HomeMy WebLinkAboutHYLANTEXPANSION_PERMITSET_061919GENERAL PROJECT NOTES ].BUILDING CODE COMPLIANCE: ALL WORKS HALL COMPLY WITH THE REQUIREMENTS OF THE EXISTING BUILDING CONSTRUCTION TYPE AS DEFIN ED BY SECTION 601 OF THE INDIANA BUILDING CODE. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF ALL APPLICABLE STATE AND LOCAL BUILDING CODES. CONTRACTORS ARE RESPONSIBLE FOR VERIFYING THE CURRENT APPLICABLE BUILDING CODES( FOR THEIR RESPECTIVE SCOPE OF WORK. ENSURE THAT ALL MATERIALS AN D LABOR ARE IN ACCORDANCE WITH THE BESTQUALITY STANDARDS OF EACH RESPECTIVE TRADE WHETHER SPECIFIED OR NOT. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL WORK IS IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL BUILDING CODES, AND STANDARDS FOR GENERAL, MECHANICAL, AND ELECTRICAL CONSTRUCTION. 2. CONTRACTOR SITE VISIT$: CONTRACTORS( SHALL VISIT THE WORK SITE PRIOR TO COMMENCEMENT, THE DRAWINGS CONTAINED HEREIN MAY NOT BE ALL INCLUSIVE OF EXISTING CONDITIONS OR NEW WORK REQUIREMENTS. CONTRACTORS( SHALL MAKE THEMSELVES FAMILIAR WITH THE WORK SITE IN THE FIELD IN ORDER TO BE FULLY AWARE OF THE REQUIREMENTS OF THE SCOPE OF WORK. 3. CONTRACTOR FIELD VERIFICATION: FIELD VERIFY ALL DIMENSIONS AND MEASUREMENTS. INFORM THE GENERAL CONTRACTOR BEFORE BEGINNING ANY CONSTRUCTION IF EXISTING CONDITIONS PREVENT OBTAINING RESULTS AS SHOWN OR SPECIFIED. DO NOT SCALE DRAWINGS, NOTED DIMENSIONS TAKE PRECEDENCE, VERIFY EXISTING CONDITIONS INDICATED ON THE DRAWINGS AND REPORT ANY DISCREPANCY THROUGH THE GEN ERAL CONTRACTOR TO SCHOTT DESIGN, INC. 4. GENERAL CONTRACTOR COORDINATION WITH OWNER: THE GEN ERAL CONTRACTOR SHALL COORDINATE WITH THE OWNER REGARDING ALL ON -SITE ACTIVITIES; SUCH AS, BUT NOT LIMITED TO, WORK SCHEDULE, MATERIALS STORAGE AND HANDLING, DELIVERIES, ACCESS TO THE WORK SITE, TRAFFIC CONTROL, AND BUILDING/PUBLIC SAFETY PROCEDURES DURING CONSTRUCTION. THE CONTRACTOR SHALL ALSO COORDINATE WORK BY OTHERS" WITH HIS/HER OWN ACTIVITIES AS NECESSARY TO EXECUTE THE OVERALL PROJECT SCOPE. THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, DAILY WORKING HOURS, WEEKEND HOURS AND HOURS THAT MAY BE WORKED PRIOR TO AND DURI NO HOLIDAYS. LANDLORD RESERVES THE RIGHT TO RESTRICT CONSTRUCTION TO NIGHTS AND WEEKENDS WHEN THAT CONSTRUCTION 15 DEEMED TO INTERFERE WITH THE OPERATIONS OF ADJACENT TENANTS. 5. PROJECT MATERIAL LEAD TIMES: FOR THOSE ITEMS TO BE ORDERED REQUIRING LEAD TIME, THE CONTRACTOR SHALL COORDINATE THE PROJECT SCHEDULE ACCORDINGLY AND COMMUNICATE TO THE OWNER, TENANT, AND SCHOTT DESIGN WHEN DECISIONS MUST BE RENDERED IN ORDER FOR THE CONTRACTOR TO MEET THE PROJECT SCHEDULE, THE OWNER, TENANT, OR DESIGNER/ARCHITECT IS NOT RESPONSIBLE FOR DELAYS RESULTING FROM THE CONTRACTOR'S FAILURE TO COMMUNICATE MATERIAL LEAD TIMES. 6. MATERIAL SUBSTITUTIONS: SUBSTITUTIONS FOR SPECIFICALLY NAMED PRODUCTS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL FROM THE DESIGNER. SUBMIT REQUESTS FOR SUBSTITUTIONS WITH APPROPRIATE SUPPORT INFORMATION TO THE DESIGNER. ALLOW REASONABLY SUFFICIENT TIME FOR THE DESIGNER TO REVIEW THE REQUEST AND RENDER A DECISION. 7. SAFE WORK AREA: SCHOTT DESIGN, INC., SHALL NOT HAVE CONTROL OVER, OR BE IN CHARGE OF, AND SHALL NOT BE RESPONSIBLE FOR A CONTRACTOR'S CONSTRUCTION MEANS, METHODS, SCHEDULES, SEQUENCES, OR SAFETY. THE CONTRACTORS SHALL BE RESPONSIBLE FOR MAINTAINING A SAFE ENVIRONMENT FOR WORKERS AN D THE PUBLIC AT ALL TIMES. B. GENERAL CONTRACTOR CLEANUP PROCEDURES: THE GENERAL CONTRACTOR SHALL ESTABLISH WITH THE LANDLORD CLEANUP PROCEDURES AND GUIDELINES TO BE FOLLOWED ON A DAILY BASIS IN ORDER TO CONDUCT BUSINESS IN ASAFE AND CLEAN ENVIRONMENT. 9. STAGING/ PARKING/ DUMPSTERS/ RESTROOMS: THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, AN AREA FOR STAGING OF CONSTRUCTION MATERIALS, EQUIPMENT, DUMPSTER AND PARKING CONSTRUCTION AND DELIVERY VEHICLES. THE USE OF EXISTING REST ROOM FACILITIES SHALL BE APPROVED BY THE LANDLORD. ONLY THOSE DESIGNATED AREAS SHALL BE USED BY CONSTRUCTION CREWS. 10. DUST CONTROL: THE GENERAL CONTRACTOR SHALL USE DUST PARTITIONS TO MINIMIZE DISTURBANCES OF DAILY TENANT OPERATIONS DURING DEMOLITION AND CONSTRUCTION WORK. DUST PARTITIONS SHALL BE CONSTRUCTED OF 2X4 WOOD STUDS ® 24"O.C., INSULATION AND 6 MIL VAPOR BARRIER ON EACH SIDE, 11. PROJECT INSTALLATION CONFLICTS: CONTACTTHE DESIGNER IMMEDIATELY IF, IN THE FIELD, CONFLICTS ARE DISCOVERED BETWEEN COMPONENTS OF DIFFERENT SYSTEMS THAT PREVENT THE INSTALLATION OF THOSE COMPONENTS AS INDICATED ON THE DRAWINGS. (I.E. WHERE EXISTING MECHANICAL DUCTWORK MAY PREVENT THE INSTALLATION OF LIGHTING FIXTURES AS INDICATED ON THE CEILING PLAN(. 12. SCHOTT DESIGN HAZARDOUS MATERIALS WAIVER: SCHOTT DESIGN, INC., IS NOT RESPONSIBLE FOR THE IDENTIFICATION, DISCOVERY, PRESENCE, HANDLING, REMOVAL, DISPOSAL OF, OR EXPOSURE TO ANY PERSONS, THAT OF HAZARDOUS MATERIALS IN ANY FORM ON THE PROJECT SITE. 13. WOOD BLOCKING IN WALLS: PROVIDE FIRE -TREATED WOOD BLOCKING IN WALLS FOR ALL WALL HUNG ITEMS INCLUDING MILLWORK, WALL STOPS, CABINETRY, ETC, 14. SHOP DRAWINGS: SHOP DRAWINGS OR CATALOG CUTS MUST BE SUBMITTED TO SCHOTT DESIGN, INC. FOR APPROVAL ON ALL MATERIALS OR ITEMS WHERE THE CONTRACTOR CHOOSES TO DEVIATE FROM WHAT IS SHOWN ON THE DRAWINGS, OR IF THE DRAWINGS DO NOT INDICATE A SPECIFIC MANUFACTURER OR MODEL NUMBER. EXPEDITE PREPARATION AND SUBMITTAL OF ALL SHOP DRAWINGS TO ALLOW SUFFICIENT TIME FOR CHECKING, APPROVAL, ORDERING, FABRICATION, AND DELIVERY OF MATERIALS AND EQUIPMENT. 15. PROJECT APPROVALS: ALL DETAILS, MATERIALS, AND INSTALLATIONS ARE SUBJECT TO FIRST APPROVAL BY SCHOTT DESIGN, INC., AND FINAL APPROVAL BY THE OWNER. 16. CHANGE ORDERS: REVIEW AND COORDINATE ALL NEW WORK AND EXISTING CONDITIONS WITH ALL OTHER TRADES, FIELD WORK ORDERS & CHANGE ORDERS WILL NOT BE APPROVED FOR ANY CONDITIONS OR CONFLICTS THAT COULD HAVE BEEN ACCOUNTED FOR BY THE BIDDER DURING PRE -BID FIELD INSPECTION AND AFTER AWARD OF CONTRACT, RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes aT, City GF Camel IVT�tDN�DMK DATE: \ 08/02/19 17. FURNITURE AND EQUIPMENT EXCLUSIONS: FURNITURE, OFFICE EQUIPMENT OFFICE PARTITION SYSTEMS, REFRIGERATORS, VENDING MACHINES, AND OTHER SIMILAR ITEMS SHOWN DASHED ON THIS DRAWING AND NOT ATTACHED TO THE BUILDING ARE FOR REFERENCE ON LV AND ARE NOT TO BE PROVIDED AS PART OF THE WORK UN LESS SPECIFICALLY STATED TO BE PROVIDED, 18. WALL PATCHING: PATCH ALL GYPSUM WALLBOARD AT AREAS OF ELECTRICAL, DATA AND SWITCH DEVICES BEING REMOVED. PATCH HOLE WITH DRYWALL, TAPE, SPACKLE AND PREPARE FOR FINISH. 