HomeMy WebLinkAboutS-604 - TYPICAL DETAILS2'-6-
ZX BLOCKING
SHEATHING NAILED TO STUD, SEE WALL SCHEDULE
WOOD STUD WALL, SEE PLAN
BATT INSULATION, SEE ARCH.
FLUID APPLIED WEATHER BARRIER
(3)8D NAILS @ 4" SPACING AT EACH STUD
(SHEATHING MUST BE CONTINUOUS
ACROSS FLOOR SYSTEM) OR (1)
SIMPSON MSTAM36 @48"O.C. W/ (7)-1Did NAILS.
(FOR UPLIFT ONLY)
SECTION -A 90° BEND W/ACI STD.
HOOK TYP
2X72S e....=. rn^&._.."
INSERT #4 HOOK BAR @ KEYWAY
& FILL WITH GROUT
5/8' TYPE X GYPSUM WALLBOARD
PT 2x SILL PLATE w/ 1/2"e EXP ANCHORS
@ 48"O.C., 312" EMS, AT SHEAR WALLS
SEE SHEAR WALL SCHEDULE FOR
CONNECTION TO SECOND FLOOR
INSERT #4 HOOK BAR @ KEYWAY
& FILL WITH GROUT
2' CONCRETE TOPPING
PARTICLE BOARD
- •.
6' RIGID INSULATION -
-----------------
SEE WOOD DIAPHRAGM
HOLLOW CORE, SEE PLAN
SHEATHING SCHEDULE
(2)#5 BAR CONT.
SECONDARY POUR
3' MIN BRG. (TYP.)
114
2X10'S
STEEL BEAM, SEE PLAN
CONTINUOUS BLOCKING
CONTINUOUS BLOCKING TO MATCH
TO MATCHFLANGE WIDTH
FLANGE WIDTH W/ 1/2' CIA. THROUGH
W/ (2) 1/2' CIA. THROUGH
3• 3•
BOLTS @ 16" O.C.
BOLTS @ 16' O.C.
2
J TOP FLANGE
STEEL BEAM, SEE PLAN
HANGER
HANGER BY SIMPSON
JB210A TOP FLANGEJ
'v
6'X12'X1/4' SIDE PLATES WITH
HANGER BY SIMPSON
(2) 5/8' DIAMETER THRU-BOLTS.
1/2' RESILIENT CHANNEL
5/8' TYPE X GYPSUM BOARD
<
SECTION -A
SCALE 1'=V-0'
O
SECTION 01I
SCALE 1/2'-1'-O' zmn asa
IY
2'-6"
SHEATHING NAILED TO STUD,
SEE WALL SCHEDULE
BRICK VENEER, SEE ARCH.
—
1 1/2" RIGID INSULATION-
1 - AIR GAP
FLUID APPLIED WEATHER BARRIER
PT 2x SILL PLATE w/ 1/2'm EXP ANCHORS
@ 48"O.C., 3 1/2' EMS, AT SHEAR WALLS
SEE SHEAR WALL SCHEDULE FOR
CONNECTION TO SECOND FLOOR
SECONDARY POUR
WEEP HOLES @16' O.C.
THIN MORTAR BED
LIGHT GUAGE FLASHING
L6x6x1/2 BRICK LEDGE ANGLE W/ —
12" DIA. X 4 12" EMBED KW IK BOLT
III EXPANSION ANCHORS W/
WASHERS @ 48' O.C.
ID
Z-6'
INSERT #4 HOOK BAR @ KEYWAY
& FILL WITH GROUT
CONCRETE TOPPING
SECTION / 02
SCALE
O
SEE PLAN
SEE PLAN
2ND FLOOR
12'-6" V
_ T.O.STEEL 2 m
11'-4'
1'-D'
ZX BLOCKING
INSERT #4HOOK BAR @ KEYWAY
5/e' TYPE X GYPSUM WALL BOARD
4 8 FILL WITH GROUT
SHEATHING NAILED TO STUD,
SEE WALL SCHEDULE
WOOD STUD WALL, SEE PLAN
HOLLOW CORE, SEE PLAN
BATT INSULATION, SEE ARCH.
(2)#5 BAR CONT.
FLUID APPLIED WEATHER BARRIER
2" CONCRETE TOPPING
(3)8D NAILS @ 4' SPACING AT EACH STUD
(SHEATHING MUST BE CONTINUOUS
TOP OF FLOOR
-
,. :-ELEV. SEE PLAN
ACROSS FLOOR SYSTEM) OR (1)
SIMPSON MSTAM36 @48.O.C. W/ (7)1(�
NAILS. (FOR UPLIFT ONLY)
�/ �.; !-•
`/ 0 !"Q•
PT 2x SILL PLATE w/ 12'm EXP ANCHORS
@ 48'oc, 31/2' EMB,ATSHEAR WALLS
HOLLOW CORE, SEE PLAN
SEE SHEAR WALL SCHEDULE FOR
CONNECTION TO SECOND FLOOR
SECONDARY POUR
ICF WALL, SEE PLAN
90° BEND W/ACI STD. HOOK TYP.
