Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Crider & Crider/Eng/CO #3/151,194.52/Jordan woods drainage Project – Project #15-16
CITY OF CARMEL TO: Crider&Crider 4806 W. 86th Street CONTRACT CHANGE ORDER NO.: 3 DATE:_ Indianapolis, IN 46268 07/09/2019 PROJECT NAME: Jordan Woods Drainage Project(15-16) CITY REQ.NO.: --- CITY PO NO.: 101399 CITY PO DATE: 2-22-18 4aoke, I. You are directed to make the following changes in this Contract: � `� *Various additions and T&M work and new culvert installation. See attached documentation. octk II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: *Change order as provided by Crider&Crider on June 27, 2019. The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 1,339,595.39 Contract Price will be increased/decreased by this Change Order $ 151,194.52 New Contract Price including this Change Order $ 1,490,789.91 Contract Time Prior to this Change Order Days Completion Date Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order Days 8/15/2019 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes The Above Changes Approved: Are Recommended Are Accepted: Zite4e1;4i VS Engineering. Inc Crider& Crider, Inc. ENGINEER CONTRACTOR Ja Brain May 4275 N. High School Road 4806 W. 86th Street `` %% Address Address M Burke mber Indianapolis, IN, 46254 Indianapolis, IN 46268 City/State/Zip City/State/Zip , *914 4.1 LC?, By By ristine S. Pauley, Clerk- Treasurer 7/10/2019 7. 25 —t Date Date Jeremy Kashman, P.E. City En ineer Jordan Woods Stormwater Improvements AR-1 CITY OF CARMEL Version 2016-08-31 1802 Jordan Woods T&M Summary of Costs Date Description Total 5/21/19 Crider tied in sump discharge and lowered structures. $2,771.12 5/24/19 Crider drained sump tie-ins to storm sewer system and adjusted rip-rap. $3,595.00 6/5/19 Crider lowered casting and adjusted Rip-Rap. $185.40 Crider lowered structure at 2047 East 110th Street and regraded ditch at 1825 East 6/6/19 109th Street. $607.50 6/7/19 Crider installed sod and regraded a ditch at 11102 Timber Lane. $948.50 Crider tied in sump drain at 2020 East 109th Street and tied in perimeter drains at 6/10/19 10828 Timber Lane. $1,979.00 Crider hand dug ditch for downspout drain at 10941 Timber Lane. Crider also 6/13/19 completed drain and performed spot work for drainage bore at 2023 E. 110th Street. $2,045.65 Hamilton Creek Emergency Repair $120,962.35 15 Woodland Drive Drainage $18,100.00 TOTAL $151,194.52 4011171111.1 TIME & MATERIAL WORK AGREEMENT ('RI I)F-:12 & (-121 I)I':12 CUSTOMER: City of Carmel DATE: 5/21/19 DESCRIPTION OF WORK PERFORMED: Sump discharge tie-ins and structure lowerings JOB#: 1802 Jordan Woods EFFECTIVE DATES: January 1,2015 to December 31,2019 EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL Straight Time Time+1/2 EQUIPMENT(OPERATOR NOT INCLUDED) LABOR RATE HRS RATE HRS TOTAL DESCRIPTION RATE/HR HR TOTAL($) LABORER $62.60 14.0 $93.90 $876.40 SKID STEER LOADER $55.00 $0.00 FINISHER $66.80 $100.20 $0.00 BACKHOE $72.00 7.0 $504.00 DRIVER $71.10 $106.60 $0.00 I.T.28 LOADER or EQUIV. $88.00 $0.00 MECHANIC $74.20 $111.30 $0.00 I.T.38 LOADER or EQUIV. $105.00 $0.00 OPERATOR $78.50 7.0 $117.70 $549.50 EXCAVATOR-320 or EQUIV. $154.00 $0.00 FOREMAN $83.80 7.0 $125.70 $586.60 EXCAVATOR-330 or EQUIV. $187.00 $0.00 SUPT. $90.10 $135.20 $0.00 EXCAVATOR-345 or EQUIV. $209.00 $0.00 SCRAPER-621 $226.00 $0.00 MATERIALS &SUPPLIES QTY. UNIT PRICE($) TOTAL SCRAPER-627 $264.00 $0.00 2"x 10'SCH40 PVC Pipe 17 $101.83 DOZER-D4 $94.00 $0.00 2"PVC 90°Bends 10 $8.90 DOZER-D5 $110.00 $0.00 2"PVC WYE Fittings 8 $25.06 DOZER-D6 $149.00 $0.00 Glue/Primer 2 $22.91 DOZER-D7 $165.00 $0.00 2"PVC 45°Bends 8 $12.64 DOZER-DS $209.00 $0.00 2"Coupling 14 $26.52 GRADER-FA65 or EQUIV. $95.00 $0.00 2"Cleanout plug&Adapter 17 $19.76 GRADER-12G or EQUIV. $116.00 $0.00 MARKUP OF 10%OF MATERIAL $21.76 GRADER-16G or EQUIV. $143.00 $0.00 TRACK LOADER-963 or EQUIV. $138.00 $0.00 PRICE($) TOTAL OFF ROAD TK.