HomeMy WebLinkAboutD-101.1±5'-1" ±3'-2 1/2" ±3'-11" 3'-4"4" 3'-4"±13'-9"A. GENERAL CONTRACTOR SHALL SCHEDULE DEMOLITION ACTIVITIES WITH THE CONSTRUCTION/PROJECT MANAGER AND BUILIDNG MANAGER INCLUDING THE FOLLOWING: 1) DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK, WITH STARTING AND ENDING DATES FOR EACH ACTIVITY. 2) DATES FOR SHUTOFF, AND CONTINUATION OF UTILITY SERVICES. 3) IDENTIFY AND ACCURATELY LOCATE UTILITIES AND OTHER SUBSURFACE AND/OR ABOVE CEILING STRUCTURAL, ELECTRICAL, OR MECHANICAL CONDITIONS. B. DO NOT START DEMOLITION WORK UNTIL UTILITY DISCONNECTING AND SEALING HAVE BEEN COMPLETED AND VERIFIED IN WRITING. C. REMOVE: REMOVE AND LEGALLY DISPOSE OF ITEMS EXCEPT THOSE INDICATED TO BE REINSTALLED, SALVAGED, OR TO REMAIN. D. REMOVE, REINSTALL, AND RELOCATE: REMOVE ITEMS INDICATED; CLEAN, SERVICE, AND OTHERWISE PREPARE THEM FOR REUSE; STORE AND PROTECT AGAINST DAMAGE. REINSTALL ITEMS IN LOCATIONS INDICATED. E. REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON ADJACENT SURFACES AND AREAS. F. COMPLETELY REMOVE ITEMS TO BE DEMOLISHED LEAVING SURFACE CLEAN, SOLID, AND READY TO RECEIVE NEW MATERIALS SPECIFIED ELSEWHERE. ALL DEMOLISHED CONSTRUCTION WASTE SHALL BE RECYCLED. G.C. TO COORDINATE AND SHALL COMPLETELY REMOVE MATERIALS FROM THE JOB SITE. G. ALL DEMOLITION WORK AND DISPOSAL SHALL BE DONE ACCORDING TO ALL LOCAL AND REGIONAL CODES. ALL DEBRIS THAT CAN BE RECYCLED SHALL BE RECYCLED AND REPORTED TO PNC. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEMOLITION PERMITS AND FEES. H. EXISTING TO REMAIN: PROTECT ITEMS INDICATED TO REMAIN AGAINST DAMAGE AND SOILING DURING DEMOLITION. WHEN PERMITTED BY THE ENGINEER, ITEMS MAY BE REMOVED TO A SUITABLE, PROTECTED STORAGE LOCATION DURING DEMOLITION AND THEN CLEANED AND REINSTALLED IN THEIR ORIGINAL LOCATIONS. I. REGULATORY REQUIREMENTS: COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE STARTING DEMOLITION. COMPLY WITH HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION. J. MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING DEMOLITION OPERATIONS. DO NOT INTERRUPT EXISTING UTILITIES SERVING OCCUPIED OR OPERATING FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY ENGINEER AND AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING UTILITIES, AS ACCEPTABLE TO OWNER AND TO GOVERNING AUTHORITIES. K. ASBESTOS: IT IS NOT EXPECTED THAT ASBESTOS WILL BE ENCOUNTERED IN THE COURSE OF THIS CONTRACT. IF ANY MATERIALS SUSPECTED OF CONTAINING ASBESTOS ARE ENCOUNTERED, DO NOT DISTURB THE MATERIALS. IMMEDIATELY NOTIFY THE TENANT AND THE LANDLORD/BUILDING OWNER. L. SURVEY THE CONDITION OF THE BUILDING TO DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN A STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF THE STRUCTURE OR ADJACENT STRUCTURES DURING DEMOLITION. M. CONDUCT DEMOLITION OPERATIONS TO PREVENT INJURY TO PEOPLE AND DAMAGE TO ADJACENT BUILDINGS AND FACILITIES TO REMAIN. ENSURE SAFE PASSAGE OF PEOPLE AROUND DEMOLITION AREA. N. ERECT TEMPORARY PROTECTION, BARRICADES AS PER LOCAL GOVERNING AUTHORITIES. O. DO NOT CLOSE OR OBSTRUCT STREETS, WALKS, OR OTHER ADJACENT OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM OWNER