19. CONSTRUCTION CLEANING: EXECUTE A THOROUGH FINAL CLEAN AND NSPECTION OF THE SPACE UPON COMPLETION OF THE PROJECT. ALL SURFACES, FIXTURES, AND EQUIPMENT SHALL BE CLEAN, AND THE SPACE SHALL BE TURNED OVER TO THE OWNER IN A CONDITION THAT REPRESENTS THE HIGHEST LEVEL OF CARE AND PROFESSIONALISM. ENSURE ALL GENERAL CONTRACTOR INSTALLED APPLIANCES WORK & DO NOT LEAK. 20, O&MMATERIALS: PROVIDE TO THE OWNER ALL OPERATION AND/OR MAINTENANCE MANUALS, OR INSTRUCTIONS FOR ALL EQUIPMENT AND SYSTEMS AT THE COMPLETION OF THE PROJECT. 21. PLAN DIMENSIONS: ALL PLAN DIMENSIONS ARE FROM FACE OF EXISTING FINISH TO FACE OF NEW GYPSUM BOARD WALL, OR FACE TO FACE OF NEW GYPSUM BOARD WALL. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN. 22. WINDOW BLINDS: CONTRACTOR TO PROVIDE AN ALLOWANCE FOR CLEANING EXISTING WINDOW BLINDS. REPLACE ANY DAMAGED OR MISSING WINDOW BLINDS WITH NEW TO MATCH BUILDING STANDARD. 23, PERMITTING: THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE REQUIREMENTS REGARDING LOCAL PLAN REVIEW, PERMITS, NSPECTIONS, AND FEES. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING ALL REQUIRED DRAWINGS AND SUPPORTING DOCUMENTS TO THE LOCAL BUILDING OFFICIAL AND/OR PERMIT DEPARTMENT. ALL REQUIRED LOCAL PERMIT FEES SHALL BE PAID BY THE GENERAL CONTRACTOR UNLESS STIPULATED OTHERWISE IN THE OWNER/CONTRACTOR AGREEMENT. 24, FIRE SEALING: FIRE SEAL ALL PENETRATIONS THROUGH RATED WALLS, FLOORS, AND CEILINGS WITH APPROVED FIRE -RATED CAULK AS DIRECTED BY LOCAL JURISDICTIONS. CONTRACTOR TO BE AWARE THAT EXISTING CONDITIONS ARE NOT NECESSARILY AN INDICATOR OF BUILDING TYPE, BUILDING TYPE LISTED ON LIDO IS BASED UPON AVAILABLE INFORMATION AND FIELD VERIFICATION. 25. WALL PENETRATIONS: WHERE STRUCTURAL BEAMS DUCTWORK, ETC. PENETRATE SOUND OR FIRE RATED PARTITIONS, GYPSUM WALLBOARD WALL TO BE SCRI BED TO FIT TIGHT, CAULKED AND FIRE DAMPERED IF REQUIRED. 26. FLOOR LEVELING: CONTRACTOR TO ALLOW FOR UNLEVEL FLOOR CONDITIONS. ALL EXISTING FLOOR AND WALL SUBSTRATES SHALL BE LEVELED AND PATCHED AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND FINISHES. ADJUST DOORS AND FRAMES AS REQUIRED. 27, REPAIR GYPSUM WALLBOARD: WHERE DEMOLITION HAS OCCURRED AT REMAINING WALLS. REPAIR ANY GYPSUM BOARD DAMAGED BY DEMOLITION. PROVIDE EXPANSION JOINTS IN DRYWALL WHERE NEW WALLS MEET OR ADJOIN TO EXISTING CORE WALLS, 28. EQUIPMENT INSTALLATION: ALL EQUIPMENT AND/OR FIXTURES SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS OR INSTRUCTIONS. FINISH NOTES 1. STATE BUILDING COMPLIANCE FOR FINISHES: ALL FINISHES SHALL COMPLY WITH CHAPTER (INTERIOR FINISHES( OF THE INDIANA BUILDING CODE FOR CLASS AFIRE RATINGS. 2. GYPSUM ASSOCIATION CONFORMITY: FOR ALL NEW DRYWALL INSTALLATIONS, INSTALL AS RECOMMENDED BY THE GYPSUM ASSOCIATION. (SUCH AS, CONTROL JOINTS, FINISH LEVELS, FASTENERS, TAPING DETAILS, CORNER BEADS, ETC.( PROVIDE NEW CEMENT BACKER BOARD AS A SUBSTRATE FOR NEW WALL TILE PER MANUFACTURER'S RECOMMENDATIONS. 3. COVER PLATES: REFERENCE REFLECTED CEILING PLAN AND ELECTRICAL PLAN FOR COLOR OF ELECTRICAL AND DATA DEVICES AND PLATES. REMOVE ALL PLATES BEFORE PAINTING AND REATTACHED AFTERWARDS. CONTRACTOR TO CONFIRM DESIRED COLOR PRIOR TO PURCHASING NEW. 4. PAINTING: ALL AREAS RECEIVING PAINT ARE TO RECEIVE PRIMER COAT AN D TWO (2( FINISH COATS. 5. FLOORING TRANSITION STRIPS: FOR CHANGE IN FLOOR FINISH MATERIAL, PROVIDE TRANSITION STRIP AT DOOR OPENINGS AS NOTED ON FINISH PLAN UNLESS NOTED OTHERWISE (I.E. WHERE VCT MEETS CARPET(. 6. DELIVERY OF COMPREHENSIVE WORK PRODUCT: WHERE LIMITS OF WORK ARE SHOWN, OTHER INCIDENTAL WORK LIKE PAINTING WHERE NEW OUTLETS HAVE BEEN INSTALLED, IS CONSIDERED PART OF THE SCOPE OF WORK. PROVIDE A COMPLETE AND FINISHED PRODUCT READY FOR TENANT AND BUILDING OWNER. 7. WALL DEMOLITION: REFINISH SURFACES TO MATCH EXISTING WHERE DEMOLITION HAS OCCURRED. REPAIR GYPSUM WALLBOARD WHERE DEMOLITION HAS OCCURRED AT REMAINING WALLS. REPAIR ANY GYPSUM BOARD DAMAGED BY DEMOLITION. PROVIDE EXPANSION JOINTS IN DRYWALL WHERE NEW WALLS MEET OR ADJOIN TO EXISTING CORE WALLS. 8. TELEPHONE BOARDS: WHERE PHONE BOARD IS PROVIDED, PAINT BOARD WITH FIRE RETARDANT PAINT TO MATCH ADJACENT WALL FINISH. 9. MILLWORK SAMPLES: SUBMIT FINISH SAMPLE OF MILLWORK (STAINED OR PAINTED AS SPECIFIED( TO SCHOTT DESIGN FOR REVIEW AND APPROVAL PRIOR TO THE FINISHING PROCESS OF ALL MILLWORK. 10. INTERIOR ELEVATION DETAILS: REFERENCE INTERIOR ELEVATION & SECTIONS WHERE PROVIDED FOR ADDITIONAL FINISH INFORMATION. 11. PAINT & ADHESIVE VOC'S: ALL PAINTS AND ADHESIVES/SEALANTS SHALL HAVE ZERO VOC CONTENT, 12. ADHESIVE MANUFACTURER RECOMMENDATIONS: ALL ADHESIVES/SEALANTS TO BE USED AS RECOMMENDED BY PRODUCT MANUFACTURER. MECHANICAL 8& ELECTRICAL NOTES I. DESIGN/BUILD MEP: THE MECHANICAL, ELECTRICAL AND PLUMBING SCOPES OF WORK ARE LIMITED TO BASIC DESIGN -BUILD ALTERATIONS WHICH ARE OUTLINED IN THESE PLANS. THE DESIGN -BUILD CONTRACTORS FOR EACH TRADE MUST NOTI FV THE ARCHITECT IF THEY FI ND THAT THE SCOPE OF WORK EXCEEDS THE LEVEL OF MECHANICAL, ELECTRICAL OR PLUMBING WORK INDICATED ON THESE DRAWINGS SO THAT ANY NECESSARY ENGINEERING CAN OCCUR AND ADDITIONAL PLANS CAN BE FILED, OR IF ADDITIONAL INFORMATION IS NEEDED IN ORDER TO DO THE WORK IN THE FIELD. THE MECHANICAL ELECTRICAL AND PLUMBING DESIGN -BUILD CONTRACTORS SHALL COMPLY WITH ALL APPLICABLE STATE AND LOCAL BUILDING CODES. FIRE SUPPRESSION AND FIRE ALARM SYSTEMS SHALL BE INSTALLED BY THE APPROPRIATE DESIGN -BUILD CONTRACTOR AND MUST COMPLY WITH ALL APPLICABLE STATE AND LOCAL BUILDING CODES. FIRE SUPPRESSION AND FIRE ALARM DESIGN -BUILD CONTRACTORS ARE RESPONSIBLE FOR COMPLETING AND FILING THEIR PLANS AND OBTAINING THEIR PERMITS, 2. DESIGN/BUILD HVAC: MECHANICAL WORK IS LIMITED TO DESIGN -BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS. NO NEW MAIN MECHANICAL APPLIANCES OR MAIN EQUIPMENT ARE BEING PROVIDED. ALL MECHANICAL WORK IS LIMITED TO RELOCATION OF DIFFUSERS AND FLEX DUCT PER NEW WALL LAYOUT. NO NEW HARD DUCTWORK OR EQUIPMENT IS BEING ADDED; MECHANICAL CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS REQUIRED SO THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY WITH THE INDIANA MECHANICAL CODE AND ALL OTHER APPLICABLE CODES, 3. HVAC HEAT LOADS: VERIFY HEAT LOADS OF ANY SPECIAL EQUIPMENT N THE TENANT SPACE, AND PROVIDE ADDITIONAL AIR FLOW IF REQUIRED. CONFIRM WITH OWNER PRIOR TO ANY PURCHASE OF NEW EQUIPMENT, REVISE ZONING IF REQUIRED. DO NOT DESIGN ANY SINGLE OFFICE SPACE TO BE ON A SPLIT ZONE UNLESS APPROVED BY BUILDING OWNER/LANDLORD. CONTRACTOR TO ENSURE THAT ALL HVAC ZONES ARE LOCATED APPROPRIATELY SUCH THAT NO SPLIT ZONES ARE IN OFFICES OR CONFERENCE ROOMS. 