-350 or EQUIV. $171.00 $0.00 OFF ROAD TK.-400 or EQUIV. $193.00 $0.00 $0.00 ROLLER,VIB.ASPHALT $99.00 $0.00 $0.00 ROLLER,VIB.DIRT $110.00 $0.00 $0.00 ROLLER,WALK BEHIND $61.00 $0.00 MARKUP OF 10%OF Sub $0.00 COMPACTOR-815 $138.00 $0.00 LOWBOY TRACTOR&TRAILER $127.00 $0.00 MATERIAL TAX PRICE($) WATER TRUCK $110.00 $0.00 Tax $15.23 SINGLE AXLE FLATBED $64.00 $0.00 PICKUP TRUCK $39.00 $0.00 POWER BROOM $83.00 $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY,AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR ANY UTILITY TRUCK W/TOOLS $50.00 $0.00 EQUIPMENT REQUIRING MOBILIZATION ASPHALT PAVER $187.00 $0.00 ALL MATERIALS WILL BE BILLED AT COST PLUS 15% CONCRETE SAW $44.00 $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% AIR COMPRESSOR $55.00 $0.00 ALL WORK ON SATURDAYS ARE TIME•1/2,ALL WORK ON SUNDAYS ARE DOUBLE TIME RATES SHOWN ARE FOR DAY TRI-AXLE $127.00 $0.00 SHIFT ONLY RENTAL EQUIP. MINIMUM CHARGES MAYBE REQUIRED TOTAL: $2,771.12 Crider&Crider Inc. Authorizing Party By: Ado,Aiitair By:_ Printed: Anthony Aiduks Printed: % CLArgr 1.�1i/1 Title: Superintendent Title: l c' THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND IS ABOVE AND BEYOND THE SCOPE OF WORK FOR ANY CURRENT CONTRACTS WITH CRIDER&CRIDER INC AND IS TO BE PAID FOR BASED UPON THE RATES AND THE TERMS AND CONDITIONS PROVIDED HEREIN. OFFICE COPY-WHITE OWNER COPY-YELLOW SUPERINTENDANT COPY-PINK �'l1 TIME & MATERIAL WORK AGREEMENT l CRIDER & CRIDER R `,I..,.w CUST1OMER: ( i-f o�-rArrge I DATE: ,7-Z/ DES RIPTION OF WORK PERFORMED: 5 vwf 4 t 5 ckarq' 1-G-in) arid 6-tYv -V(e lo, ,�s JJ JOB#: IAvz. (/0 rliatt cJ0,041l41411 ) EFFECTIVE DATES: January 1,2018 to December 31,2018 EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL Straight Time Time+112 EQUIPMENT(OPERATOR NOT INCLUDED) LABOR RATE HRS RATE HRS TOTAL DESCRIPTION RATE/HR HR TOTAL($) LABORER $62.60 (Cf $93.90 $0.00 SKID STEER LOADER $55.00 $0.00 FINISHER $66.80 $100.20 $0.00 BACKHOE $72.00 4 $0.00 DRIVER $71.10 $106.60 $0.00 I.T.28 LOADER or EQUIV. $88.00 $0.00 MECHANIC $74.20 $111.30 $0.00 I.T.38 LOADER or EQUIV. $105.00 $0.00 OPERATOR $78.50 4 $117.70 $0.00 EXCAVATOR-320 or EQUIV. $154.00 $0.00 FOREMAN $83.80 $125.70 $0.00 EXCAVATOR-330 or EQUIV. $187.00 $0.00 SUPT. $90.10 $135.20 $0.00 EXCAVATOR-345 or EQUIV. $209.00 $0.00 SCRAPER-621 $226.00 $0.00 MATERIALS& SUPPLIES QTY. UNIT PRICE($) TOTAL SCRAPER-627 $264.00 $0.00 j l I� VC- OID1G $0.00 DOZER-D4 $94.00 $0.00 'i Q J / $0.00 DOZER-D5 $110.00 $0.00 I/ I'�} w• $0.00 DOZER-D6 $149.00 $0.00 k / pl1i $0.00 DOZER-D7 $165.00 $0.00 ' i `> $0.00 DOZER-D8 $209.00 $0.00 ' M f �jt�V (r/!o 4 / $0.00 GRADER-FA65 or EQUIV. $95.00 $0.00 e Q f/Jt�� $0.00 GRADER-12G or EQUIV. $116.00 $0.00 MARKUP OF 10%OF MATERIAL $0.00 GRADER-16G or EQUIV. $143.00 $0.00 TRACK LOADER-963 or EQUIV. $138.00 $0.00 TRUCKING CO. HRS. #TRUCKS PRICE($) TOTAL OFF ROAD TK.-350 or EQUIV. $171.00 $0.00 $0.00 OFF ROAD TK.