Loading...
HomeMy WebLinkAboutPlumbing P0.3FIRE PROTECTION SPECIFICATIONS 1. GENERAL PROVISIONS A. GENERAL CONDITIONS CODES & STANDARDS 1. GENERAL CONDITIONS OF THE CONTRACT FOUND IN THE ARCHITECTURAL DRAWINGS, GENERAL AND SPECIAL CONDITIONS OF THE AMERICAN INSTITUTE OF ARCHITECTS (All AND ANY OF THE OWNER'S GENERAL REQUIREMENTS SHALL APPLY UNLESS NOTED OTHERWISE. 2. REFER TO THE GENERAL CONDITIONS ON THE ARCHITECTURAL DOCUMENTS AND THE GENERAL AND SPECIAL CONDITIONS OF THE AN FOR ADDITIONAL REQUIREMENTS REGARDING; SAFETY, COORDINATION & COOPERATION, WORKMANSHIP, PROTECTION, CUTTING AND PATCHING, DAMAGE TO OTHER WORK, PRELIMINARY OPERATIONS, STORAGE, ADJUSTMENTS, CLEANING, ETC. 3. ALL WORK SHALL BE IN CONFORMANCE WITH ALL LOCALLY ENFORCED, FEDERAL, STATE AND LOCAL CODES AND ORDINANCES INCLUDING ANY SPECIAL THE OWNER REQUIREMENTS IN ADDITION TO THOSE SPECIFIED. 4. CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY LICENSES, PERMITS AND INSPECTIONS REQUIRED TO PROCEED WITH THE WORK. THIS SHALL INCLUDE ALL REQUIRED COORDINATION WITH THE LOCAL UTILITY COMPANIES AND THEIR ASSOCIATED FEES OR COSTS. B. SCOPE OF WORK 1. THIS CONTRACT SHALL INCLUDE THE FURNISHING, INSTALLING, CONNECTING, AND OPERATION OF ALL EQUIPMENT WHICH IS A PART OF THE FIRE SUPPRESSION SYSTEMS AS SHOWN ON THE DRAWINGS AND AS REQUIRED BY SIMILAR INSTALLATIONS. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK AND WHICH IS USUALLY INCLUDED IN WORK OF A SIMILAR CHARACTER SHALL BE FURNISHED AND INSTALLED UNDER THIS CONTRACT AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED TO PROVIDE THE OWNER A COMPLETE, CODE APPROVED AND OPERATIONAL FIRE SUPPRESSION SYSTEM. 2, CAREFULLY READ SPECIFICATION FOR ALL PARTS OF THE WORK SO AS TO BECOME FAMILIAR WITH ALL TRADES'WORK SCOPE. CONSULT WITH OTHER TRADES TO INSURE PROPER LOCATIONS AND AVOID INTERFERENCES. ANY CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER BEFORE WORK IS COMMENCED. 3. CONTRACTORS SHALL BE HELD TO HAVE EXAMINED THE PREMISES AND SITE SO AS TO COMPARE THEM WITH THE DRAWINGS AND SPECIFICATIONS, NOTE THE EXISTING CONDITIONS AND OTHER WORK THAT WILL BE REQUIRED, AND THE NATURE OF THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. NO ALLOWANCE SHALL BE MADE TO THE CONTRACTOR BY REASON OF THIS FAILURE TO HAVE MADE SUCH EXAMINATION OR OF ANY ERROR ON HIS PART. 4. ALL EXISTING UTILITY AND FIRE SUPPRESSION SERVICES SHALL BE FIELD VERIFIED. CORRECTIONS TO THE DESIGN AND INSTALLATION SHALL BE MADE WITHOUT ADDITIONAL COST TO THE OWNER. 5. PROVIDE ALL CUTTING AND PATCHING REQUIRED FOR INSTALLATION OF FIRE PROTECTION WORK. ALL CORE DRILLING OR CUTTING OF FIRE RATED FLOORS, SHAFTS, AND WALLS SHALL BE FIRESTOPPED PRIOR TO FINISH PATCHING. ALL PENETRATIONS SHALL BE FIRE SEALED TO MATCH THE FIRE RATING OF THE FLOORS, SHAFTS, AND WALLS PENETRATED. THIS CONTRACTOR IS RESPONSIBLE TO COORDINATE THE OPENINGS IN WALLS AND FLOORS WITH THE GENERAL TRADES CONTRACTOR. THE FINAL LOCATIONS AND SIZES OF ALL PIPE OPENINGS SHALL BE PROVIDED BY THIS CONTRACTOR. 6. THIS CONTRACT SHALL ALSO INCLUDE ALL LABOR, MATERIALS AND MISCELLANEOUS EXPENSES REQUIRED FOR ALL REQUIRED FIRE SUPPRESSION DEMOLITION OF THE EXISTING AREAS BEING RENOVATED. a. THE DEMOLITION SHALL CONSIST OF THE COMPLETE REMOVAL(PROPERLY DISPOSED OFF SITE UNLESS OTHERWISE NOTED) OF ALL FIRE SUPPRESSION EQUIPMENT, PIPING, MATERIALS, ETC. NOT REQUIRED IN THE FINAL DESIGN AND INSTALLATION OF THE FIRE SUPPRESSION SYSTEMS FOR THE NEW RENOVATED AREAS. b. ALL ABOVE GROUND SERVICES SHALL BE REMOVED BACK TO THEIR RESPECTIVE MAIN AND CAPPED OR IF THE MAIN IS NOT REQUIRED, THE MAIN SHALL BE REMOVED IN ITS ENTIRETY a COORDINATE ALL DEMOLITION WITH THE ARCHITECTURAL DOCUMENTS AND THE ARCHITECT AND THE OWNER'S GENERAL REQUIREMENTS. 