4. HVAC DIFFUSER LOCATIONS: RELOCATE AIRSUPPLYDIFFUSERS AND RETURN -AIR GRILLES AS REQUIRED, PROVIDE PROPER AIR SUPPLY FOR DIFFUSERS AND RETURN AIR FROM RETURN AIR GRILLES. CONTRACTOR IS TO PLACE LOCATION OF DIFFUSERS AND RETURN AIR GRILLES AS REQUIRED BY CODE. 5. HVAC THERMOSTAT LOCATIONS: POSITION LOCATION OF ALL THERMOSTATS WHERE APPROPRIATE PER MECHANICAL DESIGN. COORDINATE WITH TENANT AND BUILDING OWNER FOR FURNITURE PANEL OR OTHER CONFLICTS. 6. DESIGN/BWLD ELECTRICAL: ELECTRICAL WORK IS LIMITED TO A DESIGN -BUILD SCOPE AND 15 OUTLINED IN THESE DRAWINGS. ALL ELECTRICAL WORK IS LIMITED TO ADDITIONS OR RELOCATIONS OF ELECTRICAL OUTLET DEVICES AND LIGHTING THAT DO NOT EXCEED THE CAPACITY OF THE EXISTING ELECTRICAL SERVICE IN THE BUILDING. ELECTRICAL CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS REQUIRED SO THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY WITH ALL APPLICABLE CODES. 7. ELECTRICAL CODE COMPLIANCE: COMPLY WITH THE INDIANA ELECTRICAL AND MECHANICAL CODE AND ALL OTHER APPLICABLE CODES. 8. ELECTRICAL CIRCUITING: SIZE AND CIRCUIT ELECTRICAL POWER ITEMS PROVIDE OR REUSE ELECTRICAL POWER AND DATA OUTLETS AS REQUIRED. 9. GFI OUTLETS: ALL ELECTRICAL OUTLETS WITHIN 60 OF WATER ARE TO BE G.F.C.I. 10. PHONE AND DATA ACCOMMODATIONS: AT EACH PHONE AND DATA JACK, PROVIDE PULL STRING FROM ABOVE CEILING TO BOX. TENANTS DATA CONTRACTOR 15 RESPONSIBLE FOR PULLING CONDUCTORS AND PROVIDING APPROPRIATE TERMINALS AT FACE PLATE. 11. ELECTRICAL SWITCH PLATES: PROVIDE COLORED FACEPLATES FOR ELECTRICAL OUTLETS & SWITCH PLATES TO MATCH EXISTING, UNLESS OTHERWISE NOTED. ELECTRICIAN TO FIELD VERIFY PRIOR TO PURCHASE. 12. WORKSTATION POWER: PROVIDE JUNCTION BOXES OR POWER POLES AT WORKSTATIONS WHERE SHOWN. REFER TO THE PLAN FOR THE APPROPRIATE DESIGNATIONS. DATA WILL BE RUN BY THE TENANT'S DATA VENDOR. ELECTRICIAN TO MAKE FINAL CONNECTION FROM WORKSTATION WHIP TO JUNCTION BOX. THE FURNITURE VENDOR IS TO BE RESPONSIBLE FOR WIRING THE BASE PANELS OF THE WORKSTATIONS, CONTRACTOR TO COORDINATE WITH TENANT ON WORKSTATION FURNITURE SPECIFICATIONS TO OBTAIN CIRCUITRY REQUIREMENTS PRIOR TO RUNNING ELECTRICAL CONDUITS TO JUNCTION BOXES. 13. LIGHTING CIRCUITS: VERIFY EXISTING LIGHTING CIRCUITING. SIZE NEW CIRCUITS AS REQUIRED. PROVIDE NEW OR REVISE EXISTING CIRCUITING FOR NEW LAYOUT OF LIGHT FIXTURES. 14. ELECTRICAL OUTLETS: ENSURE THAT ALL MOUNTING HEIGHTS OF ELECTRICAL DEVICES MEETA.D.A. REQUIREMENTS. 15. LIGHTING SWITCH PLATES: WHERE MULTIPLE SWITCHES ARE SHOWN PROVIDE (1( GANG BOX WITH A SINGLE COVERPLATE. 16. LIGHT FIXTURE PLACEMENT: CENTER CEILING ELEMENTS IN CEILING TILES, INCLUDING RECESSED DOWNLIGHTS, SMOKE DETECTORS, SPRINKLER HEADS, AND EXITSIGNS UNLESS OTHERWISE NOTED, 17. EMERGENCY LIGHTING: PROVIDE EMERGENCY LIGHTING IN TENANT SPACE AS REQUIRED PER NEMA AND IBC. EMERGENCY BATTERY PACKS OR LIGHTS CONNECTED TO AN EMERGENCY POWER SOURCE ARE REQUIRED IF THE SPACE CONTAINS 50 PERSONS OR MORE. FIXTURES SHOWN ON PLAN ARE FOR REFERENCE ONLY. 18, FIRE ALARM SYSTEM: PROVIDE ALARM NOTIFICATION APPLIANCES (HORNS/STROBES(, EMERGENCY SPEAKERS, SMOKE DETECTORS, FIRE PULLS, AND ANY OTHER REQUIRED ALARM & DETECTION SYSTEMS AS NECESSARY TO MEET ALL APPLICABLE CODES (INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE, NFPA(. IN RECEPTION AREAS, CONFERENCE ROOMS AND OTHER HIGH PROFILE AREAS WITHIN SUITE, ALL LOCATIONS OF SUCH DEVICES MUST BE APPROVED BY SDI OR TENANT PRIOR TO INSTALLATION. FAILURE TO DO SO MAY RESULT I N CONTRACTOR RELOCATING THESE ITEMS AT THEIR EXPENSE, 20. FIRE ALARM DEVICE LOCATIONS: COORDINATE WITH THE OWNER TENANT PRIOR TO INSTALLATION OF FIRE DETECTION DEVICES REGARDING ALL DEVICE LOCATIONS i0 AVOID CONFLICT WITH FEATURE WALLS (CONFERENCE ROOMS AND RECEPTION AREAS( AND TENANT -INSTALLED ITEMS I.E. PRESENTATION BOARDS A V EQUIPMENT AND PROJECTION SCREENS(. 21. EXISTING LIGHT FIXTURE RELAMP: IF REQUIRED, AND AS NECESSARY, PROVIDE NEW BALLASTS AND LAMPS IN ALL LIGHTS IN EXISTING SPACES. CONSULT WITH LANDLORD. 22. HVAC CONTRACTOR AIR BALANCE: CONTRACTOR TO PERFORM AIR BALANCE UPON COMPLETION OF HVAC SCOPE. PROVIDE REPORT TO LANDLORD. 23. HVAC FLEX DUCT: FLEX DUCT MUST MEET ASHRAE STANDARD BUILDING CODES FOR FLEX DUCT LENGTH. 24. ELECTRICAL CIRCUITS: AREAS WITHIN ELECTRICAL SCOPE MUST BE POWERED BY THE ELECTRICAL PANEL FROM THE FLOOR ON WHICH CONSTRUCTION OCCURS. 25, SUPPLEMENTAL HVAC/ELECTRICAL: IN THE EVENT THAT ANY SUPPLEMENTAL HVAC EQUIPMENT OR ABOVE BUILDING STANDARD ELECTRICAL POWER FACILITIES ARE INSTALLED (SUCH AS IN AN IT SERVER ROOM( CONTRACTOR SHOULD FURNISH AND INSTALL ADDITIONAL ELECTRICAL AND BTU SUB -METERING SO AS TO ENABLE OWNER TO MONITOR TENANTS UTILITY CONSUMPTION (IN RELATION TO THE SU ELECT EQUIPMENT) GOING FORWARD. THE MAKE AND MODEL OF CONTRACTOR'S PROPOSED METERS SHOULD BE REVIEWED AND APPROVED BY OWNER PRIOR TO CONTRACTOR INSTALLATION. 26. ENGINEERED MEP DRAWINGS: WHEN REQUIRED BY STATE BUILDING CODE, THE CONTRACTORS( SHALL PROVIDE DESIGN/BUILD DRAWINGS FOR MECHANICAL, PLUMBING, ELECTRICAL, OR FIRE SUPPRESSION. DRAWINGS SHALL BE CERTIFIED BY A LICENSED ENGINEER AND SUBMITTED BY THE CONTRACTOR FOR STATE DESIGN REVIEW, 27. EQUIPMENT INSTALLATIONS: ALL EQUIPMENT AND/OR FIXTURES SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS OR INSTRUCTIONS, 28. BUILDING DIRECTORY: THE BUILDING AUTOMATION SYSTEM GRAPHIC AND PROGRAMMING TO BE UPDATED WITH NEW TENANT'S INFORMATION FOR FUTURE USE. 29. ELECTRICAL PANELS: ALL ELECTRICAL PANELS TO GET UPDATED CIRCUIT SCHEDULES. FIRE PROTECTION NOTES I. FIRE EXTINGUISHERS: CONTRACTOR TO ENSURE ALL NEW AND EXISTING FIRE EXTINGUISHERS ARE INSTALLED ACCORDING TO NFPA 10. COORDINATE WITH OWNER/LANDLORD ON EXTINGUISHER TYPE AND HOUSING. MAXIMUM TRAVEL DISTANCE OF 75 FEET FROM ANY POINT TO A VISIBLE EXTINGUISHER, THE FOLLOWING NOTES APPLY ONLY IN EXISTING SPRINKLERED FACILITIES. 2. DESIGN BUILD FIRE PROTECTION SYSTEM: FIRE PROTECTION WORK IS TO BE PROVIDED BY DESIGN/BUILD SERVICES UNDER THE GENERAL CONTRACT, PROVIDE A COMPLETE, WORKING SYSTEM, SCHOTT DESIGN, INC., IS NOT RESPONSIBLE FOR THE DESIGN, INSTALLATION, OR RENOVATION OF THE FIRE SPRINKLER SYSTEM. 