-400 or EQUIV. $193.00 $0.00 $0.00 ROLLER,VIB.ASPHALT $99.00 $0.00 $0.00 ROLLER,VIB.DIRT $110.00 $0.00 $0.00 ROLLER,WALK BEHIND $61.00 $0.00 MARKUP OF 10%OF TRUCKING $0.00 COMPACTOR-815 $138.00 $0.00 LOWBOY TRACTOR&TRAILER $127.00 $0.00 SUBCONTRACTORS WORK PERFORMED QTY PRICE($) WATER TRUCK $110.00 $0.00 SINGLE AXLE FLATBED $64.00 $0.00 PICKUP TRUCK $39.00 $0.00 MARKUP OF 10%OF SUBS $0.00 POWER BROOM $83.00 $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY,AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR UTILITY TRUCK W/TOOLS $50.00 $0.00 ANY EQUIPMENT REQUIRING MOBILIZATION ASPHALT PAVER $187.00 $0.00 ALL MATERIALS WILL BE BILLED AT COST PLUS 10% CONCRETE SAW $44.00 $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% AIR COMPRESSOR $55.00 $0.00 ALL WORK ON SATURDAYS ARE TIME+1/2,ALL WORK ON SUNDAYS ARE DOUBLE TIME.RATES SHOWN ARE FOR DAY TRI-AXLE $127.00 $0.00 SHIFT ONLY RENTAL EQUIP. MINIMUM CHARGES MAYBE REQUIRED TOTAL: $7/,s-g-,_s0 Crider&Crider Inc. Authorizing Party By: 'v) � By: Printed: -NR01411 /I/�1�J✓l/4/ Printed: Title: P r remit n Title: THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED A DIRECTED AND IS ABOVE AND BEYOND THE SCOPE OF WORK FOR ANY CURRENT CONTRACTS WITH CRIDER&CRIDER INC AND IS TO BE PAID FOR BASED UPON THE RATES AND THE TERMS AND CONDITIONS PROVIDED HEREIN. OFFICE COPY-WHITE OWNER COPY-YELLOW SUPERINTENDANT COPY-PINK TIME & MATERIAL WORK AGREEMENT l ('RIDI:R & (.RIDER i `yc V Eq. CUSTOMER: City of Carmel DATE: 5/24/19 DESCRIPTION OF WORK PERFORMED: Sump drain tie-ins to storm sewer system and rip-rap adjustment. JOB#: 1802 Jordan Woods EFFECTIVE DATES: January 1,2015 to December 31,2019 EQUIPMENT RATES D0 NOT APPLY TO SNOW REMOVAL Straight Time Time+1/2 EQUIPMENT(OPERATOR NOT INCLUDED) LABOR RATE HRS RATE FIRS TOTAL DESCRIPTION RATE/HR HR TOTAL($) LABORER $62.60 20.0 $93.90 $1,252.00 SKID STEER LOADER $55.00 $0.00 FINISHER $66.80 $100.20 $0.00 BACKHOE $72.00 10.0 $720.00 DRIVER $71.10 $106.60 $0.00 I.T.28 LOADER or EQUIV. $88.00 $0.00 MECHANIC $74.20 $111.30 $000 I.T.38 LOADER or EQUIV. $105.00 $0.00 OPERATOR $78.50 10.0 $117.70 $785..00 EXCAVATOR-320 or EQUIV. $154.00 $0.00 FOREMAN $83.80 10.0 $125.70 $838.00 EXCAVATOR-330 or EQUIV. $187.00 $0.00 SUPT. $90.10 $135.20 $0.00 EXCAVATOR-345 or EQUIV. $209.00 $0.00 SCRAPER-621 $226.00 $0.00 MATERIALS &SUPPLIES QTY. UNIT PRICE($) TOTAL SCRAPER-627 $264.00 $0.00 LF $0.00 DOZER-D4 $94.00 $0.00 EA. $0.00 DOZER-D5 $110.00 $0.00 EA. $0.00 DOZER-D6 $149.00 $0.00 EA. $0.00 DOZER-D7 $165.00 $0.00 EA. $0.00 DOZER-D8 $209.00 $0.00 EA. $0.00 GRADER-FA65 or EQUIV. $95.00 $0.00 EA. $0.00 GRADER-12G or EQUIV. $116.00 $0.00 MARKUP OF 10%OF MATERIAL $0.00 GRADER-16G or EQUIV. $143.00 $0.00 TRACK LOADER-963 or EQUIV. $138.00 $0.00 PRICE($) TOTAL OFF ROAD TK.-350 or EQUIV. $171.00 $0.00 OFF ROAD TK.-400 or EQUIV. $193.00 $0.00 $0.00 ROLLER,VIB.ASPHALT $99.00 $0.00 $0.00 ROLLER,VIB.DIRT $110.00 $0.00 $0.00 ROLLER,WALK BEHIND $61.00 $0.00 MARKUP OF 10%OF Sub $0.00 COMPACTOR-815 $138.00 $0.00 LOWBOY TRACTOR&TRAILER $127.00 $0.00 MATERIAL TAX PRICE($) WATER TRUCK $110.00 $0.00 Tax $0.00 SINGLE AXLE FLATBED $64.00 $0.00 PICKUP TRUCK $39.00 $0.00 POWER BROOM $83.00 $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY,AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR ANY UTILITY TRUCK W/TOOLS $50.00 $0.00 EQUIPMENT REQUIRING MOBILIZATION ASPHALT PAVER $187.00 $0.00 ALL MATERIALS WILL BE BILLED AT COST PLUS 15% CONCRETE SAW $44.00 $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% AIR COMPRESSOR $55.00 $0.00 ALL WORK ON SATURDAYS ARE TIME•1/2,ALL WORK ON SUNDAYS ARE DOUBLE TIME.RATES SHOWN ARE FOR DAY TRI-AXLE $127.00 $0.00 SHIFT ONLY RENTAL EQUIP. MINIMUM CHARGES MAYBE REQUIRED TOTAL: $3,595.00 Crider&Crider Inc. Authorizing Party By: f�.rt,Fart Adair By: r`.