Loading...
HomeMy WebLinkAboutD-1101 2 3 4 5 B A JOB NO. D C ISSUED FOR: PERMIT RECORD CONSTRUCTION BID 520 South Main Street, Suite 2531 Akron, OH 44311 330.572.2100 Fax 330.572.2102 2019190.32 PNC BANK - PENNWOOD OFFICE11405 NORTH PENNSYVANIA STREETCARMEL, IN 4603206/19/19 06/19/19 - - 1 DEMOLITION REFLECTED CEILING PLAN 1/4"=1'-0"REV. DATE DESCRIPTIONDESIGNERPROJECT MANAGER Drawing Name: O:\2019\2019190\32 Carmel (Penn) Office IN\dwg\ConstructionDocuments\Architectural\002_201919032_D-110.dwg June 19, 2019 - ecurryD-110 DEMOLITION REFLECTEDCEILING PLANMAR EBC2 A. GENERAL CONTRACTOR SHALL SCHEDULE DEMOLITION ACTIVITIES WITH THE CONSTRUCTION/PROJECT MANAGER AND BUILIDNG MANAGER INCLUDING THE FOLLOWING: 1) DETAILED SEQUENCE OF DEMOLITION AND REMOVAL WORK, WITH STARTING AND ENDING DATES FOR EACH ACTIVITY. 2) DATES FOR SHUTOFF, AND CONTINUATION OF UTILITY SERVICES. 3) IDENTIFY AND ACCURATELY LOCATE UTILITIES AND OTHER SUBSURFACE AND/OR ABOVE CEILING STRUCTURAL, ELECTRICAL, OR MECHANICAL CONDITIONS. B. DO NOT START DEMOLITION WORK UNTIL UTILITY DISCONNECTING AND SEALING HAVE BEEN COMPLETED AND VERIFIED IN WRITING. C. REMOVE: REMOVE AND LEGALLY DISPOSE OF ITEMS EXCEPT THOSE INDICATED TO BE REINSTALLED, SALVAGED, OR TO REMAIN. D. REMOVE, REINSTALL, AND RELOCATE: REMOVE ITEMS INDICATED; CLEAN, SERVICE, AND OTHERWISE PREPARE THEM FOR REUSE; STORE AND PROTECT AGAINST DAMAGE. REINSTALL ITEMS IN LOCATIONS INDICATED. E. REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON ADJACENT SURFACES AND AREAS. F. EXISTING TO REMAIN: PROTECT ITEMS INDICATED TO REMAIN AGAINST DAMAGE AND SOILING DURING DEMOLITION. WHEN PERMITTED BY THE ENGINEER, ITEMS MAY BE REMOVED TO A SUITABLE, PROTECTED STORAGE LOCATION DURING DEMOLITION AND THEN CLEANED AND REINSTALLED IN THEIR ORIGINAL LOCATIONS. G. REGULATORY REQUIREMENTS: COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE STARTING DEMOLITION. COMPLY WITH HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION. H. MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING DEMOLITION OPERATIONS. DO NOT INTERRUPT EXISTING UTILITIES SERVING OCCUPIED OR OPERATING FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY ENGINEER AND AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING UTILITIES, AS ACCEPTABLE TO OWNER AND TO GOVERNING AUTHORITIES. I. ASBESTOS: IT IS NOT EXPECTED THAT ASBESTOS WILL BE ENCOUNTERED IN THE COURSE OF THIS CONTRACT. IF ANY MATERIALS SUSPECTED OF CONTAINING ASBESTOS ARE ENCOUNTERED, DO NOT DISTURB THE MATERIALS. IMMEDIATELY NOTIFY THE TENANT AND THE LANDLORD/BUILDING OWNER. J. SURVEY THE CONDITION OF THE BUILDING TO DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN A STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF THE STRUCTURE OR ADJACENT STRUCTURES DURING DEMOLITION. K. CONDUCT DEMOLITION OPERATIONS TO PREVENT INJURY TO PEOPLE AND DAMAGE TO ADJACENT BUILDINGS AND FACILITIES TO REMAIN. ENSURE SAFE PASSAGE OF PEOPLE AROUND DEMOLITION AREA. L. ERECT TEMPORARY PROTECTION, BARRICADES AS PER LOCAL GOVERNING AUTHORITIES. M. DO NOT CLOSE OR OBSTRUCT STREETS, WALKS, OR OTHER ADJACENT OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM OWNER AND AUTHORITIES HAVING JURISDICTION. PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC WAYS IF REQUIRED BY GOVERNING REGULATIONS. N. PROTECT EXISTING SITE IMPROVEMENTS AND APPURTENANCES TO REMAIN. O. CLEAN ADJACENT BUILDINGS AND IMPROVEMENT OF DUST, DIRT, AND DEBRIS CAUSED BY DEMOLITION OPERATIONS. RETURN ADJACENT AREAS TO CONDITION EXISTING BEFORE START OF DEMOLITION. P. DAMAGES: PROMPTLY REPAIR DAMAGES TO ADJACENT FACILITIES CAUSED BY DEMOLITION OPERATIONS AT THE GENERAL CONTRACTORS COST. A. ALL DEVICES REMOVED DURING DEMOLITION SHALL HAVE ALL ASSOCIATED CONDUIT, WIRING, AND CONTROLS REMOVED BACK TO SOURCE. GENERAL NOTES GENERAL ELECTRICAL NOTES PLAN KEYNOTES ELECTRICAL PLAN KEYNOTES -- 1. EXISTING LAY-IN CEILING SYSTEM TO BE REMOVED IN IT'S ENTIRETY. COORDINATE W/ MECHANICAL AND ELECTRICAL DRAWINGS FOR EXTENTS OF DEMOLITION. PREPARE FOR INSTALLATION OF NEW CEILING PER PLAN. REFER TO A-110 FOR NEW CONSTRUCTION. N 1. EXISTING LIGHT FIXTURES, ASSOCIATED BRANCH CIRCUIT WIRING AND CONTROLS TO BE REMOVED. 2. REMOVE EXISTING LIGHT FIXTURE(S), ASSOCIATED CONTROLS AND BRANCH CIRCUIT WIRING COMPLETE BACK TO SOURCE. 3. THE E.C. SHALL RECORD THE LOCATIONS OF EXISTING CEILING MOUNTED SPEAKERS, SECURITY EQUIPMENT AND FIRE ALARM DEVICES PRIOR TO DEMOLITION OF CEILING. REMOVE THESE DEVICES SO THAT CEILING CAN BE REMOVED. REINSTALL DEVICES AS CLOSE TO THE EXISTING LOCATION AS POSSIBLE AFTER NEW CEILING HAS BEEN INSTALLED. ENSURE THAT REINSTALLED DEVICES ARE FUNCTIONING IN THE SAME MANNER AS THEY WERE PRIOR TO REMOVAL.MATCH LINE - SEE 1/D-110.1 1 1 1 1 1 1 1 LEGEND FIXTURE SYMBOL DESCRIPTION CEILING TO BE REMOVED LIGHTING FIXTURES TO BE REMOVED MECHANICAL EQUIPMENT TO BE REMOVED NO WORK IN THIS AREA. 3 4 4 5 5 4 2 1 3 4 52 1 1 3 4 52 1 1 3 4 52 1 1 3 4 52 1 1 3 4 52 1 1 3 4 52 1 1 3 4 52 1 1 3 4 52 06/20/2019 07/23/19 William Hohlt