3. FIRE PROTECTION SYSTEM CODE COMPLIANCE: THE DESIGN/BUILD CONTRACTOR SHALL COMPLY WITH THE INDIANA BUILDING CODE, THE INDIANA FIRE CODE, AND ALL OTHER APPLICABLE LAWS, CODES, RULES AND REGULATIONS THAT APPLY TO DESIGN AND INSTALLATION OF FIRE SPRINKLER/FIRE SUPPRESSION SYSTEMS. 4. FIRE PROTECTION DESIGN DRAWINGS: THE FIRE PROTECTION CONTRACTOR SHALL GENERATE ALL REQUIRED DRAWINGS, AND SHALL FILE THOSE DRAWINGS, AND RELATED DOCUMENTS, WITH THE STATE AND LOCAL AUTHORITIES HAVING JURISDICTION OVER THE PROJECT. 5. SPRINKLER HEADS: PROVIDE NEW OR RELOCATE EXISTING SPRINKLER HEADS AS REQUIRED, PROVIDE MISSING COVER/ESCUTCHEON PLATES FOR SPRINKLER HEADS WHERE APPLICABLE. FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE START OF WORK. DOCUMENT APPROVAL DECONSTRUCTION NOTES I. DECONSTRUCTION DEFINITION: CAREFULLY DISMANTLE SPACES WITH THE GOAL OF MAXIMIZING THE REUSE POTENTIAL OF ITS COMPONENTS, 2. DECONSTRUCTION MANAGEMENT CHECKLIST: ALL ITEMS SHOWN ON THE DECONSTRUCTION PLAN HAVE BEEN CAREFULLY CONSIDERED FOR RECOVERY, REUSE, AND RECYCLING WITH THE BEST INTENT TO DIVERT ITEMS FROM THE LANDFILL. REFER TO DECONSTRUCTION MANAGEMENT CHECKLIST FOR SPECIFIC INSTRUCTIONS. 3. RECYCLING: GENERAL CONTRACTOR IS RESPONSIBLE FOR RECYCLING ANY AND ALL POSSIBLE PROJECT MATERIAL WASTE AND COORDINATING THE APPROPRIATE HAULING CONTAINERS WITH THE WASTE MANAGEMENT SUB -CONTRACTOR. A CO -MINGLE LEED CONTAINER IS REQUIRED FOR RECYCLING. 4. EXISTING STRUCTURAL ELEMENTS OF BUILDING: NO STRUCTURAL OR LOAD -BEARING CONSTRUCTION SHALL BE REMOVED, DEMOLISHED, OR DAMAGED AS A RESULT OF THIS PROJECT UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS. PROTECT ALL EXISTING STRUCTURAL MEMBERS DURING DEMOLITION/CONSTRUCTION. THE CONTRACTOR SHALL VERIFY IN THE FIELD, PRIOR TO DEMOLITION, THAT ALL ITEMS NOTED TO BE DEMOLISHED ARE NOT STRUCTURAL. CONTACTSCHOTT DESIGN IMMEDIATELY IF THE CONTRACTORS) IN THE FIELD SUSPECT THAT AN ITEM NOTED FOR DEMOLITION APPEARS TO BE STRUCTURAL OR OTHERWISE LOAD -BEARING. BEWARE OF STRUCTURAL COLUMNS AND/OR BEAMS THAT MAY BE CONCEALED BEHIN D FINISHES THAT ARE NOTED FOR REMOVAL. EXERCISE CAUTION WHEN DEMOLISHING BUILDING FINISHES OR PARTITIONS ADJACENT TO OR AROUND STRUCTURAL MEMBERS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR INADVERTENT DAMAGE TO THE BUILDING STRUCTURAL SYSTEM. 5. EQUIPMENT, FIXTURE, FINISH RE -USE: WHERE EQUIPMENT, FIXTURES, OR FINISHES ARE MOVED FROM ANY OTHER PART OF THE BUILDING TO BE REUSED IN THE PROJECT AREA, THE CONTRACTOR SHALL INCLUDE IN THEIR SCOPE OF WORK ANY NECESSARY PATCHING OR REPAIRING OF THE REMAINING AREAS FROM WHERE THE ITEMS WERE RELOCATED, UNLESS OTHERWISE DIRECTED BY OWNER. 6. DECONSTRUCTION PUNS: REMOVE ALL EXISTING WALLS AND DOORS WHERE INDICATED BY NOTE, SYMBOL, OR DASHED LINES. NOTE THAT SOME ITEMS HAVE NOT BEEN SHOWN ON DECONSTRUCTION PLAN. VISIT AREA OF WORK TO ASSURE EXTENT OF DECONSTRUCTION. 7. FIELD VERIFICATION OF EXISTING CONDITIONS: REMOVE ALL CARPET, VINYL BASE, VCi, WALL FABRIC, AND ANY OTHER FINISHES AS REQUIRED FOR NEW CONSTRUCTION. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS, REFER TO FINISH PLAN/SCHEDULE FOR CLARIFICATION OF EXISTING FINISHES TO REMAIN. 8. PROTECTION OF BUILDING ELEMENTS TO REMAIN: USE CARE TO PROTECT EXISTING BUILDING ELEMENTS INDICATED ON THE DRAWINGS TO REMAIN SUCH AS, BUT NOT LIMITED TO, EXISTING CEILING GRID, TILES, FIRE SUPPRESSION EQUIPMENT, DIFFUSERS, LIGHT FIXTURES, EQUIPMENT, CASEWORK, AND FINISHES. THE CONTRACTOR SHALL REPLACE AND/OR REPAIR, AT THE CONTRACTOR'S COST, ANY SUCH ELEMENTS DAMAGED DURING CONSTRUCTION THAT COULD HAVE OTHERWISE BEEN REASONABLY PROTECTED AND MAINTAINED IN GOOD CONDITION FOR THE OWNER'S USE IN THE PROJECT. 9. REMOVAL OF ABANDONED CABLING & WIRING: PER THE INDIANA ELECTRICAL CODE (SPREAD OF FIRE OR PRODUCTS OF COMBUSTION( REMOVE ALL ACCESSIBLE PORTIONS OF ABANDON ED CABLES AND WIRING INCLUDING BUT NOT LIMITED TO: DATA WIRING, COMMUNICATIONS WIRING, FIRE ALARM CABLES, AUDIO CABLES, COAXIAL CABLES, FIBER OPTIC CABLES/RACEWAYS, AND PLTC CABLES REFER TO SECTION 300.21. ANY SUCH CABLE OR WIRING SHOULD BE PULLED AND REMOVED BACK TO THEIR MAIN SOURCES ON THE FLOOR (I.E. ELECTRICAL PANELS, PHONE BOARDS, ETC.( 10. PROTECTION OF ABANDONED/TERMINATED BUILDING SYSTEM ELEMENTS: WHERE FIXTURES OR EQUIPMENT ARE REMOVED FROM ANY ELECTRICAL, PLUMBING, MECHANICAL, OR VOICE/DATA SYSTEMS, ALL REMAINING TERMINATIONS SHALL BE CLOSED AND PROTECTED IN STRICT ACCORDANCE WITH INDUSTRY STANDARDS AND GOVERNING SAFETY REGULATIONS OR PROCEDURES. MARK, LABEL, OR FLAG ALL TERMINATED SYSTEMS FOR FUTURE REFERENCE. CONTRACTOR TO PROVIDE AN "AS -BUILT' SET INDICATING THE LOCATION OF ALL PERMANENTLY ABANDONED SYSTEMS, 11. HAZARDOUS MATERIALS: GENERAL CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING ANY AN D ALL ITEMS THAT MAY CONTAIN HAZARDOUS OR HARMFUL MATERIALS. ALL IDENTIFIED ITEMS MUST BE PROPERLY DISPOSED OF PER EPA AND INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT RULES AND REGULATIONS. 12. COSTS: CONTRACTOR TO PROVIDE ANY COST RELATED TO SORTING AND RECYCLING, AS WELL AS ALL SCRAP METAL INCOME, AS PART OF THE DEMOLITION/DECONSTRUCTION BASE BID. 13. VALIDATION: CONTRACTOR MUST OBTAIN AND PROVIDE TO OWNER DOCUMENTATION FOR PROOF ON ALL RECYCLED ITEMS INCLUDING CREDIT FOR METALS AND CARPET. THIS DOCUMENTATION OF PROOF IS NOT INTENDED TO BE LEED PROCESS STANDARDS. TENANT/CLIENT, UPON SIGNATURE, APPROVES ALL ASPECTS OF THE SCOPE OF WORK CONTAINED IN THESE DOCUMENTS. TENANT/CLIENT COMPANY NAME DATE TENANT REPRESENTATIVE SIGNATURE TENANT REPRESENTATIVE PRINTED NAME ALL COSTS INCURRED DUE TO ANY CHANGES REQUESTED AFTER SIGN -OFF OF THESE DOCUMENTS SHALL BE THE FULL RESPONSIBILITY OF THE TENANT/CLIENT. THESE DRAWINGS, AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC., AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT THE WRITTEN CONSENT OF SCHOTT DESIGN. _MILL/CASEWORK NOTES 1. CASEWORK/MILLORK: CASEWORK AND MILLWORK GENERALLY INDICATED ON THESE DRAWINGS ARE TO BE PROVIDED UNDER THE GEN ERAL CONTRACT. 2. AWI COMPLIANCE: UNLESS INDICATED OTHERWISE, COMPLY WITH ARCHITECTURAL WOODWORK INSTITUTE (A.W.L( CURRENT STANDARDS FOR CUSTOM GRADE WOODWORK. 3. MILLWORK SHOP DRAWINGS: FURNISH SHOP DRAWINGS ON ALL MILLWORK AND CASEWORK FOR APPROVAL BY THE TENANT AN D SCHOTT DESIGN PRIOR TO FABRICATION. 4. MILLWORK FIELD VERIFICATION: WHERE CASEWORK AND MILLWORK ARE TO BE INSTALLED, VERIFY ALL DIMENSIONS ON PLANS AGAINST DIMENSIONS OF AS -BUILT CONDITIONS IN FIELD. REPORT ANY DISCREPANCIES TO SCHOTT DESIGN THROUGH THE GENERAL CONTRACTOR. MAKE ADJUSTMENTS TO CASEWORK AND MILLWORK TO FIT FIELD CONDITIONS UNLESS DOING SO WILL SIGNIFICANTLY ALTER THE INTENT OF THE DESIGN SHOWN ON THE DRAWINGS. 