--- Printed: Anthony Aiduks Printed: aiv(E,cpll..5 A_ Title: Superintendent Title: , THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND IS ABOVE AND BEYOND THE SCOPE OF WORK FOR ANY CURRENT CONTRACTS WITH CRIDER&CRIDER INC AND IS TO BE PAID FOR BASED UPON THE RATES AND THE TERMS AND CONDITIONS PROVIDED HEREIN. OFFICE COPY.WHITE OWNER COPY-YELLOW SUPERINTENDANT COPY-PINK %1 c Rll)h:I2& c ltJll�t.lt , TIME & MATERIAL WORK AGREEMENT `'1 I CUSTOMER: GIty of Ct4W I DATE: 5 'JJ� tf �j,, r f fl DESCRIPTION OF WORK gERFORMED. �V G4r&Wt +I�_ I Yl5 -�-n 5-f"o rot 51.JL C 614+eilk and fir_Kitio otai ustwlek-t JOB#: t rro 2 EFFECTIVE DATES: January 1,2018 to December 31,2018 EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL EQUIPMENT(OPERATOR NOT INCLUDED) LABOR RATE Straight Time Time RATE Time+1/2 HRS TOTAL DESCRIPTION RATE/HR HR TOTAL($) LABORER $62.60 ?7 $93.90 $0.00 _ SKID STEER LOADER $55.00 $0.00 FINISHER $66.80 $100.20 $0.00 BACKHOE $72.00 !0 $0.00 DRIVER $71.10 $106.60 $0.00 I.T.28 LOADER or EQUIV. $88.00 $0.00 MECHANIC $74.20 $111.30 $0.00 I.T.38 LOADER or EQUIV. $105.00 $0.00 OPERATOR $78.50 /0 $117.70 $0.00 EXCAVATOR-320 or EQUIV. $154.00 $0.00 FOREMAN $83.80 O $125.70 $0.00 EXCAVATOR-330 or EQUIV. $187.00 $0.00 SUPT. $90.10 ' $135.20 $0.00 EXCAVATOR-345 or EQUIV. $209.00 $0.00 SCRAPER-621 $226.00 $0.00 MATERIALS& SUPPLIES QTY. UNIT PRICE(E) TOTAL SCRAPER-627 $264.00 $0.00 Woo DOZER-D4 $94.00 $0.00 $0.00 DOZER-D5 $110.00 $0.00 $0.00 DOZER-D6 $149.00 $0.00 $0.00 DOZER-D7 $165.00 $0.00 $000 DOZER-D8 $209.00 $0.00 $0.00 GRADER-FA65 or EQUIV. $95.00 $0.00 $0.00 GRADER-12G or EQUIV. $116.00 $0.00 MARKUP OF 10%OF MATERIAL $0.00 GRADER-16G or EQUIV. $143.00 $0.00 TRACK LOADER-963 or EQUIV. $138.00 $0.00 TRUCKING CO. HRS. #TRUCKS PRICE(5) TOTAL OFF ROAD TK.-350 or EQUIV. $171.00 $0.00 $0.00 OFF ROAD TK.-400 or EQUIV. $193.00 $0.00 $0.00 ROLLER,VIB.ASPHALT $99.00 $0.00 $0.00 ROLLER,VIB.DIRT $110.00 $0.00 $0.00 ROLLER,WALK BEHIND $61.00 $0.00 MARKUP OF 10%OF TRUCKING $0.00 COMPACTOR-815 $138.00 $0.00 LOWBOY TRACTOR&TRAILER $127.00 $0.00 SUBCONTRACTORS WORK PERFORMED QTY PRICE($) WATER TRUCK $110.00 $0.00 - SINGLE AXLE FLATBED $64.00 $0.00 PICKUP TRUCK $39.00 $0.00 MARKUP OF 10%OF SUBS $0.00_ POWER BROOM $83.00 $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY,AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDEO FOR UTILITY TRUCK WTTOOLS $50.00 $0.00 ANY EQUIPMENT REQUIRING MOBILIZATION ASPHALT PAVER $187.00 $0.00 - ALL MATERIALS WILL BE BILLED AT COST PLUS 10% CONCRETE SAW $44.00 $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% AIR COMPRESSOR $55.00 $0.00 ALL WORK ON SATURDAYS ARE TIME•1/2,ALL WORK ON SUNDAYS ARE DOUBLE TIME.RATES SHOWN ARE FOR DAY TRI-AXLE $127.00 $0.00 SHIFT ONLY RENTAL EQUIP. MINIMUM CHARGES MAYBE REQUIRED TOTAL: Crider&Crider I c. Authorizing Party (4.- By: By: Printed: cubit y A- c 14.' Printed: Title: 0 rerkA/iA Title: THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND IS ABOVE AND BEYOND THE SCOPE OF WORK FOR ANY CURRENT CONTRACTS WITH CRIDER&CRIDER INC AND IS TO BE PAID FOR BASED UPON THE RATES AND THE TERMS AND CONDITIONS PROVIDED HEREIN. OFFICE COPY-WHITE OWNER COPY-YELLOW SUPERINTENDANT COPY-PINK TIME & MATERIAL WORK AGREEMENT ('121UE12 & ( RIDER 4,4 • 6k-µ` CUSTOMER: City of Carmel DATE: 6/5/19 DESCRIPTION OF WORK PERFORMED: Lowering of casting and adjustment of Rip-Rap JOB#: 1802 Jordan Woods EFFECTIVE DATES: January 1,2015 to December 31,2019 EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL Straight Time Time+1/2 EQUIPMENT(OPERATOR NOT INCLUDED) LABOR RATE HRS RATE HRS TOTAL DESCRIPTION RATE/HR HR TOTAL($) LABORER $62.60 1.0 $93.90 $62.60 SKID STEER LOADER $55.00 $0.00 FINISHER $66.80 $100.20 $0.00 BACKHOE $72.00 $0.00 DRIVER $71.10 $106.60 $0.00 I.T.28 LOADER or EQUIV. $88.00 $0.00 MECHANIC $74.20 $111.30 $0.00 I.T.38 LOADER or EQUIV. $105.00 $0.00 OPERATOR $78.50 $117.70 $0.00 EXCAVATOR-320 or EQUIV. $154.00 $0.00 FOREMAN $83.80 1.0 $125.70 $83.80 EXCAVATOR-330 or EQUIV. $187.00 $0.00 SUPT. $90.10 $135.20 $0.00 EXCAVATOR-345 or EQUIV. $209.00 $0.00 SCRAPER-621 $226.00 $0.00 MATERIALS &SUPPLIES QTY. UNIT PRICE($) TOTAL SCRAPER-627 $264.00 $0.00 LF $0.00 DOZER-D4 $94.00 $0.00 EA. $0.00 DOZER-D5 $110.00 $0.00 EA. $0.00 DOZER-D6 $149.00 $0.00 EA. $0.00 DOZER-D7 $165.00 $0.00 EA. $0.00 DOZER-D8 $209.00 $0.00 EA. $0.00 GRADER-FA65 or EQUIV. $95.00 $0.00 EA. $0.00 GRADER-12G or EQUIV. $116.00 $0.00 MARKUP OF 10%OF MATERIAL $0.00 GRADER-16G or EQUIV. $143.00 $0.00 TRACK LOADER-963 or EQUIV. $138.00 $0.00 PRICE($) TOTAL OFF ROAD TK.-350 or EQUIV. $171.00 $0.00 OFF ROAD TK.-400 or EQUIV. $193.00 $0.00 $0.00 ROLLER,VIB.ASPHALT $99.00 $0.00 $0.00 ROLLER,VIB.DIRT $110.00 $0.00 $0.00 ROLLER,WALK BEHIND $61.00 $0.00 MARKUP OF 10%OF Sub $0.00 COMPACTOR-815 $138.00 $0.00 LOWBOY TRACTOR&TRAILER $127.00 - $0.00 MATERIAL TAX PRICE($) WATER TRUCK $110.00 $0.00 Tax $0.00 SINGLE AXLE FLATBED $64.00 $0.00 PICKUP TRUCK $39.00 1.0 $39.00 POWER BROOM $83.00 $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR ANY UTILITY TRUCK W/TOOLS $50.00 $0.00 EQUIPMENT REQUIRING MOBILIZATION ASPHALT PAVER $187.00 $0.00 ALL MATERIALS WILL BE BILLED AT COST PLUS 15% CONCRETE SAW $44.00 $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 1D% AIR COMPRESSOR $55.00 $0.00 ALL WORK ON SATURDAYS ARE TIME*12,ALL WORK ON SUNDAYS ARE DOUBLE TIME RATES SHOWN ARE FOR DAY TRI-AXLE $127.00 $0.00 SHIFT ONLY RENTAL EQUIP. ?ANIMUM CHARGES MAYBE REQUIRED TOTAL: $185.40 Crider&Crider Inc. Authorizing Party 9 By: Artie?Odds By: (0 t.,f Printed: Anthony Aiduks Printed: Title: Superintendent Title: -c 2 THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND IS ABOVE AND BEYOND THE SCOPE OF WORK FOR ANY CURRENT CONTRACTS WITH CRIDER&CRIDER INC AND IS TO BE PAID FOR BASED UPON THE RATES AND THE TERMS AND CONDITIONS PROVIDED HEREIN. OFFICE COPY-WHITE OWNER COPY-YELLOW SUPERINTENDANT COPY-PINK rr. 4,0::` h' TIME & MATERIAL WORK AGREEMENTS. (_c•RIDER & CRIDER' /` ct `'r "' CUSTOMER: �4i/ of Car4e/ DATE: (s -Yr - ` DESCRIPTION OF WORK PERFORMED: Laden 6-C la,C-�-1/q�y A4 aJ 1 6 1/C JOB#: /b0Z EFFECTIVE DATES: January 1,2018 to December 31,2018 EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL Straight Time Time+1/2 EQUIPMENT(OPERATOR NOT INCLUDED) LABOR RATE HRS RATE HRS TOTAL DESCRIPTION RATE I HR HR TOTAL($) LABORER $62.60 1 $93.90 $0.00 SKID STEER LOADER $55.00 $0.00 FINISHER $66.80 $100.20 $0.00 BACKHOE $72.00 $0.00 DRIVER $71.10 $106.60 $0.00 I.T.28 LOADER or EQUIV. $88.00 $0.00 MECHANIC $74.20 $111.30 $0 00 I.T.38 LOADER or EQUIV. $105.00 $0.00 OPERATOR $78.50 $117.70 $0.00 EXCAVATOR-320 or EQUIV. $154.00 $0.00 FOREMAN $83.80 / $125.70 $0.00 EXCAVATOR-330 or EQUIV. $187.00 $0.00 SUPT. $90.10 $135.20 $0.00 EXCAVATOR-345 or EQUIV. $209.00 $0.00 SCRAPER-621 $226.00 $0.00 MATERIALS&SUPPLIES QTY. UNIT PRICE($) TOTAL SCRAPER-627 $264.00 $0.00 $0.00 DOZER-D4 $94.00 $0.00 $0.00 DOZER-D5 $110.00 $0.00 NJ/A $0.00 DOZER-D6 $149.00 $0.00 $0.00 DOZER-D7 $165.00 $0.00 $0.00 DOZER-D8 $209.00 $0.00 $0.00 GRADER-FA65 or EQUIV. $95.00 $0.00 $0.00 GRADER-12G or EQUIV. $116.00 $0.00 MARKUP OF 10%OF MATERIAL $0.00 GRADER-16G or EQUIV. $143.00 $0.00 TRACK LOADER-963 or EQUIV. $138.00 $0.00 TRUCKING CO. HRS. #TRUCKS PRICE($) TOTAL OFF ROAD TK.