7. ALL WORK INCLUDING, BUT NOT LIMITED TO PARTS, MATERIAL, EQUIPMENT AND LABOR SHALL BE GUARANTEED FOR ONE YEAR AFTER ACCEPTANCE BY THE ENGINEER AND OWNER. WHERE AN EQUIPMENT MANUFACTURER HASA WARRANTY THAT EXCEEDS ONE YEAR, THAT WARRANTY PERIOD SHALL APPLY TO THIS PROJECT. C. DOCUMENTS 1. THE DRAWINGS ARE DIAGRAMMATIC, ALL WORK SHALL BE PERFORMED AS INDICATED ON THE DRAWINGS UNLESS EXISTING CONDITIONS OR COORDINATION ISSUES REQUIRE CHANGES. THESE CHANGES SHALL BE MADE WITH NO ADDITIONAL COST TO THE OWNER. 2, ANY INCIDENTAL ITEMS OR LABOR,ETC. NOT INCLUDED IN THE SPECIFICATIONS OR THE DRAWINGS BUT REASONABLY IMPLIED AS NECESSARY FOR THE COMPLETE INSTALLATION OF ALL APPARATUS SHALL BE INCLUDING IN BID, 3. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE FURNISHED EVEN THOUGH NOT MENTIONED IN BOTH, 4. IF ERRORS ARE FOUND IN THE DRAWINGS OR SPECIFICATIONS OR DISCREPANCIES OCCUR BETWEEN THE SAME, OR BETWEEN THE FIGURES ON THE DRAWINGS, AND THE SCALE OF SAME OR BETWEEN THE LARGER AND SMALLER DRAWINGS, OR IN THE DESCRIPTIVE MATTER ON THE DRAWINGS SHALL BE REFERRED TO THE OWNER FOR REVIEW AND FINAL DECISION PRIOR TO THE BID DUE DATE. 5. THE BIDDING OF THIS WORK WILL CONTEMPLATE THE USE OF EQUIPMENT AND MATERIALS EXACTLY AS SPECIFIED HEREIN. WHERE MORE THAN ONE MANUFACTURER IS MENTIONED ANY ONE MAY BE UTILIZED. SUBSTITUTE MANUFACTURERS MAY BE OFFERED ONLY AS AN ALTERNATE TO THE SPECIFIED EQUIPMENT AND MATERIAL AND MUST BE SUBMITTED AS SPECIFIED IN THE ARCHITECTURAL DOCUMENTS. 6. MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE SYSTEMS CAN BE OF ANY RECOGNIZED MANUFACTURE PROVIDED THESE ITEMS MEET MINIMUM STANDARDS AS SET IN THESE SPECIFICATIONS. REFER TO EACH SECTION FOR ANY SPECIFIC REQUIREMENTS. C. COORDINATION 1. CONTRACTOR SHALL LOCATE, IDENTIFY AND PROTECT ANY EXISTING SERVICES WHICH ARE REQUIRED TO BE MAINTAINED OPERATIONAL AND SHALL EXERCISE EXTRA CAUTION IN THE PERFORMANCE OF ALL WORK TO AVOID DISTURBING SUCH FACILITIES. ALL COSTS FOR REPAIR OF DAMAGES TO SUCH SERVICES SHALL BE PAID BY THE CONTRACTOR CAUSING THE DAMAGE. 2. EACH CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ALL DAMAGE TO OTHER WORK CAUSED BY HIS WORK OR THROUGH THE NEGLECT OF HIS, OR HIS SUB -TRADE'S PERSONNEL. ALL PATCHING, REPAIRING, REPLACEMENT AND PAINTING, ETC. SHALL BE DONE AS DIRECTED BY THE OWNER BY THE CRAFTSMEN OF THE TRADES INVOLVED. THE COSTS OF SUCH WORK SHALL BE PAID BY THE CONTRACTOR CAUSING THE DAMAGE. E. METHODS 1. EQUIPMENT, PIPING, DUCTWORK, ETC SHALL NOT BE SUPPORTED FROM ANY CEILINGS, OTHER PIPING, CONDUIT OR DUCTWORK, ROOF DECK, OR JOIST BRIDGING. ITEMS SHALL BE SUPPORTED FROM ACCEPTABLE STRUCTURAL BUILDING COMPONENTS AS DETERMINED BY THE ARCHITECT AND STRUCTURAL ENGINEER. F. SUBMITTALS 1. SHOP DRAWINGS a. PREPARE AND SUBMIT SHOP DRAWINGS IN ACCORDANCE WITH THE MECHANICAL GENERAL PROVISIONS. b. SHOW PLANS, CROSS SECTION,ELEVATIONS, DETAILS AND JOB CONDITIONS, RELATIONSHIP TO OTHER WORK. PIPE SIZES, ELEVATIONS ABOVE FLOOR, HEAD LOCATIONS, INSPECTORS TEST CONNECTION, SPRINKLER ENTRANCE, VALVES, ALARMS, BACKFLOW PREVENTER, FLOW SWITCH AND SUPERVISORY DEVICES. c. SUBMIT DATA ON THE FOLLOWING ITEMS: (1)PIPING AND COUPLINGS. (2) WET ALARM VALVE. (3)BAOKFLOW PREVENTER. `Ice AND SUPERVISORY DEVICES. RELEASED FOR CONSTRUCTION 'RHEADS AND ESCUTCHEON PLATES. S, HANGERS AND ACCESSORIES. Subject to compliance with all regulations %ALCULATIONS of State and Inca Codes VD RECEIVE APPROVAL FROM THE AUTHORITY HAVING JURISDICTION 1BMITTAL. City of Camel DATE: \ 08/15/19 J. ONCE THE AUTHORITY HAVING JURISDICTION HAS APPROVED SHOP DRAWINGS THE SUBCONTRACTOR SHALL SEND EIGHT SETS OF APPROVED STAMPED PLANS AND EQUIPMENT CUTS TO THE ARCHITECT FOR APPROVAL. c. PLANS SUBMITTED WITHOUT ALL HYDRAULIC CALCULATIONS WILL BE RETURNED "REJECTED". d. PROVIDE INDEPENDENT HYDRAULIC CALCULATION SHEETS. e. ALL SPRINKLER PLANS SHALL BEAR THE STAMP OF A REGISTERED PROFESSIONAL FIRE PROTECTION ENGINEER LICENSED WITH THE STATE WHERE THE STORE IS LOCATED. 