AND AUTHORITIES HAVING JURISDICTION. PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC WAYS IF REQUIRED BY GOVERNING REGULATIONS. P. PROTECT EXISTING SITE IMPROVEMENTS AND APPURTENANCES TO REMAIN. Q. CLEAN ADJACENT BUILDINGS AND IMPROVEMENT OF DUST, DIRT, AND DEBRIS CAUSED BY DEMOLITION OPERATIONS. RETURN ADJACENT AREAS TO CONDITION EXISTING BEFORE START OF DEMOLITION. R. DAMAGES: PROMPTLY REPAIR DAMAGES TO ADJACENT FACILITIES CAUSED BY DEMOLITION OPERATIONS AT THE GENERAL CONTRACTORS COST. ITEMS TO BE REMOVED ITEMS TO REMAIN 1 DEMOLITION PLAN 1/4"=1'-0" 1 2 3 4 5 B A JOB NO. D C ISSUED FOR: PERMIT RECORD CONSTRUCTION BID 520 South Main Street, Suite 2531 Akron, OH 44311 330.572.2100 Fax 330.572.2102 2019190.32PNC BANK - PENNWOOD OFFICE11405 NORTH PENNSYVANIA STREETCARMEL, IN 4603206/19/19 06/19/19 - - A. ALL DEVICES REMOVED DURING DEMOLITION SHALL HAVE ALL ASSOCIATED CONDUIT, WIRING, AND CONTROLS REMOVED BACK TO SOURCE. GENERAL DEMOLITION NOTES GENERAL DEMOLITION ELECTRICAL NOTES LEGEND ADJACENT TENANT, NO WORK IN THIS AREA. FLOOR TRENCH, SEE PLAN KEY NOTES NMATCH LINE - SEE 1/D-1011 2 2 2 2 2 22 2 2 2 2 4 4 4 4 4 4 4 ELECTRICAL PLAN KEYNOTES 1. REMOVE EXISTING POWER AND/OR DATA DEVICES AND WIRING THROUGHOUT SCOPE OF WORK AREA. - A. COMPLETELY REMOVE ITEMS TO BE DEMOLISHED LEAVING SURFACE CLEAN, SOLID AND READY TO RECEIVE NEW MATERIALS SPECIFIED ELSEWHERE. DEMOLISHED MATERIAL SHALL BE CONSIDERED TO BE PROPERTY OF THE CONTRACTOR UNLESS NOTED OTHERWISE AND SHALL BE COMPLETELY REMOVED FROM THE JOB SITE. B. IN THE EVENT OF DEMOLITION OF ITEMS NOT SCHEDULED TO BE REMOVED, PROMPTLY REPLACE SUCH ITEMS TO THE APPROVAL OF THE ARCHITECT, AND AT NO ADDITIONAL COST TO THE OWNER. GENERAL MECHANICAL NOTES MECHANICAL PLAN KEYNOTES 1. EXISTING HAND SINK TO BE REMOVED ALONG WITH ALL ASSOCIATED PIPING. PATCH WALLS AND FLOOR TO MATCH EXISTING AS REQUIRED. -REV. DATE DESCRIPTIONDESIGNERPROJECT MANAGER Drawing Name: O:\2019\2019190\32 Carmel (Penn) Office IN\dwg\ConstructionDocuments\Architectural\002_201919032_D-101.dwg June 19, 2019 - ecurryD-101.1DEMOLITION FLOOR PLANMAR EBC2 DEMOLITION PLAN KEYNOTES _ 1. EXISTING CASEWORK TO BE REMOVED IN IT'S ENTIRETY. 2. EXISTING FINISHED FLOOR AND BASE TO BE REMOVED. G.C. TO ENSURE THAT EXISTING FLOOR IS SMOOTH, LEVEL AND PREPARED FOR NEW CARPET, CP1. 3. NOT USED. 4. EXISTING STOREFRONT AND GLAZING TO BE REMOVED. 5. APPROXIMATE LOCATION OF FLOOR TRENCHING IN EXISTING CONCRETE FLOOR SLAB AS REQUIRED FOR NEW UTILITY TRENCHING. WIDTH AND DEPTH OF TRENCH SHALL BE SUFFICIENT TO ACCOMMODATE INSTALLATION OF NEW LINES. (G.C. TO FIELD VERIFY EXTENT AND CONSTRUCTION OF EXISTING FLOOR SLAB, FOUNDATION SYSTEM, AND MECHANICAL SYSTEM. EXISTING FLOOR SLAB IS ASSUMED TO BE A CONVENTIONAL SLAB ON GRADE. G.C. SHALL CONDUCT A GPR SURVEY OF THE EXISTING SLAB PRIOR TO THE BEGINNING OF DEMOLITION TO ENSURE SLAB ON GRADE TYPE AND PROVIDE THE RESULTS TO THE ENGINEER OF RECORD PRIOR TO PROCEEDING). COORDINATE FINAL LOCATION WITH MECHANICAL AND ELECTRICAL SHEETS. REFER TO STRUCTURAL FOR ADDITIONAL INFORMATION. 6. APPROXIMATE LOCATION OF NEW FLOOR BOX. REFER TO ELECTRICAL DRAWINGS. 06/20/2019 07/23/19 William Hohlt