-350 or EQUIV. $171.00 $0.00 $0.00 OFF ROAD TK.-400 or EQUIV. $193.00 $0.00 $0 00 ROLLER VIB.ASPHALT $99.00 $0.00 $0.00 ROLLER,VIB.DIRT $110.00 $0.00 $0.00 ROLLER,WALK BEHIND $61.00 $0.00 MARKUP OF 10%OF TRUCKING $0.00 COMPACTOR-815 $138.00 $0.00 LOWBOY TRACTOR&TRAILER $127.00 $0.00 SUBCONTRACTORS WORK PERFORMED QTY PRICE($) WATER TRUCK $110.00 $0.00 SINGLE AXLE FLATBED $64.00 $0.00 PICKUP TRUCK $39.00 / $0.00 MARKUP OF 10%OF SUBS $0.00 POWER BROOM $83.00 $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY,AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR UTILITY TRUCK W/TOOLS $50.00 $0.00 ANY EQUIPMENT REQUIRING MOBILIZATION ASPHALT PAVER $187.00 $0.00 ALL MATERIALS WILL BE BILLED AT COST PLUS 10% CONCRETE SAW $44.00 $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% AIR COMPRESSOR $55.00 $0.00 TRI-AXLE $127.00ALL WORK ON SATURDAYS ARE TIME•12.ALL WORK ON SUNDAYS ARE DOUBLE TIME RATES SHOWN ARE FOR DAY $0.00 SHIFT ONLY RENTAL EQUIP. MINIMUM CHARGES MAYBE REQUIRED TOTAL: T 185,y© Crider&Crider Inc. Authorizing Party 7 By: 'y1����,� /y J r,' By: �7���� Printed: I t t lean y I l Af tN4�j Printed: 4.,,, 1 <D 1 Title: ' I (t4.44 Title: ` 'ttIIIII� Z. THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND IS ABOVE AND BEYOND THE SCOPE OF WORK FOR ANY CURRENT CONTRACTS WITH CRIDER&CRIDER INC AND IS TO BE PAID FOR BASED UPON THE RATES AND THE TERMS AND CONDITIONS PROVIDED HEREIN. OFFICE COPY-WHITE OWNER COPY-YELLOW SUPERINTENDANT COPY-PINK 0,.TRA Crokr TIME & MATERIAL WORK AGREEMENT ( (-1211) :12 & ( 'RI►I)l-.R J \t l "t"/ CUSTOMER: City of Carmel DATE: 6/6/19 DESCRIPTION OF WORK PERFORMED: Lowered structure at 2047 E 110th Street,Regraded ditch at 1825 E. 109th Street JOB#: 1802 Jordan Woods EFFECTIVE DATES: January 1,2015 to December 31,2019 EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL EQUIPMENT(OPERATOR NOT INCLUDED Straight Time Time+1/2 l I ABOR DESCRIPTION RATE HRS RATE HRS TOTAL RATE/HR HR TOTAL($) LABORER $62.60 2.5 $93.90 $156.50 SKID STEER LOADER $55.00 $0.00 FINISHER $66.80 $100.20 BACKHOE $72.00 2.0 $144.00 DRIVER $71.10 $0.00 I.T.28 LOADER or EQUIV. $1 .30 $0.00 $88.00 $0.00 MECHANIC $74.20 $11111.30 $0.00 I.T.38 LOADER or EQUIV. $105.00 $0.00 OPERATOR $78.50 EXCAVATOR-320 or EQUIV. $117.70 $0.00 $154.00 $0.00 FOREMAN $83.80 2.5 $125.70 $2$0.00 EXCAVATOR-330 or EQUIV. $187.00 $0.00 SUPT. $90.10 EXCAVATOR-345 or EQUIV. $135.20 $0.00 $209.00 $0.00 SCRAPER-621 $226.00 $0.00 MATERIALS&SUPPLIES QTY. UNIT PRICE($) TOTAL SCRAPER-627 $264.00 $0.00 DOZER-D4 $94.00 $0.00 LF $0.00 DOZER-D5 $110.00 $0.00 EA. $0.00 DOZER-D6 $149.00 $0.00 EA. $0.00 DOZER-D7 $165.00 $0.00 EA. $0.00 EA. $0.00 DOZER-D8 $209.00 $0.00 EA. $0.00 GRADER-FA65 or EQUIV. $95.00 $0.00 • GRADER-12G or EQUIV. EA. $0.00 $116.00 $0.00 MARKUP OF 10%OF MATERIAL $0.00 GRADER-16G or EQUIV. $143.00 $0.00 TRACK LOADER-963 or EQUIV. $138.00 $0.00 PRICE($) TOTAL OFF ROAD TK.-350 or EQUIV. $171.00 $0.00 OFF ROAD TK.