PLUMBING GENERAL NOTES
THE EQUIPMENT ROUGH -IN ITEMS AND THEIR DIMENSIONED LOCATIONS FOR
ALL CONNECTIONS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE. IN
SOME INSTANCES THE OWNER OR SUPPLIER MAY MAKE SUBSTITUTIONS OR
THE EQUIPMENT ITEMS MAY VARY FROM WHAT IS SHOWN. THEREFORE,
THESE ITEMS AND DIMENSIONS SHALL BE VERIFIED WITH THE EQUIPMENT
SUPPLIER, OWNER AND/OR EQUIPMENT ROUGH -IN DRAWINGS. THE
ARCHITECT/ENGINEER SHALL BE IMMEDIATELY NOTED, PRIOR TO
CONSTRUCTION, OF ANY DEMATIONS FROM WHAT IS SHOWN OR IMPLIED ON
THESE DRAWINGS. FAILURE OF THE APPROPRIATE CONTRACTOR TO
VERIFY ROUGH -INS OR THEIR LOCATIONS SHALL PLACE THE
RESPONSIBILITY FOR ANY SUBSEQUENT RELOCATION AND/OR ADDITIONAL
ROUGH -INS DIRECTLY UPON THE CONTRACTOR.
CONTRACTOR SHALL SUPPLY TO THE ARCHITECT SIX COPIES OF SHOP
DRAWINGS FOR APPROVAL SO THE QUALITY OF INTENDED MATERIALS OR
EQUIPMENT CAN BE RENEWED BEFORE INSTALLATION. THERE WILL BE NO
DRAW UNTIL SHOP DRAWINGS HAVE BEEN SUBMITTED AND RENEWED BY
ARCHITECT/ENGINEER.
DO NOT SCALE THIS DRAWING. REFER TO ARCHITECTURAL FLOOR PLANS
FOR BUILDING DIMENSIONS.
THE SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE
THAT THE CONTRACTOR HAS FAMILIARIZED HIMSELF WITH THE PLANS AND
BUILDING SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR
MATERIALS AND LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WALL
NOT BE RECOGNIZED, IF THEY COULD HAVE BEEN FORESEEN HAD PROPER
EXAMINATION BEEN MADE.
VERIFY SERVICE POINTS AND METERING LOCATIONS FOR PROJECT WITH
LOCAL UTILITIES AND/OR LANDLORD (DOMESTIC WATER, SANITARY SEWER,
GAS, ETC.)
THE CONTRACTOR SHALL COOPERATE FULLY AMONG THE TRADES.
ALL ROOF PENETRATIONS FOR ROOF DRAINS AND PLUMBING/GAS/
REFRIGERANT PIPING SHALL BE MADE IN ACCORDANCE WTH ROOF
SYSTEM MANUFACTURER'S GUIDELINES COORDINATE NTH ARCHITECTURAL
DETAILS AND/OR LANDLORD FOR ROOF SYSTEM USED.
PLUMBING CONTRACTOR SHALL VERIFY WITH THE LOCAL HEALTH
DEPARTMENT AND/OR WATER COMPANY AS TO THE METER AND VALUING
ARRANGEMENT OF THE DOMESTIC WATER SERVICE LINE WHICH ENTERS THE
BUILDING. SHOULD A BACKFLOW PREVENTER ASSEMBLY AND/OR
PRESSURE REDUCING VALVE ASSEMBLY BE REQUIRED, THE PLUMBER SHALL
FURNISH AND INSTALL SAME PER LOCAL AND STATE REQUIREMENTS. THE
BACKROW ASSEMBLY SHALL BE A -WATTS' SERIES /909 OR APPROVED
EQUAL MEETING ASSE STANDARDS 1013. 1015 AND 1020. IF BACKFLOW
PREVENTER IS INSTALLED, PROVIDE PROPERLY SIZED THERMAL EXPANSION
TANK IN SUPPLY PIPING OF WATER HEATER. IF WATER PRESSURE IS 65
PSI OR GREATER, A PRESSURE REDUCING VALVE ASSEMBLY SHALL BE A
'WATTS° SERIES g2SAUB-Z3 OR APPROVED EQUAL SET AT 50 LBS,
DELIVERY PRESSURE UNLESS OTHERWISE NOTED.
