HomeMy WebLinkAboutHYLANTEXPANSION_PERMITSET_061919GENERAL PROJECT NOTES
].BUILDING CODE COMPLIANCE: ALL WORKS HALL COMPLY WITH THE
REQUIREMENTS OF THE EXISTING BUILDING CONSTRUCTION TYPE AS
DEFIN ED BY SECTION 601 OF THE INDIANA BUILDING CODE. ALL WORK
SHALL COMPLY WITH THE REQUIREMENTS OF ALL APPLICABLE STATE AND
LOCAL BUILDING CODES. CONTRACTORS ARE RESPONSIBLE FOR
VERIFYING THE CURRENT APPLICABLE BUILDING CODES( FOR THEIR
RESPECTIVE SCOPE OF WORK. ENSURE THAT ALL MATERIALS AN D LABOR
ARE IN ACCORDANCE WITH THE BESTQUALITY STANDARDS OF EACH
RESPECTIVE TRADE WHETHER SPECIFIED OR NOT. THE GENERAL
CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL WORK IS IN
ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL BUILDING
CODES, AND STANDARDS FOR GENERAL, MECHANICAL, AND
ELECTRICAL CONSTRUCTION.
2. CONTRACTOR SITE VISIT$: CONTRACTORS( SHALL VISIT THE WORK
SITE PRIOR TO COMMENCEMENT, THE DRAWINGS CONTAINED HEREIN
MAY NOT BE ALL INCLUSIVE OF EXISTING CONDITIONS OR NEW WORK
REQUIREMENTS. CONTRACTORS( SHALL MAKE THEMSELVES FAMILIAR
WITH THE WORK SITE IN THE FIELD IN ORDER TO BE FULLY AWARE OF THE
REQUIREMENTS OF THE SCOPE OF WORK.
3. CONTRACTOR FIELD VERIFICATION: FIELD VERIFY ALL DIMENSIONS
AND MEASUREMENTS. INFORM THE GENERAL CONTRACTOR BEFORE
BEGINNING ANY CONSTRUCTION IF EXISTING CONDITIONS PREVENT
OBTAINING RESULTS AS SHOWN OR SPECIFIED. DO NOT SCALE
DRAWINGS, NOTED DIMENSIONS TAKE PRECEDENCE, VERIFY EXISTING
CONDITIONS INDICATED ON THE DRAWINGS AND REPORT ANY
DISCREPANCY THROUGH THE GEN ERAL CONTRACTOR TO SCHOTT
DESIGN, INC.
4. GENERAL CONTRACTOR COORDINATION WITH OWNER: THE GEN ERAL
CONTRACTOR SHALL COORDINATE WITH THE OWNER REGARDING ALL
ON -SITE ACTIVITIES; SUCH AS, BUT NOT LIMITED TO, WORK SCHEDULE,
MATERIALS STORAGE AND HANDLING, DELIVERIES, ACCESS TO THE
WORK SITE, TRAFFIC CONTROL, AND BUILDING/PUBLIC SAFETY
PROCEDURES DURING CONSTRUCTION. THE CONTRACTOR SHALL ALSO
COORDINATE WORK BY OTHERS" WITH HIS/HER OWN ACTIVITIES AS
NECESSARY TO EXECUTE THE OVERALL PROJECT SCOPE. THE GENERAL
CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, DAILY
WORKING HOURS, WEEKEND HOURS AND HOURS THAT MAY BE WORKED
PRIOR TO AND DURI NO HOLIDAYS. LANDLORD RESERVES THE RIGHT TO
RESTRICT CONSTRUCTION TO NIGHTS AND WEEKENDS WHEN THAT
CONSTRUCTION 15 DEEMED TO INTERFERE WITH THE OPERATIONS OF
ADJACENT TENANTS.
5. PROJECT MATERIAL LEAD TIMES: FOR THOSE ITEMS TO BE ORDERED
REQUIRING LEAD TIME, THE CONTRACTOR SHALL COORDINATE THE
PROJECT SCHEDULE ACCORDINGLY AND COMMUNICATE TO THE
OWNER, TENANT, AND SCHOTT DESIGN WHEN DECISIONS MUST BE
RENDERED IN ORDER FOR THE CONTRACTOR TO MEET THE PROJECT
SCHEDULE, THE OWNER, TENANT, OR DESIGNER/ARCHITECT IS NOT
RESPONSIBLE FOR DELAYS RESULTING FROM THE CONTRACTOR'S
FAILURE TO COMMUNICATE MATERIAL LEAD TIMES.
6. MATERIAL SUBSTITUTIONS: SUBSTITUTIONS FOR SPECIFICALLY NAMED
PRODUCTS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL FROM
THE DESIGNER. SUBMIT REQUESTS FOR SUBSTITUTIONS WITH APPROPRIATE
SUPPORT INFORMATION TO THE DESIGNER. ALLOW REASONABLY
SUFFICIENT TIME FOR THE DESIGNER TO REVIEW THE REQUEST AND
RENDER A DECISION.
7. SAFE WORK AREA: SCHOTT DESIGN, INC., SHALL NOT HAVE CONTROL
OVER, OR BE IN CHARGE OF, AND SHALL NOT BE RESPONSIBLE FOR A
CONTRACTOR'S CONSTRUCTION MEANS, METHODS, SCHEDULES,
SEQUENCES, OR SAFETY. THE CONTRACTORS SHALL BE RESPONSIBLE
FOR MAINTAINING A SAFE ENVIRONMENT FOR WORKERS AN D THE
PUBLIC AT ALL TIMES.
B. GENERAL CONTRACTOR CLEANUP PROCEDURES: THE GENERAL
CONTRACTOR SHALL ESTABLISH WITH THE LANDLORD CLEANUP
PROCEDURES AND GUIDELINES TO BE FOLLOWED ON A DAILY BASIS IN
ORDER TO CONDUCT BUSINESS IN ASAFE AND CLEAN ENVIRONMENT.
9. STAGING/ PARKING/ DUMPSTERS/ RESTROOMS: THE GENERAL
CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, AN AREA FOR
STAGING OF CONSTRUCTION MATERIALS, EQUIPMENT, DUMPSTER AND
PARKING CONSTRUCTION AND DELIVERY VEHICLES. THE USE OF EXISTING
REST ROOM FACILITIES SHALL BE APPROVED BY THE LANDLORD. ONLY
THOSE DESIGNATED AREAS SHALL BE USED BY CONSTRUCTION CREWS.
10. DUST CONTROL: THE GENERAL CONTRACTOR SHALL USE DUST
PARTITIONS TO MINIMIZE DISTURBANCES OF DAILY TENANT OPERATIONS
DURING DEMOLITION AND CONSTRUCTION WORK. DUST PARTITIONS
SHALL BE CONSTRUCTED OF 2X4 WOOD STUDS ® 24"O.C., INSULATION
AND 6 MIL VAPOR BARRIER ON EACH SIDE,
11. PROJECT INSTALLATION CONFLICTS: CONTACTTHE DESIGNER
IMMEDIATELY IF, IN THE FIELD, CONFLICTS ARE DISCOVERED BETWEEN
COMPONENTS OF DIFFERENT SYSTEMS THAT PREVENT THE INSTALLATION
OF THOSE COMPONENTS AS INDICATED ON THE DRAWINGS. (I.E.
WHERE EXISTING MECHANICAL DUCTWORK MAY PREVENT THE
INSTALLATION OF LIGHTING FIXTURES AS INDICATED ON THE CEILING
PLAN(.
12. SCHOTT DESIGN HAZARDOUS MATERIALS WAIVER: SCHOTT DESIGN,
INC., IS NOT RESPONSIBLE FOR THE IDENTIFICATION, DISCOVERY,
PRESENCE, HANDLING, REMOVAL, DISPOSAL OF, OR EXPOSURE TO ANY
PERSONS, THAT OF HAZARDOUS MATERIALS IN ANY FORM ON THE
PROJECT SITE.
13. WOOD BLOCKING IN WALLS: PROVIDE FIRE -TREATED WOOD
BLOCKING IN WALLS FOR ALL WALL HUNG ITEMS INCLUDING
MILLWORK, WALL STOPS, CABINETRY, ETC,
14. SHOP DRAWINGS: SHOP DRAWINGS OR CATALOG CUTS MUST BE
SUBMITTED TO SCHOTT DESIGN, INC. FOR APPROVAL ON ALL MATERIALS
OR ITEMS WHERE THE CONTRACTOR CHOOSES TO DEVIATE FROM WHAT
IS SHOWN ON THE DRAWINGS, OR IF THE DRAWINGS DO NOT INDICATE
A SPECIFIC MANUFACTURER OR MODEL NUMBER. EXPEDITE
PREPARATION AND SUBMITTAL OF ALL SHOP DRAWINGS TO ALLOW
SUFFICIENT TIME FOR CHECKING, APPROVAL, ORDERING, FABRICATION,
AND DELIVERY OF MATERIALS AND EQUIPMENT.
15. PROJECT APPROVALS: ALL DETAILS, MATERIALS, AND INSTALLATIONS
ARE SUBJECT TO FIRST APPROVAL BY SCHOTT DESIGN, INC., AND FINAL
APPROVAL BY THE OWNER.
16. CHANGE ORDERS: REVIEW AND COORDINATE ALL NEW WORK AND
EXISTING CONDITIONS WITH ALL OTHER TRADES, FIELD WORK ORDERS &
CHANGE ORDERS WILL NOT BE APPROVED FOR ANY CONDITIONS OR
CONFLICTS THAT COULD HAVE BEEN ACCOUNTED FOR BY THE BIDDER
DURING PRE -BID FIELD INSPECTION AND AFTER AWARD OF CONTRACT,
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
aT, City
GF Camel
IVT�tDN�DMK
DATE: \ 08/02/19
17. FURNITURE AND EQUIPMENT EXCLUSIONS: FURNITURE, OFFICE EQUIPMENT
OFFICE PARTITION SYSTEMS, REFRIGERATORS, VENDING MACHINES, AND
OTHER SIMILAR ITEMS SHOWN DASHED ON THIS DRAWING AND NOT
ATTACHED TO THE BUILDING ARE FOR REFERENCE ON LV AND ARE NOT TO BE
PROVIDED AS PART OF THE WORK UN LESS SPECIFICALLY STATED TO BE
PROVIDED,
18. WALL PATCHING: PATCH ALL GYPSUM WALLBOARD AT AREAS OF
ELECTRICAL, DATA AND SWITCH DEVICES BEING REMOVED. PATCH HOLE WITH
DRYWALL, TAPE, SPACKLE AND PREPARE FOR FINISH.
19. CONSTRUCTION CLEANING: EXECUTE A THOROUGH FINAL CLEAN AND
NSPECTION OF THE SPACE UPON COMPLETION OF THE PROJECT. ALL
SURFACES, FIXTURES, AND EQUIPMENT SHALL BE CLEAN, AND THE SPACE SHALL
BE TURNED OVER TO THE OWNER IN A CONDITION THAT REPRESENTS THE
HIGHEST LEVEL OF CARE AND PROFESSIONALISM. ENSURE ALL GENERAL
CONTRACTOR INSTALLED APPLIANCES WORK & DO NOT LEAK.
