HomeMy WebLinkAbout_TS-003140'-0" TRAVEL DISTANCE COMMON PATH OF TRAVEL TO THIS POINT = 22'-4" (IE. LESS THAN 75') 191'-6" TRAVEL DISTANCE FE FE DIAGONAL OF EXIT SEPARATION REQUIRED SEPARATION @ 151'-0" / 3 = 50'-4" ACTUAL SEPARATION = 85'-3" TOTAL DIAGON A L LENGT H : 151'-0" DIAGON A L / 3: 50'-4" EXL EXL EXL XEXL XEXL XEXL EXL 1 2 3 4 5 B A JOB NO. D C ISSUED FOR: PERMIT RECORD CONSTRUCTION BID 520 South Main Street, Suite 2531 Akron, OH 44311 330.572.2100 Fax 330.572.2102 2019190.32PNC BANK - PENNWOOD OFFICE11405 NORTH PENNSYVANIA STREETCARMEL, IN 4603206/19/19 06/19/19 - - 1 EGRESS PLAN 3/16"=1'-0"REV. DATE DESCRIPTIONDESIGNERPROJECT MANAGER Drawing Name: O:\2019\2019190\32 Carmel (Penn) Office IN\dwg\ConstructionDocuments\Architectural\001_201919032_TS-003.dwg June 19, 2019 - ecurryTS-003EGRESS PLANMAR EBC2 A. REFER TO SHEET TS-001 FOR FURTHER CODE DATA AND PROJECT INFORMATION. B. GENERAL CONTRACTOR TO COOORDINATE/VERIFY EXISTING FIRE EXTINGUISHER CABINET LOCATIONS WITH LOCAL FIRE MARSHAL. C. DO NOT SCALE DRAWINGS. D. B.THE BUILDING IS TO BE CONSTRUCTED IN COMPLIANCE WITH ASHRAE 90.1 OR PER THE LOCAL ENERGY CODE REQUIREMENTS. E. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO CROSS-CHECK THE MEP DRAWINGS WITH THE ARCHITECTURAL DRAWINGS PRIOR TO THE ORDERING / INSTALLATION OF MECHANICAL, ELECTRICAL, AND PLUMBING WORK. ANY DISCREPANCIES BETWEEN THE ARCHITECTURAL AND MEP DRAWINGS SHALL BE BROUGHT TO THE ARCHITECTS ATTENTION FOR IMMEDIATE CLARIFICATION. F. COORDINATE WORK WITH OTHER TRADES, EQUIPMENT FURNISHED BY OTHERS, REQUIREMENTS OF THE TENANT AND LANDLORD/BUILDING OWNER, AND THE CONSTRAINTS OF THE EXISTING CONDITIONS OF THE PROJECT SITE. COORDINATE THE INSTALLATION WITH OTHER TRADES AS REQUIRED TO ENSURE A NEAT AND ORDERLY INSTALLATION. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES BEFORE STARTING WORK. G. GENERAL CONTRACTOR AND SUB-CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY DETERMINED WITHOUT REFERENCE TO THE COMPLETE DOCUMENT SET. H. WHERE THERE MAY BE A CONFLICT IN THE SPECIFICATIONS AND/OR DRAWINGS, THEN THE MORE EXPENSIVE LABOR, MATERIALS AND EQUIPMENT SHALL BE ASSUMED TO BE REQUIRED AND SHALL BE PROVIDED BY THE GENERAL CONTRACTOR TO THE SATISFACTION OF THE TENANT. I. WHEN WORK, NOT SPECIFICALLY CALLED OUT, IS REQUIRED TO COMPLETE THE PROJECT, IT SHALL BE PROVIDED BY THE GENERAL CONTRACTOR WITH THE BEST MATERIALS AND WORKMANSHIP. J. G.C. TO REPLACE ALL CARPET WHERE DEMOLITION OCCURS TO MATCH EXISTING TO REMAIN. K. IT IS TO BE ASSUMED THAT THERE IS NO WORK IN AREAS HATCHED IN GRAY UNLESS DIRECTED BY PNC. GENERAL NOTES 36" PATH OF EGRESS LEGEND FE NEW FIRE EXTINGUISHER. CONTRACTOR SHALL COORDINATE/VERIFY PLACEMENT ,LOCATIONS, AND TYPE OF EXTINGUISHERS WITH LOCAL FIRE MARSHAL. NEW EXIT LIGHTEXL N EXISTING EXIT LIGHTXEXL TRAVEL DISTANCE (TABLE 1016.1) NOTE: PLAN DIAGRAMS WORST CASE SCENARIO 300'-0" MAX ALLOWED - FULLY SPRINKLERED. 191'-6" MAX PROVIDED. 75' MAX COMMON PATH OF TRAVEL (22'-4" PROVIDED) 06/20/2019 07/23/19 William Hohlt