2. AT THE COMPLETION OF THE PROJECT, PROVIDE OWNER WITH OPERATION AND MAINTENANCE MANUALS INCLUDING "AS -BUILT' RECORD DRAWINGS SPECIFICATIONS AND APPROVED PLANS. 3, PROJECT RECORD DOCUMENTS- MAINTAIN AT THE JOBSITE ONE COPY OF ALL CONTRACT DOCUMENTS CLEARLY MARKED AS'PROJECT RECORD COPY'. THESE DRAWINGS ARE TO BE MAINTAINED IN GOOD CONDITION, UPDATED DAILY FOR CHANGES ENCOUNTERED AND AVAILABLE AT ALL TIMES FOR INSPECTION BY THE OWNER. DONOTUSEFORFIELD CONSTRUCTIONI PROJECT RECORD DOCUMENTS ARE TO BE KEPT CURRENT WITH EXACT DIMENSIONS OF ALL WORK, EQUIPMENT, PIPING, VALVES, DUCTWORK, ETC. MARK ALL INFORMATION IN RED LINES AND NOTES SO AS TO BE EASILY IDENTIFIED FROM THE BASE DRAWING. UPON COMPLETION OF THE WORK, ONE SET OF THESE DOCUMENTS SHALL BE TURNED OVER TO THE OWNER AS ONE QUALIFICATION FOR FINAL PAYMENT. 4, AFTER THE ACCEPTANCE TESTS ARE COMPLETED AND ACCEPTED BY THE OWNER, THREE COMPLETE SETS OF ASBUILT DOCUMENTATION SHALL BE PROVIDED. IT SHALL INCLUDE, BUT NOT BE LIMITED TO ACCURATE PLAN DRAWINGS AND OPERATION AND MAINTENANCE MANUALS. II. SPRINKLER A. GENERAL 1. THE ENTIRE INSTALLATION SHALL CONFORM TO THE REQUIREMENTS OF NFPA I3,THE BUILDING OWNER'S INSURANCE COMPANY, THE LOCALLY ENFORCED BUILDING CODE, LOCAL BUILDING AND FIRE OFFICIALS AND ALL OTHER LOCAL AUTHORITIES HAVING JURISDICTION. 2. ALL WORK SHALL BE PERFORMED BY A LANDLORD APPROVED, STATE OF IN WHICH THE PROJECT IS BEING CONSTRUCTED LICENSED SPRINKLER CONTRACTOR. 3, THIS WORK SHALL INCLUDE ALL PIPING FITTINGS, HANGERS, EQUIPMENT, ETC., REQUIRED TO COMPLETE THE WORK. 4, SPRINKLER HEADS ARE TO BE CENTERED IN LAY -IN CEILING TILES. HEADS ARE TO BE SPACED SYMMETRICALLY WITH LIGHTING AND OTHER CEILING FIXTURES WHEN INSTALLED IN DRYWALL CEILINGS. 5, DETERMINE VOLUME AND PRESSURE OF INCOMING WATER SUPPLY FROM WATER FLOW TESTDATA. REVISE DESIGN WHEN TEST DATA BECOMES AVAILABLE PRIOR TO SUBMITTALS. B. CRITERIA 1. CONTRACTOR SHALL VERIFY WITH THE OWNER'S REPRESENTATIVE FOR ANY ADDITIONAL CRITERIA (PIPE SIZING I PIPE SCHEDULE OR HYDRAULIC). 2. CONTRACTOR SHALL DESIGN AND MODIFY THE EXISTING SPRINKLER SYSTEM PIPING AND HEADS FOR THE SPACE. THIS WORK SHALL INCLUDE THE RAISING OF ANY EXISTING SPRINKLER PIPING WHICH INTERFERES WITH DESIGNED CEILING ELEVATIONS. WHERE REQUIRED, THE CONTRACTOR SHALL ALSO INCLUDE COMBINING THE EXISTING SYSTEM TO A SINGLE SOURCE WHEN TAKING OVER MULTIPLE TENANTS. PROVIDE ANY AUXILIARY DRAIN PIPING REQUIRED FOR ANY TRAPPED SPRINKLER PIPING. 3, SEE ARCHITECTURALDRAWINGS FOR CEILING ELEVATIONS. UI[HNMS�]PIq.IFY 1. FIRE DEPARTMENT CONNECTION:POTTER-ROEMER OR EQUAL SERIES 5020(CONNECTION SIZES COORDINATED AND APPROVED BY THE LOCAL AUTHORITITES), WITH ALL STANDARD FEATURES, "AUTO. SPKR"LET TERING, AND THREAD TO MATCH LOCAL FIRE DEPARTMENT REQUIREMENTS. - FLUSH MOUNTED FIRE DEPARTMENT INLET CONNECTION WITH WALL PLATE WITH 'AUTOMATIC SPRINKLER' IDENTIFICATION, ALL BRASS CONSTRUCTION AND POLISHED BRASS FINISH. CONTACT THE FIRE DEPARTMENT TO VERIFY FIRE DEPARTMENT CONNECTION TYPE AND TREAD PATTERN TO MATCH THAT OF THE FIRE DEPARTMENT EQUIPMENT. PROVIDE 4" UL LISTED CHECK VALVE WITH BALL DRIP PIPED TO CHAIN, C SUPERVISION 1. THE RISER CONTROL VALVE AND ALL ZONE VALVES SHALL HAVE ELECTRIC SUPER VISION TO SIGNAL THE BUILDING FIRE ALARM SYSTEM. TAMPER SWITCHES PROVIDED BY SPRINKLER SUBCONTRACTOR AND WIRED BY THE ELECTRICAL SUBCONTRACTOR. 