HomeMy WebLinkAboutT111 Cover Sheet & General NotesGENERAL PROJECT NOTES ].BUILDING CODE COMPLIANCE: ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE EXISTING BUILDING CONSTRUCTION TYPE AS DEFINED BY SECTION 601 OF THE INDIANA BUILDING CODE. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF ALL APPLICABLE STATE AND LOCAL BUILDING CODES. CONTRACTORS ARE RESPONSIBLE FOR VERIFYING THE CURRENT APPLICABLE BUILDING CODES) FOR THEIR RESPECTIVE SCOPE OF WORK. ENSURE THAT ALL MATERIALS AND LABOR ARE IN ACCORDANCE WITH THE BEST QUALITYSTANDARDS OF EACH RESPECTIVE TRADE WHETHER SPECIFIED OR NOT. THEGENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL WORK IS IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL BUILDING CODES AND STANDARDS FOR GENERAL MECHANICAL AND ELECTRICAL CONSTRUCTION. 2. CONTRACTOR SITE VISIT$: CONTRACTOR $ SHALL VISIT THE WORK SITE PRIOR TO COMMENCEMENT. THE DRAWINGS CONTAINED HEREIN CONDITIONS MAY NOT BE ALL INCLUSIVE OF EXISTING CONDITIONS OR NEW WORK REQUIREMENTS, CONTRACTORS) SHALL MAKE THEMSELVES FAMILIAR WITH THE WORK SITE IN THE FIELD IN ORDER TO BE FULLY AWARE OF THE REQUIREMENTS OF THE SCOPE OF WORK. 3. CONTRACTOR FIELD VERIFICATION: FIELD VERIFY ALL DIMENSIONS AND MEASUREMENTS. INFORM THE GENERAL CONTRACTOR BEFORE BEGINNING ANY CONSTRUCTION IF EXISTING CONDITIONS PREVENT OBTAINING RESULTS AS SHOWN OR SPECIFIED, DO NOT SCALE DRAWINGS. NOTED DIMENSIONS TAKE PRECEDENCE. VERIFY EXISTING CONDITIONS INDICATED ON THE DRAWINGS AND REPORT ANY DISCREPANCY THROUGH THE GENERAL CONTRACTOR TO SCHOLL DESIGN, INC. 4. GENERAL CONTRACTOR COORDINATION WITH OWNER: THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE OWNER REGARDING ALL ONSITEACTIVITIES; SUCH A5, BUT NOT LIMITED TO, WORK SCHEDULE, MATERIALS STORAGE AND HANDLING, DELIVERIES, ACCESS TO THE WORKS TE, TRAFFIC CONTROL, AND BUILDING/PUBLIC SAFETY PROCEDURES DURING CONSTRUCTION. THE CONTRACTOR SHALL ALSO COORDINATE WORK BYOTHERS WITH HIS/HER OWN ACTIVITIES AS NECESSARY TO EXECUTE THE OVERALL PROJECT SCOPE. THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, DAILY WORKING HOURS, WEEKEND HOURS AND HOURS THAT MAYBE WORKED PRIOR TO AND DURING HOLIDAYS. LANDLORD RESERVES THE RIGHT TO RESTRICT CONSTRUCTION TO NIGHTS AND WEEKENDS WHEN THAT CONSTRUCTION IS DEEMED TO INTERFERE WITH THE OPERATIONS OF ADJACENT TENANTS. 5. PROJECT MATERIAL LEAD TIMES: FOR THOSE ITEMS TO BE ORDERED REQUIRING LEAD TIME, THE CONTRACTOR SHALL COORDINATE THE PROJECT SCHEDULE ACCORDINGLY AND COMMUNICATE TO THE OWNER, TENANT, AND SCHOTT DESIGN WHEN DECISIONS MUST BE RENDERED IN ORDER FOR THE CONTRACTOR TO MEET THE PROJECT SCHEDULE. THE OWNER, TENANT, OR DESIGNER/ARCHITECT IS NOT RESPONSIBLE FOR DELAYS RESULTING FROM THE CONTRACTOR'S FAILURE TO COMMUNICATE MATERIAL LEAD TIMES. 6. MATERIAL SUBSTITUTIONS:$UBSTITUTIONS FOR SPECIFICALLY NAMED PRODUCTS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL FROM THE DESIGNER. SUBMIT REQUESTS FOR SUBSTITUTIONS WITH APPROPRIATE SUPPORT INFORMATION TO THE DESIGNER, ALLOW REASONABLY SUFFICIENT TIME FOR THE DESIGNER TO REVIEW THE REQUEST AND RENDER A DECISION. 7. SAFE WORK AREA: SCHOLL DESIGN, INC., SHALL NOT HAVE CONTROL OVER, OR BE IN CHARGE OF, AND SHALL NOT BE RESPONSIBLE FOR A CONTRACTOR'S CONSTRUCTION MEANS, METHODS, SCHEDULES, SEQUENCES, OR SAFETY. THE CONTRACTORS SHALL BE RESPONSIBLE FOR MAINTAINING A SAFE ENVIRONMENT FOR WORKERS AND THE PUBLIC AT ALL TIMES. B. GENERAL CONTRACTOR CLEANUP PROCEDURES: THE GENERAL CONTRACTOR SHALL ESTABLISH WITH THE LANDLORD CLEANUP PROCEDURES AND GUIDELINES TO BE FOLLOWED ON A DAILY BASIS IN ORDER TO CONDUCT BUSINESS IN A SAFE AND CLEAN ENVIRONMENT. 