THE WATER PIPING SYSTEM SHALL BE FLUSHED AND STERILIZED IN
ACCORDANCE NTH LOCAL REGULATIONS.
THE POTABLE WATER SUPPLY SHALL BE PROTECTED AGAINST BACKROW AND
SIPHONAGE BOTH NATURAL AND INDUCED. ALL EQUIPMENT CONNECTED TO THE
POTABLE WATER SYSTEM BEING CAPABLE OF POLLUTING OR CONTAMINATING THE
POTABLE WATER DISTRIBUTION SYSTEM OR ANY PART THEREOF BY MEANS OF A
REVERSAL OF FLOW, PRESSURE DROP, PRESSURE LOSS, INDUCED VACUUM OR BY
INJECTION BECAUSE OF ANY PRIMARY OR AUXNARY PUMPING SYSTEM CONNECTED
THERETO MUST BE ISOLATED AND CONTAINED BY MEANS OF APPROVED BACKFLOW
DEVICES, CHECK VALVES, AIR GAPS OR VACUUM BREAKERS. PLUMBING CONTRACTOR
SHALL FURNISH AND INSTALL THESE DEUCES PER LOCAL CODE REQUIREMENTS.
THE HOT AND COLD WATER SUPPLY BRANCHES FOR ALL EQUIPMENT
HAVING QUICK CLOSING VALVES OF ANY TYPE SHALL HAVE WATER
HAMMER ARRESTORS INSTALLED AT THE HIGH POINT ON THE END OF
EACH BRANCH.
12. FURNISH AND INSTALL SHUTOFF OR BALL VALVE AND DIELECTRIC UNION
ON ALL EQUIPMENT HOT AND COLD WATER LINES. PLUMBING
CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO EQUIPMENT.
COORDINATE NTH EQUIPMENT SUPPLER FOR EXACT REQUIREMENTS.
13. FURNISH & INSTALL 1" (MIN.) FIBERGLASS INSULATION NTH
ALL -SERVICE JACKET ON ALL HOT, COLD, RECIRCULATING WATER UNES
ABOVE SLAB AND ALL CONDENSATE FROM MECHANICAL UNITS.
14. WATER PIPE AND FITTINGS SHALL BE COPPER OR BRASS PER CODE.
ABOVE GROUND SHALL BE TYPE L RIGID COPPER. BELOW GROUND SHALL
BE TYPE K SOFT COPPER NTH NO JOINTS PERMITTED BELOW GROUND.
ALL JOINTS SHALL BE MADE NTH 95-5 SOLDER OR EQUAL.
15. BARRIER FREE LAVATORY P-TRAP AND ANGLE STOP ASSEMBLIES SHALL
BE INSULATED NTH TRAP WRAP PROTECTIVE KIT 50OR BY BROCAR
(1-800-827-1207) OR EQUAL. ABRASION RESISTANT EXTERIOR COVER
SHALL BE SMOOTH AND HAVE 1/8" MIN. WALL OVER CUSHIONED FOAM
INSERT. FASTENERS SHALL REMAIN SUBSTANTIALLY OUT OF SIGHT.
16. VERIFY MOUNTING HEIGHTS OF ALL BARRIER FREE FIXTURES NTH ARCH.
PLANS
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and meal Codes
City
GF Carmel
�VT�S2t�B*141WML
DATE: \ 08/01/19
17. INSTALL 1" FIBERGLASS INSULATION WALL -SERVICE JACKET ON ALL
ROOF LEADERS ABOVE CEILING.
18. FURNISH AND INSTALL CONDENSATE LINES FROM ANY MECHANICAL
EQUIPMENT AS REQUIRED. WHERE LOCAL JURIDICATION REQUIRES ANY
CONDENSATE LINE TO RUN ABOVE THE CEILING OR IN A LOCATION WHERE
THE PIPES SWEATING COULD CAUSE DAMAGE, SHALL BE INSULATED. RUN
FULL SIZE TO DRAIN OR AS INDICATED ON PLANS. TURN DOWN WITH
REQUIRED AIR GAP.
19. PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL COPPER INDIRECT
WASTE PIPING REQUIRED FROM EQUIPMENT TO FLOOR DRAINS, OPEN
RECEPTACLES, OR FLOOR SINKS. PIPING SHALL COMPLY WITH STATE AND
LOCAL CODES. COORDINATE WITH ALL EQUIPMENT SUPPLIERS AND SIZE AS
REQUIRED BY PIECE OF EQUIPMENT SERVED. HOLD PIPING TIGHT TO WALL
WHERE APPLICABLE PROPERLY SECURE AS REQUIRED. COORDINATE
WITH CASEWORK SUPPLIER FOR MAXIMUM CLEARANCE UNDER CABINETS.
20, ALL EXPOSED GAS PIPING SHALL BE PAINTED TO MATCH ADJACENT WALL.
21. ALL VENT PIPE TO BE COMPATIBLE WITH STRUCTURE, MECHANICAL.
EQUIPMENT AND DUCTWORK, ELECTRICAL EQUIPMENT AND LIGHTING.
22. THE NATURAL GAS TO THE EQUIPMENT SHALL BE LOW PRESSURE. THE
REGULATOR OUTLET PRESSURE SHALL BE 7" WATER COLUMN. IF THE GAS
COMPANY IS UNABLE TO PROVIDE THIS PRESSURE, IMMEDIATELY CONTACT
THE A/E OR OWNER FOR INSTRUCTIONS. GAS PIPING SHALL BE SCHEDULE
40 BLACK STEEL, U.O.N.
23. PROVIDE CHROME PLATED ESCUTCHEONS AT ALL WALL PENETRATIONS.
24, WASTE AND VENT PIPING SHALL BE SCHEDULE 40 OR 80, TYPE 1, GRADE
1, POLYVINYL CHLORIDE COMPOUNDS AS DEFINED AND DESCRIBED IN THESE
SPECIFICATIONS FOR RIGID PVC. CONTRACTOR MAY USE CAST IRON.
25. WASTE AND VENT PIPING SHALL BE SCHEDULE 40 OR 80, TYPE 1, GRADE 1,
POLYVINYL CHLORIDE COMPOUNDS AS DEFINED AND DESCRIBED IN THESE
SPECIFICATIONS FOR RIGID PVC (ASTM DESIGNATION: D 2665, D 2949, F891
OR SCHEDULE 40 OR 30 ACRYLONITRILE-BUTADIENE-STYRENE COMPOUND AS
DEFINED AND DESCRIBED IN STANDARD SPECIFICATIONS FOR ABS (ASTM
DESIGNATION: D2661 OR F 628). IF PSIS NOT PERMITTED BY CODE
PERMI��BY CODE
CONTRACTOR TO USE CAST IRON IN UEU OF PVC. INSTALL PVC OR ABS
PIPING PER CODE. PLUMBING CONTRACTOR SHALL INSTALL 4" SOIL, WASTE
AND GREASE WASTE PIPING NTH A MINIMUM SLOPE OF 1/8° PER FOOT OR AS
REQUIRED BY CODE.
26, FOR FLOOR TILES: HOLD TOP OF FLOOR DRAINS RUSH WITH FINISHED
FLOOR. SEE ARCH. SHEETS FOR FLOOR SLOPES AROUND DRAINS. (IF REQ'D)
FOR ALTRO SHEET VINYL INSTALLATIONS: FOLLOW ALL DETAILS FOR SURFACE
MEMBRANE CLAMPING FIXTURES.
27. ALL NEW V.T.R'S SHALL BE EXTENDED TO A MINIMUM OF 12" ABOVE PARAPET
HEIGHT AND MAINTAINED 10'-0" MINIMUM FROM ALL OUTSIDE AIR INTAKES.
28. MATERIALS, EQUIPMENT, ASSEMBUES AND SYSTEMS SHALL MEET ALL
PERTINENT REQUIREMENTS OF NATIONALLY RECOGNIZED TESTING
ORGANIZATION SUCH AS THE UL, ASTM, ASSE, AWWA, AGA AND Ni AS
WELL AS THE MOST CURRENT VERSION OF THE STATE CODE AND LOCAL
AMENDMENTS.