20, O&MMATERIALS: PROVIDE TO THE OWNER ALL OPERATION AND/OR
MAINTENANCE MANUALS, OR INSTRUCTIONS FOR ALL EQUIPMENT AND
SYSTEMS AT THE COMPLETION OF THE PROJECT.
21. PLAN DIMENSIONS: ALL PLAN DIMENSIONS ARE FROM FACE OF EXISTING
FINISH TO FACE OF NEW GYPSUM BOARD WALL, OR FACE TO FACE OF NEW
GYPSUM BOARD WALL. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS
GOVERN.
22. WINDOW BLINDS: CONTRACTOR TO PROVIDE AN ALLOWANCE FOR
CLEANING EXISTING WINDOW BLINDS. REPLACE ANY DAMAGED OR MISSING
WINDOW BLINDS WITH NEW TO MATCH BUILDING STANDARD.
23, PERMITTING: THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
VERIFYING THE REQUIREMENTS REGARDING LOCAL PLAN REVIEW, PERMITS,
NSPECTIONS, AND FEES. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE
FOR SUBMITTING ALL REQUIRED DRAWINGS AND SUPPORTING DOCUMENTS TO
THE LOCAL BUILDING OFFICIAL AND/OR PERMIT DEPARTMENT. ALL REQUIRED
LOCAL PERMIT FEES SHALL BE PAID BY THE GENERAL CONTRACTOR UNLESS
STIPULATED OTHERWISE IN THE OWNER/CONTRACTOR AGREEMENT.
24, FIRE SEALING: FIRE SEAL ALL PENETRATIONS THROUGH RATED WALLS,
FLOORS, AND CEILINGS WITH APPROVED FIRE -RATED CAULK AS DIRECTED BY
LOCAL JURISDICTIONS. CONTRACTOR TO BE AWARE THAT EXISTING
CONDITIONS ARE NOT NECESSARILY AN INDICATOR OF BUILDING TYPE,
BUILDING TYPE LISTED ON LIDO IS BASED UPON AVAILABLE INFORMATION AND
FIELD VERIFICATION.
25. WALL PENETRATIONS: WHERE STRUCTURAL BEAMS DUCTWORK, ETC.
PENETRATE SOUND OR FIRE RATED PARTITIONS, GYPSUM WALLBOARD WALL TO
BE SCRI BED TO FIT TIGHT, CAULKED AND FIRE DAMPERED IF REQUIRED.
26. FLOOR LEVELING: CONTRACTOR TO ALLOW FOR UNLEVEL FLOOR
CONDITIONS. ALL EXISTING FLOOR AND WALL SUBSTRATES SHALL BE LEVELED
AND PATCHED AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND FINISHES.
ADJUST DOORS AND FRAMES AS REQUIRED.
27, REPAIR GYPSUM WALLBOARD: WHERE DEMOLITION HAS OCCURRED AT
REMAINING WALLS. REPAIR ANY GYPSUM BOARD DAMAGED BY DEMOLITION.
PROVIDE EXPANSION JOINTS IN DRYWALL WHERE NEW WALLS MEET OR
ADJOIN TO EXISTING CORE WALLS,
28. EQUIPMENT INSTALLATION: ALL EQUIPMENT AND/OR FIXTURES SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS OR INSTRUCTIONS.
FINISH NOTES
1. STATE BUILDING COMPLIANCE FOR FINISHES: ALL FINISHES SHALL COMPLY
WITH CHAPTER (INTERIOR FINISHES( OF THE INDIANA BUILDING CODE FOR
CLASS AFIRE RATINGS.
2. GYPSUM ASSOCIATION CONFORMITY: FOR ALL NEW DRYWALL
INSTALLATIONS, INSTALL AS RECOMMENDED BY THE GYPSUM ASSOCIATION.
(SUCH AS, CONTROL JOINTS, FINISH LEVELS, FASTENERS, TAPING DETAILS,
CORNER BEADS, ETC.( PROVIDE NEW CEMENT BACKER BOARD AS A
SUBSTRATE FOR NEW WALL TILE PER MANUFACTURER'S RECOMMENDATIONS.
3. COVER PLATES: REFERENCE REFLECTED CEILING PLAN AND ELECTRICAL
PLAN FOR COLOR OF ELECTRICAL AND DATA DEVICES AND PLATES. REMOVE
ALL PLATES BEFORE PAINTING AND REATTACHED AFTERWARDS. CONTRACTOR
TO CONFIRM DESIRED COLOR PRIOR TO PURCHASING NEW.
4. PAINTING: ALL AREAS RECEIVING PAINT ARE TO RECEIVE PRIMER COAT
AN D TWO (2( FINISH COATS.
5. FLOORING TRANSITION STRIPS: FOR CHANGE IN FLOOR FINISH MATERIAL,
PROVIDE TRANSITION STRIP AT DOOR OPENINGS AS NOTED ON FINISH PLAN
UNLESS NOTED OTHERWISE (I.E. WHERE VCT MEETS CARPET(.
6. DELIVERY OF COMPREHENSIVE WORK PRODUCT: WHERE LIMITS OF WORK
ARE SHOWN, OTHER INCIDENTAL WORK LIKE PAINTING WHERE NEW OUTLETS
HAVE BEEN INSTALLED, IS CONSIDERED PART OF THE SCOPE OF WORK.
PROVIDE A COMPLETE AND FINISHED PRODUCT READY FOR TENANT AND
BUILDING OWNER.
7. WALL DEMOLITION: REFINISH SURFACES TO MATCH EXISTING WHERE
DEMOLITION HAS OCCURRED. REPAIR GYPSUM WALLBOARD WHERE
DEMOLITION HAS OCCURRED AT REMAINING WALLS. REPAIR ANY GYPSUM
BOARD DAMAGED BY DEMOLITION. PROVIDE EXPANSION JOINTS IN
DRYWALL WHERE NEW WALLS MEET OR ADJOIN TO EXISTING CORE WALLS.
8. TELEPHONE BOARDS: WHERE PHONE BOARD IS PROVIDED, PAINT BOARD
WITH FIRE RETARDANT PAINT TO MATCH ADJACENT WALL FINISH.
9. MILLWORK SAMPLES: SUBMIT FINISH SAMPLE OF MILLWORK (STAINED OR
PAINTED AS SPECIFIED( TO SCHOTT DESIGN FOR REVIEW AND APPROVAL
PRIOR TO THE FINISHING PROCESS OF ALL MILLWORK.
10. INTERIOR ELEVATION DETAILS: REFERENCE INTERIOR ELEVATION &
SECTIONS WHERE PROVIDED FOR ADDITIONAL FINISH INFORMATION.
11. PAINT & ADHESIVE VOC'S: ALL PAINTS AND ADHESIVES/SEALANTS SHALL
HAVE ZERO VOC CONTENT,
12. ADHESIVE MANUFACTURER RECOMMENDATIONS: ALL
ADHESIVES/SEALANTS TO BE USED AS RECOMMENDED BY PRODUCT
MANUFACTURER.
MECHANICAL 8& ELECTRICAL NOTES
I. DESIGN/BUILD MEP: THE MECHANICAL, ELECTRICAL AND PLUMBING
SCOPES OF WORK ARE LIMITED TO BASIC DESIGN -BUILD ALTERATIONS
WHICH ARE OUTLINED IN THESE PLANS. THE DESIGN -BUILD CONTRACTORS
FOR EACH TRADE MUST NOTI FV THE ARCHITECT IF THEY FI ND THAT THE
SCOPE OF WORK EXCEEDS THE LEVEL OF MECHANICAL, ELECTRICAL OR
PLUMBING WORK INDICATED ON THESE DRAWINGS SO THAT ANY
NECESSARY ENGINEERING CAN OCCUR AND ADDITIONAL PLANS CAN BE
FILED, OR IF ADDITIONAL INFORMATION IS NEEDED IN ORDER TO DO THE
WORK IN THE FIELD. THE MECHANICAL ELECTRICAL AND PLUMBING
DESIGN -BUILD CONTRACTORS SHALL COMPLY WITH ALL APPLICABLE
STATE AND LOCAL BUILDING CODES.
FIRE SUPPRESSION AND FIRE ALARM SYSTEMS SHALL BE INSTALLED BY THE
APPROPRIATE DESIGN -BUILD CONTRACTOR AND MUST COMPLY WITH ALL
APPLICABLE STATE AND LOCAL BUILDING CODES. FIRE SUPPRESSION
AND FIRE ALARM DESIGN -BUILD CONTRACTORS ARE RESPONSIBLE FOR
COMPLETING AND FILING THEIR PLANS AND OBTAINING THEIR PERMITS,
2. DESIGN/BUILD HVAC: MECHANICAL WORK IS LIMITED TO
DESIGN -BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS. NO NEW
MAIN MECHANICAL APPLIANCES OR MAIN EQUIPMENT ARE BEING
PROVIDED. ALL MECHANICAL WORK IS LIMITED TO RELOCATION OF
DIFFUSERS AND FLEX DUCT PER NEW WALL LAYOUT. NO NEW HARD
DUCTWORK OR EQUIPMENT IS BEING ADDED; MECHANICAL
CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS
REQUIRED SO THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY
WITH THE INDIANA MECHANICAL CODE AND ALL OTHER APPLICABLE
CODES,
3. HVAC HEAT LOADS: VERIFY HEAT LOADS OF ANY SPECIAL EQUIPMENT
N THE TENANT SPACE, AND PROVIDE ADDITIONAL AIR FLOW IF REQUIRED.
CONFIRM WITH OWNER PRIOR TO ANY PURCHASE OF NEW EQUIPMENT,
REVISE ZONING IF REQUIRED. DO NOT DESIGN ANY SINGLE OFFICE
SPACE TO BE ON A SPLIT ZONE UNLESS APPROVED BY BUILDING
OWNER/LANDLORD. CONTRACTOR TO ENSURE THAT ALL HVAC ZONES
ARE LOCATED APPROPRIATELY SUCH THAT NO SPLIT ZONES ARE IN
OFFICES OR CONFERENCE ROOMS.
4. HVAC DIFFUSER LOCATIONS: RELOCATE AIRSUPPLYDIFFUSERS AND
RETURN -AIR GRILLES AS REQUIRED, PROVIDE PROPER AIR SUPPLY FOR
DIFFUSERS AND RETURN AIR FROM RETURN AIR GRILLES. CONTRACTOR IS
TO PLACE LOCATION OF DIFFUSERS AND RETURN AIR GRILLES AS
REQUIRED BY CODE.
5. HVAC THERMOSTAT LOCATIONS: POSITION LOCATION OF ALL
THERMOSTATS WHERE APPROPRIATE PER MECHANICAL DESIGN.
COORDINATE WITH TENANT AND BUILDING OWNER FOR FURNITURE
PANEL OR OTHER CONFLICTS.
