HomeMy WebLinkAboutGN 100.2 - Responsibilty MatrixOENERAL I. THE DRAWIN AND SPECIFICATIONS WILL BE CONSIDERED AS TUEXPLANATORY ANY WORK REQUIRED BY ONE BUT NOT THE OTHER WILL BE PERFORMED A5 THOJ6N REQUIRED BY NTH IN CASE OF CONFLICT BETWEEN THE DRAWIN AND SPECIFICATIONS, THE ARCHITECT WILL DETERMINE. LARGE SCALE DRAWINGS WILL TAKE PRECEDENCE OVER SMALLER PLANS OF MINOR DETAIL. 2, DO NOT SCALE DRAWIN65. VERIFY AND FOLLOW INDICATED DIMENSIONS. IN CASE OF 015- CREPANGY, NOTIFY THE ARCHITECT FOR HIS DECISION BEFORE PROCEEDING WITH THE WORK. THE DEGI510N OF THE ARCHITECT IN THE CASE OF A DISCREPANCY WILL BE FINAL. 3, THESE DRAWIN65 AND 5PECIFICATION5 ARE INTENDED TO PROVIDE FOR A COMPLETE AND FINISHED PIECE OF WORK, AND THE CONTRACTOR WILL NOT AVAIL TO OBVIOUS OR UNIN- TENTIONAL ERROR OR OM155ION AND WILL INCLUDE IN THEIR BID, PROV1510115 FOR ALL, LABOR, MATERIAL, AND 5ERVIGE5 INCIDENTAL FOR A COMPLETE AND FINISHED BUILDING IN EVERY RESPECT. THI5 DOES NOT IMPLY THAT THE CONTRACTOR WILL BE REQUIRED TO FURNI5H LABOR OR MATERIAL NOT OBVIOUSLY INTENDED, SHOWN OR GALLED FOR, HOWEVER, SHOULD HE BE61N NORK WHERE A D15CREPANCY EX15T5 BETWEEN THE DRAWIN, SPECIFICATION5 AND FIELD CONDITIONS, CORRECTIONS WILL BE MADE NCH IN THE OPINION OF THE ARCHITECT BEST ALLEVIATES THE 60NDITION5 WITH NO ADDITIONAL PAYMENT. 4. NO INTOXICATING BEVERAGES OR ILLEGAL SUBSTANCE WILL BE ALLOWED ON THE 51TE OF THE NORK AND NO PER50N WILL BE ALLOWED ON THE 5ITE INTOXICATED OR UNDER THE INFLUENCE OF INTOXICATING BEVERA6H OR ILLEGAL SUBSTANCE. FURTHERMORE, FROM THE TIME THAT THE DRIED -IN WILDING SHELL 15 COMPLETED, OR ENCLOSED FROM THE ELEMENTS, NO 5MOKIN5 OR USE OF TOBACCO IN ANY FORM WILL BE ALLOYED IN510E THE BUILDING. 5. ALL MATERIALS STORED ON THE 5ITE WILL BE ARRANGED AND MAINTAINED IN AN ORDERLY MANNER 50 THAT THE USE OF WALKS, DRIVES, ROADS AND BUTTRANCE5 REMAIN UNENCUMBERED. 6. CONTRACTOR WILL BE RESPONSIBLE FOR THE DESIGN AND INSTALLATION, INGLUDIN6 ALL EQUIPMENT, MATERIAL, ACCE550PIE5, TOOLS AND LABOR REQUIRED FOR THE COMPLETE OPERATION OF THE HORK, IN ACCORDANCE WITH ALL APPLICABLE CODE REQUIREMENT5 AND MANUFACTURER'S RECOMMENDATIONS. T. IF THE CONTRACTOR ASCERTAINS AT ANY TIME THE REQUIREMENTS OF THE DRAWIN OR SPECIFICATION CONFLICT WITH OR ARE IN VIOLATION OF APPLICABLE LAWS, CODES, REGULA- TIONS OR ORDINANCES THEY WILL NOT PROCEED WITH THE WORK IN QUESTION UNTIL THE ARGHITELT HAS BEEN NOTIFIED IN WRITING AND A NTTEN DETERMINATION 15 MADE BY THE ARCHITECT. NO FXTRA5 WILL BE ALLOWED TO MEET GORE REQUIREMENTS. 