29. ALL INSTALLED SYSTEMS, DEVICES AND RELATED ITEMS SHALL BE TESTED
IN PLACE ON SITE PER LOCAL CODE REQUIREMENTS. REPLACE ANY AND
ALL CONTRACTOR SUPPLIED DEFECTIVE DEVICES, ITEMS OR SYSTEMS AT
CONTRACTOR'S OWN EXPENSE BEFORE COMPLETION OF PROJECT.
30. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT
DOCUMENTS THAT DO NOT CHANGE THE SCOPE OR NATURE OF THE WORK
REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WTHOUT
ADDITIONAL COST TO THE OWNER. NO OTHER CHANGES MAY BE MADE
WITHOUT WRITTEN PERMISSION OF THE OWNER.
31. ALL EQUIPMENT, FIXTURES AND MATERIALS SHALL BE NEW AND UNUSED,
AND INSTALLED IN STRICT CONFORMANCE TO MANUFACTURER'S
RECOMMENDATIONS (U.Oi PROVIDE COMPLETE NTH ALL TRIM, STOPS,
HANGERS, CARRIERS, SUPPORTS, ETC. INCLUDING PROVISIONS FOR
BARRIER FREE USE, IF REQUIRED. WHERE FIXTURES ARE ACCESSIBLE,
THEY MUST COMPLY NTH ALL FEDERAL A.D.A. REGULATIONS.
32. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE
FURNISHED, FABRICATED OR FIELD ERECTED, ALL FACTORY ASSEMBLED
EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS
FURNISHED AND ALL WORK IN CONNECTION NTH THE INSTALLATION OF
MANUFACTURER'S GUARANTEED EQUIPMENT. THIS CONTRACTOR'S
GUARANTEE SHALL EXIST FOR A PERIOD OF ONE (1) YEAR FROM THE
DATE OF FINAL OWNER ACCEPTANCE OF THE WORK AND SHALL APPLY TO
ALL DEFECTS IN MATERIALS AND/OR WORKMANSHIP OF ANY KIND.
33. BIDDERS SHALL BE LICENSED CONTRACTORS IN ACCORDANCE NTH LOCAL
AND AND STATE LAWS.
34. ALL PERMITS AND FEES REQUIRED FOR THE WORK SHALL BE SECURED
AND PAID FOR BY THE CONTRACTOR AND INCLUDED IN THE BID PRICE.
35. ALL PLUMBING FIXTURES AND PIPING SYSTEMS SHALL BE INSTALLED IN
ACCORDANCE NTH THE LATEST EDITION OF STATE AND/OR LOCAL CODES.
COOPERATE AS REQUIRED WTH ALL AUTHORITIES HAVING JURISDICTION TO
INSURE THAT PROPER MATERIALS AND WORKMANSHIP ARE USED.
REQUIREMENTS OF STATE AND LOCAL CODES AND AUTHORITIES TAKE
PRECEDENCE OVER ANY INFORMATION WHICH IS INDICATED OR IMPLIED ON
THESE DRAWINGS
36. THIS SYMBOL 000 INDICATES ITEM TO BE FURNISHED BY OWNER OR KITCHEN
EQUIPMENT SUPP ER. COORDINATE INSTALLATION AND FINAL CONNECTION
REQUIREMENTS NTH SUPPLIER. FIELD VERIFY SIZES AND LOCATIONS OF ALL
SUPPLIER. FIELD VERIFY SIZES AND LOCATIONS OF ALL WATER, WASTE,
INDIRECT WASTE, GAS AND/OR ELECTRICAL CONNECTIONS PRIOR TO
INSTALLATION (TYPICAL ALL PLUMBING EQUIPMENT).
37. SEE PLUMBING ROUGH -IN DRAWINGS PROVIDED BY KITCHEN EQUIPMENT SUPPLIER
FOR MORE INFORMATION.
