Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
I37592876.05_Shadow_Wood
16023 Swingley Ridge Rd Chesterfield, MO 63017 314-434-1200 MiTek USA, Inc. Re: The truss drawing(s) referenced below have been prepared by MiTek USA, Inc. under my direct supervision based on the parameters provided by ProBuild (CarterLee Bldg Components). June 27,2019 Liu, Xuegang Pages or sheets covered by this seal: I37592876 thru I37592912 My license renewal date for the state of Indiana is July 31, 2020. 05_Shadow_Wood 05 Shadow Wood IMPORTANT NOTE: The seal on these truss component designs is a certification that the engineer named is licensed in the jurisdiction(s) identified and that the designs comply with ANSI/TPI 1. These designs are based upon parameters shown (e.g., loads, supports, dimensions, shapes and design codes), which were given to MiTek or TRENCO. Any project specific information included is for MiTek's or TRENCO's customers file reference purpose only, and was not taken into account in the preparation of these designs. MiTek or TRENCO has not independently verified the applicability of the design parameters or the designs for any particular building. Before use, the building designer should verify applicability of design parameters and properly incorporate these designs into the overall building design per ANSI/TPI 1, Chapter 2. 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss GE01 Truss Type GABLE Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592876 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 08:59:49 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-LWBr493choCRRSteaBPBs2zjcsvJ49v4BhGTZwz27ie Scale = 1:78.9 Sheet Back Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 3x4 3x4 3x6 5x6 3x6 5x6 3x6 4x8 4x6 45-7-8 45-7-8 20-2-0 20-2-0 45-7-8 25-5-8 46-7-8 1-0-0 3-0-711-5-50-10-05.00 12 Plate Offsets (X,Y)-- [26:0-5-15,0-0-6], [42:0-1-4,0-0-0], [43:0-0-0,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.11 0.07 0.18 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.01 (loc) 27 27 26 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 841 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 OTHERS 2x3 SPF No.2 *Except* 12-40,11-41,13-39: 2x4 SPF No.2 SLIDER Right 2x6 SPF No.2 1-10-14 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 12-40, 11-41, 10-42, 9-44, 13-39, 14-38, 15-37 REACTIONS.All bearings 45-7-8. (lb) - Max Horz 51=-116(LC 7) Max Uplift All uplift 100 lb or less at joint(s) 51, 41, 42, 44, 45, 46, 47, 48, 49, 50, 39, 38, 37, 36, 34, 33, 32, 31, 30, 29, 28, 26 Max Grav All reactions 250 lb or less at joint(s) 51, 40, 41, 42, 44, 45, 46, 47, 48, 49, 50, 39, 38, 37, 36, 34, 33, 32, 31, 30, 29, 26 except 28=257(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 9-10=-26/270, 10-11=-25/301, 11-12=-28/329, 12-13=-28/329, 13-14=-25/301, 14-15=-26/270 NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 2x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 51, 41, 42, 44, 45, 46, 47, 48, 49, 50, 39, 38, 37, 36, 34, 33, 32, 31, 30, 29, 28, 26. 10) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss GE02 Truss Type GABLE Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592877 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 08:59:51 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-HvJbVq5sDPS9gl11icRfyT20Ugb?Y3ONf?lZdpz27ic Scale = 1:73.1 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 3x4 3x6 5x6 3x6 3x6 3x6 40-11-0 40-11-0 21-5-8 21-5-8 40-11-0 19-5-8 41-11-0 1-0-0 2-6-011-5-53-4-05.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-R 0.28 0.12 0.18 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 25 24-25 26 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 809 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 OTHERS 2x3 SPF No.2 *Except* 13-37,12-38,14-36: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 13-37, 12-38, 11-39, 10-41, 14-36, 15-34, 16-33 REACTIONS.All bearings 40-11-0. (lb) - Max Horz 49=-91(LC 7) Max Uplift All uplift 100 lb or less at joint(s) 26, 38, 39, 41, 42, 43, 44, 45, 46, 47, 36, 34, 33, 32, 31, 30, 29, 28, 27 except 49=-142(LC 7), 48=-163(LC 6) Max Grav All reactions 250 lb or less at joint(s) 49, 26, 37, 38, 39, 41, 42, 43, 44, 45, 46, 47, 48, 36, 34, 33, 32, 31, 30, 29, 28, 27 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 9-10=-23/256, 10-11=-24/287, 11-12=-22/319, 12-13=-26/346, 13-14=-25/346, 14-15=-22/319, 15-16=-23/287, 16-17=-23/256 NOTES-(12-13) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) All plates are 2x4 MT20 unless otherwise indicated. 5) Gable requires continuous bottom chord bearing. 6) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 7) Gable studs spaced at 2-0-0 oc. 8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 9) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 10) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 26, 38, 39, 41, 42, 43, 44, 45, 46, 47, 36, 34, 33, 32, 31, 30, 29, 28, 27 except (jt=lb) 49=142, 48=163. 11) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 12) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 13) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss GE03 Truss Type Common Supported Gable Qty 2 Ply 1 05 Shadow Wood Job Reference (optional) I37592878 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 08:59:51 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-HvJbVq5sDPS9gl11icRfyT244gcTY5xNf?lZdpz27ic Scale: 3/4"=1' Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 8 7 6 2x4 2x4 4x6 2x4 2x4 2x4 3-3-0 3-3-0 -0-4-0 0-4-0 1-7-8 1-7-8 3-3-0 1-7-8 3-7-0 0-4-0 1-3-02-7-41-3-010.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-R 0.05 0.03 0.02 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 4 4 6 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 25 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-3-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)8=90/3-3-0, 6=90/3-3-0, 7=115/3-3-0 Max Horz 8=65(LC 5) Max Uplift 8=-38(LC 6), 6=-39(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 8, 6. 10) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss GE04 Truss Type GABLE Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592879 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 08:59:52 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-l5sziA6V_ja0IvcDFKyuUhbCE3wbHWoWtfV79Fz27ib Scale = 1:57.7 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 12 13 25 24 23 22 21 20 19 18 17 16 15 14 2x4 3x4 4x6 2x4 3x4 3x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 20-11-0 20-11-0 -1-0-0 1-0-0 10-5-8 10-5-8 20-11-0 10-5-8 21-11-0 1-0-0 1-2-09-0-21-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-R 0.21 0.10 0.17 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 13 13 14 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 309 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 7-19 REACTIONS.All bearings 20-11-0. (lb) - Max Horz 25=-215(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 25, 14, 20, 21, 23, 24, 18, 17, 16, 15 Max Grav All reactions 250 lb or less at joint(s) 25, 14, 19, 20, 21, 23, 24, 18, 17, 16, 15 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 6-7=-45/253, 7-8=-45/253 NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 25, 14, 20, 21, 23, 24, 18, 17, 16, 15. 10) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss GE05 Truss Type GABLE Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592880 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 08:59:53 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-DIQMwW67l1jtw3BQp1U71u7O2TGG0zRg6JEgiiz27ia Scale = 1:43.1 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 20 19 18 17 16 15 14 13 12 2x4 3x4 4x6 2x4 3x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 13-11-0 13-11-0 -1-0-0 1-0-0 6-11-8 6-11-8 13-11-0 6-11-8 14-11-0 1-0-0 1-2-06-4-101-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-R 0.14 0.07 0.14 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 11 11 12 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 164 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.All bearings 13-11-0. (lb) - Max Horz 20=154(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 17, 18, 15, 14 except 20=-133(LC 4), 12=-110(LC 5), 19=-122(LC 5), 13=-107(LC 4) Max Grav All reactions 250 lb or less at joint(s) 20, 12, 16, 17, 18, 19, 15, 14, 13 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 17, 18, 15, 14 except (jt=lb) 20=133, 12=110, 19=122, 13=107. 10) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss GE06 Truss Type GABLE Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592881 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 08:59:54 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-hU_k7s7lVKrkXDlcNl?MZ6gSmtU7lIypLz_EE8z27iZ Scale = 1:89.9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15333435 5x6 3x6 5x6 3x6 3x4 3x6 6x6 3x6 3x6 3x6 3x6 3x6 3x6 4x8 3x6 3x6 3x6 3x6 4x6 4x8 6x6 3x4 6x6 4x8 3x6 3x6 2x4 2x4 2x4 2x4 2-6-0 2-6-0 7-2-14 4-8-14 11-11-12 4-8-14 16-8-10 4-8-14 21-5-8 4-8-14 26-6-2 5-0-10 31-6-11 5-0-10 36-7-5 5-0-10 40-11-0 4-3-11 41-7-14 0-8-14 46-11-0 5-3-2 2-6-0 2-6-0 7-2-14 4-8-14 11-11-12 4-8-14 16-8-10 4-8-14 21-5-8 4-8-14 26-6-2 5-0-10 31-6-11 5-0-10 36-7-5 5-0-10 41-7-14 5-0-10 46-11-0 5-3-2 47-11-0 1-0-0 2-11-011-5-50-10-03.00 12 5.00 12 Plate Offsets (X,Y)-- [13:0-0-12,0-1-12], [15:0-0-0,0-1-12], [19:0-2-8,0-2-0], [21:0-2-8,0-1-8], [22:0-2-8,0-1-8], [25:0-2-8,0-1-8], [27:0-2-8,0-1-8], [28:0-2-8,0-1-8], [29:0-2-8 ,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.59 0.61 0.70 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.16 -0.34 0.12 (loc) 23-25 23-25 18 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 223 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 7-23,8-23: 2x4 SPF No.2, 1-30,13-15: 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-7-9 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 5-25, 6-23, 8-23, 9-22 REACTIONS.All bearings 6-3-8 except (jt=length) 30=0-3-8. (lb) - Max Horz 30=-132(LC 7) Max Uplift All uplift 100 lb or less at joint(s) 30, 18, 17 except 15=-101(LC 7) Max Grav All reactions 250 lb or less at joint(s) 15, 17, 16 except 30=1800(LC 1), 18=2223(LC 1), 18=2223(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-1262/180, 2-3=-2313/323, 3-5=-2444/373, 5-6=-2267/389, 6-7=-1935/390, 7-8=-1940/389, 8-9=-2178/380, 9-11=-2153/348, 11-12=-1564/270, 12-13=0/284, 1-30=-1774/216 BOT CHORD 28-29=-90/1253, 27-28=-127/2092, 25-27=-102/2204, 23-25=-50/2043, 22-23=-48/1957, 21-22=-91/1937, 19-21=-85/1387 WEBS 2-29=-1345/199, 2-28=-83/1016, 3-28=-478/106, 5-25=-345/94, 6-25=-21/477, 6-23=-724/149, 7-23=-193/1169, 8-23=-543/137, 8-22=-17/263, 9-21=-347/67, 11-21=-9/760, 11-19=-1002/132, 12-19=-126/1906, 12-18=-2083/266, 1-29=-198/1846 NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable studs spaced at 2-0-0 oc. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.0psf. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 30, 18, 17 except (jt=lb) 15=101. 8) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss T01 Truss Type Common Qty 8 Ply 1 05 Shadow Wood Job Reference (optional) I37592882 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 08:59:55 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-9gY6KC8NGezb9NKoxSWb6JDYOHo6UjeyZdjnmaz27iY Scale = 1:79.8 1 2 3 4 5 6 7 8 9 10 11 19 18 17 16 15 14 13 12202122 3x6 5x6 3x8 3x4 3x8 MT18HS 3x6 4x8 3x6 3x6 4x8 3x6 3x6 3x6 2x4 8x8 8x10 4x6 4x6 3x8 MT18HS 6-10-5 6-10-5 13-6-3 6-7-13 20-2-0 6-7-13 28-7-0 8-5-0 37-0-0 8-5-0 45-7-8 8-7-8 6-10-5 6-10-5 13-6-3 6-7-13 20-2-0 6-7-13 28-7-0 8-5-0 37-0-0 8-5-0 45-7-8 8-7-8 46-7-8 1-0-0 3-0-711-5-50-10-05.00 12 Plate Offsets (X,Y)-- [1:Edge,0-3-8], [10:0-6-3,Edge], [14:0-2-8,0-1-8], [17:0-2-8,0-1-8], [18:0-2-8,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.92 0.75 0.80 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.32 -0.68 0.19 (loc) 14-15 14-15 10 l/defl >999 >806 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 197 lb FT = 20% GRIP 169/123 197/144 LUMBER- TOP CHORD 2x4 SPF 2100F 1.8E *Except* 1-2: 2x4 SPF No.2 BOT CHORD 2x4 SPF 2100F 1.8E *Except* 16-19: 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 4-15,5-15,6-15: 2x4 SPF No.2, 1-19: 2x4 SPF-S Stud SLIDER Right 2x6 SPF No.2 4-8-7 BRACING- TOP CHORD Structural wood sheathing directly applied, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 4-15, 6-15, 8-14 REACTIONS.(lb/size)19=2059/0-3-8, 10=2042/0-3-8 Max Horz 19=-116(LC 7) Max Uplift 19=-78(LC 6), 10=-133(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-3=-2463/323, 3-4=-2698/404, 4-5=-2394/420, 5-6=-2424/414, 6-8=-3316/453, 8-10=-3927/468, 1-19=-1998/264 BOT CHORD 17-18=-151/2210, 15-17=-126/2418, 14-15=-208/2986, 12-14=-334/3452, 10-12=-334/3452 WEBS 3-18=-692/171, 3-17=0/307, 4-15=-558/135, 5-15=-157/1371, 6-15=-1165/219, 6-14=0/559, 8-14=-557/141, 8-12=0/320, 1-18=-214/2340 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are MT20 plates unless otherwise indicated. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.0psf. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 19 except (jt=lb) 10=133. