Loading...
HomeMy WebLinkAboutA0029'-0" FOUNDATION T/ 1ST FLR SUBFLOOR T/ 1ST FLR DBL T/ ⅊ T/ 2nd FLR SUBFLOOR T/ 2nd FLR DBL T/ ⅊8'-1"9'-1" 4'-0"#### 12" x 912" HARDBOARD FRIEZE - TRIM TO T/ WINDOW TRIM - w/ BRICK LADDER - w/ BARGE MOULD 1x6 TRIM 1x6 DOOR THRESHOLD - DTL. 03/D1.1 DRYWALL WINDOW 72"h ARCHED BOARD-N-BATTEN SHUTTER 2440P 12 12 5'-83 4" 1x6 TRIM - TRIM TO FIT - w/ METAL FLASHING 1x8 GABLE FRIEZE - NAIL TO HARDIPANEL 41"36" 41" 1x8 TRIM - CUT TO FIT & PLACE OVER FRIEZE 1x8 TRIM FYPON HEAD #WCHARS89X13 65"h ARCHED BOARD-N-BATTEN SHUTTER 9"w x 16"h CAST STONE BLOCK 1x10 RAKE BOARD - w/ 2x8 LADDER - EXTENDED 8" FROM SHEATHING FYPON DECORATIVE BRACKETS - DTLB6X4X6 FYPON DECORATIVE LOUVER - TRLV72X36 CAST STONE ARCHED HEADS - SEE DETAILS 04 & 05/A1.1 1x8 GABLE FRIEZE - w/ BRICK LADDER - w/ BARGE MOULD 1x10 RAKE BOARD - w/ 2x8 LADDER - EXTENDED 12" FROM SHEATHING 1x4 WINDOW TRIM SURROUND - w/ 1x6 (TRIM TO FIT) BETWEEN WINDOWS 2 14" x 4"d.CAST STONE WINDOW SILL - PROJECT BOTTOM 1" FROM VENEER 9"h x 314" CAST STONE WINDOW HEAD - SEE DTL. 06/D1.3 1x4 WINDOW TRIM SURROUND - w/ 1x6 (TRIM TO FIT) BETWEEN WINDOWS - SEE TRIM DETAILS ON D1.3 12" x 8" HARDBOARD FRIEZE - TRIM TO T/ WINDOW TRIM - w/ BRICK LADDER - w/ BARGE MOULD 1x8 GUTTER BOARD - ALUMINUM DOWNSPOUTS 12 12 12 12 5'-4"±812" 812" 812" 812" 1012" 8"812" 812" 5'-11"±01 A1.1 1158"73 4" 43 4" 58"58" 12 4 6 6 6 7 10 16 11 8 9 5 4 3 50" 50" 50" 50" 58" 58" 8 12 6 12 12 7.5 8 12 24" 2 1 2 1 1916/17 WS-B3 WILLIAM L.KAUF H OL Z ARCHITECTNote: All square footage calculations are taken to face of veneer. Gross square footage: Includes square footage that takes into account floor space in a two-story volume. Net square footage: Gross square footage minus the floor space in a two-story volume. Net square footage should be used for determining appraisal value. SQUARE FOOTAGE GROSS AREA NET AREA BASEMENT (UNFINISHED) FIRST FLOOR GARAGE GARAGE PATIO PORCH SECOND FLOOR 1858 Sq.Ft. 1855 Sq.Ft. 663 Sq.Ft. 253 Sq.Ft. 24 Sq.Ft. 22 Sq.Ft. 2003 Sq.Ft. 1858 Sq.Ft. 1843 Sq.Ft. 663 Sq.Ft. 253 Sq.Ft. 24 Sq.Ft. 22 Sq.Ft. 1723 Sq.Ft. ALL SIDES: HORIZONTAL OR SHAKE SIDING TO BE FIBER CEMENT BOARD SIDING MATERIAL: OVERBROOK FARMS REASON FOR PLOT: PLOT DATE: Job No. Sheet No.INHOMESITE NO. OFFICE REVIEW:MASTER BY: DATE: C DATE: 3940 Olympic Blvd, suite 100Erlanger, KY 41018PH: (859) 