38. ALL INDIRECT WASTE, WASTE PIPING OR FIXTURE WHICH RECEIVES THE DISCHARGE FROM
A DISHWASHER, STEAMER OR SIMILAR PIECE OF EQUIPMENT WHICH PRODUCES SIMILAR
PIECE OF EQUIPMENT WHICH PRODUCES WATER AT A TEMPERATURE HIGHER THAN 125F
SHALL BE DWV COPPER OR CAST IRON A MINIMUM OF 10'-0" DOWNSTREAM FROM THE
OUTLET PRODUCING SUCH DISCHARGE. COORDINATE WITH KES.
39. ALL INDIRECT WASTE PIPING FROM EQUIPMENT TO ABOVE FLOOR RECEPTOR SHALL BE
1" (MIN.) COPPER UNLESS LARGER SIZE IS INDICATED BY EQUIPMENT OPENING OR KES.
SOIL, WASTE & VENT PLUMBING PLAN
SOMM V4• a T-1
PLUMBING LEGEND
ALL SYMBOLS SHOWN IN THIS LEGEND MAY NOT
APPEAR IN THESE DOCUMENTS.
GW GREASE WASTE PIPING
SAN - SOIL AND WASTE PIPING
VENT PIPING
COLD WATER PIPING (CW)
HOT WATER PIPING (HW)
RECIRCULATING WATER PIPING
T TEMPERED WATER PIPING
F FILTERED WATER PIPING
UNION
GATE OR STOP VALVE
H CHECK VALVE OR BACKFLOW PREVENTER
5 BALL VALVE
JI" VTR QO VENT-THRU-ROOF
L13 MANUAL GAS SHUT OFF VALVE
® FLOOR DRAIN
® FLOOR SINK
TRENCH DRAIN
p�
0 CLEANOUT
AFT ABOVE FINISHED FLOOR
OCROCRED FIXTURE/EQUIPMENT DESIGNATIONS
DFU VALUES
MARK
DESCRIPTION
CITY
I DFU
TOTAL
E K
FLOOR DRAIN
6
0
0
F1
FLOOR SINK (3" TRAP)
7
5
25
F2
FLOOR SINK (4" TRAP)
1
6
18
133 303
HAND SINK - KITCHEN AREAS
2
2
4
801 J
UTILITY MOP SINK
1
5
5
A
WATER CLOSET
2
4
8
O
LAVATORY
2
1
2
306
4-COMPARTMENT WITH GREASE TRAP
1
6
6
TOTAL
68
SPECIAL NOTES
ALL INDIRECT WASTE OR WASTE PIPING RECEIVING THE DISCHARGE FROM A 4-COMP.
SINK, STEAMER OR SIMILAR PIECE OF EQUIPMENT WHICH PRODUCES WATER AT A
TEMPERATURE HIGHER THAN 125T SHALL BE DWV COPPER OR CAST IRON 10'-0"
(MIN) DOWNSTREAM FROM THE FROM THE OUTLET PRODUCING SUCH DISCHARGE.
COORDINATE NTH EQUIPMENT SUPPLIER.
CURRAN
ARCHITECTURE
5719 LAWTON LOOP E. DR. #212
INDIANAPOLIS, IN 46216
O :: 317. 288.0681
F :: 317. 288. 0753
DRAWN BY: MMD CHECKED BY: KDH
OT/E/S
ENGINEERING
25760 First Street
Cleveland, OH 44145
P 440 8712410
F 440 8717954
tesengineering.com
0�I;IsreRFo
v i No.19800267
T� N A1111VVVVVV\\
THIS DRAWING AND THE IDEAS, DESIGNS
AND CONCEPTS CONTAINED HEREIN ARE
THE EXO_Li INTELLECTUAL PROPERTY
OF CURRAN ARCHITECTURE AND ME NOT
TO BE USED OR RITRODUCED. WHOLE OR
IN PART, WITHOUT THE WRITTEN
CONSENT OF CU0.RAN ARCHTECTU0.E
0 WPY FIT201&CJRtANAVo1 ECNPE
MOE'S RESTAURANT
#0350
1424 WEST CARMEL DR.
CARMEL, IN 46032
SOIL, WASTE, AND VENT
PLUMBING PLAN
ISSUE DATE
REVISION 2 01-10-18
REVISION 3 05-14-19
AEYM 4 W27-19
PROJECT #: 180316
P 1.0