8. CONTRAGTOR WILL PROVIDE ALL PERMITS AND ARRANGE FOR INSPECTIONS AS REQUIRED BY THE CITY, COUNTY AND/OR STATE AUTHORITIES FURNISH CERTIFICATE OF FINAL INSPECTION FROM THE LOCAL WILDING IN5PECTOR, INDICATING THAT THE INSTALLATION COMPLIE5 WITH ALL GOVERNING RE AULATION5. 9, CONTRACTOR WILL BE PROPERLY LIOEN5ED TO PERFORM WORK AT THE LOCATION OF THE PROJECT AND WILL MAINTAIN ADEQUATE 5ERVICE FAGILITIE5 LOCALLY. HE WILL PROVIDE REFERENCES OF AT LEAST THREE 5AT15FACTORILY COMPLETED PROJECTS OF 51MILAR TYPE AND 51ZE TO THE OWNER, 10, CONTRACTOR WILL COORDINATE WORK 50 A5 TO CONFORM TO THE PR06FZE55 OF THE WORK OF THE TRADES, FOR THE COMPLETION OF THE ENTIRE INSTALLATION A5 50ON A5 THE CONDITION5 OF THE WILDING ALLOWS. IL SHOP DRAWINGS WILL BE 50MITTED FOR ALL EQUIPMENT AND MATERIALS WHICH MUST INTERFACE AND COORDINATE WITH OTHERS. CONTRACTOR WILL SUBMIT 51X (6) COPIES TO THE ARCHITECT FOR REVIEW. 12. UPON COMPLETION OF THE WORK, THE CONTRACTOR WILL LEAVE PROJECT IN A CLEAN AND OPERATIONAL CONDITION. 13. CONTRACTOR WILL VERIFY AND COORDINATE ALL NEW AND OR EXISTING CONDITIONS TO INCLUDE DIMENSIONS AT THE JOB 5ITE FOR COWAR15ON WITH THE DRA11IN65 PRIOR TO BIDDING THE PROJECT. SHOULD ANY DISCREPANCIES, ING014515TENCIES OR OMISSIONS BE FOUND THE ARCHITECT WILL BE NOTIFIED IN WRITING IMMEDIATELY FOR CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK. It ABBREVIATIONS THROUGHOUT THE PLANS ARE TH05E STANDARD TO THE INDUSTRY AND IN COMMON USE. NOTIFY THE ARCHITECT OF ANY ABBREVIATIONS IN QUESTION. 15. CONTRACTOR WILL COORDINATE THE INSTALLATION OF VARIOIY TRADE ITFH5 WITHIN THE SPACE ABOVE ALL 6EILICE, (INGLUDIN6 WT NOT LIMITED TO STRUCTURAL MEMBERS, MECH- ANICAL DUCTS, INSULATION, CONDUITS, RACEWAYS, SPRINKLER SYSTEM, LI6HT FIXTURES, CEILING SYSTEMS AND ANY SPECIAL 5TRUCTURAL SUPPORTS REQUIRED) AND WILL W RESPON- 51BLE FOR MAINTAINING THE FINISH 6EILIN6 HEIGHT ABOVE THE FIN15H FLOOR INDICATED IN THE ORAWIN AND THE FIN15H SCHEDULE. GEILI% HEIGHT DIMEN510N5 ARE TO THE FIN15H SURFACE OF THE CEILING. 