HomeMy WebLinkAbout19070177 State ReleaseELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA at http://www.in.gov/dhs/2650.htm.
This on-line filing is through a secure site, you can use it to submit your project information, pay the fees and upload your project plans.
Use Internet Browser to View this report other browsers are not compatible to view this report
CONSTRUCTION DESIGN RELEASE t!,
411
State Form 41191 (R9/5-98) n -
ruction type
Report Printed on: July 24, 2019
Indiana Department of Homeland Security
DIVISION OF FIRE & BUILDING SAFETY
PLAN REVIEW DIVISION
402 W. Washington St., Room E245
Indianapolis, IN 46204
To: Owner / Architect / Engineer
Landmark Design & Engineering Inc
David W. Stallings PE60019441
2750 N Burkhardt Rd
Suite 108
Evansville IN 47715
INDIANA 2
Available At Your Local Licence Branch
SUPPORT HOOSIER SAFETY
& e-mail: 8124024500, dstallings@landmarkdesign.net
the plans, specifications
V-B
Scope of release
ARCH ELEC MECH
PLUM
Type of release
Standard
Project name
Metronet Inc
Street address
12415 Old Meridian Street
city
CARMEL
have been reviewed for
07/24/19
Occupancy classification
B, S-1, REM
HAMILTON
the Fire Prevention and Building Safety Commission. The project is released for construction subject to, but not necessarily limited to, the conditions
listed below. THIS IS NOT A BUILDING PERMIT. All required local permits and licenses must be obtained prior to beginning construction work. All
construction work must be in full compliance with all applicable State rules. Any changes in the released plans and/or specifications must be filed with
and released by this Office before any work is altered. This release may be suspended or revoked if it is determined to be issued in error, in violation
of any rules of the Commission or if it is based on incorrect or insufficient information. This release shall expire by limitation, and become null and
void, if the work authorized is not commenced within one (1) year from the above date.
CONDITIONS:
Note :(AlA & Al B): In accordance with the affidavit sworn under penalties of perjury in the application for construction design release the plans
and specifications filed in conjunction with this project shall comply with all of the applicable rules and laws of Fire Prevention and Building Safety
Commission. Providing false information constitutes an act of perjury, which is a Class D felony punishable by a prison term and a fine up to $10,000.
In accordance with Section 19 of the General Administrative Rules (675 IAC 12-6-19) a complete set of plans and specifications that conform
exactly to the design that was released by the office of the state building commissioner shall be maintained on the construction jobsite as well as a
copy of the design release.
14B This project has been reviewed under the 2014 Indiana Building Code.
4GO412AC No addition or alteration shall cause an existing building, structure, or any part of the permanent
heating, ventilating, air conditioning, electrical, plumbing, sanitary, emergency detection, emergency
communication, or fire or explosion suppression systems to become unsafe or overloaded under
the provisions of the rules of the Commission for new construction in accordance with 675 IAC 12-4-
12(c).
NOTE: Flexible air ducts, both metallic and nonmetallic, shall comply with Sections 603.6.1,
603.6.1.1, 603.6.3 and 603.6.4, IMC. Flexible air connectors, both metallic and nonmetallic, shall
comply with Sections 603.6.2 through 603.6.4, IMC, in accordance with Section 603.6, IMC.
141329022 Where plumbing fixtures are required, separate facilities shall be provided for each sex in
accordance with Section 2902.2, IBC (675 IAC 13-2.6).
1413101163 Exit illumination and exit signs shall be connected to a separate emergency power source in
accordance with Section 1011.6.3, IBC (675 IAC 13-2.6).
14B100812A Exit doors shall swing in the direction of egress travel where serving an occupant load of 50 or
more, or a Group H occupancy, in accordance with Section 1008.1.2, IBC (675 IAC 13-2.6).
NOTE: DOOR 2
AREL Pursuant to 675 IAC 12-6-21, the issuance of a design release does not relieve the owner from
required compliance with all applicable rules of the commission, even if noncompliant conditions
appear in the plans and specifications that have been filed with the division. The owner is
responsible for correcting any and all areas of noncompliance even if they are discovered
subsequent to the issuing of this design release.
Page 1/2
ELECTRONICALLY FILE YOUR PROJECT WITH STATE OF INDIANA at http://www.in.gov/dhs/2650.htm.
This on-line fling is through a secure site, you can use it to submit your project information, pay the fees and upload your project plans.
Use Internet Browser to View this report, other browsers are not compatible to view this report
Please be advised that if an administrative review of this action is desired, a written petition for review must be filed at the above address with the
Fire Prevention and Building Safety Commission identifying the matter for which a review is sought no later than eighteen (18) days from the above -
stated date, unless the eighteenth day falls on a Saturday, a Sunday, a legal holiday under State statute, or a day in which the Department of Fire
and Building Services is closed during normal business hours. In the latter case, the filing deadline will be the first working day thereafter. If you
choose to petition, and the before -mentioned procedures are followed, your petition for review will be granted, and an administrative proceeding will
be conducted by an administrative law judge of the Fire Prevention and Building Safety Commission. If a petition for review is not filed, this Order will
be final, and you must comply with its requirements.
Code review offick
ludu@dhs.in.gov
Address (name,title of local official,street,city,state and ZIP code
DEPT OF COMMUNITY SERVICE
JIM BLANCHARD
ONE CIVIC SQUARE
CARMEL, IN 46032
e-mail: 3175712499
Director, Division of Fire and Building Safety
Page 212