Loading...
HomeMy WebLinkAboutE-1016A 6A +42" 1 D-1 6A 6A 6A 6A 6A 2D 2D9 10 5'-1"7'-4"D-37 CR D-39 D-411'-3"D-25 (TIE-IN) D-25 (TIE-IN) D-20 D-23 D-3 D-5 D-9 2 FB2 FB2 3 4 5 6 6 78 ℄ TYP. 11 13 14 14 14 14 14 14 6A 6A 6A 6A 6A 6A 6A 6A 6A 6A 6A 6A 6A 6A 6A 16 15 ESN "EX. PANEL F" "EX. PANEL E" "T-1" EXIST. 75 KVA XFMR "EX. PANEL C" "EX. PANEL D" FB3 FB3 FB3 FB3 FB3 FB3 FB3 FB3 D-22 D-24 D-11 GFCI 12 13 1 POWER AND SYSTEMS PLAN 1/4"=1'-0" 1 2 3 4 5 B A JOB NO. D C ISSUED FOR: PERMIT RECORD CONSTRUCTION BID 520 South Main Street, Suite 2531 Akron, OH 44311 330.572.2100 Fax 330.572.2102 2019190.32 PNC BANK - PENNWOOD OFFICE11405 NORTH PENNSYVANIA STREETCARMEL, IN 4603206/19/19 06/19/19 - - PLAN KEYNOTES GENERAL NOTES # A. MOUNT RECEPTACLES WITH THE LONG DIMENSION OF THE DEVICE VERTICAL AND THE U-SHAPED GROUND POSITION AT BOTTOM EXCEPT WHERE SPECIFICALLY NOTED ON THE PLANS TO BE MOUNTED WITH THE LONG DIMENSION OF THE DEVICE HORIZONTAL (WITH THE U-SHAPED GROUND POSITION ON THE RIGHT). MOUNT ADJACENT SYSTEMS DEVICES TO MATCH RECEPTACLE MOUNTING CONFIGURATION. B. REFER TO E-501 FOR ONE-LINE DIAGRAM.REV. DATE DESCRIPTIONDESIGNERPROJECT MANAGER Drawing Name: O:\2019\2019190\32 Carmel (Penn) Office IN\dwg\ConstructionDocuments\Architectural\050_201919032_E-101.dwg June 19, 2019 - ecurryE-101POWER AND SYSTEMS PLANMAR AJR LEGEND UNOCCUPIED FUTURE TENANT, NOT IN SCOPE. N MATCH LINE - SEE 1/E-101.1 CONFERENCE 104 LOBBY 101 VESTIBULE ENTRY 100 LOBBY 2 103 VESTIBULE 2 ENTRY 102 ROOM NEW MOTHER'S 105 CENTER SERVICE 106 OFFICE 107 OFFICE 108 OFFICE 109 OFFICE 110 OFFICE 111 OFFICE 112 OPEN AREA 116 TEAM ROOM 117 HALL 118 1. PROVIDE RECEPTACLE FOR REFRIGERATOR AT HEIGHT INDICATED. 2. FLUSH FLOOR BOX. REFER TO FLOOR BOX SCHEDULEON E-501 FOR ADDITIONAL INFORMATION. 3. RECEPTACLE FOR PRINTER/COPIER (MFD) - 120V-1ɸ, NEMA 5-20R. 4. NEW MOTHERS ROOM DOOR CARD/BIOMETRIC READER ACCESS CONTROL PANEL FURNISHED BY PNC AND INSTALLED AND WIRED BY E.C. PER MANUFACTURER'S REQUIREMENTS. THE COMPLETE OPERATING CARD/BIOMETRIC ACCESS SYSTEM SHALL INCLUDE INSTALLATION AND WIRING OF ALL REQUIRED SYSTEM COMPONENTS, SOME OF WHICH MAY BE SUPPLIED BY OTHER TRADES. COORDINATE WITH THE G.C. TO VERIFY WHAT OTHER SYSTEM COMPONENTS WILL BE SUPPLIED BY OTHERS. COORDINATE WITH PNC FOR FINAL LOCATION OF ALL SYSTEM COMPONENTS PRIOR TO ROUGH-IN OF ANY WORK FOR THIS SYSTEM. REFER TO DWG. E-602 DETAIL #7 FOR MORE INFORMATION. 5. 