-400 or EQUIV. $193.00 $0.00 ROLLER,VIB.ASPHALT $0.00 $99.00 $0.00 $0.00 ROLLER,VIB.DIRT $110.00 $0.00 ROLLER,WALK BEHIND $0.00 $61.00 $0.00 MARKUP OF 10%OF Sub $0.00 COMPACTOR-815 $138.00 $0.00 LOWBOY TRACTOR&TRAILER $127.00 $0.00 MATERIAL TAX PRICE($) WATER TRUCK $110.00 $0.00 Tax SINGLE AXLE FLATBED $0.00 $64.00 $0.00 PICKUP TRUCK $39.00 2.5 $97.50 POWER BROOM $83.00 $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY,AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR ANY UTILITY TRUCK W/TOOLS $50.00 $0.00 EQUIPMENT REQUIRING MOBILIZATION ASPHALT PAVER $187.00 $0.00 ALL MATERIALS WILL BE BILLED AT COST PLUS 15% CONCRETE SAW $44.00 $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% AIR COMPRESSOR $55.00 $0.00 TRI-AXLE ALL WORK ON SATURDAYS ARE ONE•I/2,ALL WORK ON SUNDAYS ARE DOUBLE DUE.RATES SHOWN ARE FOR DAY $127.00 $0.00 SHIFT ONLY RENTAL EQUIP. MINIMUM CHARGES MAYBE REQUIRED TOTAL: $607.50 Crider&Crider Inc. Authorizing Party By: Ii,rtkeie Y1Ih s By: Printed: Anthony Aiduks Printed: t t,-1 -y Title: Superintendent Title: CCl1`', tam L- THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND IS ABOVE AND BEYOND THE SCOPE OF WORK FOR ANY CURRENT CONTRACTS WITH CRIDER&CRIDER INC AND IS TO BE PAID FOR BASED UPON THE RATES AND THE TERMS AND CONDITIONS PROVIDED HEREIN. OFFICE COPY-WHITE OWNER COPY-YELLOW SUPERINTENDANT COPY•PINK (c ltlDl:It s c Itll)t:It TIME & MATERIAL WORK AGREEMENT ''` CUSTOMER: G(4'y p�1(r DATE: 6 p'' --/Q'/ DESCRIPTIO F 7KPERFMED O : LQtY cj1/( C 2f PO41, JOB#: 'got EFFECTIVE DATES: January 1,2018 to December 31,2018 EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL EQUIPMENT(OPERATOR NOT INCLUDED) LABOR RATEtraight Time HRSRATETime'»Z HRS TOTAL DESCRIPTION RATE/HR HR TOTAL($) LABORER $62.60 SKID STEER LOADER $55.00 $93.90 $0.00 BACKHOE $0.00 FINISHER $66.80 $100.20 $0.00 $72.00 7or $0.00 DRIVER $71.10 $106.60 $0.00 I.T.28 LOADER or EQUIV. $88.00 r $0.00 MECHANIC $74.20 I.T.38 LOADER or EQUIV. $105.00 $11 $0.00 EXCAVATOR-320 or EQUIV. OPERATOR $78.50 $117.70.70 $p pp $154.00 $0.00 FOREMAN $83.80 L,," $125.70 EXCAVATOR-330 or EQUIV. $187.00 $0.00 SUPT. $0.00 EXCAVATOR-345 or EQUIV. $90.10 $135.20 $0.00 $209.00 $0.00 , SCRAPER-621 $226.00 $0.00 MATERIALS&SUPPLIES SCRAPER-627 $264.00 $0.00 QTY. UNIT PRICE($) TOTAL DOZER-D4 $94.00 $0.00 $0.00 DOZER-D5 $110.00 $0.00 DOZER-D6 $0.00 $149.00 $0.00 $0.00 DOZER-D7 $165.00N/A $0.00 DOZER-DS $0.00 $209.00 $0.00 $0 00 GRADER-FA65 or EQUIV. $95.00 $0.00 $0.00 GRADER-12G or EQUIV. $116.00 $0.00 MARKUP OF 10%OF MATERIAL $0.00 GRADER-16G or EQUIV. $143.00 $0.00 $0.00 TRACK LOADER-963 or EQUIV. $138.00 $0.00 TRUCKING CO. HRS. #TRUCKS PRICE($) TOTAL OFF ROAD TK.-350 or EQUIV. $171.00 $0.00 OFF ROAD TK-400 or EQUIV. $193.00 $0.00 $0.00 ROLLER,VIB.ASPHALT $99.00 $0.00 $0.00 ROLLER,VIB.DIRT $110.00 $0.00 $0.00 ROLLER,WALK BEHIND $61.00 $0.00 MARKUP OF 10%OF TRUCKING $0.00 COMPACTOR-815 $138.00 $0.00 $0.00 LOWBOY TRACTOR&TRAILER $127.00 $0.00 SUBCONTRACTORS WORK PERFORMED ,QTY PRICE(S) WATER TRUCK $110.00 $0.00 SINGLE AXLE FLATBED $64.00 $0.00 PICKUP TRUCK $39.00 Z,S $0.00 MARKUP OF 10%OF SUBS POWER BROOM $8g pp $0.00 $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY,AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR UTILITY TRUCK W/TOOLS $50.00 $0.00 ANY EQUIPMENT REQUIRING MOBIUZATION ASPHALT PAVER $187.00 $0.00 CONCRETE SAW ALL MATERIALS WILL BE BILLED AT COST PLUS 10% $44.00 $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% AIR COMPRESSOR $55.00 $0.00 TRI-AXLE $127.00 ALL WORK ON SATURDAYS ARE TIME•1/2,ALL WORK ON SUNDAYS ARE DOUBLE TIME RATES SHOWN ARE FOR DAY $p'pp SHIFT ONLY RENTAL EQUIP. MINIMUM CHARGES MAYBE REQUIRED TOTAL: •6 07 5O Crider&Crider Inc. Authorizin Party By: ��� By: � Printed: 4441407/ ! gdir k5 Printed: p /‘ Title: reiMa.in Title: THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND IS ABOVE AND BEYOND THE