16, ACOE55 PANELS WILL BE PROVIDED AND INSTALLED WHEREVER REQUIRED BY THE WILDING CODE OR FOR THE PROPER OPERATION OR MAINTENANCE OF MECHANICAL OR ELECTRICAL EQUIPMENT WHETHER OR NOT INDICATED ON THE DRAWIN65. CONTRACTOR WILL COORDINATE SIZE, LOCATION AND TYPE OF ACCESS PANEL WITH OTHER 60141 WORK AND RECEIVE THE APPROVAL OF THE ARCHITECT. ALL ACCESS PANELS SHALL MAINTAIN THE FIRE RATING OF THE ASSEMBLY WHERE INSTALLED. Il. DIMENSIONS SHOWN ON THE FLOOR PLANS, SECTIONS, ELEVATIONS AND DETAILS ARE TO FACE OF 5TUD, MASONRY, CONCRETE OR STRUCTURAL 6RID CENTERLINES LMLE55 OTHERWISE NOTED. I8. ALL DUCT PENETRATIONS THROUGH PARTITIONS AND GEILIN65 WILL BE PROVIDED WITH NEC- E55ARY FRAMES AND BRACING AROUND THE OPENING AND WILL MAINTAIN THE FIRE A55EMBLY RATING OF THE WALL OR CEILING TO INCLUDE FIRE DAMPERS WHERE REWIRED. M. THE CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND SHOP PRANIIN65 ARE SUPPLEMENTAL TO THE ARCHITECTURAL DRAWIN AND WILL BE COORDINATED BY TIE CON- TRACTOR. THE CONTRACTOR WILL COORDINATE ALL DRAWINGS AND 5PECIFI6ATION5 PRIOR TO PROCEEDING WITH THE INSTALLATION OF ANY NORK, AND BRING ANY DI5GRE-PAN61E5 TO THE ATTENTION OF THE ARGHITELT FOR CLARIFICATION. 20. IMPROPERLY INSTALLED WORK WILL BE 6ORREGTED BY THE CONTRACTOR AT HI5 EXPENSE AND AT NO EXPENSE TO THE ARCHITECT, THE ARGHIT-GTS CONSULTANTS, THE CONSTRUCTION MANAGER OR THE OWNER, 21. CONSULT THE ARCHITECT AND PROJECT 5TRUCNRAL ENGINEER IN ALL GASES WHEN GUTTING INTO AN EXISTING OR NEW STRUCTURAL SYSTEM. RELEASED FOR CONSTRUCTION Subject to iompllance with all regulations of State and Local Codes City Camel ;ea.o�wl: ((�} „mnli gqof n" m=wr,, LD\ow�tlllel.Ot "aao,nR note. (1R/12 1Q 07E5 22. ALL EXIT DOORS WILL BE OPERABLE FROM IN510E WITHOUT THE LEE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT AND WILL BE ACCESSIBLE TO THE HANDICAPPED. 23. THE MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED THE FOLLOWING REQUIREM- ENTS: INTERIOR DOORS 5 POUNDS, EXTERIOR DOORS B 5 POUNDS AND FIRE RATED DOORS 15 POUNDS. 24. EMERGENCY EXITS WILL NOT BE BLOCKED AT ANY TIME. 25. WHEN IT MAY BE NECESSARY TO INTERRUPT ANY UTILITY 5ERVIGE TO MAKE CORRECTIONS AND OR CONNECTION A MINIMUM OF 48 HO. PC ADVANCE NOTICE WILL BE GIVEN TO ALL AFFECTED PARTIES. INTERRUPTIONS IN UTILITY SERVILE WILL BE OF THE SHORTEST POSSIBLE DURATION. 