9. STAGING/ PARKING/ DUMPSTERS/ RESTROOMS: THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, AN AREA FOR STAGING OF CONSTRUCTION MATERIALS, EQUIPMENT, DUMPSTER AND PARKING CONSTRUCTION AND DELIVERY VEHICLES. THE USE OF EXISTING REST ROOM FACILITIES SHALL BE APPROVED BY THE LANDLORD. ONLY THOSE DESIGNATED AREAS SHALL BE USED BY CONSTRUCTION CREWS. 10. DUST CONTROL: THE GENERAL CONTRACTOR SHALL USE DUST PARTITIONS TO MINIMIZE DISTURBANCES OF DAILY TENANT OPERATIONS DURING DEMOLITION AND CONSTRUCTION WORK. DUST PARTITIONS SHALL BE CONSTRUCTED OF 2X4 WOOD STUDS ® 24"O.C., INSULATION AND 6 MIL VAPOR BARRIER ON EACH SIDE. 11. PROJECT INSTALLATION CONFLICTS: CONTACT THE DESIGNER IMMEDIATELY IF, IN THE FIELD, CONFLICTS ARE DISCOVERED BETWEEN COMPONENTS OF DIFFERENT SYSTEMS THAT PREVENT THE INSTALLATION OF THOSE COMPONENTS AS INDICATED ON THE DRAWINGS. (I.E. WHERE EXISTING MECHANICAL DUCTWORK MAY PREVENT THE INSTALLATION OF LIGHTING FIXTURES AS INDICATED ON THE CEILING PLAN). 12, SCHOTT DESIGN HAZARDOUS MATERIALS WAIVER: SCHOTT DESIGN, INC., IS NOT RESPONSIBLE FOR THE IDENTIFICATION, DISCOVERY, PRESENCE, HANDLING, REMOVAL, DISPOSAL OF, OR EXPOSURE TO ANY PERSONS, THAT OF HAZARDOUS MATERIALS IN ANY FORM ON THE PROJECTSITE. 13. WOOD BLOCKING IN WALLS: PROVIDE FIRE -TREATED WOOD BLOCKING IN WALLS FOR ALL WALL HUNG ITEMS INCLUDING MILLWORK, WALL STOPS, CABINETRY, ETC. 14. SHOP DRAWINGS: SHOP DRAWINGS OR CATALOG CUTS MUST BE SUBMITTED TO SCHOTT DESIGN, INC. FOR APPROVAL ON ALL MATERIALS OR ITEMS WHERE THE CONTRACTOR CHOOSES TO DEVIATE FROM WHAT IS SHOWN ON THE DRAWINGS, OR IF THE DRAWINGS DO NOT INDICATE A SPECIFIC MANUFACTURER OR MODEL NUMBER. EXPEDITE PREPARATION AND SUBMITTAL OF ALL SHOP DRAWINGS TO ALLOW SUFFICIENTTIME FOR CHECKING, APPROVAL, ORDERING, FABRICATION, AND DELIVERY OF MATERIALS AND EQUIPMENT. 15. PROJECT APPROVALS: ALL DETAILS, MATERIALS, AND INSTALLATIONS ARE SUBJECT TO FIRST APPROVAL BYSCHOTT DESIGN, INC., AND FINAL APPROVAL BYTHE OWNER. 16. CHANGE ORDERS: REVIEW AND COORDINATE ALL NEW WORK AND EXISTING CONDITIONS WITH ALL OTHER TRADES. FIELDWORK ORDERS & CHANGE ORDERS WILL NOT BE APPROVED FOR ANY CONDITIONS OR CONFLICTS THAT COULD HAVE BEEN ACCOUNTED FOR BY THE BIDDER DURING PREBIDFIELD INSPECTION AND AFTER AWARD OF CONTRACT. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes aT, City of Camel IVT�tDN�DAAK DATE: \ 07/29/19 17. FURNITURE AND EQUIPMENT EXCLUSIONS: FURNITURE, OFFICE EQUIPMENT OFFICE PARTITION SYSTEMS, REFRIGERATORS, VENDING MACHINES, AND OTHER SIMILAR ITEMS SHOWN DASHED ON THIS DRAWING AND NOT ATTACHED TO THE BUILDING ARE FOR REFERENCE ONLY AND ARE NOT TO BE PROVIDED AS PART OF THE WORK UNLESS SPECIFICALLY STATED TO BE PROVIDED. 18. WALL PATCHING: PATCH ALL GYPSUM WALLBOARD AT AREAS OF ELECTRICAL, DATA AND SWITCH DEVICES BEING REMOVED. PATCH HOLE WITH DRYWALL, TAPE, SPACKLE AND PREPARE FOR FINISH. 19. CONSTRUCTION CLEANING: EXECUTE A THOROUGH FINAL CLEAN AND INSPECTION OF THE SPACE UPON COMPLETION OF THE PROJECT. ALL SURFACES, FIXTURES AND EQUIPMENT SHALL BE CLEAN AND THE SPACE SHALL BE TURNED OVER TO THE OWNER IN A CONDITION THAT REPRESENTS THE HIGHEST LEVEL OF CARE AND PROFESSIONALISM. ENSURE ALL GENERAL CONTRACTOR INSTALLED APPLIANCE S WORK & DO NOT LEAK. 20. O & M MATERIALS: PROVIDE TO THE OWNER ALL OPERATION AND/OR MAINTENANCE MANUALS, OR INSTRUCTIONS FOR ALL EQUIPMENT AND SYSTEMS AT THE COMPLETION OF THE PROJECT. 