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss T02 Truss Type Roof Special Qty 2 Ply 1 05 Shadow Wood Job Reference (optional) I37592883 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 08:59:56 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-es6UYY9?1y5SnXv?U91qfXlj7h8sDCe6oGTKI1z27iX Scale = 1:81.9 1 2 3 4 5 6 7 8 9 10 11 12 21 20 19 18 17 16 15 14 13222324 5x6 3x6 5x6 3x8 3x4 3x8 8x8 3x8 3x6 3x6 3x6 4x8 3x6 3x6 3x6 2x4 8x8 8x10 4x6 4x6 3x8 MT18HS 1-2-8 1-2-8 7-6-5 6-3-13 13-10-3 6-3-13 20-2-0 6-3-13 28-7-0 8-5-0 37-0-0 8-5-0 45-7-8 8-7-8 1-2-8 1-2-8 7-6-5 6-3-13 13-10-3 6-3-13 20-2-0 6-3-13 28-7-0 8-5-0 37-0-0 8-5-0 45-7-8 8-7-8 46-7-8 1-0-0 3-2-1411-5-50-10-03.00 12 5.00 12 Plate Offsets (X,Y)-- [1:Edge,0-3-8], [11:0-6-3,Edge], [15:0-2-8,0-1-8], [18:0-2-8,0-1-8], [19:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.92 0.72 0.69 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.33 -0.68 0.19 (loc) 15-16 15-16 11 l/defl >999 >800 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 202 lb FT = 20% GRIP 169/123 197/144 LUMBER- TOP CHORD 2x4 SPF 2100F 1.8E *Except* 1-2,2-3: 2x4 SPF No.2 BOT CHORD 2x4 SPF 2100F 1.8E *Except* 17-21: 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 5-16,6-16,7-16: 2x4 SPF No.2, 1-21: 2x4 SPF-S Stud SLIDER Right 2x6 SPF No.2 4-8-7 BRACING- TOP CHORD Structural wood sheathing directly applied, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-16, 7-16, 9-15 REACTIONS.(lb/size)21=2056/0-3-8, 11=2043/0-3-8 Max Horz 21=-117(LC 7) Max Uplift 21=-78(LC 6), 11=-133(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-647/103, 2-4=-2520/336, 4-5=-2685/406, 5-6=-2390/421, 6-7=-2426/414, 7-9=-3319/452, 9-11=-3929/468, 1-21=-2006/200 BOT CHORD 19-20=-61/686, 18-19=-152/2268, 16-18=-122/2409, 15-16=-208/2988, 13-15=-334/3454, 11-13=-334/3454 WEBS 2-20=-1826/266, 2-19=-156/1778, 4-19=-600/150, 4-18=0/250, 5-16=-559/133, 6-16=-160/1380, 7-16=-1166/219, 7-15=0/560, 9-15=-556/141, 9-13=0/319, 1-20=-196/1941 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are MT20 plates unless otherwise indicated. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.0psf. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 21 except (jt=lb) 11=133. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss T03 Truss Type Roof Special Qty 6 Ply 1 05 Shadow Wood Job Reference (optional) I37592884 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 08:59:57 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-63gslu9doFDJOgUB2tY3BkIuK4SSyc7F1wCurTz27iW Scale: 1/8"=1' 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 26 25 24 23 22 21 20 19 18 17272829 5x6 3x6 5x6 3x8 4x10 3x8 3x6 5x8 2x4 5x10 MT18HS 5x8 3x6 3x6 3x6 3x6 5x8 3x6 3x6 3x6 2x4 8x10 4x6 4x6 3x8 MT18HS3x8 MT18HS 5-1-12 5-1-12 11-6-0 6-4-4 17-9-13 6-3-13 24-1-11 6-3-13 30-5-8 6-3-13 38-10-8 8-5-0 47-3-8 8-5-0 55-11-0 8-7-8 -1-0-0 1-0-0 3-11-11 3-11-11 7-8-13 3-9-3 11-6-0 3-9-3 17-9-13 6-3-13 24-1-11 6-3-13 30-5-8 6-3-13 38-10-8 8-5-0 47-3-8 8-5-0 55-11-0 8-7-8 56-11-0 1-0-0 0-8-011-5-50-10-03.00 12 5.00 12 Plate Offsets (X,Y)-- [2:0-0-0,0-2-6], [5:0-4-12,0-2-0], [15:0-0-0,0-6-3], [19:0-2-8,0-1-8], [22:0-2-8,0-1-8], [23:0-2-8,0-1-8], [25:0-2-8,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.96 0.89 0.87 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.40 -0.86 0.23 (loc) 19-20 19-20 15 l/defl >999 >712 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 236 lb FT = 20% GRIP 169/123 197/144 LUMBER- TOP CHORD 2x4 SPF 2100F 1.8E *Except* 6-7: 2x4 SPF No.2, 12-16: 2x4 SP 2400F 2.0E BOT CHORD 2x4 SPF 2100F 1.8E *Except* 21-24: 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 9-20,10-20,11-20: 2x4 SPF No.2 SLIDER Left 2x4 SPF-S Stud 2-0-1, Right 2x6 SPF No.2 4-8-7 BRACING- TOP CHORD Structural wood sheathing directly applied. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing, Except: 5-1-13 oc bracing: 2-26. WEBS 1 Row at midpt 5-26, 8-22, 9-20, 11-20, 13-19 REACTIONS.(lb/size)2=-601/0-3-8, 26=3403/0-3-8 (req. 0-4-5), 15=2190/0-3-8 Max Horz 2=-102(LC 7) Max Uplift 2=-601(LC 1), 26=-173(LC 6), 15=-137(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-229/2263, 4-5=-284/2636, 5-6=-2778/353, 6-8=-3558/464, 8-9=-3283/479, 9-10=-2756/466, 10-11=-2792/459, 11-13=-3676/496, 13-15=-4266/509 BOT CHORD 2-26=-2108/231, 25-26=-89/571, 23-25=-256/2712, 22-23=-270/3226, 20-22=-189/2961, 19-20=-248/3319, 17-19=-372/3757, 15-17=-372/3757 WEBS 4-26=-627/138, 5-26=-4171/519, 5-25=-224/2486, 6-25=-1234/201, 6-23=-15/578, 8-22=-435/110, 9-22=-3/528, 9-20=-880/172, 10-20=-195/1662, 11-20=-1159/218, 11-19=0/552, 13-19=-537/137, 13-17=0/318 NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are MT20 plates unless otherwise indicated. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.0psf. 6) WARNING: Required bearing size at joint(s) 26 greater than input bearing size. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 2=601, 26=173, 15=137. 8) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss T04 Truss Type Roof Special Qty 3 Ply 1 05 Shadow Wood Job Reference (optional) I37592885 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 08:59:58 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-aFEEzDAFZZLA0q3Nca3Ikyr3zUqrh68PGayRNvz27iV Scale: 1/8"=1' 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 25 24 23 22 21 20 19 18 17 16262728 6x10 3x6 5x6 3x8 4x8 3x6 3x6 5x6 2x4 2x4 4x8 3x6 3x6 3x6 4x8 3x6 3x6 3x6 2x4 8x10 4x6 4x6 3x8 MT18HS3x8 9-1-12 9-1-12 11-6-0 2-4-4 17-9-13 6-3-13 24-1-11 6-3-13 30-5-8 6-3-13 38-10-8 8-5-0 47-3-8 8-5-0 55-11-0 8-7-8 -1-0-0 1-0-0 5-10-4 5-10-4 11-6-0 5-7-12 17-9-13 6-3-13 24-1-11 6-3-13 30-5-8 6-3-13 38-10-8 8-5-0 47-3-8 8-5-0 55-11-0 8-7-8 56-11-0 1-0-0 0-8-011-5-50-10-03.00 12 5.00 12 Plate Offsets (X,Y)-- [2:0-0-0,0-2-6], [14:0-6-3,Edge], [18:0-2-8,0-1-8], [21:0-2-8,0-1-8], [22:0-2-8,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.90 0.68 0.69 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.31 -0.66 0.17 (loc) 18-19 18-19 14 l/defl >999 >855 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 242 lb FT = 20% GRIP 169/123 197/144 LUMBER- TOP CHORD 2x4 SPF 2100F 1.8E *Except* 1-5,5-6: 2x4 SPF No.2 BOT CHORD 2x4 SP 2400F 2.0E *Except* 14-17: 2x4 SPF 2100F 1.8E, 20-23: 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 8-19,9-19,10-19: 2x4 SPF No.2 SLIDER Left 2x4 SPF-S Stud 2-11-7, Right 2x6 SPF No.2 4-8-7 BRACING- TOP CHORD Structural wood sheathing directly applied or 1-7-8 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing, Except: 6-0-0 oc bracing: 2-25. WEBS 1 Row at midpt 5-25, 8-19, 10-19, 12-18 REACTIONS.