20. IN THE EVENT THE UTILITY SERVILE 15 INTERRUPTED WITHOUT THE REQUIRED 48 HOUR NOTICE THE CONTRACTOR WILL BE FINANCIALLY LIABLE FOR ALL DAMAGES SUFFERED BY THE OWNER DUE TO UNAUTHORIZED INTERRUPTION. RECONNECTION WILL BE MADE AS SOON A5 P0551BLE. 21. NORK INSTALLED IN CONFLICT WITH THE DRAWIN, SPECIFICATION5 OR SHOP DRAWIN65 SHALL BE CORRECTED BY THE CONTRACTOR AT HI5 EXPENSE AND NO ADDITIONAL EXPENSE TO THE OWNER OR THE ARCHITECT. 2B. CONTRACTOR WILL PROTECT ALL FINISHED WORK AND SURFACES OF FIN15HED WORK FROM DAMAGE DURING THE COURSE OF CONSTRUCTION AND WILL REPLACE AND OR REPAIR ALL DAMAGED CAUSED BY THE CONTRACTOR TO THE SATISFACTION OF THE CHUBS AND ARCHITECT. 29, 51ZE OF MECHANICAL AND ELECTRICAL EQUIPMENT PADS OR BASES SHALL BE VERIFIED WITH EQUIPMENT MANUFACTURER. 30, ALL BUILDING CON51RUCTION WORK MECHANICAL AND ELECTRICAL INSTALLATIONS AND EQUIPMENT CONNECTION5 REQUIRED A5 PART OF THI5 PROJECT SHALL COMPLY WITH THE STATE BUILDING PULE5 AND RE6ULATION5LOCAL ORDINANCES AND ANY OTHER STATUTORY PROVISIONS PERTAINING TO TH15 6LA55 TYPE OF HORK, ANY SIGH RULES AND RE6ULATION5 SHALL BE CONSIDERED A5 PART OF THE 5PE61FICATION5 AND DRAWINGS. 31, CONTRACTOR PERFORMING WORK ON THE PREMI5E5 WILL BE RE FON51BLE FOR INITIATING, MAINTAINING AND 5UPERVI51N6 A REASONABLE AND PRUDENT SAFETY PR06RAM UNDER APPLICABLE LAMS INGLUDIN6 BUT NOT LIMITED TO THE 150LATION OF WORK AREAS AND THE PROMPT REMOVAL OF DEER15 OR TOOLS WHICH M16HT ENDANGER HEALTH, SAFETY OR WELL - FARE OF PER50N5. 32. CONTRACTOR WILL PROVIDE AND INSTALL ALL STIFFENERS, BRACING, BACK-UP PLATES AND SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF ALL CASEWORK, TOILET AC6E550RIE5 AND ALL FLOOR MOUNTED OR SUSPENDED MECHANICAL AND ELECTRICAL EQUIPMENT. 33. CONTRACTOR WILL VERIFY THE LOCATION OF ALL EXI5TING UTILITIES BELOW OR ABOVE GRADE AND COORDINATE RELATED SERVILE CONNECTIONS WITH THE RESPECTIVE UTILITY COMPANY. 34. CONTRACTOR WILL COORDINATE THE REMOVAL, ABANDONMENT, AND OR RELOCATION OF EXISTING UTILITIES ABOVE OR BELOW GRADE WITH THE RESPECTIVE UTILITY COMPANY. 35. CONTRACTOR WILL PERFORM ALL THE INORK WITHIN PUBLIC RI6HT-OF-WAY5 ACCORDING TO THE CITY .JURISDICTION FOR STANDARD PLANS AND SPECIFICATIONS. CONTRACTOR WILL OBTAIN PERMITS FROM APPROPRIATE AGENCIES. Ell CONTRACTOR WILL PROVIDE TEMPORARY BRACES, SHORES AND 6URDS REQUIRED TO SUPPORT ALL LOADS TO NCH THE WILDING STRICTURES, UTILITIES AND RI6HT-OF-WAY5 MAY BE 5U13JE6TE1) DURING CONSTRUCTION. 