Loading...
HomeMy WebLinkAboutS001 - General Notes•b � r•,w a I . a r-, m � . rs •.a rr � as n r-, r e•.r r. rr� r n ••r . .. .. •n n� -r •• ..rra r sir r rr r a . r . � r •r • c r• . •e rra. a • a•. r .. a•. >� r a. r a• .�• ,ra a ,. nr•o.,. n. r. •.a r•w as r. . .. •a :.. . •e r•r as . .. • .n a a e aa•. r .• .•. s. r w r•a. -.. va .•. as . , .,. na.. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 08/15/19 FOUNDATIONS 1. COMPACT SLAB ON GRADE AREAS WITH VIBRATING PLATE. ANY UNSUITABLE MATERIALS THUS EXPOSED SHOULD BE REMOVED AND REPLACED WITH COMPACTED, ENGINEERED FILL OP#8 STDHE. 2. COLUMN FOOTINGS AND WALL FOOTINGS TO BEAR ON FIRM NATURAL SOILS OR WELL COMPACTED BE -T OR OTHERWISE L (SUCH AS ORGANICS, IS REMOVED AND THAT THE SHALL INSPECT THE SUBGRADE AND PERFORM ANY NECESSARY TESTS TO ENSURE THAT THE ACTUAL BEARING CAPACITIES MEET OR EXCEED THE DESIGN CAPACITIES. THE TESTING AGENCY SHALL VERIFY THE BEARING CAPACITY AT EACH SPREAD COLUMN FOOTING AND EVERY 10 FEET ON CENTER FOR STRIP FOOTINGS PRIOR TO PLACEMENT OF CONCRETE. 3. PLACE FOOTINGS THE SAME DAY THE EXCAVATION IS PERFORMED. IF THIS IS NOT POSSIBLE, NEW CONCRETE SHALL BE ADEQUATELY PROTECTED AGAINST ANY DETRIMENTAL CHANGE IN CONDITION, SUCH AS RAIN AND FREEZING. 4. IT IS THE RESPONSIBILITY OF THE CONTRACTOR AND EACH SUB —CONTRACTOR TO VERIFY THE LOCATION OF ALL UTILITIES AND SERVICES SHOWN, OR NOT SHOWN, AND ESTABLISH SAFE WORKING CONDITIONS BEFORE COMMENCING WORK. 5. THE CONTRACTOR SHALL LAYOUT THE ENTIRE BUILDING AND FIELD VERIFY ALL DIMENSIONS PRIOR TO EXCAVATION. �i�Ei 061199 fy ' 'NDIANP A; STRUCTURAL ENGINEERING BY: SURINAK ENGINEERING LLC 3819 N. DELAWARE ST. INDIANAPOLIS, IN 46205 317.500.3159 WWW.SURINAKENGINEERING.COM CLIENT: CBRE 250 RIVERCFW.SE PARKWAY EAST, SUITE 600 BIRMNIT-14A AL 35244 NO. DESCRIPTION DATE REGIONS BANK 2155 E. 146TH ST, CARMEL IN GENERAL NOTES PROJECT NUMBER: 725 DATE: 5 9 2019 DRAWN BY: JAR CHECKED BY: TJS S 0 0 1 SCALE: AS NOTED