Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S100.3
FIRST FLOOR 100' - 0" ROOF PLAN 122' - 10" SECOND FLOOR 112' - 0" GARAGE LEVEL 99' - 0" A310 05 7' - 4" 8" 7' - 1 3/8"8" RIGID INSULATION -R10 MIN. @ FOUNDATION PERIMETER. VAPOR BARRIER @ HORIZONTAL AND VERTICAL FACE OF CRAWLSPACE. PERFORATED DRAINAGE TILE @ PERIMETER CONCRETE FOOTING. CONCRETE FOOTING -REFER TO STRUCTURAL DWGS. FOUNDATION DAMPROOFING. COMPACTED GRANULAR FILL. CONCRETE FOUNDATION WALL. GLAZING -REFER TO WINDOW SCHEDULE. R-30 MIN. BATT INSULATION @ FLOOR. WOOD FLOOR JOIST FRAMING -REFER TO STRUCTURAL DWGS. 3/4" PLYWOOD SUBFLOOR. DRAINAGE MAT @ FOUNDATION PERIMETER. EIFS WINDOW SILL. 4" INTERIOR DRAINAGE TILE - CONNECT TO SUMP PUMP CROCK. GLAZING -REFER TO WINDOW SCHEDULE. GLAZING -REFER TO WINDOW SCHEDULE. A310 01 SIM. ASPHALT ROOF SHINGLES. WOOD ROOF FRAMING - COORDINATE WITH FRAMER. 5/8" GYPSUM CEILING. 1/2" ROOF SHEATHING.R-20 MIN. CLOSED CELL SPRAY FOAM @ BOTTOM OF ROOF SHEATHING TO CREATE A NON-VENTILATED CATHEDRAL CEILING PROVIDE DRIP EDGE ALONG EAVES. 1X4 WOOD FASCIA. INSTALL WOOD BLOCKING AND 1X SOFFIT BOARD. WATER RESISTANT BARRIER. 2X6 WOOD WALL FRAMING. R-21 BATT INSULATION. 1/2" GYPSUM WALLBOARD. EIFS WALL FINISH. EIFS WALL FINISH.8" 9' - 4" 3/4" PLYWOOD SUBFLOOR. WOOD FLOOR JOIST FRAMING -COORDINATE WITH FRAMER. EIFS WINDOW SILL. 1/2" SHEATHING. FIRST FLOOR 100' - 0" ROOF PLAN 122' - 10" SECOND FLOOR 112' - 0" GARAGE LEVEL 99' - 0" ROOF 4 114' - 0"8' - 0 1/2"2X6 WOOD WALL FRAMING. WOOD ROOF FRAMING - COORDINATE WITH FRAMER. ASPHALT ROOF SHINGLES. 1/2" ROOF SHEATHING. PROVIDE DRIP EDGE ALONG EAVES. 1X4 WOOD FASCIA. INSTALL WOOD BLOCKING AND 1X SOFFIT BOARD. WATER RESISTANT BARRIER. EIFS WALL FINISH. 1/2" SHEATHING. 3/4" T+G WOOD CEILING. VAPOR BARRIER @ HORIZONTAL AND VERTICAL FACE OF SLAB. PERFORATED DRAINAGE TILE @ PERIMETER CONCRETE FOOTING. FOUNDATION DAMPROOFING. CONCRETE FOUNDATION WALL. DRAINAGE MAT @ FOUNDATION PERIMETER. CAST IN PLACE CONCRETE STEP.1/2" CLR.EQ.EQ. 1' - 2 3/8" WOOD HEADER ABOVE ARCHED OPENING. PROVIDE RADIUSED INFILL FRAMING TO FORM OPENING. LIMESTONE MASONRY ARCH. CONCRETE SLAB. CONCRETE FOOTING -REFER TO STRUCTURAL DWGS. PROVIDE LINEAR VENTING FOR ROOF AT THE TOP AND BOTTOM OF INTERIOR CEILING. CONTRACTOR TO COORDINATE WITH OWNER AND ARCHITECT. FIRST FLOOR 100' - 0" ROOF PLAN 122' - 10" SECOND FLOOR 112' - 0" BASEMENT FLOOR 88' - 0" GARAGE LEVEL 99' - 0"3' - 0" 7' - 0"5' - 0"4' - 0" A310 03 A310 09 1/2" GYPSUM BOARD. R-13 BATT INSULATION. 2X4 WOOD STUD WALL FRAMING. R-5 RIGID INSULATION -TAPE ALL SEAMS AND FOAM ALL EDGES @ TOP AND BOTTOM OF WALL. P.T. WOOD BOTTOM PLATE EXPANSION MATERIAL AND SEALANT JOINT. PROVIDE WATER STOP @ SLAB PERIMETER. 4" INTERIOR DRAINAGE TILE - CONNECT TO SUMP PUMP CROCK. VAPOR BARRIER BELOW CONCRETE SLAB CONCRETE FOOTING -REFER TO STRUCTURAL DWGS. AIR BARRIER CEILING -REFER TO RCP DWGS. PROVIDE 1/2" SLOPE AWAY FROM WALL. GLAZING -REFER TO WINDOW SCHEDULE. EIFS WINDOW SILL. GLAZING -REFER TO WINDOW SCHEDULE. EIFS WINDOW SILL. 3/4" PLYWOOD SUBFLOOR. ASPHALT ROOF SHINGLES. WOOD ROOF FRAMING - COORDINATE WITH FRAMER. R-38 MIN. ROOF INSULATION. 