Loading...
HomeMy WebLinkAboutA131 1st FL Finish PLanLEGEND GENERAL NOTES PLAN NOTES FLOOR COVERINGS CPTi MFG: SHAW CONTRACT TYPE: BROADLOO M PATTERN: SUMMIT BASES COLOR: ISLAND 72595 INSTALL: "LENGTH'OF SHAPES IN CARPETTO RUN IN DIRECTION OF ARROWS ON PLAN; COORDINATE WITH SCHOTT DESIGN AS NEEDED TO ENSURE PROPER INSTALLATION. NOTE: AT ALL LVT LOCATIONS, PROVIDE SKIMCOAT OF ARDEX LEVELING LATEX AS NEEDED FOR SMOOTH SUBFLOOR THAT WILL NOT ALLOW FOR TELEGRAPHING OF IMPERFECTIONS IN THE FLOOR Lu<1 MFG: PATCRAFT SIZE: 9'X60' PATTERN: SPLITWOOD 1466V COLOR: MISTED BRONZE V-2 00500 INSTALL: M STAGGER; LENGTH OF TILE TO RUN IN DIRECTION OF ARROWS ON PLAN. GDTLl MFG: DALTILE SIZE: 12X24 COLOR: CONSULATE IN EMBASSY SILVER QUARTZITE GROUT: EQUAL TO TEC 550 POWER GROUT; JOINT TO BE M", COLOR: LIGHT PEWTER INSTALL: ASHLAR; LENGTH OF TILE TO RUN IN DIRECTION OF ARROWS ON PLAN. FULL WIDTH OF TILE TO BE CENTERED ON CORRIDOR BETWEEN MEET 102 AND MEET 125 SUCH THAT CUT TILES ON EDGES OF CORRIDOR ARE EQUAL. OEXISTING CONCRETE FLOORING TO REMAIN IN THIS AREA; CLEAN AND PROVIDE SMOOTH SURFACE FREE OF FLOORING ADHESIVE AS REQUIRED. RELEASED F Subject to compliance with all regulations of State and Local Codes City Rf Camel DATE: 08/19/19 WALL BASE VBl MFG: JOHNSONITE TYPE: 4' VINYL COVE,M" GAUGE COLOR: GREY 48 TB1 MFG: DALTILE - BULLNOSE SIZE: 3X24 COLOR: CONSULATE IN EMBASSY SILVER QUARTZITE GROUT: EQUAL TO TEC 550 POWER GROUT; JOINT TO BEM'; COLOR: LIGHT PEWTER NOTE: GROUT LINES OF WALL BASE TO ALIGN WITH GROUT LINES OF FLOOR TILE. PAINT / WALLCOVERING Wl MFG: SHERWIN WILLIAMS TYPE: PROMAR 200 ZERO VOC INTERIOR LATEX COLOR: CITY LOFTSW]631 FINISH: EGGSHELL MFG SHERWIN WILLIAMS TYPE: PROMAR 200 ZERO VOC INTERIOR LATEX W2 COLOR: DORIAN GRAY SW7017 FINISH: EGGSHELL MFG SHERWIN WILLIAMS; LEVELS DRYWALL FINISH TYPE: PROMAR 200 ZERO VOC INTERIOR LATEX PT3 COLOR: NEEDLEPOINT NAVY SW0032 FINISH: EGGSHELL W4 MFG SHERWIN WILLIAMS PRIMER: PROCRYL TOPCOAT: PRO INDUSTRIALRECATALYZED WATERBASED EPDXY K46W I51 COLOR: TED FINISH: SEMI -GLOSS INSTALL: PREP AND INSTALL PER MANUFACTURER'S RECOMMENDATIONS FOR MAXIMUM ADHESION, THIS INCLUDES CLEANING AND SCUFF SANDING PRIOR TO APPLYING NEW FINISH. APPLY USING SPRAY APPLICATION. PLASTIC LAMINATE / SOLID SURFACE PLt MFG: WILSONART (OPEN SHELVES+ CASEWORK AS NOTED) COLOR: PHANTOM PEARL 8211 L-28 NOTE: GRAIN TO RUN VERTICALLY 0 MFG: FORMICA BASE CABINETS - BREAK AREA PL2 COLOR: ASHEN RIBBONWOOD 8839-58 NOTE: LINEAR TO RUN HORIZONTALLY; LINEAR PATTERN TO ALIGN PERFECTLY ALONG RUN OF PL3 MFG: FORMICA(CABINETS- LIBRARY+COPY AREA) COLOR: GRAYSTONE 46458 pli MFG: FORMICA COUNTERTOP - LIBRARY+COPY AREA) COLOR: EBONY OXIDE 299-58 pE MFG: NEVAMAR(BREAK COUNTERTOP) COLOR: WROUGHT IRON S6054T 551 MFG: FORMICA- ALTERNATE PRICE ISLAND COLOR: BLEACHED CONCRETE OZ7 MFG: HANSTONE QUARTZ- ALTERNATE PRICE ISLAND COLOR: STRATO CA701 A 0 I. REFER TO LEGEND FOR ALL ACCENT/SPECIALTY PAINT OR W ALLCOVERING THAT REQUIRES LEVEL 4 OR LEVEL 5 DRYWALL FINISH. REFER TO MANUFACTURER RECOMMENDATIONS. 2. AT ALL FLOOR TILE LOCATIONS PROVIDE WATERPROOFING CRACK ISOLATION MEMBRANE: TEC HYDRAFLEX FULL COVERAGE PER TCNA F125L I FULL. PROVIDE CONTROL JOINTS EVERY 12' AT MINIMUM OR AS RECOMMENDED BY MANUFACTURER, ® AREA NOT IN CONTRACT ❑ AREA OF WORK F01 PROVIDE SCHLUTER SCHIENE TRANSITION STRIP AT CARPET TO HARD SURFACE TRANSITION, FINISH: BRUSHED STAINLESS STEEL (EB). PROVIDE LEVELING LATEX UNDER CARPET AS SUCH THAT TOP OF FINISHES ARE LEVEL. SEAM SEAL CARPET EDGES. TRANSITION STRIP MUST BE LEVEL WITH OR SLIGHTLY HIGHER THAN HARD SURFACE EDGE. TRANSITION PROFILE MUST BE APPROPRIATE FOR FLOORING MATERIALS AND MUST BE SUBMITTED TO SDI FOR FINAL APPROVAL PRIOR TO INSTALLATION, OBASE BID: PLASTIC LAMINATE (PLIJ F02 ALTERNATE PRICE I: SOLID SURFACE SSI) ALTERNATE PRICE2: QUARTZ(QZIJ FINISH PLAN 0 2' 4' 8' 16' THIS DRAWING, AND TEE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCH07 DESIGN, INC., AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT THE WRITTEN CONSENT OF SCH07 DESIGN. W H N CL W z NJa 0Oz O V3: J LU Q U �al .. E z L0 Ln I0 SSUE DATE DESCRIPTION 6.28.19 REVIEW SET 07.01.19 PERMITSET 07.09.19 UPDATEDSET REVISIONS MARI DB DESCRIPTION 07.19.19 EH UPDATED PE0.MIT; 07.3 V2 0 Ed I REV 3 PROJECT NUMBER / 2019.096 PROJ.MGR DRAWN BY / EH AMM 1ST FLOOR FINISH PLAN >N A131