2. MECHANICAL: ALL OTHER VALVES SHALL BE PADLOCKED IN STANOARD OPERATING POSITION, WITH 2 KEYS PER PADLOCK AND ALL PADLOCKS SHALL BE KEYED THE SAME. CHAIN AND PADLOCK ALL VALVES OVER 2" SIZE. E. PIPING 1. PIPING SHALL BE BLACK STEEL PIPE PER NFPA 13. F SPRINKLER HEADS 1. SPRINKLER HEADS IN AREAS WITH CEILINGS SHALL BE RECESSED, POLISHED CHROME PENDANT AUTOMATIC SPRINKLER HEAD WITH TWO PIECE FACTORY WHITE METAL ESCUTCHEON. 2. SPRINKLER HEADS IN AREAS WITH DRYWALL CEILINGS SHALL BE FLUSH SERIES WITH WHITE CEILING PLATE. 3, SPRINKLER HEADS IN AREAS WITH EXPOSED STRUCTURE SHALL BE BRASS UPRIGHT. III. LABELING A. TAGS 1. METALTAGS'. a. BRASS WITH STAMPED LETTERS', TAG SIZE MINIMUM I-112 INCHES DIAMETER. 2. TAG CHART'. TYPEWRITTEN LETTER SIZE LIST OF APPLIED TAGS AND LOCATION IN ANODIZED ALUMINUM FRAME. B. PIPEMARKERS 1. COLOR AND LETTERING CONFORM TOASMEA13.1. 2. PLASTIC PIPE MARKERS: a. FACTORY FABRICATED, FLEXIBLE, SEMI -RIGID PLASTIC, PREFORMED TO FIT AROUND PIPE OR PIPE COVERING. LARGER SIZES MAY HAVE MAXIMUM SHEET SIZE WITH SPRING FASTENER. C. INSTALLATION 1. INSTALL IDENTIFYING DEVICES AFTER COMPLETION OF COVERINGS AND PAINTING. 2. INSTALL PLASTIC NAMEPLATES WITH CORROSIVE -RESISTANT MECHANICAL FASTENERS, OR ADHESIVE. 3, INSTALL TAGS USING CORROSION RESISTANT CHAIN. NUMBER TAGS CONSECUTIVELY BY LOCATION. 4. IDENTIFY VALVES IN MAIN AND BRANCH PIPING WITH TAGS. 5, IDENTIFY PIPING, CONCEALED OR EXPOSED, WITH PLASTIC PIPE MARKERS, PLASTIC TAPE PIPE MARKERS OR STENCILED PAINTING. IDENTIFY SERVICE, FLOW DIRECTION, AND PRESSURE. INSTALL IN CLEAR VIEW AND ALIGN WITH AXIS OF PIPING. LOCATE IDENTIFICATION NOT TO EXCEED 20 FEET ON STRAIGHT RUNS INCLUDING RISERS AND DROPS, ADJACENT TO EACH VALVE AND TEE, AT EACH SIDE OF PENETRATION OF STRUCTURE OR ENCLOSURE, AND AT EACH OBSTRUCTION. PLUMBING SPECIFICATIONS I. GENERAL PROVISIONS A. GENERAL CONDITIONS, CODES & STANDARDS 1. GENERAL CONDITIONS OF THE CONTRACT FOUND IN THE ARCHITECTURAL DRAWINGS, GENERAL AND SPECIAL CONDITIONS OF THE AMERICAN INSTITUTE OF ARCHITECTS AA) AND ANY OF THE OWNER'S GENERAL REQUIREMENTS SHALL APPLY UNLESS NOTED OTHERWISE. 2. REFER TO THE GENERAL CONDITIONS ON THE ARCHITECTURAL DOCUMENTS AND THE GENERAL AND SPECIAL CONDITIONS OF THE All FOR ADDITIONAL REQUIREMENTS REGARDINGSAFETY COORDINATION & COOPERATION WORKMANSHIP PROTECTION CUTTING AND PATCHING DAMAGE TO OTHER WORK PRELIMINARY OPERATIONS STORAGE ADJUSTMENTS, CLEANING, ETC. 3, ALL WORK SHALL BE IN CONFORMANCE WITH ALL LOCALLY ENFORCED, FEDERAL, STATE, AND LOCAL CODES AND ORDINANCES INCLUDING ANY SPECIAL THE OWNER REQUIREMENTS IN ADDITION TO THOSE SPECIFIED. 4, CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY LICENSES, PERMITS AND INSPECTIONS REQUIRED TO PROCEED WITH THE WORK. THIS SHALL INCLUDE ALL REQUIRED COORDINATION WITH THE LOCAL UTILITY COMPANIES AND THEIR ASSOCIATED FEES OR COSTS. B. SCOPE OF WORK 1. THIS CONTRACT SHALL INCLUDE THE FURNISHING, INSTALLING, CONNECTING, AND OPERATION OF ALL EQUIPMENT WHICH IS A PART OF THE PLUMBING SYSTEMS AS SHOWN ON THE DRAWINGS AND AS REQUIRED BY SIMILAR INSTALLATIONS. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK AND WHICH IS USUALLY INCLUDED IN WORK OF A SIMILAR CHARACTER SHALL BE FURNISHED AND INSTALLED UNDER THIS CONTRACT AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED TO PROVIDE THE OWNER A COMPLETE, CODE APPROVED AND OPERATIONAL PLUMBING SYSTEM. 2. CAREFULLY READ SPECIFICATION FOR ALL PARTS OF THE WORK SO AS TO BECOME FAMILIAR WITH ALL TRADES'WORK SCOPE. CONSULT WITH OTHER TRADES TO INSURE PROPER LOCATIONS AND AVOID INTERFERENCES. ANY CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER BEFORE WORK IS COMMENCED. 