JB210A TOP FLANGE
HANGER BY SIMPSON
12' RESILIENT CHANNEL WOOD BEAM, SEE PLAN
5/8" TYPE X GYPSUM BOARD
OPEN WEB TRUSS ,SEE PLAN
DHU3.5624 FACE MOUNT
HANGER BY SIMPSON. SECTION 08
SCALE
7 5/8-(W)X24'([TX16'(H) RCC CONIC.
POURED TO CATCH STUDS.
. I III II,-
�A
CMU COLUMN, SEE PLAN �II
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and meal Codes
City N m Cael
.Jt�
DATE: 07/22/19
CMU COLUMN,SEE
SECTION 13
SCALE 12'-I'-0' oz.z smz
SECTION A -A
I
SECTION 03
SCALE 12'-1'-0' wzz ea¢
13 ATTACH PLYWOOD TO LEDGER
W/ 10d NAILS @ 3" O.C.
ATTACH PLYWOOD TO LEDGER
W/ 10d NAILS @3"O.C. LONGELEDGERSVPXPANSION ANCHORS
DIA.X6"
I LONG EORS
1 1/2" GYPCRETE TOPPING @ 8- O.C. (STAGGERED)
112" GYPCRETE TOPPING
SEE WOOD DIAPHRAGM
SHEATHING SCHEDULE SEE WOOD DIAPHRAGM
SHEATHING SCHEDULE
IELEV. SEE PLAN] Y
2X10'S
12" RESILIENT CHANNEL
5/8" TYPE X GYPSUM BOARD
JB210A TOP FLANGE HANGER BY SIMPSON
(2) 2x10 LEDGER SVP 3/4' DIA. X 6' LONG
EXPANSION ANCHORS @ 8" O.C. (STAGGERED)
BOND BEAM, SEE PLAN
CMU WALL, SEE PLAN
SECTION 09
SCALE 12'-T-0' ms., 7)
PL. 10'X10'X12' W/ (4) 3/4-DIA X 6-
LONG NELSON STUDS
STEEL BEAM, SEE PLAN
:N WEB TRUSS, SEE PLAN
RESILIENT CHANNEL
" TYPE X GYPSUM BOARD
NO BEAM, SEE PLAN
IU WALL, SEE PLAN
SECTION 10
SCALE 12'-1'-0' xw., sex
CMU WALL, SEE
TOP OF BEAM
[ELEV. SEE PLAN]
2X10'S
1.5C22 METAL PAN W2"
LIGHT CONC. W/6X6-
W2SXW2S TOPPING
APLH210 HANGER BY
SIMPSON W/(4) 0.157" CIA PAF
STEEL BEAM, SEE PLAN
CONNECTION BV #10 PAF -
SCREWS FOR METAL DECK
TO C CHANNEL @6' O.C.
SECTION 14
C10X25 W/3/40 CARBON
STEEL KWIK BOLT III W/ 6
SCALE 1/2"-1'-0" .mz.z
smz
1/2' EMBED. @16" O.C.
a
m
x
2x BOTTOM PLATE
TRUSS MFR TO DESIGN
SUPPORT FOR CUMULATIVE
LOAD FROM UPPER FLOORS
WOOD FLOOR SHEATHING
ti SEE PLAN] "I2x6 RIBBON BOARD BEYOND
ONLY WHERE SHOWN IN
RELATED SECTIONS
WOOD FLOOR TRUSS
(TYP), ALIGN w/ WALL
STUDS @ 24"ac
WHERE WIDTH OF STUD
GROUP BELOW TRUSS
EXCEEDS TRUSS WIDTH, AND
AT SHEAR WALL LOCATIONS
WHERE SECTION 7/S4.10
APPLIES PROVIDE BLOCKING
IN FLOOR SPACE EA SIDE OF
TRUSS AND NAIL TO TRUSS
VERTICALS w/ (5) 10d NAILS
SECTION �L PER VERTICAL (TYP)
SCALE ^
BATT INSULATION. SEE ARCH.
SHEATHING NAILED TO STUD,
SEE WALL SCHEDULE
FLUID APPLIED WEATHER BARRIER
(3)Bd NAILS @ 4' SPACING AT
EACH STUD(SHEATHING MUST
BE CONTINUOUS ACROSS
FLOOR SYSTEM) OR (1) SIMPSON
MSTAM36 @48"0.C.
W/ D)-10d NAILS. (FOR UPLIFT ONLY)
(2)16d NAILS @ 16- O.C. INTO
TOP PLATE
2X
r-6"
5+8" TYPE X GYPSUM WALL BOARD
1/2" RESILIENT CHANNEL
6L
(3)8D NAILS @ 4- SPACING AT EACH STUD
(SHEATHING MUST BE CONTINUOUS
ACROSS FLOOR SYSTEM) OR (1)
SIMPSON MSTAM36 @48'O.C. W/ (7)10d NAILS.