21. PLAN DIMENSIONS: ALL PLAN DIMENSIONS ARE FROM FACE OF EXISTING FINISH TO FACE OF NEW GYPSUM BOARD WALL, OR FACE TO FACE OF NEW GYPSUM BOARD WALL. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN, 22. WINDOW BLINDS: CONTRACTOR TO PROVIDE AN ALLOWANCE FOR CLEANING EXISTING WINDOW BLINDS. REPLACE ANY DAMAGED OR MISSI NG WINDOW BLINDS WITH NEW TO MATCH BUILDING STANDARD. 23. PERMITTING: THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE REQUIREMENTS REGARDING LOCAL PLAN REVIEW, PERMITS, INSPECTIONS, AND FEES. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING ALL REQUIRED DRAWINGS AND SUPPORTING DOCUMENTS TO THE LOCAL BUILDING OFFICIAL AND/OR PERMIT DEPARTMENT. ALL REQUIRED LOCAL PERMIT FEES SHALL BE PAID BY THE GENERAL CONTRACTOR UNLESS STIPULATED OTHERWISE IN THE OWNER/CONTRACTOR AGREEMENT. 24. FIRE SEALING: FIRE SEAL ALL PENETRATIONS THROUGH RATED WALLS, FLOORS, AND CEILINGS WITH APPROVED FIRE -RATED CAULK AS DIRECTED BY LOCAL JURISDICTIONS. CONTRACTOR TO BE AWARE THAT EXISTING CONDITIONS ARE NOT NECESSARILY AN INDICATOR OF BUILDING TYPE. BUILDING TYPE LISTED ON LI00 IS BASED UPON AVAILABLE INFORMATION AND FIELD VERIFICATION. 25, WALL PENETRATIONS: WHERE STRUCTURAL BEAMS, DUCTWORK, ETC. PENETRATE SOUND OR FIRE RATED PARTITIONS, GYPSUM WALLBOARD WALL TO BE SCRIBED TO FITTIGHT, CAULKED AND FIRE DAMPERED IF REQUIRED. 26, FLOOR LEVELING: CONTRACTOR TO ALLOW FOR UN LEVEL FLOOR CONDITIONS. ALL EXISTING FLOOR AND WALL SUBSTRATES SHALL BE LEVELED AND PATCHED AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND FINISHES. ADJUST DOORS AND FRAMES AS REQUIRED. 27. REPAIR GYPSUM WALLBOARD: WHERE DEMOLITION HAS OCCURRED AT REMAINING WALLS, REPAIR ANY GYPSUM BOARD DAMAGED BY DEMOLITION. PROVIDE EXPANSION JOINTS IN DRYWALL WHERE NEW WALLS MEET OR ADJOIN TO EXISTING CORE WALLS. 28. EQUIPMENT INSTALLATION: ALL EQUIPMENT AND/OR FIXTURES SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS OR INSTRUCTIONS. FINISH NOTES 1. STATE BUILDING COMPLIANCE FOR FINISHES: ALL FINISHES SHALL COMPLY WITHCHAPTER8 (INTERIOR FINISHES) OF THE INDIANA BUILDING CODE FOR CLASS A FIRE RATINGS. 2. GYPSUM ASSOCIATION CONFORMITY: FOR ALL NEW DRYWALL NSTALLATIONS, INSTALL AS RECOMMENDED BY THE GYPSUM ASSOCIATION. (SUCH AS, CONTROL JOINTS, FINISH LEVELS, FASTENERS, TAPING DETAILS, CORNER BEADS, ETC.) PROVIDE NEW CEMENT BACKER BOARD AS A SUBSTRATE FOR NEW WALL TILE PER MANUFACTURER'S RECOMMENDATIONS 3. COVER PLATES: REFERENCE REFLECTED CEILING PUN AND ELECTRICAL PLAN FOR COLOR OF ELECTRICAL AND DATA DEVICES AND PLATES. REMOVE ALL PLATES BEFORE PAINTING AND REATTACHED AFTERWARDS. CONTRACTOR TO CONFIRM DESIRED COLOR PRIOR TO PURCHASING NEW, 4. PAINTING: ALL AREAS RECEIVING PAINT ARE TO RECEIVE PRIMER COAT AND TWO (2) FINISH COATS. 5. FLOORING TRANSITION STRIPS: FOR CHANGE IN FLOOR FINISH MATERIAL, PROVIDE TRANSITION STRIP AT DOOR OPENINGS AS NOTED ON FINISH PLAN UNLESS NOTED OTHERWISE (I.E. WHERE VCT MEETS CARPET). 6. DELIVERY OF COMPREHENSIVE WORK PRODUCT: WHERE LIMITS OF WORK ARE SHOWN, OTHER INCIDENTAL WORK LIKE PAINTING WHERE NEW OUTLETS HAVE BEEN INSTALLED, IS CONSIDERED PART OF THE SCOPE OF WORK. PROVIDE A COMPLETE AND FINISHED PRODUCT READY FOR TENANT AND BUILDING OWNER. 7. WALL DEMOLITION: REFINISH SURFACES TO MATCH EXISTING WHERE DEMOLITION HAS OCCURRED, REPAIR GYPSUM WALLBOARD WHERE DEMOLITION HAS OCCURRED AT REMAINING WALLS. REPAIR ANY GYPSUM BOARD DAMAGED BY DEMOLITION. PROVIDE EXPANSION JOINTS IN DRYWALL WHERE NEW WALLS MEET OR ADJOIN TO EXISTING CORE WALLS. 