HomeMy WebLinkAbout19060100 Revision AppCITY OF CARMEL
�. RESIDENTIAL REVISION 1 AMENDMENT TO EXISTING PERMIT
1
i
njaN>�� Please complete form and email to permits@carmei.in.gow.
If you have any questions, please call Building & Code Services at (317) 571-2444.
PERMIT HAS BEEN ISSUED: ❑ YEs ❑ NO IF YES, PERMIT #: 11906010(
F
NAME
EPerma Pools
PHONE
317-782-9956
❑ REMODEL
I
ADDRESS George Court
CITY
STREET ADDRESS 5245 Elmwood Ave CITMlndianapolis
STATE INZIP46203
EREUCORD
E-MAIL ADDRESS
BEST METHOD OF
❑ Deck
efrushon@permapools.com
CONTACT ❑ PHONE ® E-MAIL
NAME
STATE OF INDIANA
OR
NEW SQUARE
FOOTAGE 760
LICENSE NUMBER
PROJECT
PARCEL NUMBER 16-09-24-01-11-002.000
LOCATION
❑ REMODEL
I
ADDRESS George Court
CITY
STATE sTATEIN
ZiP46032
PROJECT
® NEW STRUCTURE
❑ REMODEL
I
❑ ACCESSORY BUILDING ❑ CELL TOWER
L
DETAILS
-
❑ ADDITION ❑ Room ❑ Porch
❑ Deck
-
❑ GARAGE ❑ Attached ❑ Detached
NEW COST OF CONSTRUCTION
(EXCLUDING LAND)
$65,000
NEW SQUARE
FOOTAGE 760
DESCRIPTION OF CHANGES TO SCOPE OF WORK FROM ORIGINAL SUBMITTAL:
Location of the pool changed in the yard, the deck is at least 10'trom the property lines and the plot plan is showing no easments. See new drawing attatched-
ADVANCED STRUCTURAL COMPONENTS REPORTING
This section is required in order to comply with the requirements of IC 22-11-21 (Public Law 104, 2018) as it relates to the use of Advanced Structural
Components (lightweight 1 -joists or Iightw+eight roof trusses) in Class I and Class II Construction that:
1. Have less mass cross-sectional area than sawn lumber of equivalent proportions used in an equivalent application; and
2. Are assembled from combustible or noncombustible materials, or both
Does this project include any Advanced Structural Components? ❑ yes (Section Below Required) ® No
Type of Advanced Structural Component (Select all that apply)
Location(s) in Structure
.,.
❑ Lightweight I -Joists — -
❑ Lightweight Roof Trusses
Class I structure permits are subject to the State of Indiana General Administrative Rules (GAR 675 IAC 12) regarding expiration time frames for beginning and
completing construction -
I, the undersigned, agree that any construction, reconstruction, enlargement, relocation, or alteration of a structure, or any change in the use of land or
structures requested by this application will comply with and conform to all applicable laws of the State of Indiana and t-te Carmel Unified Development
Ordinance {Z-625-17) and amendments, adopted under authority of I.C. 36-7 et seq, General Assembly of the State of Indiana, and all Acts amendatory
thereto. I further certify that only kitchen, bath, and floor drains are connected to the sanitary sewer. I further certify that the construction will not be
used or occupied until a Certificate of Occupancy or of Substantial Completion has been issued by the Department of Community Services, Carmel, Indiana.
Signature of Owner or Authorized Agent e& frwsh&vv
Date aug 1 2019