(2)#5 BAR CONT.
CONCRETE BEAM, SEE PLAN
5/8' TYPE X GYPSUM WALLBOARD
INSERT #4 HOOK BAR @ KEYWAY
& FILL WITH GROUT
3'-M,
Al
INTERIOR OF WALL
SECTION 03
SCALE 12'-1'-0' zoza sml
5/8" TYPE X
MULTIPLE STUD GROUP
1
END OF WALL AT
10
INSERT #4 HOOK BAR
GYPSUM WALL BOARD
SHEATHING NAILED TO STUD,
AT SHEAR WALL END
SINGLELLAT
@ KEYWAY AND FILL
WITH GROUT
SIGNAGE,
2X BLOCKING
SEE WALL SCHEDULE
BRICK VENEER, SEE ARCH
HOLDOWN, SEE PLAN
END OF WALL AT
CMU WALL, SEE PLAN
DESIGN BY OTHERS
WOOD STUD WALL,
SEE PLAN
GATT INSULATION, SEE ARCH.
A360R F1554 GR 36
DOUBLE HOEDOWN
SECONDARYPOUR
FLOOR PLAN
n
6'X4'X1/4' BRICK LEDGE ANGLE
RIGID INSULATION
THREADED ROD, SEE
DOUBLE HOLDOWN
q
_
_4TH
�1
33' - 1
O"
WITH (2) 2X8 LEDGER W/314'
rtE11/2"
HOLD DOWN SCHEDULE
WHERE INDICATED
]
2' CONCRETE TOPPING
DIA. THRU-BOLTS @24" O.C.
1" AIR GAP
FORSIZE
m
T.O.TRUSS-4
BOTTOM PLATE TO TRUSS
FLUID APPLIED WEATHER BARRIER
STRUCT TOPPING
2x SILL PLATE
<
HOLLOW CORE, SEE PLAN
33' - 7 3/4"
CONNECTION W/(4)16d NAILS @pp
WEEP HOLES @ 16" O.C.
TISLaB di
m
PL. 6"X4"X12 W/ 12"Ox4"
EACH TRUSS
THIN MORTAR BED 3RD
FLOOR PLAN n
- ..
-
SEE PLAN
BOND BEAM, SEE PLAN x
e
STUDS WELDED TO BEAM
@ 24.O.C.
_IMVHORIZONTALLY
R ROD — _ —
BACKEAND SEALANT
23 - 2" V
•i
-------
ZX10'S (FOR EIFS BAND)
T.O.TRUSS-3
O ;
:.�
TNJALL
3/4"X6" LAG SCREW AT 24" O.C.
-------BRICK
TIE(WIRE ANCHORS) AT 24' O.C.
O
AND 18' O.C. VERTICALLY
r 2
�312" MIN BRG. (TYP.)
L6X6X1/2 W/3/4 0 CARBON
STEEL KW IK BOLT III W/ 6 12'
SECTION 05 EMBED. @16' O.C.
SCALE 12'=1'-0' 17
1/2" RESILIENT CHANNEL—n� BRIM JOIST
5/8" TYPE X GYPSUM BOARD � SECTION 06
3RD FLOOR PLAN n OPEN WEB TRUSS, SCALE 1/2"=V-0" a¢a sml
P3' _ 2" V SEE PLAN
T.O.TRUSS3 (2)1 TOP PLATE W/(2)16d
TOE Ni EACH TRUSS
22 - 11 31A 2XBLOCKING
SECTIOOS
SCALE 12"-I'-o" &P ! &fiN
i
HEADER TO BEAR ON JACK
STUD OR HANGER.(SEE 2X BLOCKING AS REQUIRED
TYPICAL HEADER DETAIL) FOR HORIZONTAL PANEL
JOINTS, SEE SCHEDULE
NOTE: ALTERNATE OPTION IS TO PROVIDE BOX -OUT
IN TOP OF ICF WALL TO ALLOW FOR INSTALLATION
OF THRU-BOLT & PLATE PER TYPICAL DETAIL
40
TYPICAL SHEAR WALL HOLDOWN DETAIL AT TOP OF ICF WALL
SCALE:1/2"=1'-Om
FLOOR LEVEL STRAP OR —1
HOLDOWN REQUIRED PER
-
SHEAR WALL SCHEDULE,
,
2'X STUDS (SIZE AND
2'X STUDS (SIZE AND
LOCATIONS SHOULD MATCH
SPACING,
SPACING, SEE BEARING
HOLDOWN SHOWN ON
JACK STUD SHALL BE SEE WALL SCHEDULE)
WALL SCHEDULE)
FOUNDATION PLAN
PROVIDED AS REQUIRED