6. DESIGN/BWLD ELECTRICAL: ELECTRICAL WORK IS LIMITED TO A
DESIGN -BUILD SCOPE AND 15 OUTLINED IN THESE DRAWINGS. ALL
ELECTRICAL WORK IS LIMITED TO ADDITIONS OR RELOCATIONS OF
ELECTRICAL OUTLET DEVICES AND LIGHTING THAT DO NOT EXCEED THE
CAPACITY OF THE EXISTING ELECTRICAL SERVICE IN THE BUILDING.
ELECTRICAL CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF
ADDITIONAL WORK IS REQUIRED SO THAT ADDITIONAL PLANS CAN BE
FILED AND MUST COMPLY WITH ALL APPLICABLE CODES.
7. ELECTRICAL CODE COMPLIANCE: COMPLY WITH THE INDIANA
ELECTRICAL AND MECHANICAL CODE AND ALL OTHER APPLICABLE
CODES.
8. ELECTRICAL CIRCUITING: SIZE AND CIRCUIT ELECTRICAL POWER ITEMS
PROVIDE OR REUSE ELECTRICAL POWER AND DATA OUTLETS AS
REQUIRED.
9. GFI OUTLETS: ALL ELECTRICAL OUTLETS WITHIN 60 OF WATER ARE TO
BE G.F.C.I.
10. PHONE AND DATA ACCOMMODATIONS: AT EACH PHONE AND DATA
JACK, PROVIDE PULL STRING FROM ABOVE CEILING TO BOX. TENANTS
DATA CONTRACTOR 15 RESPONSIBLE FOR PULLING CONDUCTORS AND
PROVIDING APPROPRIATE TERMINALS AT FACE PLATE.
11. ELECTRICAL SWITCH PLATES: PROVIDE COLORED FACEPLATES FOR
ELECTRICAL OUTLETS & SWITCH PLATES TO MATCH EXISTING, UNLESS
OTHERWISE NOTED. ELECTRICIAN TO FIELD VERIFY PRIOR TO PURCHASE.
12. WORKSTATION POWER: PROVIDE JUNCTION BOXES OR POWER POLES
AT WORKSTATIONS WHERE SHOWN. REFER TO THE PLAN FOR THE
APPROPRIATE DESIGNATIONS. DATA WILL BE RUN BY THE TENANT'S DATA
VENDOR. ELECTRICIAN TO MAKE FINAL CONNECTION FROM
WORKSTATION WHIP TO JUNCTION BOX. THE FURNITURE VENDOR IS TO BE
RESPONSIBLE FOR WIRING THE BASE PANELS OF THE WORKSTATIONS,
CONTRACTOR TO COORDINATE WITH TENANT ON WORKSTATION
FURNITURE SPECIFICATIONS TO OBTAIN CIRCUITRY REQUIREMENTS PRIOR
TO RUNNING ELECTRICAL CONDUITS TO JUNCTION BOXES.
13. LIGHTING CIRCUITS: VERIFY EXISTING LIGHTING CIRCUITING. SIZE NEW
CIRCUITS AS REQUIRED. PROVIDE NEW OR REVISE EXISTING CIRCUITING
FOR NEW LAYOUT OF LIGHT FIXTURES.
14. ELECTRICAL OUTLETS: ENSURE THAT ALL MOUNTING HEIGHTS OF
ELECTRICAL DEVICES MEETA.D.A. REQUIREMENTS.
15. LIGHTING SWITCH PLATES: WHERE MULTIPLE SWITCHES ARE SHOWN
PROVIDE (1( GANG BOX WITH A SINGLE COVERPLATE.
16. LIGHT FIXTURE PLACEMENT: CENTER CEILING ELEMENTS IN CEILING
TILES, INCLUDING RECESSED DOWNLIGHTS, SMOKE DETECTORS,
SPRINKLER HEADS, AND EXITSIGNS UNLESS OTHERWISE NOTED,
17. EMERGENCY LIGHTING: PROVIDE EMERGENCY LIGHTING IN TENANT
SPACE AS REQUIRED PER NEMA AND IBC. EMERGENCY BATTERY PACKS
OR LIGHTS CONNECTED TO AN EMERGENCY POWER SOURCE ARE
REQUIRED IF THE SPACE CONTAINS 50 PERSONS OR MORE. FIXTURES
SHOWN ON PLAN ARE FOR REFERENCE ONLY.
18, FIRE ALARM SYSTEM: PROVIDE ALARM NOTIFICATION APPLIANCES
(HORNS/STROBES(, EMERGENCY SPEAKERS, SMOKE DETECTORS, FIRE
PULLS, AND ANY OTHER REQUIRED ALARM & DETECTION SYSTEMS AS
NECESSARY TO MEET ALL APPLICABLE CODES (INTERNATIONAL BUILDING
CODE, INTERNATIONAL FIRE CODE, NFPA(. IN RECEPTION AREAS,
CONFERENCE ROOMS AND OTHER HIGH PROFILE AREAS WITHIN SUITE,
ALL LOCATIONS OF SUCH DEVICES MUST BE APPROVED BY SDI OR
TENANT PRIOR TO INSTALLATION. FAILURE TO DO SO MAY RESULT I N
CONTRACTOR RELOCATING THESE ITEMS AT THEIR EXPENSE,
20. FIRE ALARM DEVICE LOCATIONS: COORDINATE WITH THE
OWNER TENANT PRIOR TO INSTALLATION OF FIRE DETECTION DEVICES
REGARDING ALL DEVICE LOCATIONS i0 AVOID CONFLICT WITH FEATURE
WALLS (CONFERENCE ROOMS AND RECEPTION AREAS( AND
TENANT -INSTALLED ITEMS I.E. PRESENTATION BOARDS A V EQUIPMENT
AND PROJECTION SCREENS(.
21. EXISTING LIGHT FIXTURE RELAMP: IF REQUIRED, AND AS NECESSARY,
PROVIDE NEW BALLASTS AND LAMPS IN ALL LIGHTS IN EXISTING SPACES.
CONSULT WITH LANDLORD.
22. HVAC CONTRACTOR AIR BALANCE: CONTRACTOR TO PERFORM AIR
BALANCE UPON COMPLETION OF HVAC SCOPE. PROVIDE REPORT TO
LANDLORD.
23. HVAC FLEX DUCT: FLEX DUCT MUST MEET ASHRAE STANDARD
BUILDING CODES FOR FLEX DUCT LENGTH.
24. ELECTRICAL CIRCUITS: AREAS WITHIN ELECTRICAL SCOPE MUST BE
POWERED BY THE ELECTRICAL PANEL FROM THE FLOOR ON WHICH
CONSTRUCTION OCCURS.
25, SUPPLEMENTAL HVAC/ELECTRICAL: IN THE EVENT THAT ANY
SUPPLEMENTAL HVAC EQUIPMENT OR ABOVE BUILDING STANDARD
ELECTRICAL POWER FACILITIES ARE INSTALLED (SUCH AS IN AN IT SERVER
ROOM( CONTRACTOR SHOULD FURNISH AND INSTALL ADDITIONAL
ELECTRICAL AND BTU SUB -METERING SO AS TO ENABLE OWNER TO
MONITOR TENANTS UTILITY CONSUMPTION (IN RELATION TO THE SU ELECT
EQUIPMENT) GOING FORWARD. THE MAKE AND MODEL OF
CONTRACTOR'S PROPOSED METERS SHOULD BE REVIEWED AND
APPROVED BY OWNER PRIOR TO CONTRACTOR INSTALLATION.
26. ENGINEERED MEP DRAWINGS: WHEN REQUIRED BY STATE BUILDING
CODE, THE CONTRACTORS( SHALL PROVIDE DESIGN/BUILD DRAWINGS
FOR MECHANICAL, PLUMBING, ELECTRICAL, OR FIRE SUPPRESSION.
DRAWINGS SHALL BE CERTIFIED BY A LICENSED ENGINEER AND SUBMITTED
BY THE CONTRACTOR FOR STATE DESIGN REVIEW,
27. EQUIPMENT INSTALLATIONS: ALL EQUIPMENT AND/OR FIXTURES SHALL
BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS OR INSTRUCTIONS,
28. BUILDING DIRECTORY: THE BUILDING AUTOMATION SYSTEM GRAPHIC
AND PROGRAMMING TO BE UPDATED WITH NEW TENANT'S INFORMATION
FOR FUTURE USE.
29. ELECTRICAL PANELS: ALL ELECTRICAL PANELS TO GET UPDATED
CIRCUIT SCHEDULES.
FIRE PROTECTION NOTES
I. FIRE EXTINGUISHERS: CONTRACTOR TO ENSURE ALL NEW AND
EXISTING FIRE EXTINGUISHERS ARE INSTALLED ACCORDING TO NFPA 10.
COORDINATE WITH OWNER/LANDLORD ON EXTINGUISHER TYPE AND
HOUSING. MAXIMUM TRAVEL DISTANCE OF 75 FEET FROM ANY POINT TO
A VISIBLE EXTINGUISHER,
THE FOLLOWING NOTES APPLY ONLY IN EXISTING SPRINKLERED FACILITIES.
2. DESIGN BUILD FIRE PROTECTION SYSTEM: FIRE PROTECTION WORK IS
TO BE PROVIDED BY DESIGN/BUILD SERVICES UNDER THE GENERAL
CONTRACT, PROVIDE A COMPLETE, WORKING SYSTEM, SCHOTT
DESIGN, INC., IS NOT RESPONSIBLE FOR THE DESIGN, INSTALLATION, OR
RENOVATION OF THE FIRE SPRINKLER SYSTEM.
3. FIRE PROTECTION SYSTEM CODE COMPLIANCE: THE DESIGN/BUILD
CONTRACTOR SHALL COMPLY WITH THE INDIANA BUILDING CODE, THE
INDIANA FIRE CODE, AND ALL OTHER APPLICABLE LAWS, CODES, RULES
AND REGULATIONS THAT APPLY TO DESIGN AND INSTALLATION OF FIRE
SPRINKLER/FIRE SUPPRESSION SYSTEMS.
4. FIRE PROTECTION DESIGN DRAWINGS: THE FIRE PROTECTION
CONTRACTOR SHALL GENERATE ALL REQUIRED DRAWINGS, AND SHALL
FILE THOSE DRAWINGS, AND RELATED DOCUMENTS, WITH THE STATE AND
LOCAL AUTHORITIES HAVING JURISDICTION OVER THE PROJECT.
5. SPRINKLER HEADS: PROVIDE NEW OR RELOCATE EXISTING SPRINKLER
HEADS AS REQUIRED, PROVIDE MISSING COVER/ESCUTCHEON PLATES
FOR SPRINKLER HEADS WHERE APPLICABLE. FIELD VERIFY EXISTING
CONDITIONS PRIOR TO THE START OF WORK.