8. TELEPHONE BOARDS: WHERE PHONE BOARD IS PROVIDED, PAINT BOARD WITH FIRE RETARDANT PAI NT TO MATCH ADJACENT WALL FINISH. 9. MILLWORK SAMPLES: SUBMIT FINISH SAMPLE OF MILLWORK (STAINED OR PAINTED AS SPECIFIED) TO SCHOTT DESIGN FOR REVIEW AND APPROVAL PRIOR TO THE FINISHING PROCESS OF ALL MILLWORK. 10. INTERIOR ELEVATION DETAILS: REFERENCE INTERIOR ELEVATION & SECTIONS WHERE PROVIDED FOR ADDITIONAL FINISH INFORMATION. 11. PAINT &ADHESIVE VOC'S: ALL PAINTS AND ADHESIVES/SEALANTS SHALL HAVE ZERO VOC CONTENT. 12. ADHESIVE MANUFACTURER RECOMMENDATIONS: ALL ADHESIVES/SEALANTS TO BE USED AS RECOMMENDED BY PRODUCT MANUFACTURER. MECHANICAL & ELECTRICAL NOTES DECONSTRUCTION NOTES I. DESIGN/BUILD MEP: THE MECHANICAL, ELECTRICAL AND PLUMBING 19. FIRE ALARM DEVICE LOCATIONS: COORDINATE WITH THE 1. DECONSTRUCTION DEFINITION: CAREFULLY DISMANTLE SPACES WITH SCOPES OF WORK ARE LIMITED TO BASIC DESIGN -BUILD ALTERATIONS TENANT PRIORTOLOCATIONS INSTALLATION OF FIRE DETECTION DEVICES THE GOAL OF MAXIMIZING THE REUSE POTENTIAL OF ITS COMPONENTS. WHIOWNER NEDI NTHESE PHA NS. THEDES IGN-BUILD AVOID CONFLICT WITH FEATURE FOR EACH TRUTH( FOREACHMUSTNOTIFYTHE THEY IND THARTHE FINDTHAT WALLS( ONFER LACEROMSANDREC ROOMS 2. DECONSTRUCTION MANAGEMENTCHECKLIST: OR HE SCOPE OF WORK EXCEEDS THE LEVEL OF MECHANICAL, ELECTRICAL OR LEVEL OHITECT MECHFNICAL, TENANT-INSTALLED ITEMS TENANT -INSTALLED ITEM$ LE. PRESENTATION BOARDS, A V EQUIPMENT A/ E ( / CAREFULLLITEMSSERED THE DECONSTRUCTION PLAN HAVE BEEN CAREFULLY CONSIDERED FOR PLUMBING WORK INDICATED ON THESE DRAWINGS SO THAT ANY AND PROJECTION SCREENS). RECOVERY, REUSE, AND RECYCLING WITH THE BEST INTENT TO DIVERT NECESSARY ENGINEERING CAN OCCUR AND ADDITIONAL PLANS CAN BE ITEMS FROM THE LANDFILL. REFER TO DECONSTRUCTION MANAGEMENT FILED, OR IF ADDITIONAL INFORMATION IS NEEDED IN ORDER TO DO THE 20.VIDEEXISTING LIGHT FIXTURE IF REQUIRED, AND NECESSARY, CHECKLIST FOR SPECIFIC INSTRUCTIONS. WORK IN THE FIELD. THE MECHANICAL ELECTRICAL AND PLUMBING IS LAMP: PROVIDE NEW BALLASTS AND LAMPS IN ALL LIGHTS IN EXISTING SPACES. DESIGN -BUILD CAL TRACTORS SHALL COMPLY WITH ALL APPLICABLE CONSULT WITH LANDLORD. AL CONTRACTORFOR STATE AND LOCAL BUILDING CODES. R3. ECYCLING AND PROJECT MATERIAL RECYCLING ANY AND ALL POSSIBLE PROJECT MATERIAL WASTE AND FIRE SUPPRESSION AND FIRE ALARM SYSTEMS SHALL BE INSTALLED BY THE 21. HVAC R BALANCE: PERFORM AIR COORDINATING THE APPROPRIATE HAULING CONTAINERS WITH THE APPROPRIATE DESIGN -BUILD CONTRACTOR AND MUST COMPLY WITH ALL BALANCE UPON COMPLETION OF HVAC SCOPE PROVIDE REPORT TO UPON COMPLETITOR ON SCOPE. PROVIDE WASTE MANAGEMENT SUB -CONTRACTOR. A CO -MINGLE LEED / APPLICABLESTATE AND BUILDING CODES. ESUPPRESSION LANDLORD. CONTAINER IS REQUIRED FOR RECYCLING. AND FIRE ALARM DESIGN -BUILD CONTRACTORS ARE RESPONSIBLE FOR -BULL E COMPLETING AND FILI NG THEIR PLANS AND OBTAIN ING THEIR PERMITS. 22. HVAC FLEX DUCT: FLEX DUCT MUST MEET ASHRAE STANDARD 4. EXISTING STRUCTURAL ELEMENTS OF BUILDING: NO STRUCTURAL OR BUILDING CODES FOR FLEX DUCT LENGTH. LOAD -BEARING CONSTRUCTION SHALL BE REMOVED, DEMOLISHED, OR 2. DESIGN/BUILD HVAC: MECHANICAL WORK IS LIMITED TO A DAMAGED AS A RESULT OF THIS PROJECT UNLESS SPECIFICALLY NOTED DESIGN -BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS. NO NEW 23. ELECTRICAL CIRCUITS: AREAS WITHIN ELECTRICAL SCOPE MUST BE OTHERWISE ON THE DRAWINGS. PROTECT ALL EXISTING STRUCTURAL MAIN MECHANICAL APPLIANCES OR MAIN EQUIPMENT ARE BEING POWERED BY THE ELECTRICAL PANEL FROM THE FLOOR ON WHICH MEMBERS DURING DEMOLITION/CONSTRUCTION. THE CONTRACTOR PROVIDED. ALL