HomeMy WebLinkAboutA-110.14'-0" 2'-0"2'-11 1/2"2'-5"1 2 3 4 5
B
A
JOB NO.
D
C
ISSUED FOR:
PERMIT
RECORD
CONSTRUCTION
BID
520 South Main Street, Suite 2531
Akron, OH 44311
330.572.2100 Fax 330.572.2102
2019190.32
PNC BANK - PENNWOOD OFFICE11405 NORTH PENNSYVANIA STREETCARMEL, IN 4603206/19/19
06/19/19
-
-MATCH LINE - SEE 1/A-110OFFICE
113
OFFICE
114
OFFICE
115
TRAINING
118
FUTURE TENANT
UNOCCUPIED
---
LOBBY 2
103
2 2 2 2
1 REFLECTED CEILING PLAN
1/4"=1'-0"
A. DO NOT SCALE DRAWINGS.
B. THE BUILDING IS TO BE CONSTRUCTED IN COMPLIANCE WITH ASHRAE 90.1 OR PER THE LOCAL ENERGY
CODE REQUIREMENTS.
C. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO CROSS-CHECK THE MEP DRAWINGS WITH
THE ARCHITECTURAL DRAWINGS PRIOR TO THE ORDERING / INSTALLATION OF MECHANICAL, ELECTRICAL,
AND PLUMBING WORK. ANY DISCREPANCIES BETWEEN THE ARCHITECTURAL AND MEP DRAWINGS SHALL
BE BROUGHT TO THE ARCHITECTS ATTENTION FOR IMMEDIATE CLARIFICATION.
D. COORDINATE WORK WITH OTHER TRADES, EQUIPMENT FURNISHED BY OTHERS, REQUIREMENTS OF THE
TENANT AND LANDLORD/BUILDING OWNER, AND THE CONSTRAINTS OF THE EXISTING CONDITIONS OF THE
PROJECT SITE. COORDINATE THE INSTALLATION WITH OTHER TRADES AS REQUIRED TO ENSURE A NEAT
AND ORDERLY INSTALLATION. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES BEFORE STARTING
WORK.
E. GENERAL CONTRACTOR AND SUB-CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION
DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE
DOCUMENT SET AND CANNOT BE ACCURATELY DETERMINED WITHOUT REFERENCE TO THE COMPLETE
DOCUMENT SET.
F. WHERE THERE MAY BE A CONFLICT IN THE SPECIFICATIONS AND/OR DRAWINGS, THEN THE MORE
EXPENSIVE LABOR, MATERIALS AND EQUIPMENT SHALL BE ASSUMED TO BE REQUIRED AND SHALL BE
PROVIDED BY THE GENERAL CONTRACTOR TO THE SATISFACTION OF THE TENANT.
G. WHEN WORK, NOT SPECIFICALLY CALLED OUT, IS REQUIRED TO COMPLETE THE PROJECT, IT SHALL BE
PROVIDED BY THE GENERAL CONTRACTOR WITH THE BEST MATERIALS AND WORKMANSHIP.
H. CEILING GRID HANGER WIRES SHALL NOT BE ATTACHED TO ROOF DECK. HANGERS TO ATTACH TO
STRUCTURAL MEMBERS ONLY. MAY REQUIRE ADDITIONAL SUPPORT MEMBERS BE ADDED TO PROVIDE
ADDITIONAL LIGHTING SUPPORT AND/OR CEILING SUPPORT, WHEN REQUIRED, PER SEISMIC ZONE AND
LOCAL CODE. ATTACHING CEILING DIRECTLY TO DECK IS NOT PERMITTED.
I. ELECTRICAL CONTRACTOR SHALL VERIFY PROPER OPERATION OF ALL EMERGENCY LIGHTS, EGRESS
LIGHTS, EXIT SIGNS AND ALARM APPLIANCES. REPAIR AND/OR REPLACE AS REQUIRED. EQUIPMENT WILL
BE TESTED AT FINAL INSPECTION
1. CENTER CEILING GRID IN SPACE UNLESS NOTED OTHERWISE.
2. WINDOW SHADE, SEE SHEET A-110.
3. START CEILING GRID AT NOTED LOCATION.
4. CENTER LIGHT WITHIN GRID.
PLAN KEYNOTES GENERAL NOTES
LEGEND
ADJACENT TENANT, NO WORK IN THIS
AREA.
SEE LIGHT FIXTURE SCHEDULE ON ELECTRICAL DRAWINGS
FOR MOUNTING HEIGHTS.
FIXTURE
SYMBOL TYPE
NEW 2X2 ACOUSTICAL PANEL CEILING (CL2)
NEW LIGHTING FIXTURES. SEE ELECTRICAL.
NEW MECHANICAL EQUIPMENT . SEE
MECHANICAL
N
#
VESTIBULE 2
ENTRY
102
P1
B.O. BULKHEAD
8'-10" A.F.F.
CLG. HGT.
9'-0" A.F.F.
1
2
A-110
STORAGE
121
CLG. HGT.
9'-0" A.F.F.
4
3
CLG. HGT.
9'-0" A.F.F.
1
CLG. HGT.
9'-0" A.F.F.
1
CLG. HGT.
9'-0" A.F.F.
1
CLG. HGT.
9'-0" A.F.F.
1
FUTURE TENANT
UNOCCUPIED
---
FIXTURE
SYMBOL TYPE
EXISTING MECHANICAL EQUIPMENT . SEE
MECHANICAL
3
REV. DATE DESCRIPTIONDESIGNERPROJECT MANAGER Drawing Name: O:\2019\2019190\32 Carmel (Penn) Office IN\dwg\ConstructionDocuments\Architectural\010_201919032_A-110.dwg
June 20, 2019 - ecurryA-110.1REFLECTED CEILING PLANMAR EBC2
06/20/2019
07/23/19
William Hohlt