Loading...
HomeMy WebLinkAboutL102 LANDSCAPE DETAILS (V2)PROJECT NO. CHECK:DRAWN: PLAN DATE: DESIGN: STATE OF No. PE10707583 OO14020 Mississinewa Drive Carmel, Indiana 46033 P: 317.324.8695 F: 317.324.8717 www.Fritz-Eng.com PRELI MI N A R Y NOT F O R CONS T R U C TI O N Fritz Engineering Services, LLC REVISIONS AND ISSUES BYDATE CLIENT: PROJECT: PROJECT LOCATION: GENERAL NOTES / LEGEND: SECTION, TOWNSHIP, RANGE: TAKE 5 QUICK LUBE JRF CONSTRUCTION 233 E. 175TH ST. WESTFIELD, INDIANA 46074 5/16/2019 1904001 9799 MICHIGAN RD. CARMEL, INDIANA 46032 HAMILTON COUNTY S7, T17N, R3E SHEET NAME SHEET NO. "IT'S THE LAW" R Know what's below. Call before you dig. 2 WORKING DAYS BEFORE YOU DIG.L102 LANDSCAPE DETAILS 1.REV. PER TAC CMNTS 7/17/2019                         AF                 AF AF KG INFILTRATION BASIN PLANTING SPECIFICATIONS PREPARATION A.IF VEGETATION INCLUDING COVER CROP EXISTS ON THE SITE, APPLY A 2 % GLYPHOSATE HERBICIDE AT LEAST TWO WEEKS PRIOR TO INSTALLATION ON ALL ACTIVELY GROWING VEGETATION. VERIFY THAT A GOOD KILL HAS RESULTED FROM THE HERBICIDE APPLICATION PRIOR TO PLANTING. B.SPREAD SPECIFIED MULCH TO A DEPTH OF TWO INCHES ACROSS THE AREA TO BE PLUGGED. C.DO NOT APPLY ANY FERTILIZER INSTALLATION PLANT PLUGS A.USE AN AUGER OR OTHER APPROPRIATE TOOL TO EXCAVATE PLANTING HOLES ON 1 FOOT CENTERS IN A STAGGERED PATTERN. B.EVENLY DISTRIBUTE GRASSES AND SEDGES THROUGHOUT PLANTING. PLACE WILDFLOWERS IN INFORMAL DRIFTS OF 3-7 OF ANY ONE SPECIES WITH THE EDGES BLENDED INTO ADJACENT SPECIES TO AVOID A FORMAL APPEARANCE. C.PLANT PLUGS LEVEL WITH EXISTING SOIL GRADE. BE CERTAIN THAT SOIL IS PLACED AROUND THE PLUGS AND FIRMED INTO PLACE. DO NOT FILL AROUND PLUGS WITH MULCH. D.THOROUGHLY SOAK PLUGGED AREA WITH WATER UNTIL SOIL IS MOIST TO A DEPTH OF 4 INCHES. SEEDING A.PLACE A PORTION OF THE SEED IN A CLEAN, DRY 5 GALLON BUCKET. MIX 2 PARTS COARSE SAND WITH 1 PART SEED. THOROUGHLY MIX SEED AND SAND. B.HAND BROADCAST SEED/SAND MIXTURE ACROSS THE SPECIFIED TILLED AREA. APPLY HALF THE SEED/SAND MIXTURE OVER THE ENTIRE AREA. APPLY THE SECOND HALF OVER THE SAME AREA UTILIZING THE SAME PROCEDURE. THIS METHOD PREVENTS USING ALL OF THE SEED BEFORE THE ENTIRE AREA IS COVERED. C.LIGHTLY FIRM SEED BED WITH A ROLLER WHERE SOIL MOISTURE PERMITS. DO NOT ROLL AREAS WHERE SOIL IS MOIST ENOUGH TO STICK TO THE ROLLER. D.APPLY 1 WIDTH OF EROSION BLANKET STARTING JUST ABOVE THE NORMAL WATERLINE. SECURE WITH 2 STAPLES PER SQUARE YD NOTE: SEE SHEET THIS SHEET FOR SEED MIX INSTALLATION SPECIFICATIONS INFILTRATION BASIN VEGETATION NOTES