(lb/size)2=29/0-3-8, 25=2941/0-3-8, 14=2023/0-3-8 Max Horz 2=-102(LC 7) Max Uplift 2=-94(LC 11), 25=-151(LC 6), 14=-135(LC 7) Max Grav 2=104(LC 10), 25=2941(LC 1), 14=2023(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-45/799, 4-5=-181/1406, 5-7=-2380/321, 7-8=-2603/397, 8-9=-2341/415, 9-10=-2376/409, 10-12=-3270/447, 12-14=-3883/463 BOT CHORD 2-25=-713/76, 24-25=-31/416, 22-24=-32/416, 21-22=-137/2137, 19-21=-114/2334, 18-19=-203/2944, 16-18=-330/3413, 14-16=-330/3413 WEBS 4-25=-693/206, 5-25=-2969/400, 5-22=-168/1935, 7-22=-670/157, 7-21=0/318, 8-19=-527/127, 9-19=-156/1342, 10-19=-1167/219, 10-18=0/562, 12-18=-560/141, 12-16=0/319 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are MT20 plates unless otherwise indicated. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.0psf. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 2 except (jt=lb) 25=151, 14=135. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss T05 Truss Type Roof Special Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592886 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 08:59:59 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-2RodAZBuKtT1e_eZAIaXG9NDeuA3QZOYUEh_vLz27iU Scale: 1/8"=1' 1 2 3 4 5 6 7 8 9 10 11 12 13 14 24 23 22 21 20 19 18 17 16 152526274x8 3x6 6x10 3x6 5x6 3x8 3x6 5x6 2x4 2x4 4x8 3x6 3x6 3x6 4x8 3x6 3x6 3x6 2x4 8x10 4x6 4x6 3x8 MT18HS3x8 9-1-12 9-1-12 11-6-0 2-4-4 17-9-13 6-3-13 24-1-11 6-3-13 30-5-8 6-3-13 38-10-8 8-5-0 47-3-8 8-5-0 55-11-0 8-7-8 5-10-4 5-10-4 11-6-0 5-7-12 17-9-13 6-3-13 24-1-11 6-3-13 30-5-8 6-3-13 38-10-8 8-5-0 47-3-8 8-5-0 55-11-0 8-7-8 56-11-0 1-0-0 0-8-011-5-50-10-03.00 12 5.00 12 Plate Offsets (X,Y)-- [1:0-0-0,0-1-8], [13:0-6-3,Edge], [17:0-2-8,0-1-8], [20:0-2-8,0-1-8], [21:0-2-8,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.91 0.68 0.69 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.31 -0.66 0.17 (loc) 17-18 17-18 13 l/defl >999 >854 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 241 lb FT = 20% GRIP 169/123 197/144 LUMBER- TOP CHORD 2x4 SPF 2100F 1.8E *Except* 1-4,4-5: 2x4 SPF No.2 BOT CHORD 2x4 SP 2400F 2.0E *Except* 13-16: 2x4 SPF 2100F 1.8E, 19-22: 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 7-18,8-18,9-18: 2x4 SPF No.2 SLIDER Left 2x4 SPF-S Stud 2-11-7, Right 2x6 SPF No.2 4-8-7 BRACING- TOP CHORD Structural wood sheathing directly applied or 1-7-8 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing, Except: 6-0-0 oc bracing: 1-24. WEBS 1 Row at midpt 4-24, 7-18, 9-18, 11-17 REACTIONS.(lb/size)1=-32/0-3-8, 24=2943/0-3-8, 13=2023/0-3-8 Max Horz 1=106(LC 6) Max Uplift 1=-115(LC 11), 24=-151(LC 6), 13=-135(LC 7) Max Grav 1=42(LC 10), 24=2943(LC 1), 13=2023(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-3=-36/786, 3-4=-175/1398, 4-6=-2383/323, 6-7=-2604/398, 7-8=-2341/416, 8-9=-2377/409, 9-11=-3271/448, 11-13=-3884/464 BOT CHORD 1-24=-699/75, 23-24=-33/420, 21-23=-34/420, 20-21=-139/2140, 18-20=-115/2335, 17-18=-203/2944, 15-17=-330/3414, 13-15=-330/3414 WEBS 3-24=-700/211, 4-24=-2964/396, 4-21=-166/1933, 6-21=-668/157, 6-20=0/318, 7-18=-528/128, 8-18=-157/1343, 9-18=-1167/219, 9-17=0/562, 11-17=-560/141, 11-15=0/319 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are MT20 plates unless otherwise indicated. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.0psf. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 1=115, 24=151, 13=135. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss T06 Truss Type Common Qty 6 Ply 1 05 Shadow Wood Job Reference (optional) I37592887 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:00 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-WeL?OvCW5AbuF8Dmj?6mpNwSyIUm9xqijuRYRoz27iT Scale = 1:73.1 1 2 3 4 5 6 7 8 9 10 17 16 15 14 13 12 111819202122232425 3x6 5x6 3x6 3x16 MT18HS3x4 3x8 3x6 4x8 3x6 4x6 3x6 3x6 3x12 4x8 3x6 3x8 10-4-0 10-4-0 21-5-8 11-1-8 30-7-0 9-1-8 40-11-0 10-4-0 7-3-8 7-3-8 14-4-8 7-1-0 21-5-8 7-1-0 27-10-8 6-5-0 34-3-8 6-5-0 40-11-0 6-7-8 41-11-0 1-0-0 2-6-011-5-53-4-05.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.68 0.78 1.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.50 -0.92 0.13 (loc) 14-16 14-16 11 l/defl >970 >528 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 183 lb FT = 20% GRIP 169/123 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF 2100F 1.8E WEBS 2x4 SPF No.2 *Except* 2-16,4-16,6-12,7-12: 2x3 SPF No.2, 1-17,9-11: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 3-1-10 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 4-14, 6-14, 2-17, 7-11 REACTIONS.(lb/size)17=1948/Mechanical, 11=2043/0-3-8 Max Horz 17=-91(LC 7) Max Uplift 17=-83(LC 6), 11=-109(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-2693/370, 4-5=-2117/368, 5-6=-2107/371, 6-7=-2384/350, 9-11=-284/157 BOT CHORD 16-17=-172/2288, 14-16=-116/2285, 12-14=-85/2121, 11-12=-126/1884 WEBS 2-16=0/319, 4-16=0/353, 4-14=-688/182, 5-14=-138/1189, 6-14=-501/147, 7-12=0/466, 2-17=-2722/263, 7-11=-2431/224 NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) All plates are MT20 plates unless otherwise indicated. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.0psf. 6) Refer to girder(s) for truss to truss connections. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 17 except (jt=lb) 11=109. 8) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss T07 Truss Type Common Qty 4 Ply 1 05 Shadow Wood Job Reference (optional) I37592888 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:01 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-_qvNbFD8sUjktIoyHjd?MaTnni0zucRryYA5_Ez27iS Scale: 3/4"=1' 1 2 3 4 5 8 7 6 4x6 2x4 2x4 3x8 3x6 3x6 1-7-8 1-7-8 3-3-0 1-7-8 -0-4-0 0-4-0 1-7-8 1-7-8 3-3-0 1-7-8 3-7-0 0-4-0 1-3-02-7-41-3-010.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-P 0.03 0.02 0.02 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 7 7 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 16 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-8,4-6: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 3-3-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)8=147/0-3-8, 6=147/0-3-8 Max Horz 8=65(LC 5) Max Uplift 8=-13(LC 6), 6=-13(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 8, 6. 6) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss T08 Truss Type Common Qty 5 Ply 1 05 Shadow Wood Job Reference (optional) I37592889 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:01 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-_qvNbFD8sUjktIoyHjd?MaTdHisYuZDryYA5_Ez27iS Scale = 1:55.1 1 2 3 4 5 6 7 10 9 811121314 4x6 3x6 5x12 2x4 2x4 3x6 6x8 6x8 10-5-8 10-5-8 20-11-0 10-5-8 -1-0-0 1-0-0 5-4-0 5-4-0 10-5-8 5-1-8 15-7-0 5-1-8 20-11-0 5-4-0 21-11-0 1-0-0 1-2-09-0-21-2-09.00 12 Plate Offsets (X,Y)-- [2:0-1-3,0-1-8], [6:0-1-3,0-1-8], [8:Edge,0-1-8], [9:0-6-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.70 0.68 0.22 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.21 -0.53 0.03 (loc) 9-10 9-10 8 l/defl >999 >459 n/a L/d 240 180 n/a PLATES MT20 Weight: 78 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF 2100F 1.8E BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-10,6-8: 2x6 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)10=985/0-3-8, 8=985/0-3-8 Max Horz 10=216(LC 5) Max Uplift 10=-68(LC 6), 8=-68(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1009/125, 3-4=-782/135, 4-5=-782/135, 5-6=-1009/125, 2-10=-838/146, 6-8=-838/146 BOT CHORD 9-10=-52/688, 8-9=0/688 WEBS 4-9=-58/505 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.0psf. