Loading...
HomeMy WebLinkAboutA005 - PROPOSED FLOOR PLANS13'-7 5/8"18'-0"A7A7 B7B7 PORCH DOWNSPOUT DOWNSPOUT A8A8 B8B8 18'-0"14'-0"1'-3 1/4" A7A7 B7B7DECK BEDROOM FIRST NOTES:FIRST FLOOR NOTES: FURNISH & INSTALL PAN FLASHING OVER KITCHEN BAY WINDOW STRUCTURE. F/I TREX RAIN ESCAPE SYSTEM AT NEW DECK JOISTS W/ GUTTER AT INSIDE OF DECK BEAM. F/I 1X FIBER CEMENT TRIM AT NEW POSTS. SEE ELEVATIONS FOR DETAIL. F/I 1X FIBER CEMENT TRIM & NECESSARY BLOCKING TO WRAP DECK BEAM & CONCEAL RAIN ESCAPE GUTTER. F/I 4X4 CEDAR CORBELS AT NEW POSTS. SEE ELEVATIONS FOR DETAIL. F/I (2) WHITE ALUMINUM DOWNSPOUTS AT INSIDE FACE OF POSTS TO ELBOWS AT GRADE AS SHOWN ON PLANS. F/I FIBER CEMENT PANEL & 1X FIBER CEMENT TRIM AT NEW STUD WALL OVER KITCHEN BAY WINDOW. SEE ELEVATIONS FOR DETAIL. F/I 3/8" PINE PLY BEAD CEILING W/ FIBER CEMENT BATTEN TRIM AT UNDERSIDE OF DECK JOISTS. PRIME & PAINT ALL NEW TRIM & CEILING MATERIALS. SECOND FLOOR NOTES:SECOND FLOOR NOTES: FURNISH & INSTALL NEW 7" FIBER CEMENT SIDING WHERE REMOVED FOR DECK FRAMING. F/I 5/4X6 TREATED DECKING W/ PICTURE FRAME EDGE OVER NEW DECK JOISTS. F/I 1X12 FIBER CEMENT FASCIA AT DECK PERIMETER. F/I (10) 4X4 TREATED RAIL POSTS AT DECK PERIMETER SPACED EVENLY ON EACH SIDE AS SHOWN ON PLANS. F/I COMPOSITE POST SLEEVES, CAPS, & SKIRTS AT NEW 4X4 RAIL POSTS. F/I COMPOSITE RAILS & ALUMINUM BALUSTERS AT DECK PERIMETER AS SHOWN ON PLANS. F/I 32"W X 80"H FULL-GLASS FIBERGLASS DOOR W/ LOCKSET IN BEDROOM AS SHOWN ON PLANS. MAINTAIN SAME HEADER HEIGHT. PATCH DRYWALL AS NECESSARY ADJACENT TO NEW DOOR FRAME. F/I (2) 34 1/2"W X 65"H VINYL SINGLE-HUNG WINDOWS W/ TEMPERED GLASS IN EXISTING OPENINGS IN BEDROOM AS SHOWN ON PLANS. F/I CASING AT NEW DOOR & WINDOWS IN BEDROOM TO MATCH EXISTING AS CLOSELY AS POSSIBLE. PRIME & PAINT NEW DOOR, DRYWALL PATCH, NEW CASING, NEW SIDING, AND DECK FASCIA. #0 of 11 Date: 07.17.19 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications.Mewhinney ResidenceDeck AdditionBrian Mewhinney13680 Fossil Dr.Carmel, Indiana 46074Approved By: Date: SCALE: AS NOTED 5 FINAL Jordan Stocklin Designer jstocklin@caseindy.com PROPOSED FLOOR PLANS Dave Null Lead Designer dnull@caseindy.com FIRST FLOORAA SCALE: 3/8" = 1' SECOND FLOORBB SCALE: 3/8" = 1' 07/23/19 Mike Sheeks