MECHANICAL WORK IS LIMITED TO RELOCATION OF CONSTRUCTION OCCURS. SHALL VERIFY IN THE FIELD, PRIOR TO DEMOLITION, THAT ALL ITEMS DIFFUSERS AND FLEX DUCT PER NEW WALL LAYOUT. NO NEW HARD NOTED TO BE DEMOLISHED ARE NOT STRUCTURAL. CONTACT SCHOTT DUCTWORK OR EQUIPMENT IS BEING ADDED; MECHANICAL 24. SUPPLEMENTAL HVAC/ELECTRICAL: IN THE EVENT THAT ANY DESIGN IMMEDIATELY IF THE CONTRACTORS) IN THE FIELD SUSPECT CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS SUPPLEMENTAL HVAC EQUIPMENT OR ABOVE BUILDING STANDARD THAT AN ITEM NOTED FOR DEMOLITION APPEARS TO BE STRUCTURAL OR REQUIRED SO THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY ELECTRICAL POWER FACILITIES ARE INSTALLED (SUCH AS IN AN IT SERVER OTHERWISE LOAD -BEARING. BEWARE OF STRUCTURAL COLUMNS WITH THE INDIANA MECHANICAL CODE AND ALL OTHER APPLICABLE ROOM) CONTRACTOR SHOULD FURNISH AND INSTALL ADDITIONAL AND/OR BEAMS THAT MAY BE CONCEALED BEHIND FINISHES THAT ARE CODES. ELECTRICAL AN D BTU SUB -METERING SO AS TO ENABLE OWNER TO NOTED FOR REMOVAL. EXERCISE CAUTION WHEN DEMOLISHING TENANT'S UTILITY CONSUMPTION (IN RELATION TO THE SUBJECT BUILDING FINISHES OR PARTITIONS ADJACENT TO OR AROUND 3.MONITOR LOADS: VERIFVHEEQUIPMENT SPECIALIR MAKE ANDSTRUCTURAL MODELOFINADVERTENT MEMBERS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR PROVIDE A FLOW IN THE TENANT ADDITIONAL IO AL A AIR FLOWIFIPMEN. SHOULD BE CONTRACTOR'S PROPOSED METERS SHOULD BE REVIEWED AND CONTRCT)GOINGFOSED METERS DAMAGE TO THE BUILDING STRUCTURAL SYSTEM. C NFIRM WITSPACEAND PURCHASE CONFIRM WITH OWNER PRIOR TO ANY PURCHASE OF NEW EQUIPMENT, APPROVED BY OWNER PRIOR TO CONTRACTOR INSTALLATION. REVISE ZONING IF REQUIRED. DO NOT DESIGN ANY SINGLE OFFICE 5. EQUIPMENT, FIXTURE, FINISH RE -USE: WHERE EQUIPMENT, FIXTURES, SPACE TO BE ON A SPLIT ZON E UNLESS APPROVED BY BUILDING MEP WHEN REQUIRED BYSTATBUILDING OR FINISHES ARE MOVED FROM ANY OTHER PART OF THE BUILDING TO OWNER/LANDLORD. CONTRACTOR TO ENSURE THAT ALL HVAC ZONES E'THE CONTRACTORSRED ) SHALL PROVIDE CODE PROVIDE DE SIGN/BUILD DRAWINGS COD BE REUSED IN THE PROJECT AREA, THE CONTRACTOR SHALL INCLUDE IN ARE LOCATED APPROPRIATELY SUCH THAT NO SPLIT ZONES ARE IN FOR MECHANICAL, PLUMBING, ELECTRICAL, OR FIRE SUPPRESSION. ECH LAICAL, PLUMBING, THEIR SCOPE OF WORK ANY NECESSARY PATCHING OR REPAIRING OF OFFICES OR CONFERENCE ROOMS. DRAWINGS SHALL BE CERTIFIED BY LICENSED ENGINEER AND SUBMITTED THE REMAINING AREAS FROM WHERE THE ITEMS WERE RELOCATED, BY THE CONTRACTOR FOR STATE DESIGN REVIEW. UNLESS OTHERWISE DIRECTED BY OWNER. 4. HVAC DIFFUSER LOCATIONS: RELOCATE AIR -SUPPLY DIFFUSERS AND RETURNAIRGRILLES AS REQUIRED. PROVIDE PROPER AIR SUPPLY FOR 26. EQUIPMENT INSTALLATIONS: ALL EQUIPMENT AND/OR FIXTURES SHALL 6. DECONSTRUCTION PLANS: REMOVE ALL EXISTING WALLS AND DIFFUSERS AND RETURN AIR FROM RETURN AIR GRILLES. CONTRACTOR IS BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S DOORS WHERE INDICATED BY NOTE, SYMBOL, OR DASHED LINES. NOTE TO PLACE LOCATION OF DIFFUSERS AND RETURN AIR GRILLES AS RECOMMENDATIONS OR INSTRUCTIONS. THAT SOME ITEMS HAVE NOT BEEN SHOWN ON DECONSTRUCTION REQUIRED BY CODE. PLAN, VISIT AREA OF WORK TO ASSURE EXTENT OF DECONSTRUCTION. 27. BUILDING DIRECTORY: THE BUILDING AUTOMATION SYSTEM GRAPHIC 5. HVAC THERMOSTAT LOCATIONS: POSITION LOCATION OF ALL AND PROGRAMMING TO BE UPDATED WITH NEW TENANT'S IN FORMATION 7, FIELD VERIFICATION OF EXISTING CONDITIONS: REMOVE ALL THERMOSTATS WHERE APPROPRIATE PER MECHANICAL DESIGN. FOR FUTURE USE, CARPET, VINYL BASE,VCT, WALL FABRIC, AND ANY OTHER FINISHES AS COORDINATE WITH TENANT AND BUILDING OWNER FOR FURNITURE REQUIRED FOR NEW CONSTRUCTION, CONTRACTOR TO FIELD VERIFY PANEL OR OTHER CONFLICTS. 