(FOR UPLIFT ONLY)
PT 2x SILL PLATE w/ 1/2"B EXP ANCHORS
@ 48"O.C., 3 12" EMB, AT SHEAR WALLS
SEE SHEAR WALL SCHEDULE FOR
CONNECTION TO SECOND FLOOR
2X BLOCKING
5/8' TYPE X
GYPSUM WALL BOARD
WOOD STUD WALL, SEE PLAN
4 1/2' GYPCRETE TOPPING
SEE WOOD DIAPHRAGM
SHEATHING SCHEDULE
'.N WEB TRUSS, SEE PLAN
RESILIENT CHANNEL
TYPE X GYPSUM BOARD
SECTION 11
SCALE 12'-1'-0' wa aeon ZX BLOCKING
5/8' TYPE X GYPSUM WALL BC
SHEATHING NAILED TO STUD,
INSERT#4 HOOK BAR
@ KEYWAY AND FILL WOOD STUD WALL, SEE PLAN
WITH GROUT BATT INSULATION, SEE ARCH.
SECONDARY POUR FLUID APPLIED WEATHER BAF
2" CONCRETE TOPPING
HOLLOW CORE, SEE PLAN
12'0x4' STUDS WELDED
TO BEAM @ Z-0" O.C.
PLATE 61
BOND BEAM,SEE PLAN) �3 1/2' MIN BRG. (TYP.)
#3 BAR CONT. [BX13 1/2 W/3/40 CARBON
STEEL KW IK BOLT III W/ 6 1/2"
SECTION 1$ EMBED. @16' O.C.
SCALE 1/2'=V-0" -mzz e)
BLOCKING
2X BLOCKING
WOOD WALL, SEE PLAN
5/8" TYPE X GYPSUM WALL BOARD
12' RESILIENT CHANNEL
BOTTOM PLATE TO TRUSS CONNECTION
W/(4)16d NAILS @ EACH TRUSS
RESILIENT CHANNEL
'TYPE X GYPSUM BOARD
EN WEB TRUSS, SEE PLAN
BLOCKING
FT INSULATION, SEE ARCH.
'TYPE X GYPSUM WALL BOARD
' OSB SHEATHING
CD STUD WALL, SEE PLAN
;ONCRETE TOPPING
TOP OF FLOOR
ELEV. SEE PLAN
CORE, SEE PLAN
SECTION 07
SCALE 12'-1'-0' mz.z sax
WOOD COLUMN, SEE PLAN
11/2' GYPCRETE TOPPING
SEE WOOD DIAPHRAGM
L SHEATHING SCHEDULE
(3)8D NAILS @ 4" SPACING AT EACH STUD
(SHEATHING MUST BE CONTINUOUS
ACROSS FLOOR SYSTEM) OR (1)
SIMPSON MSTAM36 @48"O.C. W/ (7)-10d NAILS
(FOR UPLIFT ONLY)
SECONDARY POUR
PT 2x SILL PLATE w/ 1/2'B EXP ANCHORS
@ 48.O.C., 31/2' EMB, AT SHEAR WALLS
SEE SHEAR WALL SCHEDULE FOR
CONNECTION TO SECOND FLOOR
900 BEND W/ACI STD. HOOK TYP.
(2)#5 BAR CONT.
WOOD BEAM, SEE PLAN
L 6'X6"X12', W/ (4) 3/4'X6'
LAG SCREW
6'
° NOTE:-
_RFD FACTORED BEAM TO COLUMN
CONNECTION LOAD: 12.0 KIPS
1 12'
3"
1 1/2'
SECTION 12
SCALE 12'-1'-0' t
smz
r-s•
to
INSERT #4 HOOK BAR @ KEYWAY
8 FILL WITH GROUT
2" CONCRETE TOPPING
DLLOW CORE, SEE PLAN
MIN BRG. (TYP.)
FEEL BEAM. SEE PLAN
SECTION 16
SCALE 12'-1'-0' mz.z sex
it
BAS E4
BASE4
2901 CLINT MOORE ROAD, #114
BOCA RATON, FLORIDA 33496
888.901.8008 www.base-4.com
RICARDO J. MUNIZ-GUILLET,AIA
5453 NW 106TH DR
CORAL SPRINGS, FL 33076
Seal:
J ' ..G 1
Cr:.. \ Sin Eja-.S,sB
•. Fd��9c
NO. -
11 OZ 0]`96
SATE-./: /4
ot`L✓ OF !t
.
'-•YD l AN' .2
SSS/ONAL
B�
ADAM GINSBURG, PE
w.,
Owner:
THE WITNESS GROUP
600 ENTERPRISES DRIVE
LEWIS CENTER,OH
513.623.9430
SUITES BY HILTON
HOMEN,�
CARMEL,INDIANA
PROTOTYPE VERSION-V2.2 2016
REVISION: MAY 2016
ISSUE O.DELTA
DATE
DESCRIPTION
1
SO
2019.03.04
ISSUED FOR
PERMIT
CURRENT ISSUE
ISSUED FOR PERMIT
CURRENT ISSUE DATE
2019.03.04
DRAWN BY
TJ
CHECKED BY
AJG
PROJECT NO,
64-134-1705
SHEET NAME
TYPICAL DETAILS
DRAWINGS NO.
S=602