31. CONTRACTOR WILL PROVIDE ONE COMPLETE SET OF A5-WILT CRAVINGS INDICATIN5 ALL DISCREPANCE5 OR CHANGES FROM OR16INAL PH116N DOGUMENT5 INDICATING ACTUAL LOCATIONS OF CONCEALED WORK TO THE ARGHITELT AT THE COMPLETION OF WORK AND PRIOR TO FINAL PAYMENT. 38. DRAWINGS OF EXISTING 5ITE OR WILDING CONDITIONS HAVE BEEN COMPILED FROM EXI5TIN6 DATA SUPPLIED BY OTHERS TO THE ARCHITECT. THE ARCHITECT MAKES NO WARRANTY EITHER EXPRE55ED OR IMPLIED FOR THE ACCURACY OR COMPLETENE55 OF THE EXISTING INFORMATION RECORDED. CONTRACTOR WILL FIELD VERIFY ALL EXI5TIN6 CONDITIONS. 3M. INSTALLATION OF FIRE ALARM 51 AUTOMATIC FIRE SPRINKLER 5Y5TEM AND STANDPIPE SYSTEM WILL NOT BE STARTED UNTIL DETAIL PLANS, SPECIFICATIONS AND ENGINEERING CALCULATIONS HAVE BEEN REVIB^ED BY THE ARCHITECT AND AN APPROVAL HAS BEEN ISSUED BY THE DEPARTMENT OF JURISDICTION, 40. FIRE ALARM SYSTEMS WILL BE APPROVED / REVIEWED BY THE LOCAL 5ERVIGIN6 FIRE DEPARTMENT HAVING JURISDICTION PRIOR TO INSTALLATION. 41. ALL CONCRETE FLOORS MUST BE 3p09 P51 COMPRESSIVE STRENGTH AT A 28 DAY TEST. 42, ALL DRYWALL SHALL BE 5/60 TYPE 'X" ONE -HOUR FIRE RATED: TAPED, SHACKLED SANDED, AND READY FOR PAINTING. 43. EACH SUBCONTRACTOR SHALL DO HI5 OWN CUTTING AND PATCHING A5 REQUIRED FOR H15 PORTION OF THE WORK. 44, HANDICAPPED TOILET ROOMS TO BE PROVIDED. PROVIDE GRAB BARS A5 PER ADA. REQUIREMENTS AND 5'-0' DIAMETER CLEARANCE IN EACH SPECIFIED TOILET ROOM. 45, G.C. SHALL BID TO SUPPLY AND INSTALL 4" BATT INSULATION IN RESTROOM HALL5. IF PROJECT NAB YOUTH AREA, WALL5 SHALL BE SOUND IN50LAT P FROM REMAINING E ILDIN6. G.C. SHALL CONFIRM WITH OWNER FOR ANY ADDITIONAL ROOMS WHICH HE MAY REQUIRE TO BE SOUND INSULATED. 46, PAINTING: ALL SURFACES SHALL BE PREPARED FOR NEW PAINT OR FOR REPAINTING - DRYWAW FIRST GOAT PRIMER AND T O (2) TOP COATS OF LATEX E66 SHELL ENAMEL HOOD: FIRST 60AT PRIMER, TOP COATED WITH LATEX TRIM METAL: FIRST (,OAT ZING CHROMATE PRIMER, TOP COATED WITH METALA5TIK ENAMEL, OR ENAMEL KITCHEN AREA AND ALL REST ROOMS SHALL BE PAINTED WITH FIRST A PRIMER AND TOP COATED WITH ALKYD -SEMI, 6LO55 ENAMEL. S do 2 ...p, �.gnV Pm ACCEPTED BY OWNER