28. ELECTRICAL PANELS: ALL ELECTRICAL PANELS TO GET UPDATED EXISTING CONDITIONS. REFER TO FINISH PLAN/SCHEDULE FOR CIRCUIT SCHEDULES. CLARIFICATION OF EXISTING FINISHES TO REMAIN. 6. DESIGN/BUILD ELECTRICAL: UTLINEICA THESE RAWIITEDTOA AND IS AWED IN DRAWINGS, ALL DESIGNELECTRI-BUILD LWORK B. PROTECTION REMAIN: USE CARE 15 TO ADDITIONS OR RELOCATIONS OF FIRE PROTECTION NOTES PROTECT EXISTING BUILDING ELEMENTS ND ON HE WI NGS ELECTRICAL OUTLET DEVICES AND LIGHTING THAT DO NOT EXCEED THE TO REMAIN SUCH AS, BUT NOT LIMITED TO, EXISTING CEICATED ILING GRID, CAPACITY OF THE EXISTING ELECTRICAL SERVICE IN THE BUILDING. TILES, FI RE SUPPRESSION EQUIPMENT, DIFFUSERS, LIGHT FIXTURES, ELECTRICAL CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF 1. FIRE EXTINGUISHERS: CONTRACTOR TO ENSURE ALL NEW AND EQUIPMENT,CASEWORK, AND FINISHES, THE CONTRACTOR SHALL ADDITIONAL WORK IS REQUIRED SO THAT ADDITIONAL PLANS CAN BE EXISTING FIRE EXTINGUISHERS ARE INSTALLED ACCORDING TO N FPA 10. REPLACE AND/OR REPAIR, AT THE CONTRACTOR'S COST, ANY SUCH FILED AND MUST COMPLY WITH ALL APPLICABLE CODES. COORDI NATE WITH OWN ER/LAN DLORD ON EXTINGUISHER TYPE AND ELEMENTS DAMAGED DURING CONSTRUCTION THAT COULD HAVE HOUSING. MAXIMUM TRAVEL DISTANCE OF 75 FEET FROM ANY POINT TO OTHERWISE BEEN REASONABLY PROTECTED AND MAINTAIN ED IN 7. ELECTRICAL CODE COMPLIANCE: COMPLY WITH THE INDIANA A VISIBLE EXTINGUISHER. GOOD CONDITION FOR THE OWNER'S USE IN THE PROJECT. ELECTRICAL AND MECHANICAL CODE AND ALL OTHER APPLICABLE CODES. THE FOLLOWING NOTES APPLY ONLY IN EXISTING SPRINKLERED FACILITIES. 9. REMOVAL OF ABANDONED CABLING& WIRING: PER THE INDIANA ELECTRICAL CODE (SPREAD OF FIRE OR PRODUCTS OF COMBUSTION) 8. ELECTRICAL CIRCUITING: SIZE AND CIRCUIT ELECTRICAL POWER ITEMS. 2. DESIGN BUILD FIRE PROTECTION SYSTEM: FIRE PROTECTION WORK IS REMOVE ALL ACCESSIBLE PORTIONS OF ABANDONED CABLES AND PROVIDE OR REUSE ELECTRICAL POWER AND DATA OUTLETS AS TO BE PROVIDED BY DESIGN/BUILD SERVICES UN DER THE GENERAL WIRING INCLUDING BUT NOT LIMITED TO: DATA WIRING, REQUIRED. CONTRACT. PROVIDE A COMPLETE, WORKING SYSTEM. SCHOTT COMMUNICATIONS WIRING, FIRE ALARM CABLES, AUDIO CABLES, DESIGN, INC., IS NOT RESPONSIBLE FOR THE DESIGN, INSTALLATION, OR COAXIAL CABLES, FIBER OPTIC CABLES/RACEWAYS, AND PLTC CABLES. 9. GFI OUTLETS: ALL ELECTRICAL OUTLETS WITHIN 6'-0"OF WATER ARE TO RENOVATION OF THE FIRE SPRINKLER SYSTEM. REFER TO SECTION 300.21. ANY SUCH CABLE OR WIRING SHOULD BE BE G.F.C.I. PULLED AND REMOVED BACK TO THEIR MAIN SOURCES ON THE FLOOR 3. FIRE PROTECTION SYSTEM CODE COMPLIANCE: THE DESIGN/BUILD (I.E. ELECTRICAL PANELS, PHONE BOARDS, ETC.) 10. PHONE AND DATA ACCOMMODATIONS: AT EACH PHONE AND DATA CONTRACTOR SHALL COMPLY WITH THE INDIANA BUILDING CODE, THE JACK, PROVIDE PULL STRING FROM ABOVE CEILING TO BOX. TENANTS INDIANA FIRE CODE, AND ALL OTHER APPLICABLE LAWS, CODES, RULES 10. PROTECTION OF ABANDONED/TERMINATED BUILDING SYSTEM DATA CONTRACTOR IS RESPONSIBLE FOR PULLING CONDUCTORS AND AND REGULATIONS THAT APPLY TO DESIGN AND INSTALLATION OF FIRE ELEMENTS: WHERE FIXTURES OR EQUIPMENT ARE REMOVED FROM ANY PROVIDING APPROPRIATE TERMINALS AT FACE PLATE. SPRINKLER/FIRE SUPPRESSION SYSTEMS. ELECTRICAL, PLUMBING, MECHANICAL, OR VOICE/DATA SYSTEMS, ALL REMAINING TERMINATIONS SHALL BE CLOSED AND PROTECTED IN 11. ELECTRICAL SWITCH PLATES: PROVIDE COLORED FACEPLATES FOR 4. FIRE