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10, 8. 6) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss T09 Truss Type Common Qty 2 Ply 1 05 Shadow Wood Job Reference (optional) I37592890 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:02 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-S0TlobDmdorbVSN8rQ8Euo?lJ5Ckd05_ACwfWgz27iR Scale = 1:55.1 1 2 3 4 5 6 9 8 710111213 4x6 5x8 3x6 5x12 2x4 2x4 4x6 6x8 10-5-8 10-5-8 20-11-0 10-5-8 -1-0-0 1-0-0 5-4-0 5-4-0 10-5-8 5-1-8 15-7-0 5-1-8 20-11-0 5-4-0 1-2-09-0-21-2-09.00 12 Plate Offsets (X,Y)-- [2:0-1-3,0-1-8], [6:0-1-3,0-1-8], [7:Edge,0-2-0], [8:0-6-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.88 0.69 0.25 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.23 -0.59 0.03 (loc) 8-9 8-9 7 l/defl >999 >413 n/a L/d 240 180 n/a PLATES MT20 Weight: 76 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF 2100F 1.8E *Except* 4-6: 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-9,6-7: 2x6 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)9=987/0-3-8, 7=909/0-3-8 Max Horz 9=227(LC 5) Max Uplift 9=-68(LC 6), 7=-29(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1009/125, 3-4=-781/134, 4-5=-782/134, 5-6=-1014/125, 2-9=-837/145, 6-7=-752/104 BOT CHORD 8-9=-63/689, 7-8=-6/703 WEBS 4-8=-58/507 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.0psf. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 9, 7. 6) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss T10 Truss Type Common Qty 3 Ply 1 05 Shadow Wood Job Reference (optional) I37592891 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:03 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-wD170xEOO5zS6bxLP8fTR?YwEVYqMTI8PsfC27z27iQ Scale = 1:55.1 1 2 3 4 5 8 7 69101112 5x8 4x6 5x8 4x6 5x12 2x4 2x4 4x6 10-5-8 10-5-8 20-11-0 10-5-8 5-4-0 5-4-0 10-5-8 5-1-8 15-7-0 5-1-8 20-11-0 5-4-0 1-2-09-0-21-2-09.00 12 Plate Offsets (X,Y)-- [1:0-1-3,0-1-8], [5:0-1-3,0-1-8], [6:Edge,0-2-0], [7:0-6-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.87 0.70 0.25 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.21 -0.55 0.03 (loc) 6-7 6-7 6 l/defl >999 >444 n/a L/d 240 180 n/a PLATES MT20 Weight: 75 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-8,5-6: 2x6 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-2-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)8=911/0-3-8, 6=911/0-3-8 Max Horz 8=213(LC 5) Max Uplift 8=-29(LC 6), 6=-29(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-1013/125, 2-3=-782/134, 3-4=-782/134, 4-5=-1013/125, 1-8=-750/104, 5-6=-750/104 BOT CHORD 7-8=-61/704, 6-7=-6/704 WEBS 3-7=-57/509 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members, with BCDL = 10.0psf. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 8, 6. 6) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss T11 Truss Type Common Qty 3 Ply 1 05 Shadow Wood Job Reference (optional) I37592892 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:03 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-wD170xEOO5zS6bxLP8fTR?YzeVeJMVq8PsfC27z27iQ Scale = 1:39.9 1 2 3 4 5 6 7 10 9 8 4x6 3x4 3x4 3x8 2x4 2x4 4x6 4x6 6-11-8 6-11-8 13-11-0 6-11-8 -1-0-0 1-0-0 3-7-0 3-7-0 6-11-8 3-4-8 10-4-0 3-4-8 13-11-0 3-7-0 14-11-0 1-0-0 1-2-06-4-101-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.65 0.28 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.12 0.01 (loc) 9 8-9 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 54 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-10,6-8: 2x6 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)10=612/0-3-8, 8=612/0-3-8 Max Horz 10=155(LC 5) Max Uplift 10=-57(LC 6), 8=-57(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-556/89, 3-4=-418/100, 4-5=-418/100, 5-6=-556/89, 2-10=-533/117, 6-8=-533/117 BOT CHORD 9-10=-46/351, 8-9=0/351 WEBS 4-9=-47/272 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10, 8. 6) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss T12 Truss Type Common Qty 2 Ply 1 05 Shadow Wood Job Reference (optional) I37592893 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:04 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-PPbWDHF09P5JklWXyrAizD58RvyW5y4HeWPlbZz27iP Scale = 1:39.9 1 2 3 4 5 6 9 8 7 4x6 4x6 3x4 3x4 3x8 2x4 2x4 4x6 6-11-8 6-11-8 13-11-0 6-11-8 3-7-0 3-7-0 6-11-8 3-4-8 10-4-0 3-4-8 13-11-0 3-7-0 14-11-0 1-0-0 1-2-06-4-101-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.65 0.41 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.05 -0.13 0.01 (loc) 8 7-8 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 53 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-9,5-7: 2x6 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)9=535/0-3-8, 7=615/0-3-8 Max Horz 9=-166(LC 4) Max Uplift 9=-18(LC 6), 7=-57(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-561/89, 2-3=-420/99, 3-4=-420/99, 4-5=-558/89, 1-9=-449/74, 5-7=-534/116 BOT CHORD 8-9=-44/364, 7-8=0/353 WEBS 3-8=-46/271 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 9, 7. 6) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss T13 Truss Type Common Qty 2 Ply 1 05 Shadow Wood Job Reference (optional) I37592894 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:05 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-tb9uRdGewjDAMv5jWYhxWQdMQJHeqPKRtA8J7?z27iO Scale = 1:39.9 1 2 3 4 5 8 7 6 3x6 4x6 3x6 3x4 3x4 3x8 2x4 2x4 6-11-8 6-11-8 13-11-0 6-11-8 3-7-0 3-7-0 6-11-8 3-4-8 10-4-0 3-4-8 13-11-0 3-7-0 1-2-06-4-101-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.50 0.42 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.06 -0.13 0.01 (loc) 7 7-8 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 51 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-8,5-6: 2x6 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)8=538/0-3-8, 6=538/0-3-8 Max Horz 8=152(LC 5) Max Uplift 8=-18(LC 6), 6=-18(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-563/89, 2-3=-422/99, 3-4=-422/99, 4-5=-563/89, 1-8=-450/74, 5-6=-450/74 BOT CHORD 7-8=-55/366, 6-7=0/366 WEBS 3-7=-45/271 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 8, 6. 6) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss TG01 Truss Type COMMON GIRDER Qty 1 Ply 2 05 Shadow Wood Job Reference (optional) I37592895 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:05 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-tb9uRdGewjDAMv5jWYhxWQdQmJJcqQ0RtA8J7?z27iO Scale = 1:39.9 1 2 3 4 5 10 9 8 7 6 3x4 4x6 3x4 3x4 3x4 3x8 3x4 2x4 3x4 2x4 3-7-0 3-7-0 6-11-8 3-4-8 10-4-0 3-4-8 13-11-0 3-7-0 3-7-0 3-7-0 6-11-8 3-4-8 10-4-0 3-4-8 13-11-0 3-7-0 1-2-06-4-101-2-09.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.22 0.29 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.02 -0.06 0.00 (loc) 8-9 8-9 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 113 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-10,5-6: 2x6 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)10=538/0-3-8, 6=538/0-3-8 Max Horz 10=-152(LC 4) Max Uplift 10=-18(LC 6), 6=-18(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-542/73, 2-3=-436/112, 3-4=-436/112, 4-5=-542/73, 1-10=-424/61, 5-6=-424/61 BOT CHORD 9-10=-50/359, 8-9=-50/359, 7-8=0/359, 6-7=0/359 WEBS 3-8=-68/255 NOTES-(9-10) 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc, 2x6 - 2 rows staggered at 0-9-0 oc. Bottom chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Webs connected as follows: 2x3 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10, 6. 8) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V01 Truss Type GABLE Qty 2 Ply 1 05 Shadow Wood Job Reference (optional) I37592896 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:06 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-LojGezGHh0L1z3gw4GCA3eAc4jhgZtEa5qusfRz27iN Scale = 1:23.5 1 2 3 6 5 4 2x4 2x4 3x4 2x4 2x4 2x4 3-11-0 3-11-0 1-11-8 1-11-8 3-11-0 1-11-8 2-5-74-1-02-5-710.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-R 0.19 0.17 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 14 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 WEBS 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-11-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)6=71/3-11-0, 4=71/3-11-0, 5=154/3-11-0 Max Horz 6=-114(LC 4) Max Uplift 6=-41(LC 7), 4=-41(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6, 4. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). THIS COMPONENT IS TO BE USED IN CONJUNCTION WITH A RIGID DIAPHRAGM. THIS DIAPHRAGM MUST BE CAPABLE OF TRANSFERRING ROOF LOADS TO THE GROUND WITH NEGLIGIBLE LATERAL DEFLECTIONS. June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V02 Truss Type GABLE Qty 2 Ply 1 05 Shadow Wood Job Reference (optional) I37592897 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:06 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-LojGezGHh0L1z3gw4GCA3eAdZjiuZtTa5qusfRz27iN Scale = 1:19.2 1 2 3 6 5 4 2x4 2x4 3x4 2x4 2x4 2x4 3-11-0 3-11-0 1-11-8 1-11-8 3-11-0 1-11-8 1-7-73-3-01-7-710.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-R 0.09 0.10 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 12 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 WEBS 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-11-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)6=75/3-11-0, 4=75/3-11-0, 5=146/3-11-0 Max Horz 6=-86(LC 4) Max Uplift 6=-34(LC 7), 4=-34(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6, 4. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). THIS COMPONENT IS TO BE USED IN CONJUNCTION WITH A RIGID DIAPHRAGM. THIS DIAPHRAGM MUST BE CAPABLE OF TRANSFERRING ROOF LOADS TO THE GROUND WITH NEGLIGIBLE LATERAL DEFLECTIONS. June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V03 Truss Type GABLE Qty 2 Ply 1 05 Shadow Wood Job Reference (optional) I37592898 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:07 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-p_GesIHvSKTubDF6ezkPbrjpt63uIKukKUdQBuz27iM Scale = 1:15.0 1 2 3 6 5 4 2x4 2x4 3x4 2x4 2x4 2x4 3-11-0 3-11-0 1-11-8 1-11-8 3-11-0 1-11-8 0-9-72-5-00-9-710.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-R 0.06 0.05 0.02 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 10 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 WEBS 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-11-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)6=86/3-11-0, 4=86/3-11-0, 5=124/3-11-0 Max Horz 6=-57(LC 4) Max Uplift 6=-27(LC 7), 4=-27(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6, 4. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). THIS COMPONENT IS TO BE USED IN CONJUNCTION WITH A RIGID DIAPHRAGM. THIS DIAPHRAGM MUST BE CAPABLE OF TRANSFERRING ROOF LOADS TO THE GROUND WITH NEGLIGIBLE LATERAL DEFLECTIONS. June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V04 Truss Type GABLE Qty 2 Ply 1 05 Shadow Wood Job Reference (optional) I37592899 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:08 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-HAq03eIXCeblDNqIBhFe83Fz9WP01nCtZ8NzkKz27iL Scale = 1:10.7 1 2 3 4 2x4 3x4 2x4 2x4 3-9-11 3-9-11 1-10-13 1-10-13 3-9-11 1-10-13 0-0-41-7-00-0-410.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-P 0.09 0.05 0.01 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 7 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-9-11 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=73/3-9-11, 3=73/3-9-11, 4=112/3-9-11 Max Horz 1=-31(LC 4) Max Uplift 1=-11(LC 7), 3=-13(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V05 Truss Type GABLE Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592900 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:08 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-HAq03eIXCeblDNqIBhFe83FveWOC1matZ8NzkKz27iL Scale = 1:35.2 1 2 3 4 5 8 7 69103x4 3x6 3x4 2x4 2x4 2x4 2x4 2x4 14-10-12 14-10-12 7-5-6 7-5-6 14-10-12 7-5-6 0-0-45-7-00-0-49.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.38 0.11 0.12 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 39 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 14-10-12. (lb) - Max Horz 1=-123(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1 except 8=-107(LC 6), 6=-107(LC 7) Max Grav All reactions 250 lb or less at joint(s) 1, 5, 7 except 8=333(LC 10), 6=333(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1 except (jt=lb) 8=107, 6=107. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V06 Truss Type GABLE Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592901 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:09 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-lNOPG_J9zxkcqWPUlOmtgGo4hwkfmDK0no6WGmz27iK Scale = 1:29.9 1 2 3 4 5 8 7 63x4 3x6 3x4 2x4 2x4 2x4 2x4 2x4 12-8-1 12-8-1 6-4-1 6-4-1 12-8-1 6-4-1 0-0-44-9-00-0-49.