3, CONTRACTORS SHALL BE HELD TO HAVE EXAMINED THE PREMISES AND SITE SO AS TO COMPARE THEM WITH THE DRAWINGS AND SPECIFICATIONS NOTE THE EXISTING CONDITIONS AND OTHER WORK THAT WILL BE REQUIRED AND THE NATURE OF THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. NO ALLOWANCE SHALL BE MADE TO THE CONTRACTOR BY REASON OF THIS FAILURE TO HAVE MADE SUCH EXAMINATION OR OF MY ERROR ON HIS PART. 4, ALL EXISTING UTILITY AND PLUMBING SERVICES SHALL BE FIELD VERIFIED. CORRECTIONS TO THE DESIGN AND INSTALLATION SHALL BE MADE WITHOUT ADDITIONAL COST TO THE OWNER. 5, PROVIDE ALL CUTTING AND PATCHING REQUIRED FOR INSTALLATION OF PLUMBING WORK. ALL CORE DRILLING OR CUTTING OF FIRE RATED FLOORS, SHAFTS, AND WALLS SHALL BE FIRESTOPPED PRIOR TO FINISH PATCHING. ALL PENETRATIONS SHALL BE FIRE SEALED TO MATCH THE FIRE RATING OF THE FLOORS, SHAFTS, AND WALLS PENETRATED. THIS CONTRACTOR IS RESPONSIBLE TO COORDINATE ALL WALL AND FLOOR OPENINGS WITH THE GENERAL TRADES CONTRACTOR. THE FINAL LOCATIONS AND SIZES OF ALL PIPE OPENINGS SHALL BE PROVIDED BY THIS CONTRACTOR. 6. THIS CONTRACT SHALL ALSO INCLUDE ALL LABOR, MATERIALS AND MISCELLANEOUS EXPENSES REQUIRED FOR ALL REQUIRED MECHANICAL DEMOLITION OF THE EXISTING AREAS BEING RENOVATED. a. THE DEMOLITION SHALL CONSIST OF THE COMPLETE REMOVAL(PROPERLY DISPOSED OFF SITE UNLESS OTHERWISE NOTED) OF ALL PLUMBING EQUIPMENT, PIPING, MATERIALS, ETC. NOT REQUIRED IN THE FINAL DESIGN AND INSTALLATION OF THE PLUMBING SYSTEMS FOR THE NEW RENOVATED AREAS. b. ALL UNDERGROUND SERVICES NOT BEING REUSED SHALL BE CAPPED BELOW THE FLOOR c. ALL ABOVE GROUND SERVICES SHALL BE REMOVED BACK TO THEIR RESPECTIVE MAIN AND CAPPED OR IF THE MAIN IS NOT REQUIRED, THE MAIN SHALL BE REMOVED IN ITS ENTIRETY. 4. COORDINATE ALL DEMOLITION WITH THE ARCHITECTURAL DOCUMENTS AND THE ARCHITECT AND THE OWNER'S GENERAL REQUIREMENTS. 7, ALL WORK INCLUDING, BUT NOT LIMITED TO PARTS, MATERIAL, EQUIPMENT AND LABOR SHALL BE GUARANTEED FOR ONE YEAR AFTER ACCEPTANCE BY THE ENGINEER AND OWNER. WHERE AN EQUIPMENT MANUFACTURER HASA WARRANTY THAT EXCEEDS ONE YEAR, THAT WARRANTY PERIOD SHALL APPLY TO THIS PROJECT. C. DOCUMENTS 1. THE DRAWINGS ARE DIAGRAMMATIC, ALL WORK SHALL BE PERFORMED AS INDICATED ON THE DRAWINGS UNLESS EXISTING CONDITIONS OR COORDINATION ISSUES REQUIRE CHANGES. THESE CHANGES SHALL BE MADE WITH NO ADDITIONAL COST TO THE OWNER. 2. ANY INCIDENTAL ITEMS OR LABOR, ETC NOT INCLUDED IN THE SPECIFICATIONS OR THE DRAWINGS BUT REASONABLY IMPLIED AS NECESSARY FOR THE COMPLETE INSTALLATION OF ALL APPARATUS SHALL BE INCLUDING IN BID. 3, THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE FURNISHED EVEN THOUGH NOT MENTIONED IN BOTH. 4. IF ERRORS ARE FOUND IN THE DRAWINGS OR SPECIFICATIONS OR DISCREPANCIES OCCUR BETWEEN THE SAME OR BETWEEN THE FIGURES ON THE DRAWINGS AND THE SCALE OF SAME OR BETWEEN THE LARGER AND SMALLER DRAWINGS OR IN THE DESCRIPTIVE MATTER ON THE DRAWINGS SHALL BE REFERRED TO THE OWNER FOR REVIEW AND FINAL DECISION PRIOR TO THE BID DUE DATE. 5, THE BIDDING OF THIS WORK WILL CONTEMPLATE THE USE OF EQUIPMENT AND MATERIALS EXACTLY AS SPECIFIED HEREIN. WHERE MORE THAN ONE MANUFACTURER IS MENTIONED ANY ONE MAY BE UTILIZED. SUBSTITUTE MANUFACTURERS MAY BE OFFERED ONLY AS AN ALTERNATE TO THE SPECIFIED EQUIPMENT AND MATERIAL AND MUST BE SUBMITTED AS SPECIFIED IN THE ARCHITECTURAL DOCUMENTS. 6, MISCELLANEOUS ITEMS NECESSARY TO COMPLETE THE SYSTEMS CAN BE OF ANY RECOGNIZED MANUFACTURE PROVIDED THESE ITEMS MEET MINIMUM STANDARDS AS SET IN THESE SPECIFICATIONS. REFER TO EACH SECTION FOR ANY SPECIFIC REQUIREMENTS. q[HCq:U]IPCtla]PI 1. CONTRACTOR SHALL LOCATE, IDENTIFY AND PROTECT ANY EXISTING SERVICES WHICH ARE REQUIRED TO BE MAINTAINED OPERATIONAL AND SHALL EXERCISE EXTRA CAUTION IN THE PERFORMANCE OF ALL WORK TO AVOID DISTURBING SUCH FACILITIES. ALL COSTS FOR REPAIR OF DAMAGES TO SUCH SERVICES SHALL BE PAID BY THE CONTRACTOR CAUSING THE DAMAGE. 