1"PVC. FROM POWER SECTION OF FLOOR BOX . STUB CONDUIT UP IN WALL, TRANSITION TO EMT, AND RUN CONDUIT OVERHEAD TO PANEL INDICATED. 6. THE DIMENSIONED LOCATION OF THE FLOOR BOX IS PROVIDED FOR BIDDING PURPOSES ONLY. THE E.C. SHALL VERIFY THE EXACT LOCATION OF THE FLOOR BOX WITH PNC AND FURNITURE VENDOR PRIOR TO ROUGH-IN. 7. PROVIDE TELEVISION BOX FOR POWER,AND DATA ARLINGTON INDUSTRIES CATALOG #TVBS505, 2-GANG STEEL. PROVIDE (1) 20A. SURGE PROTECTED DUPLEX RECEPTACLE FOR POWER, LEVITON #7380-W IN ONE GANG AND DATA IN THE OTHER GANG. PROVIDE BARRIER BETWEEN SECTIONS. BOX SHALL BE FLUSH MOUNTED. COORDINATE MOUNTING HEIGHTS WITH ELEVATIONS ON SHEETS I-201 THRU I-203. VERIFY WITH PNC PRIOR TO ROUGH-IN. 8. CENTERLINE SHOWN IS THE CENTERLINE OF THE TV MOUNTING BRACKET. DIMENSIONS SHOWN ARE CRITICAL FOR THE PROPER CLEARANCES FOR THE TV POWER AND DATA CABLES. 9. PROVIDE (1) 1"C. BETWEEN POWER SECTION OF FLOOR BOX AND TELEVISION BOX REFERENCED IN KEY NOTE 11. STUB CONDUIT UP IN WALL UP TO TELEVISION BOX AND FROM TELEVISION BOX RUN CONDUIT OVERHEAD TO PANEL INDICATED. 10. PROVIDE (1) 1-1/4" PVC CONDUIT BETWEEN SYSTEMS SECTION OF FLOOR BOX AND TELEVISION BOX REFERENCED IN KEY NOTE 11. STUB CONDUIT UP IN WALL, TRANSITION TO EMT AND ROUTE TO TELEVISION BOX, AND THEN FROM TELEVISION BOX. STUB UP ABOVE CEILING WITH INSULATING BUSHING ON END OF CONDUIT. 11. 1-1/4" PVC. FROM SYSTEMS SECTION OF FLOOR BOX. STUB UP IN WALL, TRANSITION TO EMT AND ROUTE CONDUIT UP IN WALL TO ABOVE LAY-IN CEILING. TERMINATE CONDUIT ABOVE CEILING WITH AN INSULATING BUSHING. 12. FIELD VERIFY LOCATION OF EACH EXISTING PANEL AND TRANSFORMER IN THIS AREA. 13. OPEN OFFICE RECEPTACLES AND DATA FLOOR BOX SHALL BE LOCATED IN TRENCH. DEVICES ARE FED THROUGH CONDUITS RUNNING IN TRENCH. COORDINATE EXACT LOCATIONS WITH FURNITURE VENDOR PRIOR TO ROUGH-IN. REFER TO ARCH. DRAWINGS FOR EXACT LOCATION OF TRENCH. 14. RECEPTACLES AND DATA PORTS SHALL BE COORDINATED WITH FURNITURE VENDOR. DEVICES SHALL BE EASILY ACCESSIBLE . COORDINATE EXACT LOCATION WITH VENDOR PRIOR TO ROUGH-IN. 15. LUTRON "EcoSystem" "Energi Savr Node" (ESN), A & B. MOUNT DEVICES ONE ABOVE THE OTHER ON WALL ABOVE "EcoSystem" TIMECLOCK REFERENCED IN NOTE 16. REFER TO DETAIL 1/E-601 FOR WIRING REQUIREMENTS. 16. LUTRON "EcoSystem" TIMECLOCK. SURFACE MOUNT IN A STANDARD 4-GANG BOX BELOW ESN-A & B AT 48" A.F.F. REFER TO DETAIL 1/E-601 FOR WIRING REQUIREMENTS. 06/20/2019 07/23/19 William Hohlt