DOCUMENT APPROVAL
DECONSTRUCTION NOTES
I. DECONSTRUCTION DEFINITION: CAREFULLY DISMANTLE SPACES WITH
THE GOAL OF MAXIMIZING THE REUSE POTENTIAL OF ITS COMPONENTS,
2. DECONSTRUCTION MANAGEMENT CHECKLIST: ALL ITEMS SHOWN ON
THE DECONSTRUCTION PLAN HAVE BEEN CAREFULLY CONSIDERED FOR
RECOVERY, REUSE, AND RECYCLING WITH THE BEST INTENT TO DIVERT
ITEMS FROM THE LANDFILL. REFER TO DECONSTRUCTION MANAGEMENT
CHECKLIST FOR SPECIFIC INSTRUCTIONS.
3. RECYCLING: GENERAL CONTRACTOR IS RESPONSIBLE FOR
RECYCLING ANY AND ALL POSSIBLE PROJECT MATERIAL WASTE AND
COORDINATING THE APPROPRIATE HAULING CONTAINERS WITH THE
WASTE MANAGEMENT SUB -CONTRACTOR. A CO -MINGLE LEED
CONTAINER IS REQUIRED FOR RECYCLING.
4. EXISTING STRUCTURAL ELEMENTS OF BUILDING: NO STRUCTURAL OR
LOAD -BEARING CONSTRUCTION SHALL BE REMOVED, DEMOLISHED, OR
DAMAGED AS A RESULT OF THIS PROJECT UNLESS SPECIFICALLY NOTED
OTHERWISE ON THE DRAWINGS. PROTECT ALL EXISTING STRUCTURAL
MEMBERS DURING DEMOLITION/CONSTRUCTION. THE CONTRACTOR
SHALL VERIFY IN THE FIELD, PRIOR TO DEMOLITION, THAT ALL ITEMS
NOTED TO BE DEMOLISHED ARE NOT STRUCTURAL. CONTACTSCHOTT
DESIGN IMMEDIATELY IF THE CONTRACTORS) IN THE FIELD SUSPECT
THAT AN ITEM NOTED FOR DEMOLITION APPEARS TO BE STRUCTURAL OR
OTHERWISE LOAD -BEARING. BEWARE OF STRUCTURAL COLUMNS
AND/OR BEAMS THAT MAY BE CONCEALED BEHIN D FINISHES THAT ARE
NOTED FOR REMOVAL. EXERCISE CAUTION WHEN DEMOLISHING
BUILDING FINISHES OR PARTITIONS ADJACENT TO OR AROUND
STRUCTURAL MEMBERS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR
INADVERTENT DAMAGE TO THE BUILDING STRUCTURAL SYSTEM.
5. EQUIPMENT, FIXTURE, FINISH RE -USE: WHERE EQUIPMENT, FIXTURES,
OR FINISHES ARE MOVED FROM ANY OTHER PART OF THE BUILDING TO
BE REUSED IN THE PROJECT AREA, THE CONTRACTOR SHALL INCLUDE IN
THEIR SCOPE OF WORK ANY NECESSARY PATCHING OR REPAIRING OF
THE REMAINING AREAS FROM WHERE THE ITEMS WERE RELOCATED,
UNLESS OTHERWISE DIRECTED BY OWNER.
6. DECONSTRUCTION PUNS: REMOVE ALL EXISTING WALLS AND
DOORS WHERE INDICATED BY NOTE, SYMBOL, OR DASHED LINES. NOTE
THAT SOME ITEMS HAVE NOT BEEN SHOWN ON DECONSTRUCTION
PLAN. VISIT AREA OF WORK TO ASSURE EXTENT OF DECONSTRUCTION.
7. FIELD VERIFICATION OF EXISTING CONDITIONS: REMOVE ALL
CARPET, VINYL BASE, VCi, WALL FABRIC, AND ANY OTHER FINISHES AS
REQUIRED FOR NEW CONSTRUCTION. CONTRACTOR TO FIELD VERIFY
EXISTING CONDITIONS, REFER TO FINISH PLAN/SCHEDULE FOR
CLARIFICATION OF EXISTING FINISHES TO REMAIN.
8. PROTECTION OF BUILDING ELEMENTS TO REMAIN: USE CARE TO
PROTECT EXISTING BUILDING ELEMENTS INDICATED ON THE DRAWINGS
TO REMAIN SUCH AS, BUT NOT LIMITED TO, EXISTING CEILING GRID,
TILES, FIRE SUPPRESSION EQUIPMENT, DIFFUSERS, LIGHT FIXTURES,
EQUIPMENT, CASEWORK, AND FINISHES. THE CONTRACTOR SHALL
REPLACE AND/OR REPAIR, AT THE CONTRACTOR'S COST, ANY SUCH
ELEMENTS DAMAGED DURING CONSTRUCTION THAT COULD HAVE
OTHERWISE BEEN REASONABLY PROTECTED AND MAINTAINED IN
GOOD CONDITION FOR THE OWNER'S USE IN THE PROJECT.
9. REMOVAL OF ABANDONED CABLING & WIRING: PER THE INDIANA
ELECTRICAL CODE (SPREAD OF FIRE OR PRODUCTS OF COMBUSTION(
REMOVE ALL ACCESSIBLE PORTIONS OF ABANDON ED CABLES AND
WIRING INCLUDING BUT NOT LIMITED TO: DATA WIRING,
COMMUNICATIONS WIRING, FIRE ALARM CABLES, AUDIO CABLES,
COAXIAL CABLES, FIBER OPTIC CABLES/RACEWAYS, AND PLTC CABLES
REFER TO SECTION 300.21. ANY SUCH CABLE OR WIRING SHOULD BE
PULLED AND REMOVED BACK TO THEIR MAIN SOURCES ON THE FLOOR
(I.E. ELECTRICAL PANELS, PHONE BOARDS, ETC.(
10. PROTECTION OF ABANDONED/TERMINATED BUILDING SYSTEM
ELEMENTS: WHERE FIXTURES OR EQUIPMENT ARE REMOVED FROM ANY
ELECTRICAL, PLUMBING, MECHANICAL, OR VOICE/DATA SYSTEMS, ALL
REMAINING TERMINATIONS SHALL BE CLOSED AND PROTECTED IN
STRICT ACCORDANCE WITH INDUSTRY STANDARDS AND GOVERNING
SAFETY REGULATIONS OR PROCEDURES. MARK, LABEL, OR FLAG ALL
TERMINATED SYSTEMS FOR FUTURE REFERENCE. CONTRACTOR TO
PROVIDE AN "AS -BUILT' SET INDICATING THE LOCATION OF ALL
PERMANENTLY ABANDONED SYSTEMS,
11. HAZARDOUS MATERIALS: GENERAL CONTRACTOR IS RESPONSIBLE
FOR IDENTIFYING ANY AN D ALL ITEMS THAT MAY CONTAIN HAZARDOUS
OR HARMFUL MATERIALS. ALL IDENTIFIED ITEMS MUST BE PROPERLY
DISPOSED OF PER EPA AND INDIANA DEPARTMENT OF ENVIRONMENTAL
MANAGEMENT RULES AND REGULATIONS.
12. COSTS: CONTRACTOR TO PROVIDE ANY COST RELATED TO
SORTING AND RECYCLING, AS WELL AS ALL SCRAP METAL INCOME, AS
PART OF THE DEMOLITION/DECONSTRUCTION BASE BID.
13. VALIDATION: CONTRACTOR MUST OBTAIN AND PROVIDE TO
OWNER DOCUMENTATION FOR PROOF ON ALL RECYCLED ITEMS
INCLUDING CREDIT FOR METALS AND CARPET. THIS DOCUMENTATION
OF PROOF IS NOT INTENDED TO BE LEED PROCESS STANDARDS.
TENANT/CLIENT, UPON SIGNATURE, APPROVES ALL ASPECTS OF THE SCOPE OF WORK CONTAINED
IN THESE DOCUMENTS.
TENANT/CLIENT COMPANY NAME DATE
TENANT REPRESENTATIVE SIGNATURE TENANT REPRESENTATIVE PRINTED NAME
ALL COSTS INCURRED DUE TO ANY CHANGES REQUESTED AFTER SIGN -OFF OF THESE DOCUMENTS SHALL BE THE FULL RESPONSIBILITY OF THE
TENANT/CLIENT.
THESE DRAWINGS, AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT
DESIGN, INC., AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT THE WRITTEN CONSENT OF SCHOTT DESIGN.
_MILL/CASEWORK NOTES
1. CASEWORK/MILLORK: CASEWORK AND MILLWORK GENERALLY
INDICATED ON THESE DRAWINGS ARE TO BE PROVIDED UNDER THE
GEN ERAL CONTRACT.
2. AWI COMPLIANCE: UNLESS INDICATED OTHERWISE, COMPLY WITH
ARCHITECTURAL WOODWORK INSTITUTE (A.W.L( CURRENT STANDARDS
FOR CUSTOM GRADE WOODWORK.
3. MILLWORK SHOP DRAWINGS: FURNISH SHOP DRAWINGS ON ALL
MILLWORK AND CASEWORK FOR APPROVAL BY THE TENANT AN D
SCHOTT DESIGN PRIOR TO FABRICATION.
4. MILLWORK FIELD VERIFICATION: WHERE CASEWORK AND MILLWORK
ARE TO BE INSTALLED, VERIFY ALL DIMENSIONS ON PLANS AGAINST
DIMENSIONS OF AS -BUILT CONDITIONS IN FIELD. REPORT ANY
DISCREPANCIES TO SCHOTT DESIGN THROUGH THE GENERAL
CONTRACTOR. MAKE ADJUSTMENTS TO CASEWORK AND MILLWORK
TO FIT FIELD CONDITIONS UNLESS DOING SO WILL SIGNIFICANTLY ALTER
THE INTENT OF THE DESIGN SHOWN ON THE DRAWINGS.
5. DRAWING REVIEW AND DISCREPANCIES: VERIFY FINISHES (LAMINATE,
VENEER, STAINS, ETC.( ON THE SECTIONS AND ELEVATION DRAWINGS
WITH FINISHES INDICATED ON THE FINISH PLAN/SCHEDULES,
IMMEDIATELY REPORT ANY DISCREPANCIES TO SCHOTT DESIGN
THROUGH THE GEN ERAL CONTRACTOR.
6. MILLWORK REQUIREMENTS: REFER TO MILLWORK SECTIONS &
ELEVATIONS . UNLESS OTHERWISE SHOWN, PLASTIC LAMINATE CLAD,
COUNTERTOPS WITH 4" BACKSPLASHES WHERE INDICATED.
BACKSPLASHES TO BE FIELD APPLIED. REFER TO MILLWORK SECTIONS &
ELEVATIONS FOR CABINETRY SPECIFICATIONS(CUSTOM PLASTIC
LAMINATE OR PRE -MANUFACTURED STOCK CABINETRY(. EDGES OF
PLASTIC LAMINATE COUNTERTOPS, CABINETS AND DRAWERS TO BE
PLASTIC LAMINATE AND NOT PVC OR OTHER STOCK PLASTIC EDGING
UNLESS NOTED OTHERWISE.