5/8" GYPSUM CEILING. 1/2" ROOF SHEATHING. PROVIDE DRIP EDGE ALONG EAVES. 1X4 WOOD FASCIA. INSTALL WOOD BLOCKING AND 1X SOFFIT BOARD. WATER RESISTANT BARRIER. 2X6 WOOD WALL FRAMING. R-21 BATT INSULATION. 3/4" T+G WOOD CLADDING EIFS WALL FINISH. 3/4" PLYWOOD SUBFLOOR. WOOD FLOOR JOIST FRAMING -COORDINATE WITH FRAMER. 1/2" SHEATHING. CONCRETE SLAB. PERFORATED DRAINAGE TILE @ PERIMETER CONCRETE FOOTING.11' - 0"5' - 10 5/8" METAL ROOFING. WRAP BEAM IN WOOD TRIM. 3/4" T+G WOOD CEILING 1X4 WOOD FASCIA. FOUNDATION DAMPROOFING. CONCRETE FOUNDATION WALL. DRAINAGE MAT @ FOUNDATION PERIMETER. SLOPE 2:12 FIRST FLOOR 100' - 0" SECOND FLOOR 112' - 0" BASEMENT FLOOR 88' - 0" GARAGE LEVEL 99' - 0" ROOF 4 114' - 0" ROOF 7 120' - 9" ROOF 8 119' - 9" A310 05 2' - 0" 6' - 0" 8" 7' - 6 7/8"6' - 0"2' - 6" 9' - 5 7/8"1'-0" CLR. 1/2" GYPSUM BOARD. R-13 BATT INSULATION. 2X4 WOOD STUD WALL FRAMING. R-5 RIGID INSULATION -TAPE ALL SEAMS AND FOAM ALL EDGES @ TOP AND BOTTOM OF WALL. P.T. WOOD BOTTOM PLATE EXPANSION MATERIAL AND SEALANT JOINT. PROVIDE WATER STOP @ SLAB PERIMETER. 4" INTERIOR DRAINAGE TILE - CONNECT TO SUMP PUMP CROCK. VAPOR BARRIER BELOW CONCRETE SLAB CONCRETE FOOTING -REFER TO STRUCTURAL DWGS. AIR BARRIER CEILING -REFER TO RCP DWGS. 3/4" PLYWOOD SUBFLOOR. GLAZING -REFER TO WINDOW SCHEDULE (EMERGENCY WINDOW) 3' - 0"1' - 3"EQ. 7' - 0" EQ. 1' - 0" 1' - 0"4" GLAZING -REFER TO WINDOW SCHEDULE GLAZING -REFER TO WINDOW SCHEDULE STEEL LADDER -PAINT. PERFORATED DRAINAGE TILE @ PERIMETER CONCRETE FOOTING. PROVIDE DRAIN LOCATED IN EMERGENCY EGRESS OPENING. EIFS WINDOW SILL. ASPHALT ROOF SHINGLES. WOOD ROOF FRAMING - COORDINATE WITH FRAMER. 5/8" GYPSUM CEILING. 1/2" ROOF SHEATHING. PROVIDE DRIP EDGE ALONG EAVES. 1X4 WOOD FASCIA. INSTALL WOOD BLOCKING AND 1X SOFFIT BOARD. WATER RESISTANT BARRIER. 2X6 WOOD WALL FRAMING. R-21 BATT INSULATION. EIFS WALL FINISH. 1/2" SHEATHING. WOOD FLOOR JOIST FRAMING -COORDINATE WITH FRAMER. CONCRETE FOOTING -REFER TO STRUCTURAL DWGS. FOUNDATION DAMPROOFING. CONCRETE FOUNDATION WALL. DRAINAGE MAT @ FOUNDATION PERIMETER. A310 01 SIM. R-20 MIN. CLOSED CELL SPRAY FOAM @ BOTTOM OF ROOF SHEATHING TO CREATE A NON- VENTILATED CATHEDRAL CEILING REVISIONS: DRAWN BY DATE ISSUED CHECKED BY Scope Drawings These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for the proper execution and completion of work. PROJECT NUMBER: 618 East Market Street Indianapolis, Indiana 46202 phone 317/264.8162 a x i s a r c h . c o m CLIENT Author Checker 02/22/19 A303 WALL SECTIONS 18012POMEROY RESIDENCESPRING MILL ROAD & 111TH STREETCARMEL, INDIANA 46032Joe Logan JGB Custom Homes 317-538-0887 jlogan2086@aol.com SCALE: 1/2" = 1'-0" 02 WS -SOUTH FOYER SCALE: 1/2" = 1'-0" 03 WS -SOUTH PATIO SCALE: 1/2" = 1'-0"04 WS -STUCO METAL ROOF SCALE: 1/2" = 1'-0" 05 WS -BACK STAIR #DESCRIPTION DATE 03/22/19 Adam Schriner