AGGEPTED BY DESIGNER ACCEPTED BY CONTRACTOR DATE: FZE57ONS 5 I L 7"or v1ATFZ X DES UPTION CNN ifO NER NOTE: REFER TO ALL SHEETS FOR ADDITIONAL RESPONSIBITIE5 6G: PRIMARY GONTRAGTOR SUB-GONT: SUB -CONTRACTOR AFFECTED SERVICE DE5GRIPTION PROVIDE INSTALL ELEC. GAS WATER SEWER REMARKS GENERAL PERMITS /5015-CON C/SUB-GON EACH TRADE TO SUBMIT PAPERWORK - FEES PAID BY OWNER BARRICADE / FENCING GC/OWN GG/OWN DUMPSTERS GG/OWN GG/OWN SUPERVISION GC/OWN GC/OWN SELECTIVE DEMOLITION 6C/SUB GC/SUB CONCRETE SLAB GUTS 66/51 GC/5UB X SLAB BAGKFILL 6C/SUB GC/SUB CONCRETE SLAB 6C/5UB GG/505 METALS THREADED RODS 6C/SU5 GC/5UB COUNTER BRACKET 6C/5UB 6C/5U5 LT GAUGE FRAMING 6C/5UB 66/5U5 STRUCTURAL STEEL 6C/5UB GC/SUB WOOD AND PLASTIG WOOD BLOCKING IN WALL - FT MATERIAL 6C/SU13 GC/5UB COUNTERTOPS 6C/SU5 GC/5UB MILLWORK AND TRIM 6C/5UB GC/5UB PLYWOOD - FT MATERIAL 6C/5UB GG/5UB FRP WALL PANELS 6C/5UB GC/SUB 4" WALL BASE 6C/5UB GC/5UB DOORS AND WINDOWS 5G WOOD DOORS 6C/5UB 6C/5UB HM STEEL DOORS 6C/5UB 6G/51YB NANA WALL SYSTEM OWN 6C/5UB STOREFRONT SYSTEM 6C/SUB GG/SUB FINISHES CONCRETE SEALER 6C/5UB GC/5UB FRP WALL PANELS 6C/5UB 6C/5LAB GYPSUM WALLBOARD 6C/5UB 6G/51YB INTERIOR WALL PAINT 66/51 6C/5UB 4" WALL BASE 6C/5UB 6G/51YB HI -BUILD URETHANE COATING 6C/5UB 6G/51YB 5PE61ALTIES RESTROOM ACCESSORIES 6C/5UB GC/5UB ADA 516NA&E 6C/5UB GG/SUB EXITING 516NA6E 66/51 6C/515 FIRE EXTINGUISHER 6C/SUB 6G/51YB FOOD EQUIPMENT REFRIGERATED GASES OWN OWN X BLENDERS OWN OWN X STAINLESS STEEL TABLE OWN OWN CHANNEL LETTERS OWN OWN HVAG EQUIPMENT EQUIPMENT - DURANCE, COIL, GONDENSOR 6C/SUB 6G/50B DUCTWORK 6C/SUB 6G/SUB CONTROL 6C/SUB 6C/5UB EXHAUST (RESTROOH, 8 KITGHEN) 6C/SUB 6G/SUB EQUIPMENT LINE SETS 6C/SUB 6C/SUB DUCT/PIPE INSULATION 6C/SUB 6C/SUB PLUMBING PLUMBING FIXTURES 6C/SUB 6G/SUB I X X WATER PIPING 6C/SUB GC/SUB X SEWER PIPING AND EXCAVATION 6C/SUB 6C/SUB X FITTIN65 AND FAUCETS 6C/SUB GG/SUB X BRACING AND HANGERS 6C/SUB GC/SUB X ELECTRICAL LIGHTING FIXTURES AND BOX (AS NECESSARY) 6C/SUB 6G/SUB X POWER OUTLETS AND BACKBOX 6C/SUB GC/SUB X BRACING CIRCUITING 60NOUIT AND WIRE 6C/SUB 6C/SUB X BRAGIN6 AND HANGERS 6C/SUB GG/SUB X TRIM AND FAGEPLATE5 6C/SUB 6C/SUB X DISCONNECTS 6C/SUB 66/5UB X • - , 71.2 O '^ H O � M U FTa W N o Np N 0p H M [= Q c3 Es� CIO E CI Fz� z¢� M �zx o. E N No. Mq