Loading...
HomeMy WebLinkAbout364M Project Name 19060083 —lot 9 Parkside Village Plan I� PARKSME MLAGEHOMEOWNER.S'ASS'OCUTION, INC ARcMTEC71MA,L CONTROL COADHTTEE urease con w1we1-b of& 1) Name_ _- 1 a LL 1n1 Phom 3 17 3 8 3 6 �q o Address r Mcidel or Unit Type Lot Number 2) Briefly descibe the proposed change- _ i i q_ s v N_ 2 e 3) Will there be changes or modificattk= in basic utility services or existing structures to accommodate the proposed change? Please indicate. 4) Please list below the major construction materials which will be used in this project. Be as specific as possibic (aterior materWs must conform to those used on the original building or be sufficiently compatible.) VTl S; `',n_Z±e Mu`Fch - HP0,se b Fov,- G(c-,Ls 51;d.�j DdoVS, 5) Please attach the following information: A) Plot plan indicating the location and dimensions of the project. B) Blueprints or working drawings indicating all necessary dimensions and elevations. C) If available, a photograph or drawing of a similar completed project. Yes No Yes No Electric Fxterior Walls Telephone Patio Fencing . Cas — x Patio Slab Water _ x Sidewalks _ Sewage _ Pavements x TV Cable x Other 4) Please list below the major construction materials which will be used in this project. Be as specific as possibic (aterior materWs must conform to those used on the original building or be sufficiently compatible.) VTl S; `',n_Z±e Mu`Fch - HP0,se b Fov,- G(c-,Ls 51;d.�j DdoVS, 5) Please attach the following information: A) Plot plan indicating the location and dimensions of the project. B) Blueprints or working drawings indicating all necessary dimensions and elevations. C) If available, a photograph or drawing of a similar completed project. b) Project schedule: A) The project will be done by: 4Homeowner —Contractor(s) Name Both B) Please indicate the approximate time needed to complete the project, subsequent to the Board Approval. 2- Nk o K f h Q Please indicate any building permits that will be required. r PyL f I I a Y esese000eeeeoe®0000era�eoeeaoesosoeuaaoaeeeaoaeaaaoaaa€,�aaassaoeoeoaeoas NOTE:AH submitted materials shall remain the property of the Association You may wish to make a copy for you personal. records. The Board/Architecunif Committee is allowed up to 30 days from date of receipt to approve your request. I hereby acknowledge that I have read and understand the ARCHITECTURAL CONTROL STANDARDS set forth by the Board, as welt as the Declaration of Covenants and Restrictions. CommWee Action - Honmowner's Signature ****DO NOT WMEBELOW**** Approved as submitted Approved with conditions stated in comments Deferred ( ) Additioitat information required: ( ) Ott" { ) Denied Comments: "'t . Architectural CWntrc4t6min6ee Representative