2. EACH CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ALL DAMAGE TO OTHER WORK CAUSED BY HIS WORK OR THROUGH THE NEGLECT OF HIS, OR HIS SUB -TRADE'S PERSONNEL. ALL PATCHING, REPAIRING, REPLACEMENT AND PAINTING, ETC. SHALL BE DONE AS DIRECTED BY THE OWNER BY THE CRAFTSMEN OF THE TRADES INVOLVED. THE COSTS OF SUCH WORK SHALL BE PAID BY THE CONTRACTOR CAUSING THE DAMAGE. E. METHODS 1. EXCAVATIONS SHALL BE MADE IN OPEN TRENCHES. FLOORS SHALL BE SAW CUT. PIPING SHALL BE LAID ON AN APPROPRIATELY GRADED 6' BED OF CLEAN AND DRY SAND. ENGINEERED FILL SHALL BE USED TO BACKFILL TO 6'ABOVE THE PIPING. BACKFILL THE REMAINDER OF THE TRENCH UTILIZING THE EXCAVATED MATERIAL IF APPROVED BY THE ARCHITECT OR THE OWNER. IF THE EXCAVATED MATERIALS ARE NOT ACCEPTABLE, ENGINEERED FILL ACCEPTABLE TO THE ARCHITECT SHALL BE UTILIZED TO BACKFILL THE REMAINDER OF THE TRENCH. BACKFILL SHALL BE ACCOMPLISHED IN 9"LIFTS WITH ALL LIFTS COMPACTED TO 95%PROCTOR. PATCH FLOOR TO MATCH EXISTING. 2. EQUIPMENT,PIPING,ETC. SHALL NOT BE SUPPORTED FROM ANY CEILINGS, OTHER PIPING, CONDUIT OR DUCTWORK, ROOF DECK, OR JOIST BRIDGING. ITEMS SHALL BE SUPPORTED FROM ACCEPTABLE STRUCTURAL BUILDING COMPONENTS AS DETERMINED BY THE ARCHITECT AND STRUCTURAL ENGINEER. 3, ALL ROOF PENETRATIONS, RASHINGS AND COUNTER FLASHINGS SHALL BE PERFORMED BY THE OWNER'S ROOFING CONTRACTOR AT THE REQUESTING CONTRACTOR'S COST. F. SUBMITTALS 1, SHOP DRAWINGS SHALL BE PROVIDED TO THE ARCHITECT OF ALL EQUIPMENT AND ACCESSORIES PROVIDED FOR THE PROJECT WHETHER SPECIFIED HEREINOR ON THE DRAWINGS. REVIEW OF THE SHOP DRAWINGS SHALL BE FOR GENERAL DESIGN CONCEPT AND ADHERENCE WITH THE SPECIFICATIONS. OTANTITV OF SHOP DRAWINGS SUBMITTED SHALL BE AS SPECIFIED BY THE ARCHITECT. SHOP DRAWINGS SHALL BE PREPARED BY THE CONTRACTOR SHOWING LOCATIONS AND MEASUREMENTS FROM COLUMNS OF ALL CONCEALED AND EXPOSED PIPING, DUCTWORK, CONDUIT, EQUIPMENT, ACCESSORIES, ETC., AND SUBMITTED PRIOR TO INSTALLATION. THE OWNER MAY MAKE REPRODUCIBLE COPIES OF THEIR DRAWINGS AVAILABLE FOR USE IN PREPARATION OF SHOP DRAWINGS HOWEVER THE OWNER SHALL NOT BE HELD RESPONSIBLE FOR NOT CONFIRMING ALL INFORMATION ON THE DRAWINGS PRIOR TO FABRICATION ANDIOR INSTALLATION. 2. PROJECT RECORD DOCUMENTS- MAINTAIN AT THE JOBSITE ONE COPY OF ALL CONTRACT DOCUMENTS CLEARLY MARKED AS 'PROJECT RECORD COPY". THESE DRAWINGS ARE TO BE MAINTAINED IN GOOD CONDITION, UPDATED DAILY FOR CHANGES ENCOUNTERED AND AVAILABLE AT ALL TIMES FOR INSPECTION BY THE OWNER. DO NOT USE FOR FIELD CONSTRUCTIONI PROJECT RECORD DOCUMENTS ARE TO BE KEPT CURRENT WITH EXACT DIMENSIONS OFALL WORK,EQUIPMENT, PIPING, VALVES, DUCTWORK, ETC. M ERRLL INFORMATION IN RED LINES AND NOTES SO AS TO BE EASILY IDENTIFIED FROM THE BASE DRAWING. UPON COMPLETION OF THE WORK, ONE SET OF THESE DOCUMENTS SHALL BE TURNED OVER TO THE OWNER AS ONE QUALIFICATION FOR FINAL PAYMENT. 3. AFTER THE BALANCING AND ACCEPTANCE TESTS ARE COMPLETED AND ACCEPTED BY THE OWNER, THREE COMPLETE SETS OF AS -BUILT DOCUMENTATION SHALL BE PROVIDED. IT SHALL INCLUDE, BUT NOT BE LIMITED TO ACCURATE PLAN DRAWINGS, SYSTEM AND CONTROL SCHEMATICS, SEQUENCE OF OPERATION, WIRING DIAGRAMS AND OPERATION AND MAINTENANCE MANUALS. II. INSULATION A. GENERAL 1. INSTALLATION SHALL CONFORM TO THE MANUFACTURER'S RECOMMENDATIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. 2. CLEAN AND DRY SURFACES PRIOR TO INSULATING. 3. EXTEND INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS, HANGERS AND SIMILAR PENETRATIONS. 4, INSULATION JACKET AND FITTING COVER MUST BE PLENUM RATED. 5. IT IS ESSENTIAL THAT THE INTEGRITY OF THE VAPOR -BARRIER BE MAINTAINED. SEAL ALL PENETRATIONS OF THE VAPOR BARRIER BY STAPLES HANGERS OR WHERE OTHERWISE DAMAGED. 6. MAINTAIN ACCESS TO VALVES. 