7. MILLWORK WALL BLOCKING: TO PROVIDE BLOCKING IN WALLS FOR
ALL MILLWORK, WALL STOPS, HARDWARE, AND CABINETRY WHERE
SPECIFIED. ALL WOOD BLOCKING TO BE FIRE RATED.
9
4
i
se.
z
r
Im
VICINITY MAP
NOT TO SCALE
KEY PLAN - 2ND FLOOR
N
NOT TO SCALE
C
INDEX OF DRAWINGS
TIII COVER SHEET AND GENERAL PROJECTNOTES
LI00 LIFE SAFETY PLAN
DI I I DECONSTRUCTION PLAN
At I I ARCHITECTURAL FLOOR PLAN
A121 REFLECTED CEILING PLAN
A131 FINISH PLAN
A211 DOORSCHEDULE
EIII ELECTRICALPLAN
THIS DRAWING. AND ME IDEAS,
DESIGNS AND CONCEPTS CONTAINED
HEREIN, ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF SCHOTT
DESIGN, INC., AND ARE NOT TO BE
USED OR REPRODUCED IN WHOLE, OR
IN PART, WITHOUT ME WRITTEN
CONSENT OF SCH07 DESIGN.
N
N
W
C)
ZN
F
W
O
_ W Z
Z
H
at�
Z Z
mmi
QO
5.
0. a
Q
� Z
X W Q
UJ
ZZ
r
0
Q
r
ISSUE
DATE
iiiiiiiiim
DESCRIPTION
06.17.19
REVIEW SET
06.19.19
PERMIT SET
REVISIONS
PROJECT NUMBER
2018.479
PROD. MGR DRAWN BY
2ND FLOOR
COVER SHEET AND
GENERAL NOTES
T I I I
TRAVEL DISTANCE = 122'-1"
® AREA NOT IN CONTRACT
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and meal Codes
City of Camel
DATE: 08/02/19
ENLARGED LIFE SAFETY PLAN
0 4' 8' 16'
2
3
4
5
6
7
6
9
10
11
12
13
14
15
16
F - .
� IiP '�rnl'f p1���7� ♦
CODE SUMMARY
SCOPE OF WORK
OFFICE REMODEL OF PREVIOUSLY BUILTOUTOFFICE SPACE
PREVIOUS USE OF SPACE
B(USINESS)
OCCUPANCY CLASSIFICATION
B(USINESS)
CHANGE OF OCCUPANCY CLASP
NO
TOTAL BUILDING AREA
32,209 SF/FLOOR
X
1 4STORIES
=
128,836 SF
TOTAL PROJECT AREA
OCCUPANCY CALCULATIONS
NUMBER OF EXITS
2,561 SF
SPACE TYPE
AREA
SF PER OCCUPANT
OCCUPLOAD
GEN. OFFICE
2,561 SF
100
26
TOTAL OCCUPANTS IN PROJECT AREA 26
REQUIRED:I PROVIDED:3
SPRINKLER SYSTEM(YES/NO)
YES- EXISTING TO REMAIN
TOTAL AREA OF ACCESSORY USES
0 SF
TOTAL AREA ON THE FLOOR
32,209 SF
ACCESSORY AREA EXCEEDS 10%
NO
FIRE WALLS, AND/OR OCCUPANCY
SEPARATIONS (IF REQUIRED(
N/A
ASHRAE 90.1 SUMMARY
REQUIREMENTS WILL BE MET (SEE REFLECTED CEILING PLAN(
BUILT BEFORE 1978E
NO
BUILDING CONSTRUCTION TYPE
IRS
LEGEND
Ep EXISTING ELECTRICAL PANEL LOCATION
EX EXISTING EXIT- BUILDING STAIR LOCATION
TIFF FIRE EXTINGUISHER
® EXITSIGN
"" EMERGENCY LIGHT
— — — TRAVEL DISTANCE
OVERALL BUILDING
NOT TO SCALE
GENERAL NOTES
LI. REFER TO ARCHITECTURAL PLAN FOR WALL TYPE AND CONSTRUCTION
DETAILS.
L2. EXISTING COMMON CORRIDOR TO REMAIN. EXISTING EXIT SIGNS, FIRE
PULLS, FIRE EXTINGUISHERS, ALARM NOTIFICATION APPLIANCES TO
REMAIN, RELOCATE EXISTING EXIT SIGNS, FIRE PULLS, FIRE
EXTINGUISHERS AND ALARM NOTIFICATIONS AS REQUIRED TO MEET
ALL LOCAL AND STATE CODES.
LIFE SAFETY NOTES
I. PROVIDE EMERGENCY LIGHTING IN TENANT SPACE AS REQUIRED PER
NEMAANDIBC. EMERGENCY BATTERY PACKS OR LIGHTS
CONNECTED TO AN EMERGENCY POWER SOURCE ARE REQUIRED IF
THE SPACE CONTAINS 50 PERSONS OR MORE. FIXTURES SHOWN ON
PLAN ARE FOR REFERENCE ONLY.
2. PROVIDE ALARM NOTIFICATION APPLIANCES(HORNS/STROBES),
EMERGENCY SPEAKERS, SMOKE DETECTORS, FIRE PULLS, AND ANY
OTHER REQUIRED ALARM & DETECTION SYSTEMS AS NECESSARY TO
MEET ALL APPLICABLE CODES (INTERNATIONAL BUILDING CODE,
INTERNATIONAL FIRE CODE, NFPA), IN RECEPTION AREAS,
CONFERENCE ROOMS AND OTHER HIGH PROFILE AREAS WITHIN SUITE,
ALL LOCATIONS OF SUCH DEVICES MUST BE APPROVED BY SDI OR
TENANT PRIOR TO INSTALLATION. FAILURE TO DO SO MAY RESULT I N
CONTRACTOR RELOCATING THESE ITEMS AT THEIR EXPENSE.
3. FIRE EXTINGUISHERS: CONTRACTOR TO ENSURE ALL NEW AND
EXISTING FIRE EXTINGUISHERS ARE INSTALLED ACCORDING TO NFPA
10. COORDINATE WITH OWNER/LANDLORD ON EXTI NGUISHER TYPE
AND HOUSING. MAXIMUM TRAVEL DISTANCE OF 75 FEET FROM ANY
POINT TO A VISIBLE EXTINGUISHER.
THE FOLLOWING NOTES APPLY ONLY IN EXISTING SPRINKLERED FACILITIES,
4. FIRE PROTECTION WORK IS TO BE PROVIDED BY DESIGN/BUILD
SERVICES UNDER THE GENERAL CONTRACT. PROVIDE A COMPLETE,
WORKING SYSTEM, SCHOTT DESIGN, INC., IS NOT RESPONSIBLE FOR
THE DESIGN, INSTALLATION, OR RENOVATION OF THE FIRE SPRINKLER
SYSTEM.
5. THE FIRE PROTECTION CONTRACTOR SHALL GENERATE ALL REQUIRED
DRAWINGS, AND SHALL FILE THOSE DRAWINGS, AND RELATED
DOCUMENTS, WITH THE STATE AND LOCAL AUTHORITIES HAVING
JURISDICTION OVER THE PROJECT.
THIS DRAWING. AND ME IDEAS,
DESIGNS AND CONCEPTS CONTAINED
HEREIN, ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF SCHOTT
DESIGN, INC., AND ARE NOT TO BE
USED OR REPRODUCED IN WHOLE, OR
IN PART, WITHOUT ME WRITTEN
CONSENT OF SCH07 DESIGN.
0
N
N
J CD
ZCN
C0
F
IMEM
O LU
Z WZ
H
to N
aZzo
Gaon
2XWQ
LI n
zz
0
Q
O
r
ISSUE
DATE
DESCRIPTION
06.17.19
REVIEW SET
06.19.19
PERMIT SET
REVISIONS
PROJECT NUMBER
2018.479
DRAWN BY
BW
2ND FLOOR
LIFE SAFETY
L 100
LEGEND
RECYCLING NOTES
GENERAL NOTES
PLAN NOTES
EXISTING TO BE REMOVED EXISTING TO REMAIN
WALL
WALL
==xxxx PARTIAL HEIGHT WALL xxxxxx: PARTIAL HEIGHT WALL
i DOOR AND FRAME
xr-cx WINDOW/SIDELIGHT
CEILING GRID AND
TILES, 2'x4'
CEILING GRID AND
i--?--r TILES, 2'x2'
F'T
I i�I SUPPLY AIR DIFFUSERS
K �v
caum
F., EXHAUST FAN
L-J
LIGHT FIXTURE,
LL _rJJ FLUORESCENT, 2'x4'
r'LIGHTFIXTURE,
L_J l FLUORESCENT,2'x2'
LIGHT FIXTURE, CAN
F----+ LIGHT FIXTURE,
FLUORESCENT
"4F F[ LIGHT FIXTURE, TRACK
11
tk LIGHT FIXTURE,
LIGHT FIXTURE,
PENDANT
LIGHTSWITCH
EXIT LIGHT
q�y^
C-]
EMERGENCY LIGHT
I�VD)1l ELECTRIC OUTLETS)
DATA OR
b COMMUNICATION
OUTLET
7 DOOR AND FRAME
x WINDOW/SIDELIGHT
NOTE: EXISTING FIXTURES THATARE REMOVED CAN BE REUSED IF IN
GOOD CONDITION.
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
DATE: 08/02/19
DECONSTRUCTION MANAGEMENT CHECKLIST
CO -MINGLE SORT REQUIRED
THIS CHECKLIST ONLY APPLIES TO ITEMS BEING REMOVED. REFER TO DECONSTRUCTION PLAN.
CO-MINGLE/LEED CONTAINER REQUIRED FOR RECYCLING.
CONTAINER:
w
w
ITEM BEING
REMOVED
?
u
REMARKS
x.
wy
¢p
wp
�U
OXU
JU
Yo
DOORS
REUSE ALL EXISTING DOORS IN NEW LAYOUT WHERE POSSIBLE
FRAMES
DOOR HARDWAREREUSE
ALL EXISTING HARDWARE IN NEW LAYOUT WHERE POSSIBLE
METAL LIGHT BOXESCASEWORK
UNITCARPET
#\/
TILEBROADLOOM
CARPETAPPLIANCES
GENERAL SORTING REQUIREMENTS (AS APPLICABLE):
LEED CO -MINGLE RECYCLING CONTAINER: SHIPPING/PACKAGING, WOOD STUDS, WOOD TRIM, HVAC COMPONENTS,
CEILING GRID, METAL STUDS, WIRING/ CONDUIT, AND OUTLETS/SWITCHES
TRASH CONTAINER: DRYWALL, INSULATION, VINYL BASE, VCT, WALLCOVERING, CEILING TILES AND LVT (LUXURY VINYL
TILE(
CONTACTS:
KRUSE CARPD RECYCLING: COORDINATE PICK UP AND REQUIREMENTS WITH SUSAN SHAFER 317.337.1950
CARPET RECYCLING: KRUSE PICKUP AND RECYCLING FEES ARE TO BE
PAID THROUGH SCHOTT DESIGN'S NO COST ADD PROGRAM. NOTE:
THE DEMOLITION CREW/GENERAL CONTRACTOR WILL NO LONGER BE
PAYING THE CARPET DISPOSAL TIPPING FEES AT THE LANDFILL.