5. DRAWING REVIEW AND DISCREPANCIES: VERIFY FINISHES (LAMINATE, VENEER, STAINS, ETC.( ON THE SECTIONS AND ELEVATION DRAWINGS WITH FINISHES INDICATED ON THE FINISH PLAN/SCHEDULES, IMMEDIATELY REPORT ANY DISCREPANCIES TO SCHOTT DESIGN THROUGH THE GEN ERAL CONTRACTOR. 6. MILLWORK REQUIREMENTS: REFER TO MILLWORK SECTIONS & ELEVATIONS . UNLESS OTHERWISE SHOWN, PLASTIC LAMINATE CLAD, COUNTERTOPS WITH 4" BACKSPLASHES WHERE INDICATED. BACKSPLASHES TO BE FIELD APPLIED. REFER TO MILLWORK SECTIONS & ELEVATIONS FOR CABINETRY SPECIFICATIONS(CUSTOM PLASTIC LAMINATE OR PRE -MANUFACTURED STOCK CABINETRY(. EDGES OF PLASTIC LAMINATE COUNTERTOPS, CABINETS AND DRAWERS TO BE PLASTIC LAMINATE AND NOT PVC OR OTHER STOCK PLASTIC EDGING UNLESS NOTED OTHERWISE. 7. MILLWORK WALL BLOCKING: TO PROVIDE BLOCKING IN WALLS FOR ALL MILLWORK, WALL STOPS, HARDWARE, AND CABINETRY WHERE SPECIFIED. ALL WOOD BLOCKING TO BE FIRE RATED. 9 4 i se. z r Im VICINITY MAP NOT TO SCALE KEY PLAN - 2ND FLOOR N NOT TO SCALE C INDEX OF DRAWINGS TIII COVER SHEET AND GENERAL PROJECTNOTES LI00 LIFE SAFETY PLAN DI I I DECONSTRUCTION PLAN At I I ARCHITECTURAL FLOOR PLAN A121 REFLECTED CEILING PLAN A131 FINISH PLAN A211 DOORSCHEDULE EIII ELECTRICALPLAN THIS DRAWING. AND ME IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC., AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT ME WRITTEN CONSENT OF SCH07 DESIGN. N N W C) ZN F W O _ W Z Z H at� Z Z mmi QO 5. 0. a Q � Z X W Q UJ ZZ r 0 Q r ISSUE DATE iiiiiiiiim DESCRIPTION 06.17.19 REVIEW SET 06.19.19 PERMIT SET REVISIONS PROJECT NUMBER 2018.479 PROD. MGR DRAWN BY 2ND FLOOR COVER SHEET AND GENERAL NOTES T I I I TRAVEL DISTANCE = 122'-1" ® AREA NOT IN CONTRACT RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and meal Codes City of Camel DATE: 08/02/19 ENLARGED LIFE SAFETY PLAN 0 4' 8' 16' 2 3 4 5 6 7 6 9 10 11 12 13 14 15 16 F - . � IiP '�rnl'f p1���7� ♦ CODE SUMMARY SCOPE OF WORK OFFICE REMODEL OF PREVIOUSLY BUILTOUTOFFICE SPACE PREVIOUS USE OF SPACE B(USINESS) OCCUPANCY CLASSIFICATION B(USINESS) CHANGE OF OCCUPANCY CLASP NO TOTAL BUILDING AREA 32,209 SF/FLOOR X 1 4STORIES = 128,836 SF TOTAL PROJECT AREA OCCUPANCY CALCULATIONS NUMBER OF EXITS 2,561 SF SPACE TYPE AREA SF PER OCCUPANT OCCUPLOAD GEN. OFFICE 2,561 SF 100 26 TOTAL OCCUPANTS IN PROJECT AREA 26 REQUIRED:I PROVIDED:3 SPRINKLER SYSTEM(YES/NO) YES- EXISTING TO REMAIN TOTAL AREA OF ACCESSORY USES 0 SF TOTAL AREA ON THE FLOOR 32,209 SF ACCESSORY AREA EXCEEDS 10% NO FIRE WALLS, AND/OR OCCUPANCY SEPARATIONS (IF REQUIRED( N/A ASHRAE 90.1 SUMMARY REQUIREMENTS WILL BE MET (SEE REFLECTED CEILING PLAN( BUILT BEFORE 1978E NO BUILDING CONSTRUCTION TYPE IRS LEGEND Ep EXISTING ELECTRICAL PANEL LOCATION EX EXISTING EXIT- BUILDING STAIR LOCATION TIFF FIRE EXTINGUISHER ® EXITSIGN "" EMERGENCY LIGHT — — — TRAVEL DISTANCE OVERALL BUILDING NOT TO SCALE GENERAL NOTES LI. REFER TO ARCHITECTURAL PLAN FOR WALL TYPE AND CONSTRUCTION DETAILS. L2. EXISTING COMMON CORRIDOR TO REMAIN. EXISTING EXIT SIGNS, FIRE PULLS, FIRE EXTINGUISHERS, ALARM NOTIFICATION APPLIANCES TO REMAIN, RELOCATE EXISTING EXIT SIGNS, FIRE PULLS, FIRE EXTINGUISHERS AND ALARM NOTIFICATIONS AS REQUIRED TO MEET ALL LOCAL AND STATE CODES. LIFE SAFETY NOTES I. PROVIDE EMERGENCY LIGHTING IN TENANT SPACE AS REQUIRED PER NEMAANDIBC. EMERGENCY BATTERY PACKS OR LIGHTS CONNECTED TO AN EMERGENCY POWER SOURCE ARE REQUIRED IF THE SPACE CONTAINS 50 PERSONS OR MORE. FIXTURES SHOWN ON PLAN ARE FOR REFERENCE ONLY. 2. PROVIDE ALARM NOTIFICATION APPLIANCES(HORNS/STROBES), EMERGENCY SPEAKERS, SMOKE DETECTORS, FIRE PULLS, AND ANY OTHER REQUIRED ALARM & DETECTION SYSTEMS AS NECESSARY TO MEET ALL APPLICABLE CODES (INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE, NFPA), IN RECEPTION AREAS, CONFERENCE ROOMS AND OTHER HIGH PROFILE AREAS WITHIN SUITE, ALL LOCATIONS OF SUCH DEVICES MUST BE APPROVED BY SDI OR TENANT PRIOR TO INSTALLATION. FAILURE TO DO SO MAY RESULT I N CONTRACTOR RELOCATING THESE ITEMS AT THEIR EXPENSE. 3. FIRE EXTINGUISHERS: CONTRACTOR TO ENSURE ALL NEW AND EXISTING FIRE EXTINGUISHERS ARE INSTALLED ACCORDING TO NFPA 10. COORDINATE WITH OWNER/LANDLORD ON EXTI NGUISHER TYPE AND HOUSING. MAXIMUM TRAVEL DISTANCE OF 75 FEET FROM ANY POINT TO A VISIBLE EXTINGUISHER. THE FOLLOWING NOTES APPLY ONLY IN EXISTING SPRINKLERED FACILITIES, 4. FIRE PROTECTION WORK IS TO BE PROVIDED BY DESIGN/BUILD SERVICES UNDER THE GENERAL CONTRACT. PROVIDE A COMPLETE, WORKING SYSTEM, SCHOTT DESIGN, INC., IS NOT RESPONSIBLE FOR THE DESIGN, INSTALLATION, OR RENOVATION OF THE FIRE SPRINKLER SYSTEM. 5. THE FIRE PROTECTION CONTRACTOR SHALL GENERATE ALL REQUIRED DRAWINGS, AND SHALL FILE THOSE DRAWINGS, AND RELATED DOCUMENTS, WITH THE STATE AND LOCAL AUTHORITIES HAVING JURISDICTION OVER THE PROJECT. THIS DRAWING. AND ME IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC., AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT ME WRITTEN CONSENT OF SCH07 DESIGN. 0 N N J CD ZCN C0 F IMEM O LU Z WZ H to N aZzo Gaon 2XWQ LI n zz 0 Q O r ISSUE DATE DESCRIPTION 06.17.19 REVIEW SET 06.19.19 PERMIT SET REVISIONS PROJECT NUMBER 2018.479 DRAWN BY BW 2ND FLOOR LIFE SAFETY L 100 LEGEND RECYCLING NOTES GENERAL NOTES PLAN NOTES EXISTING TO BE REMOVED EXISTING TO REMAIN WALL WALL ==xxxx PARTIAL HEIGHT WALL xxxxxx: PARTIAL HEIGHT WALL i DOOR AND FRAME xr-cx WINDOW/SIDELIGHT CEILING GRID AND TILES, 2'x4' CEILING GRID AND i--?--r TILES, 2'x2' F'T I i�I SUPPLY AIR DIFFUSERS K �v caum F., EXHAUST FAN L-J LIGHT FIXTURE, LL _rJJ FLUORESCENT, 2'x4' r'LIGHTFIXTURE, L_J l FLUORESCENT,2'x2' LIGHT FIXTURE, CAN F----+ LIGHT FIXTURE, FLUORESCENT "4F F[ LIGHT FIXTURE, TRACK 11 tk LIGHT FIXTURE, LIGHT FIXTURE, PENDANT LIGHTSWITCH EXIT LIGHT q�y^ C-] EMERGENCY LIGHT I�VD)1l ELECTRIC OUTLETS) DATA OR b COMMUNICATION OUTLET 7 DOOR AND FRAME x WINDOW/SIDELIGHT NOTE: EXISTING FIXTURES THATARE REMOVED CAN BE REUSED IF IN GOOD CONDITION. