Loading...
HomeMy WebLinkAboutA-1011 2 3 4 5 B A JOB NO. D C ISSUED FOR: PERMIT RECORD CONSTRUCTION BID 520 South Main Street, Suite 2531 Akron, OH 44311 330.572.2100 Fax 330.572.2102 2019190.32 PNC BANK - PENNWOOD OFFICE11405 NORTH PENNSYVANIA STREETCARMEL, IN 4603206/19/19 06/19/19 - - 1 FLOOR PLAN 1/4"=1'-0"REV. DATE DESCRIPTIONDESIGNERPROJECT MANAGER Drawing Name: O:\2019\2019190\32 Carmel (Penn) Office IN\dwg\ConstructionDocuments\Architectural\010_201919032_A-101.dwg June 19, 2019 - ecurryA-101FLOOR PLANMAR EBC2 A. DO NOT SCALE DRAWINGS. B. THE BUILDING IS TO BE CONSTRUCTED IN COMPLIANCE WITH ASHRAE 90.1 OR PER THE LOCAL ENERGY CODE REQUIREMENTS. C. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO CROSS-CHECK THE MEP DRAWINGS WITH THE ARCHITECTURAL DRAWINGS PRIOR TO THE ORDERING / INSTALLATION OF MECHANICAL, ELECTRICAL, AND PLUMBING WORK. ANY DISCREPANCIES BETWEEN THE ARCHITECTURAL AND MEP DRAWINGS SHALL BE BROUGHT TO THE ARCHITECTS ATTENTION FOR IMMEDIATE CLARIFICATION. D. COORDINATE WORK WITH OTHER TRADES, EQUIPMENT FURNISHED BY OTHERS, REQUIREMENTS OF THE TENANT AND LANDLORD/BUILDING OWNER, AND THE CONSTRAINTS OF THE EXISTING CONDITIONS OF THE PROJECT SITE. COORDINATE THE INSTALLATION WITH OTHER TRADES AS REQUIRED TO ENSURE A NEAT AND ORDERLY INSTALLATION. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES BEFORE STARTING WORK. E. GENERAL CONTRACTOR AND SUB-CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY DETERMINED WITHOUT REFERENCE TO THE COMPLETE DOCUMENT SET. F. WHERE THERE MAY BE A CONFLICT IN THE SPECIFICATIONS AND/OR DRAWINGS, THEN THE MORE EXPENSIVE LABOR, MATERIALS AND EQUIPMENT SHALL BE ASSUMED TO BE REQUIRED AND SHALL BE PROVIDED BY THE GENERAL CONTRACTOR TO THE SATISFACTION OF THE TENANT. G. WHEN WORK, NOT SPECIFICALLY CALLED OUT, IS REQUIRED TO COMPLETE THE PROJECT, IT SHALL BE PROVIDED BY THE GENERAL CONTRACTOR WITH THE BEST MATERIALS AND WORKMANSHIP. H. G.C. TO REPLACE ALL CARPET WHERE DEMOLITION OCCURS TO MATCH EXISTING TO REMAIN PLAN KEYNOTES GENERAL NOTES 1. MFD PRINTER TO BE PROVIDED BY PNC. 2. OFFICE FURNITURE BY OTHERS. G.C. TO COORDINATE PLACEMENT WITH PNC. 3. (3) 36" WIDE FLAT FILES WITH COMMON TOP. G.C. TO COORDINATE PLACEMENT WITH PNC. 4. WORKSTATION FURNITURE BY OTHERS. G.C. TO COORDINATE PLACEMENT WITH PNC. 5. 65" MONITOR. REFER TO INTERIOR ELEVATION FOR MOUNTING HEIGHT. 6. BASE CABINETRY. COORDINATE WITH PNC AND VENDOR. SEE 200 SHEETS. 7. COUNTERTOP WITH SUPPORT BRACKETS. BRACKETS TO BE PAINTED TO MATCH ADJACENT WALL, SEE SHEETS I-501. 8. G. C. TO ENSURE THAT EXISTING AREA IS SMOOTH, LEVEL, AND PREPARED TO RECEIVE NEW FLOOR FINISH. 9. FURNITURE. PROVIDED BY PNC AND VENDOR. 10. ROD AND SHELF INSTALLED BY G.C. 11. UNDER-COUNTER REFRIGERATOR. G.C. TO COORDINATE PLACEMENT WITH PNC. 12. DROP-IN SINK. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. 13. 55" MONITOR. REFER TO INTERIOR ELEVATION FOR MOUNTING HEIGHT. 14. TACK BOARD. COORDINATE PLACEMENT WITH PNC. 15. WASTE STREAM CENTER. COORDINATE PLACEMENT WITH PNC. 16. WALL CABINETRY. COORDINATE WITH PNC AND VENDOR. SEE 200 SHEETS 17. OFFICE FRONT INTERIOR SAFETY GLAZING SYSTEM AND DOORS SUPPLIED AND INSTALLED BY OTHERS. LEGEND ADJACENT TENANT, NO WORK IN THIS AREA. N - EXISTING WALL PARTITION NEW FULL HEIGHT WALL PARTITION MATCH LINE - SEE 1/A-101.1 CONFERENCE 104 LOBBY 101 VESTIBULE ENTRY 100 LOBBY 2 103 VESTIBULE 2 ENTRY 102 ROOM NEW MOTHER'S 105 CENTER SERVICE 106 OFFICE 107 OFFICE 108 OFFICE 109 OFFICE 110 OFFICE 111 112 112 OPEN AREA 116 TEAM ROOM 117 HALL 118 1 2 3 4 5 6 7 8 9 10 11 12 16 8 9 8 8 8 8 9 11 12 6 16 8 9 1 2 8 2 8 2 8 2 8 2 8 2 8 4 8 8 9 10 8 8 1 I-201 2 I-201 5I-201 6I-201 13 4I-201 17 17 17 17 17 17 17 14 15 CLOSET 120 7 06/20/2019 07/23/19 William Hohlt