CONTRACTOR IS RESPONSIBLE FOR ALL COORDINATION.
I. CARPET BEING REMOVED TO BE RECYCLED VIA KRUSE CARPET
RECYCLING. COORDINATE REQUIREMENTS AND PICK UP WITH
SUSAN SHAFER (317) 337-1950.
2. CARPET TILES SHOULD BE PALLETIZED; BROADLOOM SHOULD BE
PILED NEATLY.
3. COLLECT DOCUMENTATION FROM KRUSE AS PROOF OF RECEIVAL
FORWARD TO THE GENERAL CONTRACTOR.
I. REFER TO ALL DECONSTRUCTION NOTES ON TITLE SHEET TI II.
2. ALL ITEMS BEING REMOVED FROM PROJECT AREA ARE TO BE
CAREFULLY CONSIDERED FOR REUSE IN THE PROJECTOR
BUILDING IF POSSIBLE. FOR ALL ITEMS DETERMINED FOR
REMOVAL, REFER TO THE DECONSTRUCTION MANAGEMENT
CHECKLIST BELOW.
3. REMOVE EXISTING RECEPTACLES AND/OR SWITCHES AS SHOWN
ON PLAN PER LEGEND. PATCH WALL AND PREPARE FOR NEW
FINISHES AS REQUIRED.
4. REMOVE EXISTING CEILING TILES AND 2X4 LIGHT FIXTURES
THROUGHOUT EXPANSION AREA, UNLESS OTHERWISE NOTED.
EXISTING CEILING GRID TO REMAIN. REFER TO DECONSTRUCTION
CHECKLIST FOR PROPER RECYCLING METHOD OF LIGHT FIXTURES.
D01 REMOVE EXISTING CABINETRY AND COUNTERTOP. REFERTO
DECONSTRUCTION CHECKLIST FOR PROPER RECYCLING METHOD.
D02 REMOVE EXISTING SINK. NO SERVICE SINKS ARE BEING REMOVED.
D03 REMOVE EXISTING COAT ROD AND SHELF.
ODESIGN INTENT IS FOR ALL METAL OUTLET/DATA BOXES AND/OR
D04 WIRE MOLD ON EXTERIOR WINDOW LINE WITHIN THIS ROOM TO BE
REMOVED. PATCH WALL AND PREPARE FOR NEW FINISHES AS
REQUIRED.
® AREA NOT IN CONTRACT DECONSTRUCTION PLAN
❑ AREA OF WORK 0 2 4 8 16 NC
THIS DRAWING. AND ME IDEAS,
DESIGNS AND CONCEPTS CONTAINED
HEREIN, ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF SCHOTT
DESIGN, INC.. AND ARE NOT TO BE
USED OR REPRODUCED IN WHOLE, OR
IN PART, WITHOUT ME WRITHED
CONSENT OF SCH07 DESIGN.
N
N
W
CD
Z`�C
CN
0
E �
O W
Z W z
H
t�
aZz0
Q n
=XwQ
WIC
Zz
r
0
Q
r
ISSUE
DATE
DESCRIPTION
06.17.19
REVIEW SET
06.19.19
PERMITSET
REVISIONS
PROJECT NUMBER
2018.479
PROD. MGR DRAWN BY
2ND FLOOR
DECONSTRUCTION
PLAN
DIII
ARCHITECTURAL LEGEND
NEW CONSTRUCTION EXISTING TO REMAIN
mr
WALL
WALL
PARTIAL HEIGHT WALL
®
PARTIAL HEIGHT WALL
E=
�o
WINDOW/SIDELIGHT
aec
WINDOW/SIDELIGHT
®
DOOR AND FRAME
(SEE DOOR SCHEDULE)
77
DOOR AND FRAME
NOTE: IF IN GOOD CONDITION, EXISTING DOORS SALVAGED FROM
DEMOLITION CAN BE SUBSTITUTED FOR NEW DOORS.
WALL TYPES
NOTE:
ALL PLAN DIMENSIONS ARE FROM FACE TO FACE OF FINISHED WALL.
ALL WALLS ARE TO BE WI UNLESS OTHERWISE NOTED.
PROVIDE MOISTURE R I TANT/GREEN BOARD AS REQUIRED IN
RESTROOM AND/OR SHOWER ROOMS.
NOT ALL WALL TYPES LISTED BELOW ARE NECESSARILY USED ON THIS
PROJECT. REFER TO REFLECTED CEILING PLAN FOR CEILING HEIGHTS.
F WALL WITH INSULATION
3s%" METAL STUDS AT I6"O.CJ � I
ONE LAYER OF 5%" TYPE "X' GYPSUM BOARD
EACH SIDE;
EXTEND WALL TO UNDERSIDE OF CEILING;
FIBERGLASS SOUND BATT INSULATION INSIDE
WALL AND 2-0 EACH EACH SIDE OF WALL ABOVE
CEILING
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City Bf Camel
DATE: 08/02/19
WALL
THICKNESS
METAL STUD
EXISTING WIN
MULLION
PRE -FINISHED ALUMINUM
RECEIVER TRIM- FASTEN AT
WINDOW SILL AND SET IN A
CONTINUOUS BEAD OF
CAULK AT WINDOW MULLION
WHERE NEW WALLS MEET.
TRIM COLOR TO MATCH
BUILDING WINDOW
MULLIONS.
LINE OF EXISTING WINDOW
SILL COVER BELOW
CONTINUOUS BEAD OF
ACOUSTICAL SEALANT
n WALL AT MULLION DETAIL
AI I I NOT TO SCALE
GENERAL NOTES
I. SEE ELECTRICAL PLAN FOR INTENDED FURNITURE LAYOUT.
2. REFER TO FINISH PLAN FOR ALL ACCENT/SPECIALTY PAINT OR
WALLCOVERING THAT REQUIRES LEVEL 4 OR LEVEL 5 DRYWALL
FINISH. REFER TO MANUFACTURER RECOMMENDATIONS.
PLAN NOTES
miiiiiiiiiim
A01 ALIGN FINISHED WALL SURFACES. PROVIDE SAME THICKNESS
STUDS AS EXISTING WALL AT DOOR INFILLS OR WHERE NEW WALLS
ARE IN LINE WITH EXISTING WALLS.
A02 NEW FIRE EXTINGUISHER AND SEMI -RECESSED FIRE EXTINGUISHER
ECABINET TO BE PROVIDED AND INSTALLED BY CONTRACTOR,
CABINET TO BE PAINTED TO MATCH ADJACENT WALL. ALL FIRE
EXTINGUISHERS ARE TO BE INSTALLED ACCORDING TO NFPA 10.
ODESIGN INTENT IS FOR N EW WALL TO ALIGN WITH EDGE OF
A03 WINDOW. CONTRACTOR TO CONFIRM EXACT LOCATION IN
FIELD TO ENSURE ACCURATE WALL PLACEMENT.
OPROVIDE ADDITIONAL BLOCKING IN WALL AS REQUIRED FOR
A04 TENANT'S WALL MOUNTED TELEVISION; COORDINATE EXACT
LOCATION WITH TENANT.
AREA NOT IN CONTRACT ARCHITECTURAL PLAN
AREA OF WORK 0 ] 4 8 16 NC
THIS DRAWING. AND ME IDEAS.
DESIGNS AND CONCEPTS CONTAINED
HEREIN, ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF SCHOTT
DESIGN. INC.. AND ARE NOT TO BE
USED OR REPRODUCED IN WHOLE. OR
IN PART. WITHOUT ME WRITHED
CONSENT OF SCH07 DESIGN.
N
N
W
H
CD
Z`�CN
C0
F
O LU
Z WZ
H
to c/j
aZzo
>aon
2XWQ
Win
zz
0
Q
0
ISSUE
DATE
DESCRIPTION
06.17.19
REVIEW SET
06.19.19
PERMITSET
REVISIONS
PROJECT NUMBER
2018.479
PROD. MGR DRAWN BY
2ND FLOOR
ARCHITECTURAL
FLOOR PLAN
A111
LEGEND
NEW OR RELOCATED EXISTING TO REMAIN
LIGHT FIXTURE, 2'x4', LIGHT FIXTURE, 2'x4',
FLUORESCENT, BUILDING FLUORESCENT, BUILDING
STANDARD INDIRECT/DIRECT STANDARD INDIRECT/DIRECT
®
EXIT LIGHT FIXTURE
EMERGENCY LIGHT FIXTURE
4W EXIT/EMERGENCY LIGHT
FIXTURE COMBO
$N LIGHT SWITCH
$N3 LIGHT SWITCH, 3-WAY
$ND LIGHT SWITCH, DIMMER
$NP SWITCH, PROJECTOR
SCREEN
$NG SWITCH, GARBAGE
DISPOSAL (ABOVE
COUNTERTOP(
$NE SWITCH, EXHAUST FAN
i — N LIGHTCIRCUIT
® EXIT LIGHT FIXTURE
EMERGENCY LIGHT FIXTURE
4e EXIT/EMERGENCY LIGHT
FIXTURE COMBO
$ LIGHT SWITCH
$3 LIGHT SWITCH, &WAY
3D LIGHT SWITCH, DIMMER
$P
SWITCH, PROJECTOR
SCREEN
$G
SWITCH, GARBAGE
DISPOSAL
3E SWITCH, EXHAUST FAN
. --\ LIGHTCIRCUIT
III CEILING GRID, CEILING GRID,
J—L—L SUSPENDED, 2'x2SUSPENDED, 2'x2'
®RELOCATED DIFFUSER,
LAY -IN, 2'x2'
® RELOCATED DIFFUSER,
LAY IN, 1'x4'
RELOCATED DIFFUSER,
LAY -IN, 4"x4'
® EXHAUST FAN, 2'x2'
®DIFFUSER,
LAY IN, 2'x2'
® DIFFUSER,
LAY IN, 1'x4'
m DIFFUSER,
LAY -IN, 4"x4'
EXHAUST FAN,
22x2'
NOTE: IF IN GOOD CONDITION, EXISTING H.V.A.C. DEVICES AND CEILING TILES
SALVAGED FROM DEMOLITION CAN BE SUBSTITUTED FOR NEW. NO NEW
HVAC DUCTWORK IS TO BE INSTALLED PER THIS SHEET.
RELOCATE DIFFUSERS &
nMECHANICAL DIFFUSER RELOCATION
RELEASED FOR CONSTRUCTION `REFER TO MECHANICAL NOTES FOR FURTHER INFORMATION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
DATE: 08/02/19
GENERAL NOTES
I. PROVIDE NEW BUILDING STANDARD CEILING TILE AND REUSE
EXISTING CEILING GRID, UNLESS OTHERWISE NOTED. EXISTING GRID IS
2 x2 AT fJ'-S'A.F.F. TILES ARE 2x2 ACOUSTICAL LAY IN TILES. REPAIR
ANY DAMAGED GRID.