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 08/02/19 DECONSTRUCTION MANAGEMENT CHECKLIST CO -MINGLE SORT REQUIRED THIS CHECKLIST ONLY APPLIES TO ITEMS BEING REMOVED. REFER TO DECONSTRUCTION PLAN. CO-MINGLE/LEED CONTAINER REQUIRED FOR RECYCLING. CONTAINER: w w ITEM BEING REMOVED ? u REMARKS x. wy ¢p wp �U OXU JU Yo DOORS REUSE ALL EXISTING DOORS IN NEW LAYOUT WHERE POSSIBLE FRAMES DOOR HARDWAREREUSE ALL EXISTING HARDWARE IN NEW LAYOUT WHERE POSSIBLE METAL LIGHT BOXESCASEWORK UNITCARPET #\/ TILEBROADLOOM CARPETAPPLIANCES GENERAL SORTING REQUIREMENTS (AS APPLICABLE): LEED CO -MINGLE RECYCLING CONTAINER: SHIPPING/PACKAGING, WOOD STUDS, WOOD TRIM, HVAC COMPONENTS, CEILING GRID, METAL STUDS, WIRING/ CONDUIT, AND OUTLETS/SWITCHES TRASH CONTAINER: DRYWALL, INSULATION, VINYL BASE, VCT, WALLCOVERING, CEILING TILES AND LVT (LUXURY VINYL TILE( CONTACTS: KRUSE CARPD RECYCLING: COORDINATE PICK UP AND REQUIREMENTS WITH SUSAN SHAFER 317.337.1950 CARPET RECYCLING: KRUSE PICKUP AND RECYCLING FEES ARE TO BE PAID THROUGH SCHOTT DESIGN'S NO COST ADD PROGRAM. NOTE: THE DEMOLITION CREW/GENERAL CONTRACTOR WILL NO LONGER BE PAYING THE CARPET DISPOSAL TIPPING FEES AT THE LANDFILL. CONTRACTOR IS RESPONSIBLE FOR ALL COORDINATION. I. CARPET BEING REMOVED TO BE RECYCLED VIA KRUSE CARPET RECYCLING. COORDINATE REQUIREMENTS AND PICK UP WITH SUSAN SHAFER (317) 337-1950. 2. CARPET TILES SHOULD BE PALLETIZED; BROADLOOM SHOULD BE PILED NEATLY. 3. COLLECT DOCUMENTATION FROM KRUSE AS PROOF OF RECEIVAL FORWARD TO THE GENERAL CONTRACTOR. I. REFER TO ALL DECONSTRUCTION NOTES ON TITLE SHEET TI II. 2. ALL ITEMS BEING REMOVED FROM PROJECT AREA ARE TO BE CAREFULLY CONSIDERED FOR REUSE IN THE PROJECTOR BUILDING IF POSSIBLE. FOR ALL ITEMS DETERMINED FOR REMOVAL, REFER TO THE DECONSTRUCTION MANAGEMENT CHECKLIST BELOW. 3. REMOVE EXISTING RECEPTACLES AND/OR SWITCHES AS SHOWN ON PLAN PER LEGEND. PATCH WALL AND PREPARE FOR NEW FINISHES AS REQUIRED. 4. REMOVE EXISTING CEILING TILES AND 2X4 LIGHT FIXTURES THROUGHOUT EXPANSION AREA, UNLESS OTHERWISE NOTED. EXISTING CEILING GRID TO REMAIN. REFER TO DECONSTRUCTION CHECKLIST FOR PROPER RECYCLING METHOD OF LIGHT FIXTURES. D01 REMOVE EXISTING CABINETRY AND COUNTERTOP. REFERTO DECONSTRUCTION CHECKLIST FOR PROPER RECYCLING METHOD. D02 REMOVE EXISTING SINK. NO SERVICE SINKS ARE BEING REMOVED. D03 REMOVE EXISTING COAT ROD AND SHELF. ODESIGN INTENT IS FOR ALL METAL OUTLET/DATA BOXES AND/OR D04 WIRE MOLD ON EXTERIOR WINDOW LINE WITHIN THIS ROOM TO BE REMOVED. PATCH WALL AND PREPARE FOR NEW FINISHES AS REQUIRED. ® AREA NOT IN CONTRACT DECONSTRUCTION PLAN ❑ AREA OF WORK 0 2 4 8 16 NC THIS DRAWING. AND ME IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC.. AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT ME WRITHED CONSENT OF SCH07 DESIGN. N N W CD Z`�C CN 0 E � O W Z W z H t� aZz0 Q n =XwQ WIC Zz r 0 Q r ISSUE DATE DESCRIPTION 06.17.19 REVIEW SET 06.19.19 PERMITSET REVISIONS PROJECT NUMBER 2018.479 PROD. MGR DRAWN BY 2ND FLOOR DECONSTRUCTION PLAN DIII ARCHITECTURAL LEGEND NEW CONSTRUCTION EXISTING TO REMAIN mr WALL WALL PARTIAL HEIGHT WALL ® PARTIAL HEIGHT WALL E= �o WINDOW/SIDELIGHT a­ec WINDOW/SIDELIGHT ® DOOR AND FRAME (SEE DOOR SCHEDULE) 77 DOOR AND FRAME NOTE: IF IN GOOD CONDITION, EXISTING DOORS SALVAGED FROM DEMOLITION CAN BE SUBSTITUTED FOR NEW DOORS. WALL TYPES NOTE: ALL PLAN DIMENSIONS ARE FROM FACE TO FACE OF FINISHED WALL. ALL WALLS ARE TO BE WI UNLESS OTHERWISE NOTED. PROVIDE MOISTURE R I TANT/GREEN BOARD AS REQUIRED IN RESTROOM AND/OR SHOWER ROOMS. NOT ALL WALL TYPES LISTED BELOW ARE NECESSARILY USED ON THIS PROJECT. REFER TO REFLECTED CEILING PLAN FOR CEILING HEIGHTS. F WALL WITH INSULATION 3s%" METAL STUDS AT I6"O.CJ � I ONE LAYER OF 5%" TYPE "X' GYPSUM BOARD EACH SIDE; EXTEND WALL TO UNDERSIDE OF CEILING; FIBERGLASS SOUND BATT INSULATION INSIDE WALL AND 2-0 EACH EACH SIDE OF WALL ABOVE CEILING RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City Bf Camel DATE: 08/02/19 WALL THICKNESS METAL STUD EXISTING WIN MULLION PRE -FINISHED ALUMINUM RECEIVER TRIM- FASTEN AT WINDOW SILL AND SET IN A CONTINUOUS BEAD OF CAULK AT WINDOW MULLION WHERE NEW WALLS MEET. TRIM COLOR TO MATCH BUILDING WINDOW MULLIONS. LINE OF EXISTING WINDOW SILL COVER BELOW CONTINUOUS BEAD OF ACOUSTICAL SEALANT n WALL AT MULLION DETAIL AI I I NOT TO SCALE GENERAL NOTES I. SEE ELECTRICAL PLAN FOR INTENDED FURNITURE LAYOUT. 2. REFER TO FINISH PLAN FOR ALL ACCENT/SPECIALTY PAINT OR WALLCOVERING THAT REQUIRES LEVEL 4 OR LEVEL 5 DRYWALL FINISH. REFER TO MANUFACTURER RECOMMENDATIONS. PLAN NOTES miiiiiiiiiim A01 ALIGN FINISHED WALL SURFACES. PROVIDE SAME THICKNESS STUDS AS EXISTING WALL AT DOOR INFILLS OR WHERE NEW WALLS ARE IN LINE WITH EXISTING WALLS. A02 NEW FIRE EXTINGUISHER AND SEMI -RECESSED FIRE EXTINGUISHER ECABINET TO BE PROVIDED AND INSTALLED BY CONTRACTOR, CABINET TO BE PAINTED TO MATCH ADJACENT WALL. ALL FIRE EXTINGUISHERS ARE TO BE INSTALLED ACCORDING TO NFPA 10. ODESIGN INTENT IS FOR N EW WALL TO ALIGN WITH EDGE OF A03 WINDOW. CONTRACTOR TO CONFIRM EXACT LOCATION IN FIELD TO ENSURE ACCURATE WALL PLACEMENT. OPROVIDE ADDITIONAL BLOCKING IN WALL AS REQUIRED FOR A04 TENANT'S WALL MOUNTED TELEVISION; COORDINATE EXACT LOCATION WITH TENANT. AREA NOT IN CONTRACT ARCHITECTURAL PLAN AREA OF WORK 0 ] 4 8 16 NC THIS DRAWING. AND ME IDEAS. DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN. INC.. AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE. OR IN PART. WITHOUT ME WRITHED CONSENT OF SCH07 DESIGN. N N W H CD Z`�CN C0 F O LU Z WZ H to c/j aZzo >aon 2XWQ Win zz 0 Q 0 ISSUE DATE DESCRIPTION 06.17.19 REVIEW SET 06.19.19 PERMITSET REVISIONS PROJECT NUMBER 2018.479 PROD. MGR DRAWN BY 2ND FLOOR ARCHITECTURAL FLOOR PLAN A111 LEGEND NEW OR RELOCATED EXISTING TO REMAIN LIGHT FIXTURE, 2'x4', LIGHT FIXTURE, 2'x4', FLUORESCENT, BUILDING FLUORESCENT, BUILDING STANDARD INDIRECT/DIRECT STANDARD INDIRECT/DIRECT ® EXIT LIGHT FIXTURE EMERGENCY LIGHT FIXTURE 4W EXIT/EMERGENCY LIGHT FIXTURE COMBO $N LIGHT SWITCH $N3 LIGHT SWITCH, 3-WAY $ND LIGHT SWITCH, DIMMER $NP SWITCH, PROJECTOR SCREEN $NG SWITCH, GARBAGE DISPOSAL (ABOVE COUNTERTOP( $NE SWITCH, EXHAUST FAN i — N LIGHTCIRCUIT ® EXIT LIGHT FIXTURE EMERGENCY LIGHT FIXTURE 4e EXIT/EMERGENCY LIGHT FIXTURE COMBO $ LIGHT SWITCH $3 LIGHT SWITCH, &WAY 3D LIGHT SWITCH, DIMMER $P SWITCH, PROJECTOR SCREEN $G SWITCH, GARBAGE DISPOSAL 3E SWITCH, EXHAUST FAN . --\ LIGHTCIRCUIT III CEILING GRID, CEILING GRID, J—L—L SUSPENDED, 2'x2SUSPENDED, 2'x2' ®RELOCATED DIFFUSER, LAY -IN, 2'x2' ® RELOCATED DIFFUSER, LAY IN, 1'x4' RELOCATED DIFFUSER, LAY -IN, 4"x4' ® EXHAUST FAN, 2'x2' ®DIFFUSER, LAY IN, 2'x2' ® DIFFUSER, LAY IN, 1'x4' m DIFFUSER, LAY -IN, 4"x4' EXHAUST FAN, 22x2' NOTE: IF IN GOOD CONDITION, EXISTING H.V.A.C. DEVICES AND CEILING TILES SALVAGED FROM DEMOLITION CAN BE SUBSTITUTED FOR NEW. NO NEW HVAC DUCTWORK