341-4709FIELD SPEC HOTLINE: (859) 341-4709COPYRIGHT ALL RIGHTS RESERVED FISCHER HOMES, Inc.JOB INFO: DATE: PERMIT: SIGN-OFF: CONSTRUCTION:REVISION:REVISION:REVISION:REVISION:HOME TYPE:PLAN:6/25/2019 4:11 PM# OBF010930000 ALBIE MARCO3936 BEAR CREEK WAYSTANTON57-460-STANTON GRANDE VISTA WITH BRICK CARMEL, IN93 05/2017 -------- ----------------------------------------Masterpiece fieldspecchange@fischerhomes.com REVISED BY:---- AILEEN MARCOARCH. SPECIALIST:SAPPHIRE TRADE SUPPORT sapphiretradepartners@fischerhomes.com Fischer Homes Indianapolis II, LLC ----A1.0 MATERIAL LEGEND 1 3 1x8 RAKE BOARD 4 1x8 GUTTER BOARD - w/ ALUM. GUTTER & DOWNSPOUTS 12" x 912" HARDBOARD FRIEZE - TRIM TO T/ WINDOWS 5 FIBERGLASS / ASPHALT SHINGLES 6 PREFINISHED CORNER TRIM - TYPICAL w/ VINYL SIDING <OR> 1x4 CORNER TRIM - TYPICAL w/ FIBER CEMENT PLANK SIDING / PANELS 7 1x6 WINDOW JAMB TRIM 8 9 1x8 WINDOW JAMB TRIM 1x10 WINDOW JAMB TRIM 12 1x12 KICK PLATE - TRIM TO FIT 13 (2) 1x8 KICK PLATE - BUTTED TOGETHER 10 21 4"h. x 4"d. CAST STONE SILL - PROJECT BOTTOM 1"± HORIZONTAL SIDING - REFER TO BOX NOTE BELOW FOR MATERIAL - SEE DTL SHEETS WS-V OR WS-F SHAKE SIDING - REFER TO BOX NOTE BELOW FOR MATERIAL - SEE DTL SHEETS WS-V OR WS-F FIBER CEMENT BOARD PANEL - STUCCO FINISH - SEE DTL SHEET WS-F ALL MATERIALS ARE 'TYPICAL' UNLESS OTHERWISE NOTED FIBER CEMENT BOARD PANEL - SMOOTH FINISH - SEE DTL SHEET WS-F CULTURED STONE VENEER - REFER TO SELECTIONS - SEE DTL SHEETS WS-C BRICK VENEER - SEE DTL SHEETS WS-B WAVEY-EDGE CEDAR SIDING -SEE DTL SHEETS WS-V OR WS-F 11 BRICK SILL COURSE - SLOPE 1" - PROJECT BOTTOM 1" 2 1x8 GABLE FRIEZE NOTE: REFER TO A7.0 FOR THE ROOF PLAN, RIDGE VENT LOCATIONS, AND GUTTER AND DOWNSPOUT LOCATIONS. 14 21 4"h. x 2 3 4"d. CAST STONE SILL - PROJECT BOTTOM 3 4"± 15 12" x 912" HARDBOARD FRIEZE, LAPPED - TRIM TO T/ WINDOWS 16 1x8 BAND BOARD 17 1x6 CORNER TRIM 18 1x12 TRIM 19 1x8 TRIM 20 35 8"h. x 65 8"d. CAST STONE SILL -PROJECTBOTTOM 1"± FIBER CEMENT BOARD PANEL - VERTICAL SIDING - SEE DTL SHEET WS-F 21 1x4 TRIM 22 1x10 TRIM 23 1x6 TRIM 24 BLOCKING @ TRUSS CANTILEVER NOTE: DASHED LINES BELOW T/ FOUNDATION DEPICT INSTALLED WINDOWS OR DOORS - LOCATED PER A2.0 SCALE = 1'-0" FRONT ELEVATION 1/4"01 SCALE = 1'-0" LEFT SIDE ELEVATION 1/8"02 SCALE = 1'-0" REAR ELEVATION 1/8"03 SCALE = 1'-0" RIGHT SIDE ELEVATION 1/8"04 07/22/19 William Hohlt