2. PROVIDE LIKE CEILING TILES IN INDIVIDUAL ROOMS WHERE POSSIBLE
TO CREATE UNIFORM LOOK.
3. PROVIDE EMERGENCY LIGHTING IN TENANT SPACE AS REQUIRED PER
NEMA AND IBC. EMERGENCY BATTERY PACKS OR LIGHTS
CONNECTED TO AN EMERGENCY POWER SOURCE ARE REQUIRED IF
THE SPACE CONTAINS 50 PERSONS OR MORE. FIXTURES SHOWN ON
PLAN ARE FOR REFERENCE ONLY, IN RECEPTION AREAS,
CONFERENCE ROOMS AND OTHER HIGH PROFILE AREAS WITHIN
SUITE, ALL LOCATIONS OF SUCH DEVICES MUST BE APPROVED BY SDI
OR TENANT PRIOR TO INSTALLATION. FAILURE TO DO SO MAY RESULT
IN CONTRACTOR RELOCATING THESE ITEMS AT THEIR EXPENSE.
4. LAYOUT SHOWN IS INTENDED TO MEET ASHRAE 90.1 STANDARDS.
ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR COMPLIANT
INSTALLATION, IF ADJUSTMENT IS REQUIRED TO MEET ASHRAE 90.1,
CONTRACTOR MUST NOTIFY SDI. OVER 50%OF THE LIGHTING WILL
BE REPLACED WITH NEW, SO ASHRAE WATTAGE REQUIREMENTS WILL
NEED TO BE MET.
5. ALL NEW SWITCHES TO BE OCCUPANCY SENSORS; PROVIDE COMBO
UNIT WITH BOTH ULTRASONIC AND INFRARED TECHNOLOGY WITH A
ONE BUTTON OVERRIDE. OCCUPANCY SENSORS ARE TO BE
LOCATED SUCH THAT OCCUPANCY WITHIN ANY PORTION OF
INCLUDED AREA IS DETECTED. PROVIDE CEILING MOUNTED
OCCUPANCY SENSORS IN OPEN AREAS AS REQUIRED,
6. NEW DEVICES AND FACE PLATES TO MATCH EXISTING. WHERE
POSSIBLE, GANG MULTIPLE SWITCHES TO ACCOMMODATE
MULTISWITCHPLATE WHEN SWITCHES ARE SHOWN ADJACENT ON
PLAN,
7. ELECTRICAL WORK IS LIMITED TO A DESIGN -BUILD SCOPE AND IS
OUTLINED IN THESE DRAWINGS. ALL ELECTRICAL WORK IS LIMITED TO
ADDITIONS OR RELOCATIONS OF ELECTRICAL OUTLET DEVICES AN D
LIGHTING THAT DO NOT EXCEED THE CAPACITY OF THE EXISTING
ELECTRICAL SERVICE IN THE BUILDING. ELECTRICAL CONTRACTOR IS
TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS REQUIRED
SO THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY WITH
ALL APPLICABLE CODES.
MECHANICAL NOTES PLAN NOTES
I. MECHANICAL WORK IS LIMITED TO A DESIGN- BUILD SCOPE AND IS
TIE IN N EW AND EXISTING LIGHT FIXTURES TO EXISTING CIRCUIT
OUTLINED IN THESE DRAWINGS. NO NEW MAIN MECHANICAL
R01 AND EXISTING LIGHTSWITCH. IF NOT POSSIBLE, PROVIDE NEW
O
APPLIANCES OR MAIN EQUIPMENT ARE BEING PROVIDED. ALL
LIGHT SWITCH AS REQUIRED.
MECHANICAL WORK IS LIMITED TO RELOCATION OF DIFFUSERS AND
FLEX DUCT PER NEW WALL LAYOUT. NO NEW HARD DUCTWORK OR
EQUIPMENT IS BEING ADDED; MECHANICAL CONTRACTORIS TO
NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS REQUIRED SO
THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY WITH THE
INDIANA MECHANICAL CODE AND ALL OTHER APPLICABLE CODES,
® AREA NOT IN CONTRACT REFLECTED CEILING PLAN
❑ AREA OF WORK N
.� I<)
THIS DRAWING. AND ME IDEAS,
DESIGNS AND CONCEPTS CONTAINED
HEREIN, ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF SCHOTT
DESIGN, INC., AND ARE NOT TO BE
USED OR REPRODUCED IN WHOLE, OR
IN PART, WITHOUT ME WRITTEN
CONSENT OF SCH07 DESIGN.
O
N
N
W
H
CD
ZCN
C0
1
O W
Z WZ
aaRaRaR� �/
t�
`Q} Z z tj
Q n
=XwQ
Win
zz
T-
0
Q
0
ISSUE
DATE
DESCRIPTION
06.17.19
REVIEW SET
06.19.19
PERMITSET
REVISIONS
PROJECT NUMBER
2018.479
PROD. MGR DRAWN BY
2ND FLOOR
REFLECTED
CEILING PLAN
Al 21
LEGEND
FLOOR COVERINGS
CARPET
NOTE: SHAW CONTRACT MANUFACTURE PARTICIPATES IN
SCHOTT DESIGN'S RECYCLING NO COST ADD TO CLIENT
OR PROJECT PROCESS. REFER TO SCHOTT DESIGN
DECONSTRUCTION NOTES ON DI I I FOR PROCESS DETAILS.
C('1t MFG SHAW CONTRACT
TYPE: BROADLOOM
PATTERN: OUTLINE 5AI87
COLOR: NIGHT87496
EX EXISTING TO REMAIN. CLEAN AND REPAIR
AS REQUIRED FOR LIKE NEW
APPEARANCE.
WALL BASE
VB1 MFG: JOHNSONITE
TYPE: 4" VINYL COVE,ye" GAUGE
COLOR: 20 CHARCOAL
EXISTING TO REMAIN, REPAIR AS
EX REQUIRED PER DECONSTRUCTION
PAINT
f�1 MFG: SHERWIN WILLIAMS
TYPE: PROMAR 200 ZERO VOC INTERIOR LATEX
COLOR: ORIGINAL WHITESW7077
FINISH: FLAT
O MFG: SHERWIN WILLIAMS
TYPE: PROMAR 200 ZERO VOC INTERIOR LATEX
COLOR: STILLWATER SW6223
FINISH: FLAT
�3 MFG: SHERWIN WILLIAMS
TYPE: PROMAR 200 ZERO VOC INTERIOR LATEX
COLOR: PEACOCK PLUME SWO020
FINISH: FLAT
O EXISTING TO REMAIN. TOUCH UP/REPAIRAS REQUIRED PER
DECONSTRUCTION.
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
DATE: 08/02/19
GENERAL NOTES
I. REFER TO LEGEND FOR ALL ACCENT/SPECIALTY PAINT OR
WALLCOVERING THAT REQUIRES LEVEL 4 OR LEVEL 5 DRYWALL
FINISH. REFER TO MANUFACTURER RECOMMENDATIONS.
2. AT ALL FLOOR TILE LOCATIONS PROVIDE WATERPROOFING CRACK
ISOLATION MEMBRANE: TEC HYDRAFLEX FULL COVERAGE PER
TCNA F 125-11 FULL. PROVIDE CONTROL JOINTS EVERY 12' AT
MINIMUM OR AS RECOMMENDED BY MANUFACTURER.
3. AT NEW WALL TILE LOCATIONS PROVIDE APPROPRIATE SUBSTRATE FOR
WALL TILE TAT EXISTING WALLS SCHLUTER KERDI BOARD OR EQUAL) TAT
NEW WALLS CEMENT BACKER BOARD) AS RECOMMENDED BY
MANUFACTURER.
PLAN NOTES
iiiiiiiiiiim
SSEAM SEAL TRANSITION BETWEEN EXISTING CARPET AND NEW
CARPET. SLIGHT DYE LOT DIFFERENCE WILL OCCUR BETWEEN
EXISTING AND NEW CARPET. MATCH EXISTING PATTERN
DIRECTION TO CREATE SEAMLESS APPEARANCE AS MUCH AS
POSSIBLE.
® AREA NOT IN CONTRACT FINISH PLAN
❑ AREA OF WORK 0 ]' 4' R' 16' N I<)
THIS DRAWING. AND ME IDEAS,
DESIGNS AND CONCEPTS CONTAINED
HEREIN, ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF SCHOTT
DESIGN, INC.. AND ARE NOT TO BE
USED OR REPRODUCED IN WHOLE, OR
IN PART, WITHOUT THE WRITTEN
CONSENT OF SCH07 DESIGN.
0
N
N
W
H
CD
ZCN
CV
E NNO
O LU
Z W Z
Lu
I —
atn N Zzo
>aon
2XWQ
Win
zz
0
Q
0
ISSUE
DATE
DESCRIPTION
06.17.19
REVIEW SET
06.19.19
PERMITSET
REVISIONS
PROJECT NUMBER
2018.479
PROD. MGR DRAWN BY
2ND FLOOR
FINISH PLAN
A131
DOOR SCHEDULE
# DIMENSIONS DOOR FRAME HARDWARE REM.
Ol
3'-0'Sc8'-0'k13/"
TYPE
Dl
MATERIAL
EUSE/MATCH
EXISTING
FINISH
TYPE
F2
MATERIAL
TIMELY
FINISH
MATCH
EXIST.
OL
Rl
STAIN TO
MATCH EXIST.
02
3'-0'k8'-0'kl%"
IEXISTING
EUSE/MATCH
STAIN TO
MATCH EXIST.
F2
TIMELY
MATCH
EXIST.
OIL
11
03
3'-0'k8'-0NIY%'
Dl
EUSE/MATCH
EXISTING
STAIN TO
MATCH EXIST.
I
TIMELY
MATCH_
EXIST.
OIL
I
04
3'-0'k8'-0'kl%"
IEXISTING
EUSE/MATCH
STAIN TO
MATCH EXIST.
F2
TIMELY
MATCH_
EXIST.
OIL
I
OS
3'-0'k8'-0'kl%"
IEXISTING
EUSE/MATCH
STAIN TO
MATCH EXIST.
ITIMELY
MATCH_
EXIST.
OIL
I
Ob
3'-0'k8'-0'kl%"
Dl
EUSE/MATCH
EXISTING
STAIN TO
MATCH EXIST.
I
TIMELY
MATCH
EXIST.
OIL
11
3'-0'k8'-0NIY%'
D2
EUSE/MATCH
EXISTING
STAIN TO
MATCH E%IST.
FI
TIMELY
MATCH
EXIST.
OIL
I
FO8
3'-0'k8'-0NIY%'
Dl
EUSE/MATCH
EXISTING
STAIN TO
MATCH E%IST.
F2
TIMELY
MAT HOL
EXIST.