7. INSULATION SHALL BE BY OWENS-CORNING, KNAUF, OR MANVILLE. B. PLUMBING 1, ALL ABOVE GROUND PIPING SHALL BE INSULATED WITH FIBERGLASS PIPING INSULATION WITH AN ALL SERVICE JACKET AND SELF SEALING LAP (ASYSSL). a. DOMESTIC HOT AND COLDWATER PIPING -1INCH THICK. 2, FITTINGS AND VALVES SHALL BE INSULATED WITH PRE -MOLDED FIBERGLASS FITTINGS AND COVERED WITH A PRE -FORMED PVC FITTING COVER. 3. SEE FIXTURE SPECIFICATIONS FOR BARRIER FREE REQUIREMENTS. III. PLUMBING A.GENERAL 1, THE ENTIRE PLUMBING INSTALLATION, MATERIALS EQUIPMENT, ETC. SHALL CONFORM TO THE REQUIREMENTS OF THE LOCALLY ENFORCED BUILDING CODE, THE INTERNATIONAL PLUMBING CODE, AND THE AMERICAN DISABILITIES ACT GUIDELINES, ANSI At 17.1 REQUIREMENTS FOR THE PHYSICALLY CHALLENGED AND THE UNIFORM FEDERAL ACCESSIBILITY STANDARDS (LEAS). CONTRACTOR TO VERIFY ALL PLUMBING ROUGH IN DIMENSIONS MEET THE ABOVE NOTED REQUIREMENTS. VERIFY FINAL ROUGH IN WITH ARCHITECT PRIOR TO BACKFILLING OR WALL INSTALLATION. 2. TEST ALL SEWER AND WATER PIPING IN ACCORDANCE WITH LOCAL CODES AND ORDINANCES. 3. FURNISH ACCESS DOORS FOR WALL CLEAN OUTS AND VALVES IN WALLS. 4. FIXTURE FITTINGS THAT ARE DESIGNED ANDIOR INTENDED TO DELIVER POTABLE WATER FOR HUMAN CONSUMPTION SHALL BE THIRDPARTYTESTED AND CERTIFIED FOR NOT EXCEEDING THE MAXIMUM ALLOWABLE LEAD CONTENT, PER THE NSFIASNI 372 STANDARD. 5. ALL FIXTURES AND EQUIPMENT NOT SPECIFIED HERE -IN ARE BEING PROVIDED BY OTHERS. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ROUGHING IN ALL SERVICES FOR ALL EQUIPMENT WHETHER PROVIDED BY THIS CONTRACTOR OR OTHERS. CONTRACTORSHALL COORDINATE HIS INSTALLATION WITH THE APPROPRIATE EQUIPMENT SUPPLIER FOR PROPER ROUGH IN INFORMATION AND SHALL REVISE THE DESIGN AS REQUIRED TO MATCH THE EQUIPMENT BEING SUPPLIED. THIS CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS REQUIRED TO CONNECT ALL FIXTURES TO THE PLUMBING SYSTEMS INCLUDING BUT NOT LIMITED TO ALL WATER OR NATURAL GAS CONNECTIONS FROM APPROPRIATE STOP OR VALVE, ALL DIRECT SANITARY CONNECTIONS, ALL INDIRECT WASTE CONNECTIONS TO FLOOR DRAINS OR SINKS FROM SINKS OR EQUIPMENT, WALK-IN COOLER AND FREEZER COIL CONDENSATE DRAIN PIPING, ETC. 6 FIRE STOPPING- REFER TO ARCHITECTURAL DRAWINGS FOR WALL TYPE AND UL CONSTRUCTION DESIGN NUMBER. FOR RATED MASONRY WALL AND FLOOR ASSEMBLIES, PROVIDE A UL APPROVED THROUGH -PENETRATION FIRE STOP SYSTEM NUMBER GAJ-1175. FOR RATED GYPSUM BOARD ASSEMBLIES PROVIDE A UL APPROVED THROUGH -PENETRATION FIRE STOP SYSTEM NUMBER W-L-1 D03, B. PIPING 1. PIPE HANGERS FOR THE PLUMBING SYSTEM SHALL BE ADJUSTABLE CLEVIS HANGERS WITH APPROPRIATE CLAMP. ALL PIPING SHALL BE SUPPORTED ON A MAXIMUM SPACING OF: a. 6' CENTERS FOR PIPING 314" AND SMALLER. a 8'CENTERS FOR 1"PIPING. c. 10' CENTERS FOR PIPING LARGER THAN 1". tl. PIPING ABOVE THE ROOF SHALL BE SUPPORTED PER THE DETAIL ON THE DRAWINGS. e. PIPE HANGERS FOR INSULATED PIPING SYSTEMS SHALL BE SIZED FOR THE GROSS OUTSIDE DIMENSION OF THE PIPE AND INSULATION. SEE INSULATION SPECIFICATIONS FOR INSULATION REQUIREMENTS. C. SANITARY AND VENT 1. ALL PIPING SHALL PITCH TO ITS APPROPRIATE MAIN AT NO LESS THAN II8"PER FOOT SLOPE. 2. UNDERGROUND WASTE AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON HUB AND SPIGOT PIPE WITH COMPRESSION GASKET JOINTS OR SCHEDULE 40 UM PVC PIPING AND FITTINGS WITH SOLVENT WELDED JOINTS. 3. ABOVE GROUND WASTE AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON NPHUB PIPE WITH STAINLESS STEEL BANDED JOINTS AND BE HUNG PER C 18 P I. REQUIREMENTS OR SCHEDULE 40 DWV PVC PIPING AND FITTINGS WITH SOLVENT WELDED JOINTS. a. PVC PIPING SHALL NOT BE INSTALLED INA RETURN AIR PLENUM. 