Loading...
HomeMy WebLinkAboutA080.0AV 8'-11"1'-0" 6 1/4" 2'-0 1/2"3'-6 1 /2" 5'-0" 4'-1 1 1/2"5'-7 7/8" 40SF BUILD NEW UPPER BOOKSHELF WITH (3) NEW ADJUSTABLE SHELVES IN EACH TO BE STAINED TO COORDINATE WITH MANTEL; PAINT BOXES TO MATCH PERIMETER KITCHEN CABINETRY NEW NATURAL BROWN MAGRA HEARTH MANTEL; CUT TO FIT BETWEEN BOOKCASES INSTALL NEW CABINET DOORS ON EXISTING BOOKCASE BASES; TO MATCH KITCHEN PERIMETER CABINETS INSTALL NEW LEDGE STONE TILE FROM HEARTH TO CEILING INSTALL NEW CAMBRIA HEARTH CAP INSTALL NEW CROWN TO MATCH EXISTING ROOM FIRE BOX TO REMAIN NEW CLEAR GLASS PAINT WOOD TOP AND BASE CABINETRY BOXES WHITE TO MATCH PERIMETER; INTERIOR TO REMAIN AS IS BLACK METAL L CHANNEL AS NEEDED TO TRIM PAINT FACE OF HEARTH BLOCK FOR TV MOUNT; CONFIRM INSTALL HEIGHT WITH H.O. CONFIRM OUTLET HEIGHTS WITH H.O. CONFIRM CHASE LOCATION FOR A/V ACCESS POINT PRIOR TO NEW STONE INSTALLATION #1 of 21 Date: 5.3.19 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications.Griffin ResidenceKitchen RemodelGigi and Jon14274 Skipper CourtCarmel, Indiana 46033Approved By: Date: Jennifer Norrington Lead Designer jnorrington@caseindy.com 317.205.4398(c) 14 FINAL #2 #3 #4 5.31.19 7.1.19 7.26.19 Maggie Smith Designer msmith@caseindy.com AA PROPOSED ELEVATIONS SCALE: 1/2" = 1' LIVING ROOM ELEVATION 08/13/19 William Hohlt