PROTECTION DESIGN DRAWINGS: THE FIRE PROTECTION STRICT ACCORDANCE WITH INDUSTRY STANDARDS AND GOVERNING ELECTRICAL OUTLETS SWITCH PLATES TO MATCH EXISTING, UNLESS CONTRACTOR SHALL GENERATE ALL REQUIRED DRAWINGS, AND SHALL SAFETY REGULATIONS OR PROCEDURES. MARK LABEL OR FLAG ALL OTHERWISE NOTED, ELECTRICIAN TO FIELD VERIFY PRIOR TO PURCHASE. FILE SE ITH AND AND RELATED DOCLION TERMINATED SYSTEMS FOR REFERENCE. CONTRACTOR TO HAVING OVER LOCAL AUTHORITIES HAVING JURISDICTION OVER THE PROJECT. LOCH AUTHORITIES PROJECT. PROVIDE LOCATION PROVIDE AN"AS-BUILP'SEi INDICATING THE LOCATION OF ALL INDICATING 12. WORK STATION POWER: PROVIDE JUNCTION BOXES OR POWER POLES PERMANENTLY ABANDONED SYSTEMS. AT WORKSTATIONS WHERE SHOWN. REFER TO THE PLAN FOR THE 5. SPRINKLER HEADS: PROVIDE NEW OR RELOCATE EXISTING SPRINKLER APPROPRIATE DESIGNATIONS. DATA WILL BE RUN BY THE TENANT'S DATA HEADS AS REQUIRED. PROVIDE MISSING COVER/ESCUTCHEON PLATES 11. HAZARDOUS MATERIALS: GENERAL CONTRACTOR IS RESPONSIBLE VENDOR. ELECTRICIAN TO MAKE FINAL CONNECTION FROM FOR SPRINKLER HEADS WHERE APPLICABLE. FIELD VERIFY EXISTING FOR IDENTIFYING ANY AND ALL ITEMS THAT MAY CONTAIN HAZARDOUS WORKSTATION WHIP TO JUNCTION BOX. THE FURNITURE VENDOR IS TO BE CONDITIONS PRIOR TO THE START OF WORK. OR HARMFUL MATERIALS, ALL IDENTIFIED ITEMS MUST BE PROPERLY RESPONSIBLE FOR WIRING THE BASE PANELS OF THE WORKSTATIONS. DISPOSED OF PER EPA AND INDIANA DEPARTMENT OF ENVIRONMENTAL CONTRACTOR TO COORDINATE WITH TENANT ON WORKSTATION EFFECTIVE CODES MANAGEMENT RULES AND REGULATIONS. FURNITURE SPECIFICATIONS TO OBTAIN CIRCUITRY REQUIREMENTS PRIOR TO RUNNING ELECTRICAL CONDUITS TO JUNCTION BOXES. 12. COSTS: CONTRACTOR TO PROVIDE ANY COST RELATED TO - GENERAL ADMINISTRATIVE RULES (6751AC 12) SORTING AND RECYCLING, AS WELL AS ALL SCRAP METAL INCOME, AS 13. LIGHTING CIRCUITS: VERIFY EXISTING LIGHTING CIRCUITING. SIZE NEW - INDIANA BUILDING CODE, 2014 EDITION (IBC, 2012 EDITION, 6751AC PART OF THE DEMOLITION/DECONSTRUCTION BASE BID. CIRCUITS AS REQUIRED. PROVIDE NEW OR REVISE EXISTING CIRCUITING 13-2.6) FOR NEW LAYOUT OF LIGHT FIXTURES. - HANDICAPPED ACCESSIBILITY CODE: 2014 INDIANA BUILDING CODE 13. VALIDATION: CONTRACTOR MUST OBTAIN AND PROVIDE TO CHAPTER 11, ANSI AI 17.1-2009, 6751AC 13-2612) OWNER DOCUMENTATION FOR PROOF ON ALL RECYCLED ITEMS 14. ELECTRICAL OUTLETS: ENSURE THAT ALL MOUNTING HEIGHTS OF - INDIANA FIRE CODE, 2014 EDITION(IFC2012 EDITION, 6751AC 22-2.5) INCLUDING CREDIT FOR METALS AND CARPET. THIS DOCUMENTATION ELECTRICAL DEVICES MEET A.D.A. REQUIREMENTS. - INDIANA PLUMBING CODE, 2006 EDITION (6751AC 16-1.4) OF PROOF IS NOT INTENDED TO BE LEED PROCESS STANDARDS. - INDIANA ELECTRICAL CODE, 2009 EDITION (2008 NFPA 70, 6751AC 15. LIGHTING SWITCH PLATES: WHERE MULTIPLE SWITCHES ARE SHOWN, 171,8) PROVIDE (1) GANG BOX WITH A SINGLE COVERPLATE. - INDIANA MECHANICAL CODE, 2014 EDITION (IMC, 2012 EDITION, 675 IAC 18-1.6) 16. LIGHT FIXTURE PLACEMENT: CENTER CEILING ELEMENTS IN CEILING - ENERGY CONSERVATION CODE, 2010 (ASHREA 90.1, 2007 EDITION, TILES, INCLUDING RECESSED DOWNLIGHTS, SMOKE DETECTORS, 6751AC 19.3) SPRINKLER HEADS, AND EXIT SIGNS UNLESS OTHERWISE NOTED. 