4. SANITARY PIPING EXTERIOR TO THE BUILDING AREA SHALL BE SCHEDULE 80 DWV PVC PIPING AND FITTINGS WITH SOLVENT WELDED JOINTS. D. DOMESTIC WATER 1. CONTRACTOR SHALL COORDINATE WITH THE BUILDING OWNER AND THE LOCAL WATER COMPANY FOR THE INSTALLATION OF A NEW WATER SERVICE. THIS SHALL INCLUDE THE FEESICOSTS AND INSTALLATION OF A NEW WATER METER AS SHOWN ON THE PLANS AND THE ASSOCIATED REMOTE READER. THE ENTIRE INSTALLATION SHALL CONFORM TO THE REQUIREMENTS OF THE LOCAL WATER COMPANY. LOCATE REMOTE READER AT BUILDING OWNER'S AND WATER COMPANY'S DIRECTION. 2. TEST WATER PIPING TO HYDROSTATIC PRESSURE OF 1 M PSIG. FOR TWO HOURS. STERILIZE ALL DOMESTIC WATER PIPING IN ACCORDANCE WITH AW.W.A. STANDARDS. 3. ABOVE GROUND WATER PIPING SHALL BE TYPE 1- HARD DRAWN COPPER PIPE WITH WROUGHT COPPER FITTINGS AND 95-5 SOLDERED JOINTS. AS AN ALTERNATE THE CONTRACTOR MAY UTILIZE COPPER PRESS FITTINGS (PROPRESS SYSTEM) AS MANUFACTURED BY VIEGA. FITTINGS SHALL CONFORM TO THE MATERIAL AND SIZING REQUIREMENTS OF ASME B16.18 OR ASME B16.22. 0-RINGS FOR FITTINGS SHALL BE BEEN. INSTALLATION OF FITTINGS SHALL CONFORM TO CODE AND THE MANUFACTURER'S SPECIFICATIONSIREQUIREMENTS. WATER PIPING JOINTS BETWEEN DIFFERENT MATERIALS SHALL BE PER THE LOCALLY ENFORCED PLUMBING CODE SECTION 605.22. 4. DOMESTIC WATER VALVES SHALL BE MILWAUKEE VALVE pBA-1000R 4BA-150 BALL VALVE IV. LABELING A. SUMMARY 1. SECTION INCLUDES NAMEPLATES, TAGS, AND PIPE MARKERS. B.REFERENCES 1. ASMEA13.1(AMERICAN SOCIETY OF MECHANICAL ENGINEERS)-SCHEMEFORTHE IDENTIFICATION OF PIPING SYSTEMS. C NAMEPLATES 1. PRODUCT DESCRIPTION: LAMINATED THREE -LAYER PLASTIC WITH ENGRAVED BLACK LETTERS ON LIGHT CONTRASTING BACKGROUND COLOR. D. PIPE MARKERS 1. COLOR AND LETTERING: CONFORM TO ASME A13. 1, 2. PLASTIC PIPE MARKERS: a. FACTORY FABRICATED ,FLEXIBLE, SEMI -RIGID PLASTIC, PREFORMED TO FIT AROUND PIPE OR PIPE COVERING. LARGER SIZES MAY HAVE MAXIMUM SHEET SIZE WITH SPRING FASTENER. E. LABELS 1. DESCRIPTION: POLYESTER OR LAMINATED All SIZE 1.9 X075 INCHES, ADHESIVE BACKED WITH PRINTED IDENTIFICATION. 2. CONTRACTOR TO PROVIDE LABELS AT EACH ENTRANCE DOOR TO CHILLER ROOM-'DONOT ENTER ROOM WHEN BEACON IS FLASHING" F. PREPARATION 1. DEGREASE AND CLEAN SURFACES TO RECEIVE ADHESIVE FOR IDENTIFICATION MATERIALS. G. INSTALLATION 1. INSTALL IDENTIFYING DEVICES AFTER COMPLETION OF COVERINGS AND PAINTING. 2. INSTALL PLASTIC NAMEPLATES WITH CORROSIVE -RESISTANT MECHANICAL FASTENERS, OR ADHESIVE. 3. INSTALL LABELS WITH SUFFICIENT ADHESIVE TO ENSURE PERMANENT ADHESION AND SEAL WITH CLEAR LACQUER. FOR UNFINISHED CANVAS COVERING, APPLY PAINT PRIMER BEFORE APPLYING LABELS. 4, TAG AUTOMATIC CONTROLS,INSTRUMENTS, AND RELAYS. KEY TO CONTROL SCHEMATIC. 5. IDENTIFY PIPING, CONCEALED OR EXPOSED, WITH PLASTIC PIPE MARKERS, PLASTIC TAPE PIPE MARKERS OR STENCILED PAINTING. IDENTIFY SERVICE, FLOW DIRECTION, AND PRESSURE. INSTALL IN CLEAR VIEW AND ALIGN WITH AXIS OF PIPING. LOCATE IDENTIFICATION NOT TO EXCEED 20 FEET ON STRAIGHT RUNS INCLUDING RISERS AND DROPS, ADJACENT TO EACH VALVE AND TEE, AT EACH SIDE OF PENETRATION OF STRUCTURE OR ENCLOSURE, AND AT EACH OBSTRUCTION. CURRAN ARCHITECTURE 5719 LAW -TON LOOP EAST DR STE 212 INDIANAPOLIS, IN 46216 O :: 317.288.0681 F :: 317.288.0753 CONSULTANT DRAWN BY: JJC CHECKED BY: KDH *T/E/S ENGINEERING 25760 First Street Cleveland, OH 44145 P 440 871 2410 F 440 8717954 tesengineering.com CERTIFICATION STATE OF 7/11/2019 THIS DRAWING AND THE IDEAS. DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE I NTELLECTUAL PROPERTY OF CURRAN ARCHITECTURE, AND ARE NOT TO BE USED OR REPRODUCED, WHOLE OR IN PART, WITH WT THE WRITTEN CONSENT OF CURRAN ARCH ITECTUtE. 0 COPrit i 2019, CURMN ARCHITECTURE INTERIOR BUILD -OUT FOR: I = pq 10 rl 0 So F45 CLAY TERRACE CLAY TERRACE BLVD. E14 CARMEL, IN PLUMBING SPECIFICATIONS ISSUE DATES ISSUED FOR REVIEW 4 13-19 ISSUED FOR PERMIT 7-10-19 PROJECT NUMBER: 180364 P093