Loading...
HomeMy WebLinkAboutS100.0606820682840 26682840R 3 R CT M O GD GD RR R R R 3 EXISTING 2X4 FRAMING DEMOLITION & FRAMING KEY NO DEMO IN THIS ROOM EXISTING 2X6 FRAMING WALL SECTION TO BE REMOVED NEW 2x4 FRAMING NEW 2X6 FRAMING BULK HEAD / LOWERED CEILING EXISTING/DEMO PLAN SCALE: 1/2" = 1' Zhiss ResidenceKitchen Remodel12499 Shadow Cove WayCarmel, IN 46033Date:Revision: 1 SHEET OF 7 SIGNATURE / SEALDESIGNER: TYLER VARGO E: tylerv@customlivingusa.com C: 574.274.4155Client Initials: Date: The plans, including all text, drawings, concepts and ideas, forming a part of the plans, and the selection and arrangement thereof Copright 2018 by Custom Living, Inc., Indianapolis IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans, or their content, without the prior written permission of Custom Living. Inc is strictly prohibited.CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462206/27/2019 DATE: GENERAL SITE PREP & DEMO NOTES Install plastic to seal off areas being remodeled from rest of home as necessary. Install floor covering for construction path from door designated as the construction entrance to locations of remodeling as necessary. Install additional floor covering or wall protection as needed over areas close to the areas of construction activity. Install dust control measures on HVAC cold air returns located within the locations of remodeling. Custom Living can provide a HEPA Air Scrubber to aid in airborne dust control from the start of demolition up to priming of new drywall depending on site conditions, Homeowner understands that this will help to reduce airborne dust; however, it will still not mitigate it in its entirety. Demolition Contractor(s) are responsible for all labor, for the scope of work specified in the drawings provided by Custom Living. Homeowner understands that Custom Living has only provided a labor and material allowance for the scope of Demolition denoted on the drawings, Any additional scope added or uncovered during demolition will be a Change Order during construction. Homeowners understand that Decmolition work will generate dust and noise throughout the house, Custom Living will provide site protection measures to reduce where possible, but Homeowners should not expect 100% containment. SITE PREP & DEMO PLAN NOTES Provide ram board flooring protection from front door to kitchen Plastic off areas of demo Install zip wall at back hallway near main stairs MECHANICAL DISCONNECT NOTES Disconnect existing sink and faucet; save faucet for reinstallation Disconnect existing dishwasher Disconnect existing water line to refrigerator Disconnect toilet and vanity located in powder bath prior to demolition Disconnect and remove (5) recessed cans lights Disconnect power supply to all appliances Disconnect outlets and switches on walls to be demo'd or relocated Delete existing back splash telephone jack DEMO PLAN NOTES Remove all existing appliances (TRASH) Remove all existing kitchen countertops and cabinets Remove pony wall as shown Remove necessary drywall on walls for mechanical rough ins Remove drywall on kitchen ceiling for electrical locates OPTIONAL PRICING: Remove existing hardwood flooring located in kitchen and dining room, remove tile flooring located in hallway, powder bath and laundry room. (Pull washer and dryer prior to demo, re-connect following demo, pull during flooring install and reinstall following flooring installation) EQUIPMENT RENTAL NOTES No equipment rental is in the current construction budget. ** PRINTS TO SCALE IF PRINTED ON 24" X 36" ** 07/11/19 Adam Schriner