IS TO BE INSTALLED PER THIS SHEET. RELOCATE DIFFUSERS & nMECHANICAL DIFFUSER RELOCATION RELEASED FOR CONSTRUCTION `REFER TO MECHANICAL NOTES FOR FURTHER INFORMATION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 08/02/19 GENERAL NOTES I. PROVIDE NEW BUILDING STANDARD CEILING TILE AND REUSE EXISTING CEILING GRID, UNLESS OTHERWISE NOTED. EXISTING GRID IS 2 x2 AT fJ'-S'A.F.F. TILES ARE 2x2 ACOUSTICAL LAY IN TILES. REPAIR ANY DAMAGED GRID. 2. PROVIDE LIKE CEILING TILES IN INDIVIDUAL ROOMS WHERE POSSIBLE TO CREATE UNIFORM LOOK. 3. PROVIDE EMERGENCY LIGHTING IN TENANT SPACE AS REQUIRED PER NEMA AND IBC. EMERGENCY BATTERY PACKS OR LIGHTS CONNECTED TO AN EMERGENCY POWER SOURCE ARE REQUIRED IF THE SPACE CONTAINS 50 PERSONS OR MORE. FIXTURES SHOWN ON PLAN ARE FOR REFERENCE ONLY, IN RECEPTION AREAS, CONFERENCE ROOMS AND OTHER HIGH PROFILE AREAS WITHIN SUITE, ALL LOCATIONS OF SUCH DEVICES MUST BE APPROVED BY SDI OR TENANT PRIOR TO INSTALLATION. FAILURE TO DO SO MAY RESULT IN CONTRACTOR RELOCATING THESE ITEMS AT THEIR EXPENSE. 4. LAYOUT SHOWN IS INTENDED TO MEET ASHRAE 90.1 STANDARDS. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR COMPLIANT INSTALLATION, IF ADJUSTMENT IS REQUIRED TO MEET ASHRAE 90.1, CONTRACTOR MUST NOTIFY SDI. OVER 50%OF THE LIGHTING WILL BE REPLACED WITH NEW, SO ASHRAE WATTAGE REQUIREMENTS WILL NEED TO BE MET. 5. ALL NEW SWITCHES TO BE OCCUPANCY SENSORS; PROVIDE COMBO UNIT WITH BOTH ULTRASONIC AND INFRARED TECHNOLOGY WITH A ONE BUTTON OVERRIDE. OCCUPANCY SENSORS ARE TO BE LOCATED SUCH THAT OCCUPANCY WITHIN ANY PORTION OF INCLUDED AREA IS DETECTED. PROVIDE CEILING MOUNTED OCCUPANCY SENSORS IN OPEN AREAS AS REQUIRED, 6. NEW DEVICES AND FACE PLATES TO MATCH EXISTING. WHERE POSSIBLE, GANG MULTIPLE SWITCHES TO ACCOMMODATE MULTISWITCHPLATE WHEN SWITCHES ARE SHOWN ADJACENT ON PLAN, 7. ELECTRICAL WORK IS LIMITED TO A DESIGN -BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS. ALL ELECTRICAL WORK IS LIMITED TO ADDITIONS OR RELOCATIONS OF ELECTRICAL OUTLET DEVICES AN D LIGHTING THAT DO NOT EXCEED THE CAPACITY OF THE EXISTING ELECTRICAL SERVICE IN THE BUILDING. ELECTRICAL CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS REQUIRED SO THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY WITH ALL APPLICABLE CODES. MECHANICAL NOTES PLAN NOTES I. MECHANICAL WORK IS LIMITED TO A DESIGN- BUILD SCOPE AND IS TIE IN N EW AND EXISTING LIGHT FIXTURES TO EXISTING CIRCUIT OUTLINED IN THESE DRAWINGS. NO NEW MAIN MECHANICAL R01 AND EXISTING LIGHTSWITCH. IF NOT POSSIBLE, PROVIDE NEW O APPLIANCES OR MAIN EQUIPMENT ARE BEING PROVIDED. ALL LIGHT SWITCH AS REQUIRED. MECHANICAL WORK IS LIMITED TO RELOCATION OF DIFFUSERS AND FLEX DUCT PER NEW WALL LAYOUT. NO NEW HARD DUCTWORK OR EQUIPMENT IS BEING ADDED; MECHANICAL CONTRACTORIS TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS REQUIRED SO THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY WITH THE INDIANA MECHANICAL CODE AND ALL OTHER APPLICABLE CODES, ® AREA NOT IN CONTRACT REFLECTED CEILING PLAN ❑ AREA OF WORK N .� I<) THIS DRAWING. AND ME IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC., AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT ME WRITTEN CONSENT OF SCH07 DESIGN. O N N W H CD ZCN C0 1 O W Z WZ aaRaRaR� �/ t� `Q} Z z tj Q n =XwQ Win zz T- 0 Q 0 ISSUE DATE DESCRIPTION 06.17.19 REVIEW SET 06.19.19 PERMITSET REVISIONS PROJECT NUMBER 2018.479 PROD. MGR DRAWN BY 2ND FLOOR REFLECTED CEILING PLAN Al 21 LEGEND FLOOR COVERINGS CARPET NOTE: SHAW CONTRACT MANUFACTURE PARTICIPATES IN SCHOTT DESIGN'S RECYCLING NO COST ADD TO CLIENT OR PROJECT PROCESS. REFER TO SCHOTT DESIGN DECONSTRUCTION NOTES ON DI I I FOR PROCESS DETAILS. C('1t MFG SHAW CONTRACT TYPE: BROADLOOM PATTERN: OUTLINE 5AI87 COLOR: NIGHT87496 EX EXISTING TO REMAIN. CLEAN AND REPAIR AS REQUIRED FOR LIKE NEW APPEARANCE. WALL BASE VB1 MFG: JOHNSONITE TYPE: 4" VINYL COVE,ye" GAUGE COLOR: 20 CHARCOAL EXISTING TO REMAIN, REPAIR AS EX REQUIRED PER DECONSTRUCTION PAINT f�1 MFG: SHERWIN WILLIAMS TYPE: PROMAR 200 ZERO VOC INTERIOR LATEX COLOR: ORIGINAL WHITESW7077 FINISH: FLAT O MFG: SHERWIN WILLIAMS TYPE: PROMAR 200 ZERO VOC INTERIOR LATEX COLOR: STILLWATER SW6223 FINISH: FLAT �3 MFG: SHERWIN WILLIAMS TYPE: PROMAR 200 ZERO VOC INTERIOR LATEX COLOR: PEACOCK PLUME SWO020 FINISH: FLAT O EXISTING TO REMAIN. TOUCH UP/REPAIRAS REQUIRED PER DECONSTRUCTION. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 08/02/19 GENERAL NOTES I. REFER TO LEGEND FOR ALL ACCENT/SPECIALTY PAINT OR WALLCOVERING THAT REQUIRES LEVEL 4 OR LEVEL 5 DRYWALL FINISH. REFER TO MANUFACTURER RECOMMENDATIONS. 2. AT ALL FLOOR TILE LOCATIONS PROVIDE WATERPROOFING CRACK ISOLATION MEMBRANE: TEC HYDRAFLEX FULL COVERAGE PER TCNA F 125-11 FULL. PROVIDE CONTROL JOINTS EVERY 12' AT MINIMUM OR AS RECOMMENDED BY MANUFACTURER. 3. AT NEW WALL TILE LOCATIONS PROVIDE APPROPRIATE SUBSTRATE FOR WALL TILE TAT EXISTING WALLS SCHLUTER KERDI BOARD OR EQUAL) TAT NEW WALLS CEMENT BACKER BOARD) AS RECOMMENDED BY MANUFACTURER. PLAN NOTES iiiiiiiiiiim SSEAM SEAL TRANSITION BETWEEN EXISTING CARPET AND NEW CARPET. SLIGHT DYE LOT DIFFERENCE WILL OCCUR BETWEEN EXISTING AND NEW CARPET. MATCH EXISTING PATTERN DIRECTION TO CREATE SEAMLESS APPEARANCE AS MUCH AS POSSIBLE. ® AREA NOT IN CONTRACT FINISH PLAN ❑ AREA OF WORK 0 ]' 4' R' 16' N I<) THIS DRAWING. AND ME IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC.. AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT THE WRITTEN CONSENT OF SCH07 DESIGN. 0 N N W H CD ZCN CV E NNO O LU Z W Z Lu I — atn N Zzo >aon 2XWQ Win zz 0 Q 0 ISSUE DATE DESCRIPTION 06.17.19 REVIEW SET 06.19.19 PERMITSET REVISIONS PROJECT NUMBER 2018.479 PROD. MGR DRAWN BY 2ND FLOOR FINISH PLAN A131 DOOR SCHEDULE # DIMENSIONS DOOR FRAME HARDWARE REM. Ol 3'-0'Sc8'-0'k13/" TYPE Dl MATERIAL EUSE/MATCH EXISTING FINISH TYPE F2 MATERIAL TIMELY FINISH MATCH EXIST. OL Rl STAIN TO MATCH EXIST. 