17. EMERGENCY LIGHTING: PROVIDE EMERGENCY LIGHTING IN TENANT SPACE AS REQUIRED PER NEMA AND IBC. EMERGENCY BATTERY PACKS OR LIGHTS CONNECTED TO AN EMERGENCY POWER SOURCE ARE REQUIREDN THESPACE OR MORE. FIXTURES SHOWN ON PLAN ARE FOR REFERENCE ONLY. FOR REFERENCEONLY. DOCUMENT APPROVAL 18. FIRE ALARM SYSTEM: PROVIDE ALARM NOTIFICATION APPLIANCES (HORNS/STROBES), EMERGENCY SPEAKERS, SMOKE DETECTORS, FIRE TENANT/CLIENT, UPON SIGNATURE, APPROVES ALL ASPECTS OF THE SCOPE OF WORK CONTAINED IN PULLS, AND ANY OTHER REQUIRED ALARM& DETECTION SYSTEMS As NECESSARY TO MEET ALL APPLICABLE CODES (INTERNATIONAL BUILDING THESE DOCUMENTS. CODE, INTERNATIONAL FIRE CODE, NFPA). IN RECEPTION AREAS, CONFERENCE ROOMS AND OTHER HIGH PROFILEAREAS WITHIN SUITE, ALL LOCATIONS OF SUCH DEVICES MUST BE APPROVED BYSDI OR TENANT PRIOR TO INSTALLATION. FAILURE TO DO SO MAY RESULT IN CONTRACTOR RELOCATINGTHESE ITEMS ATTHEIR EXPENSE. TENANT/CLIENT COMPANY NAME ITgJiltl�Ng97�iTa1G\LL7i.9RPJdED 7i1gJc\J�3g93sjq.L/_\L\Li971�a1LgwPJcn4 ALL COSTS INCURRED DUE TO ANY CHANGES REQUESTED AFTER SIGN -OFF OF THESE DOCUMENTS SHALL BE THE FULL RESPONSIBILITY OF THE TENANT/CLIENT. THESE DRAWINGS, AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC., AND ARE NOTTO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT THE WRITTEN CONSENT OF SCHOTT DESIGN. MILL/CASEWORK NOTES I. CASEWORK/MILLORK: CASEWORK AND MILLWORK GENERALLY INDICATED ON THESE DRAWINGS ARE TO BE PROVIDED UNDER THE GENERAL CONTRACT. 2. AWI COMPLIANCE: UNLESS INDICATED OTHERWISE, COMPLY WITH ARCHITECTURAL WOODWORK INSTITUTE (A.W.I.) CURRENT STANDARDS FOR CUSTOM GRADE WOODWORK. 3. MILLWORK SHOP DRAWINGS: FURNISH SHOP DRAWINGS ON ALL MILLWORK AND CASEWORK FOR APPROVAL BY THE TENANT AND SCHOTT DESIGN PRIOR TO FABRICATION. 4. MILLWORK FIELD VERIFICATION: WHERE CASEWORK AND MILLWORK ARE TO BE INSTALLED, VERIFY ALL DIMENSIONS ON PLANS AGAINST DIMENSIONS OF AS -BUILT CONDITIONS INFIELD. REPORT ANY DISCREPANCIES TO SCHOLL DESIGN THROUGH THE GENERAL CONTRACTOR, MAKE ADJUSTMENTS TO CASEWORK AND MILLWORK TO FIT FIELD CONDITIONS UNLESS DOING SO WILL SIGNIFICANTLY ALTER THE INTENT OF THE DESIGN SHOWN ON THE DRAWINGS. 5. DRAWING REVIEW AND DISCREPANCIES: VERIFY FINISHES (LAMINATE, VENEER, STAINS, ETC.( ON THE SECTIONS AND ELEVATION DRAWINGS WITH FINISHES INDICATED ON THE FINISH PLAN/SCHEDULES. IMMEDIATELY REPORT ANY DISCREPANCIES TO SCHOTT DESIGN THROUGH THE GENERAL CONTRACTOR. 6. MILLWORK REQUIREMENTS: REFER TO MILLWORK SECTIONS& ELEVATIONS . UNLESS OTHERWISE SHOWN, PLASTIC LAMINATE CLAD, COUNTERTOPS WITH 4" BACKSPLASHES WHERE INDICATED. BACKSPLASHES TO BE FIELD APPLIED. REFER TO MILLWORK SECTIONS & ELEVATIONS FOR CABINETRY SPECIFICATIONS(CUSTOM PLASTIC LAMINATE OR PRE -MANUFACTURED STOCK CABINETRY). EDGESOF PLASTIC LAMINATE COUNTERTOPS, CABINETS AND DRAWERS TO BE PLASTIC LAMINATE AND NOT PVC OR OTHER STOCK PLASTIC EDGING UNLESS NOTED OTHERWISE. 7. MILLWORK WALL BLOCKING: TO PROVIDE BLOCKING IN WALLS FOR ALL MILLWORK, WALL STOPS, HARDWARE, AND CABINETRY WHERE SPECIFIED. ALL WOOD BLOCKING TO BE FIRE RATED. V x9 u a,. mal..wlx. ix w i i VICINITY MAP NOT TO SCALE KEY PLAN - 2ND FLOOR (>N NOT TO SCALE INDEX OF DRAWINGS Till COVER SHEET AND GENERAL PROJECT NOTES U00 LIFESAFETYPLAN Alit DECONSTRUCTION PLAN / ARCHITECTURAL FLOOR PLAN A121 REFLECTED CEILING PLAN / ELECTRICAL PLAN A211 DOOR SCHEDULE/ INTERIOR DETAILS/ FINISHPLAN mw THIS DRAWING, AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN. ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC., AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT THE WRITTEN CONSENT OF SCHOU DESIGN. aaJ z Q O� a _N Vi ul V z~ Z a �, l F O axLU°� W Cv Z W LU `O LL. LU W Z ZVaJ CwC > C aWnf� UWWQ ,�v/� � U ``I r Z W OM W M R.f � aV $SUE DATE DESCRIPTION 06.17.19 REVIEW SET 07.03.19 PERMITSET REVISIONS PROJECT NUMBER 2018.498 PROJ.MGR DRAWN BY BW BW 2ND FLOOR COVER SHEET AND GENERAL NOTES T111