Loading...
HomeMy WebLinkAboutS100 - Column Pier Repair2) COLUMN TO #4 TIES 6" FROM IOO BE REPAIRED TOP, AT MIDPT, AND 6" FROM BOTTOM (LAP 6" MIN.)— #5 BARS DOAELED IN MR OF 8" TO EXISTING FOOTING w/EPDXY (8 TOTAL) 1 BUI LDI NG LAYOUT N 5100 NOT TO SCALE f #4 TIES 6" FROM TOP, AT MDPT, AND 6" FROM BOTTOM #5 BARS DME].ED A MR OF 8" TO EXISTING FOOTING w/IEXY (B TOTAL) - RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 08/15/19 �A EXISTING STEEL COLUMN w/ BASEPLATE CONCRETE PIER TO MATCH PERIMETER CIM£PLSION OF BRICK DIMENSION AND TO BE FLUSH w/GRADE jw�-NEW 4,000 PSI AIR-ENTRNNED CONCRETE PIER (a)PLAN VIEW OF REPAIR 5100 NOT TO SCALE EXISTING STEEL COLUMN w/ BASEPLATE PER TO MATCH PEPoIvM OF BACK AND TO IE RUSH w/GRADE �GRACE IF CONCRETE SLAB IS D444M REPOU2 NEW 4,000 PSI AIR-fNTRAINED CONCRETE PIER SECTION A -A NOT TO SCALE EXISTING 4'-0"x4'-0"x1'-0" FOOTWG C�iSTpq ��� 0A719 s STRUCTURAL ENGINEERING BY: SURINAK ENGINEERING LLC 3819 N. DELAWARE ST. INDIANAPOLIS, IN 46205 317.500.3159 WWW.SURINAKENGINEERING.COM CLIENT: CBRE 250 RVE2CH4SE PARKWAY EAST, SUITE 600 BRIANCNHAA Al- 35244 NO. DESCRIPTION DATE REGIONS BANK 2155 E. 146TH ST. CARMEL IN COLUMN PIER REPAIR PROJECT NUMBER: 725 DATE: 5 9 2019 DRAWN BY: JAR CHECKED BY: TJS S10 SCALE: AS NOTED