02 3'-0'k8'-0'kl%" IEXISTING EUSE/MATCH STAIN TO MATCH EXIST. F2 TIMELY MATCH EXIST. OIL 11 03 3'-0'k8'-0NIY%' Dl EUSE/MATCH EXISTING STAIN TO MATCH EXIST. I TIMELY MATCH_ EXIST. OIL I 04 3'-0'k8'-0'kl%" IEXISTING EUSE/MATCH STAIN TO MATCH EXIST. F2 TIMELY MATCH_ EXIST. OIL I OS 3'-0'k8'-0'kl%" IEXISTING EUSE/MATCH STAIN TO MATCH EXIST. ITIMELY MATCH_ EXIST. OIL I Ob 3'-0'k8'-0'kl%" Dl EUSE/MATCH EXISTING STAIN TO MATCH EXIST. I TIMELY MATCH EXIST. OIL 11 3'-0'k8'-0NIY%' D2 EUSE/MATCH EXISTING STAIN TO MATCH E%IST. FI TIMELY MATCH EXIST. OIL I FO8 3'-0'k8'-0NIY%' Dl EUSE/MATCH EXISTING STAIN TO MATCH E%IST. F2 TIMELY MAT HOL EXIST. R1 3-0'kFULL HEIGHT D3 HERCULITE GLASS SYSTEM I DRYWALL WRAPPED OPENING EL, CR, CL, PP R2 DOOR/FRAME TYPES 0 U 0 0 0 3'-0 D1 D2 RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City d Camel DATE: 08/02/19 XoX D3 ROVINONE LOCKING LAELMR PULL ON EACH SIM Of DOOR TOTAL COUNT 2), AS NOTED IN REMARKS R"'ifl' i=411 11�11 REMARKS RI. PROVIDE VINYL FILM; LLUMAR, FROST SERIES 36"ROLL, GLACIER NRM55 PS4. DESIGN INTENT IS FOR FILM TO BE INSTALLED FROM 2'-6" AFF TO 5'-6" AFF. R2. PROVIDE ADA COMPLIANT C.R. LAURENCE BRUSHED STAINLESS 60" LOCKING LADDER PULL#LLPA60BS, PROVIDE VINYL FILM ON DOOR. DESIGN INTENT IS FOR FILM STYLE AND PLACEMENT TO MATCH TENANT'S EXISTING SUITTE DOUBLE DOOR ENTRY. CONFIRM EXACT REQUIREMENTS WITH TENANT. HARDWARE LEGEND CL CLOSER CH COATHOOK OR CARD READER BYTE FAINT (N.LC.) DB DEADBOLT DL DUMMY LEVER EL ELECTROMAGNETIC LOCK (PER IBC 2012) ES ELECTRIC STRIKE BY TENANT I N.I.C.) H HOLD OPEN KP KICK PLATE KS KICK STOP OL OFFICE LOCKSET PH PANIC HARDWARE PIT PRIVACY LOCKSET PP PUSH/PULL PS PASSAGE LATCHSET PV PIVOT HINGE RL ROLLER LATCHES SL STOREROOM LOCKSET TS TOP STRIKES F1 F2 DOOR/FRAME NOTES I. REUSE DOORS FROM DECONSTRUCTION WHERE POSSIBLE; TOUCH UP EXISTING DOOR STAIN AS REQUIRED. PROVIDE NEW BUILDING STANDARD DOORS MATCHING EXISTING VENEER AS REQUIRED. STAIN NEW DOORS TO MATCH EXISTING. PRE -MACHINE NEW DOORS FOR CYLINDRICAL LOCKSETS. 2. PROVIDE NEW HARDWARE TO MATCH EXISTING ON NEW DOORS. REUSE EXISTING HARDWARE ON EXISTING DOORS WHERE POSSIBLE, FOR NEW DOOR HARDWARE, PROVIDE GRADE 2 MINIMUM BUILDING STANDARD. PROVIDE A.D.A. ACCESSIBLE LEVER HANDLES ON NEW LOCK AND LATCHSETS. 3. PROVIDE NEW BUILDING STANDARD FRAMES AS REQUIRED. REUSE EXISTING FROM DEMOLITION WHERE POSSIBLE. IF FRAMES ARE NOT BEING REPAINTED, TOUCH UP EXISTING FRAMES TO BE REUSED. 4. FRAME ALL DOOR ROUGH OPENINGS 4" FROM ADJACENT WALL CORNERS UNLESS OTHERWISE NOTED ON PLAN. 5. REFER TO TENANT AND LANDLORD FOR KEYING REQUIREMENTS AND LOCKSETS. 6. TENANT'S SECURITY VENDOR IS RESPONSIBLE FOR THE SPECIFICATION, PURCHASE, AND INSTALLATION OF ALL ACCESS CONTROLLED ELECTRONIC AND/OR MAGNETIC HARDWARE AND ASSOCIATED DEVICES. ALL SPECIFICATIONS AND INSTALLATIONS MUST COMPLY WITH THE INDIANA BUILDING CODE, CHAPTER 10, MEANS OF EGRESS. 7. PROVIDE BUTT HINGES ON ALL DOORS AS FOLLOWS: • 7'0 HT, TO HAVE 3 HINGES • GREATER THAN 7-0 IN IN HT. TO HAVE 4 HINGES • FINISH TO MATCH HARDWARE SET 8. PROVIDE()) SET OF SILENCERS ON ALL DOOR FRAMES UNLESS OTHERWISE NOTED. 9. PROVIDE WALL STOP (FLOOR STOP WHERE APPLICABLE)AT EACH DOOR UNLESS OTHERWISE NOTED. PROVIDE WOOD BLOCKING BEHIND WALL STOP. Q E N O �,OpU N VOl= n z ^ 0 o=v?-0O P Q^ w ooaN Qa C THIS DRAWING. AND ME IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC., AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WIM IR ME WRITTEN CONSENT OF SCH07 DESIGN. O N N W H Z" R r O H W Zw r N �ZZ C w W ::� Z R— O Cr CV Z v / O r ISSUE DATE DESCRIPTION 06.17.19 REWEW SET 06.19.19 PERMIT SET REVISIONS MARX DATE I DB IN 0. AR10700017 STATE OF PROJECT NUMBER 2018.479 PROD. MGR DRAWN BY 2ND FLOOR DOOR SCHEDULE A211 LEGEND NEW CONSTRUCTION EXISTING TO REMAIN POWER OUTLET, DUPLEX POWER OUTLET, DUPLEX POWER OUTLET POWER OUTLET QUADRUPLE% QUADRUPLE% JQ JUNCTION BOX QJ JUNCTION BOX OCEILING MOUNTED CEILING MOUNTED JUNCTION BOX JUNCTION BOX ® BOX, BLANK COVER PLATE ® BOX, BLANK COVER PLATE ® BOX, OPEN QO BOX, OPEN P PROVIDE JUNCTION BOX P POWER AND DATA POLE EI ABOVE CEILING FOR O POWER POLE CONNECTION. POWER POLE BY OTHERS. FLOOR BOX WITH POWER FLOOR BOX WITH POWER F6I® AND DATA, FLUSH � AND DATA, FLUSH MOUNTED MOUNTED FLOOR BOX WITH FLOOR BOX WITH ® JUNCTION BOX AND J 14 JUNCTION BOX AND DATA, FLUSH MOUNTED DATA, FLUSH MOUNTED DATA/COMMUNICATION DATA/COMMUNICATION 14 OUTLET (PROVIDE BOX b OUTLET AND PULL STRING ONLY) DED DEDICATED CIRCUIT GFCI GROUND FAULT CIRCUIT INTERRUPT OUTLET +42" HEIGHT OF ELECTRICAL OR DATA DEVICE RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 08/02/19 GENERAL NOTES I. TENANT'S FURNITURE VENDOR IS RESPONSIBLE FOR INSTALLATION OF FURNITURE AND FIELD VERIFICATION OF ALL CRITICAL DIMENSIONS. 2. ALL OUTLETS ARE TO INSTALLED 18" MIN. A.F.F. TO THE CENTER OF THE DEVICE PER ADA GUIDELINES UNLESS NOTED OTHERWISE. ALL NEW DEVICES AND FACE PLATES TO MATCH EXISTING. 3. REFER TO DOOR SCHEDULE AND COORDINATE WITH TENANT/OWNER REGARDING POWER LOCATIONS TO ACCOMMODATE ELECTRIC STRIKES, CARD READERS AND/OR MAG-LOCKS. CARD READERS ARE TYPICALLY INSTALLED BY THE TENANT'S SECURITY CONTRACTOR AND NOT SPECIFIED BY SDI. 4. ELECTRICAL WORK IS LIMITED TO A DESIGN -BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS. ALL ELECTRICAL WORK IS LIMITED TO ADDITIONS OR RELOCATIONS OF ELECTRICAL OUTLET DEVICES AND LIGHTING THAT DO NOT EXCEED THE CAPACITY OF THE EXISTING ELECTRICAL SERVICE IN THE BUILDING. ELECTRICAL CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS REQUIRED SO THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY WITH ALL APPLICABLE CODES, PLAN NOTES E01 COORDINATE COPIER RECEPTACLE WITH TENANT. PROVIDE DEDICATED RECEPTACLE AS REQUIRED. E02 PROVIDE JUNCTION BOX AND DATA FOR TENANT'S FURNITURE SYSTEM. COORDINATE EXACT LOCATION WITH TENANT'S FURNITURE VENDOR. EOJ PROVIDE FLUSH MOUNT FLOOR CORE WITH POKE THRU DEVICE FOR POWER AND DATA. COORDINATE WITH TENANTS FURNITURE VENDOR ON EXACT LOCATION, PROVIDE POKE THRU DEVICE SUBMITTAL TO TENANT FOR APPROVAL PRIOR TO ORDERING. E04 IF POSSIBLE, CONVERT EXISTING BLANK/OPEN BOX TO NEW RECEPTACLE AS SHOWN, IF NOT POSSIBLE, REMOVE BLANK/OPEN BOX AND PROVIDE NEW RECEPTACLE AT THIS LOCATION. E05 PROVIDE MAG-LOCK HARDWARE AND POWER AS REQUIRED TO HERCU LITE DOOR. SEE DOOR SCHEDULE FOR MORE DETAILS. ALL CARD READER HARDWARE TO BE PROVIDED AND INSTALLED BY TENANT'S SECURITY VENDOR, COORDINATE WITH VENDOR FOR MORE INFORMATION. PROVIDE POWER AND DATA FOR TENANT'S WALL MOUNTED E06 TELEVISION AT HEIGHT NOTED ON PLAN. COORDINATE EXACT LOCATION WITH TENANT. ® AREA NOT IN CONTRACT ELECTRICAL PLAN ❑ AREA OF WORK 0 2' 4' 8' 16' IN THIS DRAWING. AND ME IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC., AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT ME WRITTEN CONSENT OF SCH07 DESIGN. O N N W H CD Z`�C CN 0 E � O LU Z WZ H ato c/j Zz0 >aon 2XWQ Win zz T- 0 Q 0 ISSUE DATE DESCRIPTION 06.17.19 REVIEW SET 06.19.19 PERMITSET REVISIONS PROJECT NUMBER 2018.479 DRAWN BY BW 2ND FLOOR ELECTRICAL PLAN E111