AT FLOOR LEVEL STRAP OR
RIM JOIST
OPENING HOLDOWN REQUIRED PER
OPTION 1: (NO UPLIFT STRAPS) SHEAR WALL SCHEDULE,
DOUBLE 2'X TOP PLATE
FASTEN SHEATHING TO STUDS LOCATIONS SHOULD MATCH
HOLDOWN SHOWN ON
,
(SIZE AND SPACING SEE SHEAR
FOUNDATION PLAN
NAILS AND SPACING SEE
WALL SCHEDULE, SHEATHING
_
TYP. FLOOR TO FLOOR
MUST BE CONTINUOUS ACROSS
CONNECTION DETAIL
HEADER TO BEAR ON JACK
FLOOR)
STUD OR HANGER.(SEE
OPTION 2: (1) MSTC52 STRAP
TYPICAL HEADER DETAIL)
BLOCKING BETWEEN JOIST
@48' O.C. (SHEATHING NEED NOT
SEE TYPICAL BLOCKING
BE CONTINUOUS ACROSS FLOOR)
PANEL 2X STUDS (SIZE
DETAILS AND SPACING SEE
WALL SCH EDULE)
'
DOUBLE 2"X TOP PLATE SEE SHEAR WALL SCHEDULE
FOR HOLDOWN TYPE & SEE
WALL AND COLUMN PLANS
FOR LOCATION
SHEATHING SEE WALL
SCHEDULE
SEE SCHEDUL
BOTTOM PLAT
ATTACHMENT
ZX SILL PLATE
RELEASED FOR CONSTRUCTION
,LL FRAMING DETAIL
Subject to compliance with all regulations
of State and Local Codes
City d Camel ((��
`�vmlUtlenrJnwJ�L
x
DATE: 07/22/19
2X BLOCKING AS REQUIRED
FOR HORIZONTAL PANEL
JOINTS, SEE SCHEDULE
2X SILL PLATE SHEATHING, SEE SHEAR
REFER TO WALL SCHEDULE WALL SCHEDULE
FOR (2)HD, SECOND HD SHOULD
BE APPLIED @ 16 O.C. WITH THE
STUD SAME AS END POST.
SEE SCHEDULE FOR
BOTTOM PLATE
ATTACHMFA'ILING PATTERN (SEE O�
SHEAR
WALL SCHEDULE)
TYP. EXT. SHEAR WALL FRAMING DETAIL
SCALE:1/8"=1'-Om
SEE SHEAR WALL SCHEDULE
FOR HOLDOWN TYPE & SEE
WALL AND COLUMN PLANS
FOR LOCATION
SEE SCHEDULE FOR
1 DOUBLE 2"X TOP PLATE
2X BLOCKING AS REQUIRED
FOR HORIZONTAL PANEL
JOINTS, SEE SCHEDULE
BOTTOM PLATE SHEATHING SEE
ATTACHMENT SHEAR
2X SILL PLATE WALL SCHEDULE
NAILING PATTERN (SEE SHEAR
WALL SCHEDULE)
TYP. INT. BEARING SHEAR WALL FRAMING DETAIL
SCALE:1/8'=1'-0'
SECTION 04
SCALE 12'-T-o- z+ Bex
BAS E4
BASE4
2901 CLINT MOORE ROAD, #114
BOCA RATON, FLORIDA 33496
888.901.8008 www.bafie4.cc m
RICARDO J. MUNIZ-GUILLET,AIA
5453 NW 106TH DR
CORAL SPRINGS, FL 33076
Seal:
J ... �.1N
Cr: p\STEq
�•e" Fd��9c
NO.
11 OZ 0]`96
9y/S�ATE�./: (aQ'
ol✓ OF
SSS/ONAL
B�
ADAM GINSBURG, PE
w.y
mne"rwn
Owner:
THE WITNESS GROUP
600 ENTERPRISES DRIVE
LEWIS CENTER,OH
513.623.9430
HOME
SUITES BY HILTON
CARMEL,INDIANA
PROTOTYPE VERSION-V2.2 2016
REVISION: MAY 2016
I NSOUE
DELTA
DSSTE UE
DESCRIPTION
1
SO
2019.03.04
ISSUED FOR
PERMIT
CURRENT ISSUE
ISSUED FOR PERMIT
CURRENT ISSUE DATE
2019.03.04
DRAWN BY
TJ
CHECKED BY
AJG
PROJECT NO,
B4-134-1705
SHEET NAME
TYPICAL DETAILS
DRAWINGS NO.
S=604