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.36 0.09 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 32 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 12-8-1. (lb) - Max Horz 1=104(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 1, 5, 8, 6 Max Grav All reactions 250 lb or less at joint(s) 1, 5 except 7=253(LC 1), 8=297(LC 10), 6=297(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 5, 8, 6. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V07 Truss Type GABLE Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592902 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:09 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-lNOPG_J9zxkcqWPUlOmtgGo4ewhxmDV0no6WGmz27iK Scale: 1/2"=1' 1 2 3 44x8 6x6 4x8 2x4 10-5-6 10-5-6 5-2-11 5-2-11 10-5-6 5-2-11 0-0-43-11-00-0-49.00 12 Plate Offsets (X,Y)-- [1:0-7-3,Edge], [2:Edge,0-2-8], [3:0-4-3,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-SH 0.36 0.27 0.07 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 24 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=186/10-5-6, 3=186/10-5-6, 4=396/10-5-6 Max Horz 1=-85(LC 4) Max Uplift 1=-15(LC 6), 3=-20(LC 7), 4=-1(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3, 4. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V08 Truss Type GABLE Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592903 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:10 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-DZynUKKnkFsTSg_hJ6H6DULDUK1hVhBA0Ss4oDz27iJ Scale = 1:20.9 1 2 3 4 2x4 3x4 2x4 2x4 8-2-12 8-2-12 4-1-6 4-1-6 8-2-12 4-1-6 0-0-43-1-00-0-49.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-P 0.48 0.30 0.05 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 17 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=168/8-2-12, 3=168/8-2-12, 4=272/8-2-12 Max Horz 1=66(LC 5) Max Uplift 1=-24(LC 6), 3=-30(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V09 Truss Type GABLE Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592904 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:11 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-hlW9hgKPVZ_K4qZttpoLmhtS?kOEE8lJF6bdKfz27iI Scale: 3/4"=1' 1 2 3 4 2x4 3x4 2x4 2x4 6-0-1 6-0-1 3-0-1 3-0-1 6-0-1 3-0-1 0-0-42-3-00-0-49.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-P 0.24 0.15 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 12 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=119/6-0-1, 3=119/6-0-1, 4=193/6-0-1 Max Horz 1=47(LC 5) Max Uplift 1=-17(LC 6), 3=-21(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V10 Truss Type Valley Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592905 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:11 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-hlW9hgKPVZ_K4qZttpoLmhtUSkNIE88JF6bdKfz27iI Scale = 1:9.8 1 2 3 2x4 2x4 2x4 3-9-6 3-9-6 1-10-11 1-10-11 3-9-6 1-10-11 0-0-41-5-00-0-49.00 12 Plate Offsets (X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-P 0.08 0.21 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 6 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-9-6 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=126/3-9-6, 3=126/3-9-6 Max Horz 1=-28(LC 4) Max Uplift 1=-5(LC 6), 3=-5(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V11 Truss Type GABLE Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592906 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:12 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-Ax4Xv0L1Gs6Bh_83QXJaIvQZN7iOzbkTUmLAt5z27iH Scale = 1:20.5 1 2 3 4 2x4 3x4 2x4 2x4 8-0-6 8-0-6 4-0-3 4-0-3 8-0-6 4-0-3 0-0-43-0-20-0-49.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-P 0.46 0.28 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 16 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=164/8-0-6, 3=164/8-0-6, 4=265/8-0-6 Max Horz 1=-65(LC 4) Max Uplift 1=-24(LC 6), 3=-29(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V12 Truss Type GABLE Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592907 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:12 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-Ax4Xv0L1Gs6Bh_83QXJaIvQd07kdzb1TUmLAt5z27iH Scale: 3/4"=1' 1 2 3 4 2x4 3x4 2x4 2x4 5-9-12 5-9-12 2-10-14 2-10-14 5-9-12 2-10-14 0-0-42-2-20-0-49.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-P 0.22 0.14 0.02 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 11 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-9-12 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=115/5-9-12, 3=115/5-9-12, 4=186/5-9-12 Max Horz 1=-45(LC 4) Max Uplift 1=-17(LC 6), 3=-20(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V13 Truss Type Valley Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592908 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:13 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:2hBXdEOx8xltUaR0ir?g3WyJLZ9-e8ev6MMg1AE1J8iG_Eqpr6yq5X49i2eciQ4kPXz27iG Scale = 1:9.5 1 2 3 2x4 2x4 2x4 3-7-1 3-7-1 1-9-9 1-9-9 3-7-1 1-9-9 0-0-41-4-20-0-49.00 12 Plate Offsets (X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-P 0.07 0.18 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 6 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-7-1 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=119/3-7-1, 3=119/3-7-1 Max Horz 1=26(LC 5) Max Uplift 1=-5(LC 6), 3=-5(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 7) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V14 Truss Type GABLE Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592909 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:13 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-e8ev6MMg1AE1J8iG_Eqpr6yiUX13i2eciQ4kPXz27iG Scale = 1:10.3 1 2 3 3x4 2x4 2x4 5-4-5 5-4-5 0-0-41-4-13.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-P 0.62 0.38 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 WEBS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-4-5 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=173/5-4-5, 3=173/5-4-5 Max Horz 1=36(LC 5) Max Uplift 1=-13(LC 4), 3=-17(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Gable requires continuous bottom chord bearing. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V15 Truss Type GABLE Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592910 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:14 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-6KCIKiNIoUMuxIHSYxM2NKVoSxKMRVulx4qHx_z27iF Scale = 1:12.4 1 2 3 2x4 2x4 3x4 6-3-13 6-3-13 1-6-150-0-43.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-P 0.93 0.57 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 2 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 11 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 WEBS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)3=212/6-3-13, 2=212/6-3-13 Max Horz 3=-44(LC 4) Max Uplift 3=-21(LC 7), 2=-16(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Gable requires continuous bottom chord bearing. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 2. 6) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V16 Truss Type Valley Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592911 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:14 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-6KCIKiNIoUMuxIHSYxM2NKV_lxRuRVulx4qHx_z27iF Scale = 1:8.5 1 2 3 2x4 2x4 2x4 2-8-14 2-8-14 1-1-110-0-45.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-P 0.14 0.09 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 2 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 5 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 WEBS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-8-14 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)3=83/2-8-5, 2=83/2-8-5 Max Horz 3=-29(LC 4) Max Uplift 3=-10(LC 7), 2=-4(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Gable requires continuous bottom chord bearing. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 2. 6) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 05_Shadow_Wood Truss V17 Truss Type Valley Qty 1 Ply 1 05 Shadow Wood Job Reference (optional) I37592912 8.220 s Nov 16 2018 MiTek Industries, Inc. Thu Jun 27 09:00:15 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:jAXtJ2ozokt8tlXqi1fHBQyGc1j-aWlgX1NwZnUlYRse6ftHwX24OLlcAy8vAkZrTQz27iE Scale = 1:11.4 1 2 3 2x4 2x4 2x4 4-1-14 4-1-14 1-8-130-0-45.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 * 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2003/TPI2002 CSI. TC BC WB Matrix-P 0.41 0.25 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 2 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 8 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 WEBS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-1-14 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)3=140/4-1-5, 2=140/4-1-5 Max Horz 3=-49(LC 4) Max Uplift 3=-17(LC 7), 2=-7(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Gable requires continuous bottom chord bearing. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) * This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-6-0 tall by 2-0-0 wide will fit between the bottom chord and any other members. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 2. 6) This truss is designed in accordance with the 2003 International Residential Code sections R502.11.1 and R802.10.2 and referenced standard ANSI/TPI 1. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). June 27,2019 PRODUCT CODE APPROVALSLATERAL BRACING LOCATIONIndicates location where bearings(supports) occur. Icons vary butreaction section indicates jointnumber where bearings occur.Min size shown is for crushing only.Indicated by symbol shown and/orby text in the bracing section of theoutput. Use T or I bracingif indicated.The first dimension is the plate width measured perpendicular to slots. Second dimension isthe length parallel to slots.Center plate on joint unless x, yoffsets are indicated.Dimensions are in ft-in-sixteenths.Apply plates to both sides of trussand fully embed teeth.1. Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI.2. Truss bracing must be designed by an engineer. For wide truss spacing, individual lateral braces themselves may require bracing, or alternative Tor I bracing should be considered.3. Never exceed the design loading shown and never stack materials on inadequately braced trusses.4. Provide copies of this truss design to the building designer, erection supervisor, property owner and all other interested parties.5. Cut members to bear tightly against each other.6. Place plates on each face of truss at each joint and embed fully. Knots and wane at joint locations are regulated by ANSI/TPI 1.7. Design assumes trusses will be suitably protected from the environment in accord with ANSI/TPI 1.8. Unless otherwise noted, moisture content of lumber shall not exceed 19% at time of fabrication.9. Unless expressly noted, this design is not applicable for use with fire retardant, preservative treated, or green lumber.10. Camber is a non-structural consideration and is the responsibility of truss fabricator. General practice is to camber for dead load deflection.11. Plate type, size, orientation and location dimensions indicated are minimum plating requirements.12. Lumber used shall be of the species and size, and in all respects, equal to or better than that specified.13. Top chords must be sheathed or purlins provided at spacing indicated on design.14. Bottom chords require lateral bracing at 10 ft. spacing, or less, if no ceiling is installed, unless otherwise noted.15. Connections not shown are the responsibility of others.16. Do not cut or alter truss member or plate without prior approval of an engineer.17. Install and load vertically unless indicated otherwise.18. Use of green or treated lumber may pose unacceptable environmental, health or performance risks. Consult with project engineer before use.19. Review all portions of this design (front, back, words and pictures) before use. Reviewing pictures alone is not sufficient.20. Design assumes manufacture in accordance with ANSI/TPI 1 Quality Criteria.Failure to Follow Could Cause PropertyDamage or Personal Injury (Drawings not to scale)© 2012 MiTek® All Rights ReservedMiTek Engineering Reference Sheet: MII-7473 rev. 10/03/2015edge of truss.from outside"16/1-0ICC-ES Reports:ESR-1311, ESR-1352, ESR1988ER-3907, ESR-2362, ESR-1397, ESR-3282JOINTS ARE GENERALLY NUMBERED/LETTERED CLOCKWISEAROUND THE TRUSS STARTING AT THE JOINT FARTHEST TOTHE LEFT.CHORDS AND WEBS ARE IDENTIFIED BY END JOINTNUMBERS/LETTERS.W 4 - 6 W3-6W3 - 7 W2-7W1-7C1-8 C5-6C6-7C7-8C4-5 C3-4C2-3C1-2TOP CHORD TOP CHORD 87654321BOTTOM CHORDSTOP CHORDSBEARING4 x 4PLATE SIZEThis symbol indicates the required direction of slots inconnector plates."16/1For 4 x 2 orientation, locateplates 0- 1"4/3PLATE LOCATION AND ORIENTATIONSymbolsNumbering SystemGeneral Safety Notes *Plate location details available in MiTek 20/20software or upon request.Industry Standards:ANSI/TPI1: National Design Specification for Metal Plate Connected Wood Truss Construction.DSB-89: Design Standard for Bracing.BCSI: Building Component Safety Information, Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses.6-4-8WEBSTrusses are designed for wind loads in the plane of the truss unless otherwise shown.Lumber design values are in accordance with ANSI/TPI 1 section 6.3 These truss designs rely on lumber values established by others.dimensions shown in ft-in-sixteenths