Loading...
HomeMy WebLinkAbout19070198 Applicationa ' `' SWIhOdUNG POOL / SPA CONSTRUCTION For Commercial, Institutional, or Residential Projects 4p� cJ man City of Carmel, Department of Community Services PERMIT #: (Q O 7 0 1 "! L� BUILDER of NAME: PHONE:311. �� ��? PAX:.I'_758-1�4 RECORD: lea STREET CITY: STATE: ZIP; V. b 1-l1n0) ust e BUILDERS EMAIL ADDRESS:. BEST MEMOD OF CONTACT: L,COwI 31 -94-SZ-711 PROPERTY NAME: �� PHONE: FAX: 9/4'x70-61AC OWNER + tR INFO: STREET ADDRESS: CITY: .. STATE; ZIP: k0eq,a SIJ. LALObB2 PROTECT ADDRESS OFCONSTRUCfION: C) Y4vv►'e� �3a LOCATION q We INFO: PROJECT NAME: (If applicable) LOT * and SUBDIVISION NAME; (If applicable) L00 1^e ESTIMATED COST `5(� SQUARE FOOTAGE IL6M RE TYPE, OF CONSTRUCTION: u(A ,ob Including deck area; IF APPLICABLE: SUMP PUMP: ❑ YES -, NO POOL COLOR: S V l L.ivtet' IS ANY PART OF PROPERTY WITHIN ts�f El YES NO (If YES—INDICATE DRAINAGE ON SITE PLAN) i n-i SPECIAL HOOD HAZARD AREA: R STATE COMMERCIAL CLASS OF POOL SCOPE(S) OF DESIGN RELEASE At IF COMMERCIAL: RELEASE; POOL COVER: X YES ❑ NO IF APPLICABLE; AUTO FILTER: W YES ❑. NO SEPTIC SYSTEM: ❑ YES ;(NO POOL HEATED: YES ❑ NO IF HEATED: GAS ❑ ELECTRIC SLIDE: ❑YES NO DIVING BOARD: YES ❑ NO POOL BUILDERS WILL BE RESPONSIBLE FOR: Notification to pool owners that these inspections are to be made, and also will relate the various codes applicable. Pool builders shall coordinate with owners for the inspector's access to site on days inspections are scheduled. Under the Carmel / Clay Zoning )rtfinance, Chapter Z9.U, sec. Zv.Vn.Va: -tare pees snmi ae assessea on msssea This permit is valid only if construction commences within 18U days of the date of issuance of this permit and must be completed, having the Certificate of Occupancy issued, within 18 months of the date of issuance. Class I Structure Permits are subject to the State of Indiana General Administrative Rules (GAR 675 IAC 12) regarding expiration time frames for beginning and completing construction. 1, the undersigned, agree that any construction, reconstruction, enlargement, relocation, or alteration of a structure, or any change in the me of land or structures requested by this application will comply with and conform, to all applicable laws of the State of Indiana and the `Zoning Ordinance of Carmel Indiana - 1993" (Z-289) and amendments, adopted under authority of I.C. 36.7 et seq, General Assembly of the State of Indiana, and all Acts amendatory thereto. I further certify that only kitchen, bath, and floor drains aro connected to the sanitary sewer. I further certify that the construction will not be used or occupied until a Certifloate of Occupancy has been issued by the Department of Community Services, Carmel, Indiana. I also certify, under the penalties of Perjury (Indiana Code 35.44.2-1) that all of the information I have provided in this Application and other documentation is true and accurate to the best of my knowledge and belief, and that I have not knowingly or intentionally provided or omitted any informapon that would tend to hide, obscure, or otherwise mislead the Dept of Community Services regarding the truth of the matters addressed Al / A e BONDING / GROUNDING 2n° BONDING / GROUNDING FINAL- Bldg _ FINAL- FORESTRY FINAL — Carmel Fire Department ReviewedjAppmved: Dept. of Community Services (Date) .drip A- F� _1 �1 9, X15 EtiatedName »ate PERMIT FEE (Flat Rate + Sq. R. fee): INSPECTION FEES: CERTIFICATE OF OCCUPANCY: TOTAL: Fee Received by: Date