R1
3-0'kFULL HEIGHT
D3
HERCULITE GLASS SYSTEM
I DRYWALL WRAPPED OPENING
EL, CR, CL, PP
R2
DOOR/FRAME TYPES
0
U
0
0
0
3'-0
D1 D2
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City d Camel
DATE: 08/02/19
XoX
D3
ROVINONE
LOCKING LAELMR PULL
ON EACH SIM Of
DOOR TOTAL COUNT
2), AS NOTED IN
REMARKS
R"'ifl' i=411
11�11
REMARKS
RI. PROVIDE VINYL FILM; LLUMAR, FROST SERIES 36"ROLL, GLACIER
NRM55 PS4. DESIGN INTENT IS FOR FILM TO BE INSTALLED FROM
2'-6" AFF TO 5'-6" AFF.
R2. PROVIDE ADA COMPLIANT C.R. LAURENCE BRUSHED STAINLESS 60"
LOCKING LADDER PULL#LLPA60BS, PROVIDE VINYL FILM ON
DOOR. DESIGN INTENT IS FOR FILM STYLE AND PLACEMENT TO
MATCH TENANT'S EXISTING SUITTE DOUBLE DOOR ENTRY. CONFIRM
EXACT REQUIREMENTS WITH TENANT.
HARDWARE LEGEND
CL CLOSER
CH COATHOOK
OR CARD READER BYTE FAINT (N.LC.)
DB DEADBOLT
DL DUMMY LEVER
EL ELECTROMAGNETIC LOCK (PER IBC 2012)
ES ELECTRIC STRIKE BY TENANT I N.I.C.)
H HOLD OPEN
KP KICK PLATE
KS KICK STOP
OL OFFICE LOCKSET
PH PANIC HARDWARE
PIT PRIVACY LOCKSET
PP PUSH/PULL
PS PASSAGE LATCHSET
PV PIVOT HINGE
RL ROLLER LATCHES
SL STOREROOM LOCKSET
TS TOP STRIKES
F1 F2
DOOR/FRAME NOTES
I. REUSE DOORS FROM DECONSTRUCTION WHERE POSSIBLE; TOUCH UP
EXISTING DOOR STAIN AS REQUIRED. PROVIDE NEW BUILDING STANDARD
DOORS MATCHING EXISTING VENEER AS REQUIRED. STAIN NEW DOORS
TO MATCH EXISTING. PRE -MACHINE NEW DOORS FOR CYLINDRICAL
LOCKSETS.
2. PROVIDE NEW HARDWARE TO MATCH EXISTING ON NEW DOORS. REUSE
EXISTING HARDWARE ON EXISTING DOORS WHERE POSSIBLE, FOR NEW
DOOR HARDWARE, PROVIDE GRADE 2 MINIMUM BUILDING STANDARD.
PROVIDE A.D.A. ACCESSIBLE LEVER HANDLES ON NEW LOCK AND
LATCHSETS.
3. PROVIDE NEW BUILDING STANDARD FRAMES AS REQUIRED. REUSE
EXISTING FROM DEMOLITION WHERE POSSIBLE. IF FRAMES ARE NOT BEING
REPAINTED, TOUCH UP EXISTING FRAMES TO BE REUSED.
4. FRAME ALL DOOR ROUGH OPENINGS 4" FROM ADJACENT WALL
CORNERS UNLESS OTHERWISE NOTED ON PLAN.
5. REFER TO TENANT AND LANDLORD FOR KEYING REQUIREMENTS AND
LOCKSETS.
6. TENANT'S SECURITY VENDOR IS RESPONSIBLE FOR THE SPECIFICATION,
PURCHASE, AND INSTALLATION OF ALL ACCESS CONTROLLED
ELECTRONIC AND/OR MAGNETIC HARDWARE AND ASSOCIATED DEVICES.
ALL SPECIFICATIONS AND INSTALLATIONS MUST COMPLY WITH THE
INDIANA BUILDING CODE, CHAPTER 10, MEANS OF EGRESS.
7. PROVIDE BUTT HINGES ON ALL DOORS AS FOLLOWS:
• 7'0 HT, TO HAVE 3 HINGES
• GREATER THAN 7-0 IN IN HT. TO HAVE 4 HINGES
• FINISH TO MATCH HARDWARE SET
8. PROVIDE()) SET OF SILENCERS ON ALL DOOR FRAMES UNLESS OTHERWISE
NOTED.
9. PROVIDE WALL STOP (FLOOR STOP WHERE APPLICABLE)AT EACH DOOR
UNLESS OTHERWISE NOTED. PROVIDE WOOD BLOCKING BEHIND WALL
STOP.
Q E
N O
�,OpU
N VOl=
n z ^ 0
o=v?-0O P Q^
w ooaN
Qa
C
THIS DRAWING. AND ME IDEAS,
DESIGNS AND CONCEPTS CONTAINED
HEREIN, ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF SCHOTT
DESIGN, INC., AND ARE NOT TO BE
USED OR REPRODUCED IN WHOLE, OR
IN PART, WIM IR ME WRITTEN
CONSENT OF SCH07 DESIGN.
O
N
N
W
H
Z"
R
r O H
W
Zw
r
N
�ZZ
C
w
W ::�
Z
R—
O
Cr
CV
Z
v /
O
r
ISSUE
DATE
DESCRIPTION
06.17.19
REWEW SET
06.19.19
PERMIT SET
REVISIONS
MARX DATE I DB
IN 0.
AR10700017
STATE OF
PROJECT NUMBER
2018.479
PROD. MGR DRAWN BY
2ND FLOOR
DOOR SCHEDULE
A211
LEGEND
NEW CONSTRUCTION
EXISTING TO REMAIN
POWER OUTLET, DUPLEX
POWER OUTLET, DUPLEX
POWER OUTLET
POWER OUTLET
QUADRUPLE%
QUADRUPLE%
JQ
JUNCTION BOX
QJ
JUNCTION BOX
OCEILING
MOUNTED
CEILING MOUNTED
JUNCTION BOX
JUNCTION BOX
®
BOX, BLANK COVER PLATE
®
BOX, BLANK COVER PLATE
®
BOX, OPEN
QO
BOX, OPEN
P
PROVIDE JUNCTION BOX
P
POWER AND DATA POLE
EI
ABOVE CEILING FOR
O
POWER POLE
CONNECTION. POWER
POLE BY OTHERS.
FLOOR BOX WITH POWER
FLOOR BOX WITH POWER
F6I®
AND DATA, FLUSH
�
AND DATA, FLUSH
MOUNTED
MOUNTED
FLOOR BOX WITH
FLOOR BOX WITH
®
JUNCTION BOX AND
J 14
JUNCTION BOX AND
DATA, FLUSH MOUNTED
DATA, FLUSH MOUNTED
DATA/COMMUNICATION
DATA/COMMUNICATION
14
OUTLET (PROVIDE BOX
b
OUTLET
AND PULL STRING ONLY)
DED
DEDICATED CIRCUIT
GFCI
GROUND FAULT CIRCUIT
INTERRUPT OUTLET
+42"
HEIGHT OF ELECTRICAL
OR DATA DEVICE
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
DATE: 08/02/19
GENERAL NOTES
I. TENANT'S FURNITURE VENDOR IS RESPONSIBLE FOR INSTALLATION OF
FURNITURE AND FIELD VERIFICATION OF ALL CRITICAL DIMENSIONS.
2. ALL OUTLETS ARE TO INSTALLED 18" MIN. A.F.F. TO THE CENTER OF
THE DEVICE PER ADA GUIDELINES UNLESS NOTED OTHERWISE. ALL
NEW DEVICES AND FACE PLATES TO MATCH EXISTING.
3. REFER TO DOOR SCHEDULE AND COORDINATE WITH
TENANT/OWNER REGARDING POWER LOCATIONS TO
ACCOMMODATE ELECTRIC STRIKES, CARD READERS AND/OR
MAG-LOCKS. CARD READERS ARE TYPICALLY INSTALLED BY THE
TENANT'S SECURITY CONTRACTOR AND NOT SPECIFIED BY SDI.
4. ELECTRICAL WORK IS LIMITED TO A DESIGN -BUILD SCOPE AND IS
OUTLINED IN THESE DRAWINGS. ALL ELECTRICAL WORK IS LIMITED
TO ADDITIONS OR RELOCATIONS OF ELECTRICAL OUTLET DEVICES
AND LIGHTING THAT DO NOT EXCEED THE CAPACITY OF THE
EXISTING ELECTRICAL SERVICE IN THE BUILDING. ELECTRICAL
CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL
WORK IS REQUIRED SO THAT ADDITIONAL PLANS CAN BE FILED AND
MUST COMPLY WITH ALL APPLICABLE CODES,
PLAN NOTES
E01 COORDINATE COPIER RECEPTACLE WITH TENANT. PROVIDE
DEDICATED RECEPTACLE AS REQUIRED.
E02 PROVIDE JUNCTION BOX AND DATA FOR TENANT'S FURNITURE
SYSTEM. COORDINATE EXACT LOCATION WITH TENANT'S
FURNITURE VENDOR.
EOJ PROVIDE FLUSH MOUNT FLOOR CORE WITH POKE THRU DEVICE
FOR POWER AND DATA. COORDINATE WITH TENANTS FURNITURE
VENDOR ON EXACT LOCATION, PROVIDE POKE THRU DEVICE
SUBMITTAL TO TENANT FOR APPROVAL PRIOR TO ORDERING.
E04 IF POSSIBLE, CONVERT EXISTING BLANK/OPEN BOX TO NEW
RECEPTACLE AS SHOWN, IF NOT POSSIBLE, REMOVE BLANK/OPEN
BOX AND PROVIDE NEW RECEPTACLE AT THIS LOCATION.
E05 PROVIDE MAG-LOCK HARDWARE AND POWER AS REQUIRED TO
HERCU LITE DOOR. SEE DOOR SCHEDULE FOR MORE DETAILS. ALL
CARD READER HARDWARE TO BE PROVIDED AND INSTALLED BY
TENANT'S SECURITY VENDOR, COORDINATE WITH VENDOR FOR
MORE INFORMATION.
PROVIDE POWER AND DATA FOR TENANT'S WALL MOUNTED
E06
TELEVISION AT HEIGHT NOTED ON PLAN. COORDINATE EXACT
LOCATION WITH TENANT.
® AREA NOT IN CONTRACT ELECTRICAL PLAN
❑ AREA OF WORK 0 2' 4' 8' 16' IN
THIS DRAWING. AND ME IDEAS,
DESIGNS AND CONCEPTS CONTAINED
HEREIN, ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF SCHOTT
DESIGN, INC., AND ARE NOT TO BE
USED OR REPRODUCED IN WHOLE, OR
IN PART, WITHOUT ME WRITTEN
CONSENT OF SCH07 DESIGN.
O
N
N
W
H
CD
Z`�C
CN
0
E �
O LU
Z WZ
H
ato c/j
Zz0
>aon
2XWQ
Win
zz
T-
0
Q
0
ISSUE
DATE
DESCRIPTION
06.17.19
REVIEW SET
06.19.19
PERMITSET
REVISIONS
PROJECT NUMBER
2018.479
DRAWN BY
BW
2ND FLOOR
ELECTRICAL PLAN
E111