SCOPE OF WORK FOR ANY CURRENT CONTRACTS WITH CRIDER&CRIDER INC AND IS TO BE PAID FOR BASED UPON THE RATES AND THE TERMS AND CONDITIONS PROVIDED OFFICE COPY-WHITE HEREIN. OWNER COPY-YELLOW SUPERINTENDANT COPY-PINK RAC TO ` 1 TIME & MATERIAL WORK AGREEMENT CRIDER & CRIDER Fv T tR= CUSTOMER: City of Carmel DATE: 6/7/19 DESCRIPTION OF WORK PERFORMED: Installation of sod and regrading of ditch at 11102 Timber Lane. JOB#: 1802 Jordan Woods EFFECTIVE DATES: January 1,2015 to December 31,2019 EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL Straight Time Time+1/2 EQUIPMENT(OPERATOR NOT INCLUDED) LABOR RATE HRS RATE HRS TOTAL DESCRIPTION RATE I HR HR TOTAL($) LABORER $62.60 2.0 $93.90 $125.20 SKID STEER LOADER $55.00 $0.00 FINISHER $66.80 $100.20 $0.00 BACKHOE $72.00 2.0 $144.00 DRIVER $71.10 $106.60 $0.00 I.T.28 LOADER or EQUIV. $88.00 $0.00 MECHANIC $74.20 $111.30 $0.00 I.T.38 LOADER or EQUIV. $105.00 $0.00 OPERATOR $78.50 $117.70 $0.00 EXCAVATOR-320 or EQUIV. $154.00 $0.00 FOREMAN $83.80 2.0 $125.70 $167.60 EXCAVATOR-330 or EQUIV. $187.00 $0.00 SUPT. $90.10 2.0 $135.20 $180.20 EXCAVATOR-345 or EQUIV. $209.00 $0.00 SCRAPER-621 $226.00 $0.00 MATERIALS&SUPPLIES QTY. UNIT PRICE($) TOTAL SCRAPER-627 $264.00 $0.00 Sod(Ameri-Turf) 250 SF $0.56 $140.00 DOZER-04 $94.00 $0.00 Pallet(Ameri-Turf) 1 EA. $10.00 $10.00 DOZER-D5 $110.00 $0.00 EA. $0.00 DOZER-D6 $149.00 $0.00 EA. $0.00 DOZER-D7 $165.00 $0.00 EA. $0.00 DOZER-D8 $209.00 $0.00 EA. $0.00 GRADER-FA65 or EQUIV. $95.00 $0.00 EA. $0.00 GRADER-12G or EQUIV. $116.00 $0.00 MARKUP OF 10%OF MATERIAL $15.00 GRADER-16G or EQUIV. $143.00 $0.00 TRACK LOADER-963 or EQUIV. $138.00 $0.00 PRICE($) TOTAL OFF ROAD TK.-350 or EQUIV. $171.00 $0.00 OFF ROAD TK.-400 or EQUIV. $193.00 $0.00 _ $0.00 ROLLER,VIB.ASPHALT $99.00 $0.00 $0.00 ROLLER,VIB.DIRT $110.00 $0.00 $0.00 ROLLER,WALK BEHIND $61.00 $0.00 MARKUP OF 10%OF Sub $0.00 COMPACTOR-815 $138.00 $0.00 LOWBOY TRACTOR&TRAILER $127.00 $0.00 MATERIAL TAX PRICE($) WATER TRUCK $110.00 $0.00 Tax $10.50 SINGLE AXLE FLATBED $64.00 $0.00 PICKUP TRUCK $39.00 4.0 $156.00 POWER BROOM $83.00 $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY.AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR ANY UTILITY TRUCK W/TOOLS $50.00 $0.00 EQUIPMENT REQUIRING MOBIUZATION ASPHALT PAVER $187.00 $0.00 ALL MATERIALS WILL BE BILLED AT COST PLUS 15% CONCRETE SAW $44.00 $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% AIR COMPRESSOR $55.00 $0.00 ALL WORK ON SATURDAYS ARE TIME+1/2 ALL WORK ON SUNDAYS ARE DOUBLE TIME RATES SHOWN ARE FOR DAY TRI-AXLE $127.00 $0.00 SHIFT ONLY RENTAL EQUIP. MINIMUM CHARGES MAYBE REQUIRED TOTAL: $948.50 Crider&Crider Inc. Authorizing Party By: Ara,Airia By: - C ..ti---- Printed: Anthony Aiduks Printed: A C' (--)--.1 Title: Superintendent Title: THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND IS ABOVE AND BEYOND THE SCOPE OF WORK FOR ANY CURRENT CONTRACTS WITH CRIDER&CRIDER INC AND IS TO BE PAID FOR BASED UPON THE RATES AND THE TERMS AND CONDITIONS PROVIDED HEREIN. OFFICE COPY-WH TE OWNER COPY-YELLOW SUPERINTENDANT COPY-PINK 4112111143 TIME & MATERIAL WORK AGREEMENT CRIDER S C'RIIL)ER CUSTOMER: City of Carmel DATE: 6/10/19 DESCRIPTION OF WORK PERFORMED: Tied in sump drain at 2020 E. 109th Street.Tied in perimeter drains at 10828 Timber Ln and aquired straw mat. JOB#: 1802 Jordan Woods EFFECTIVE DATES: January 1,2015 to December 31,2019 _ EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL Straight Time Time+1/2 EQUIPMENT(OPERATOR NOT INCLUDED) LABOR RATE HRS RATE FIRS TOTAL DESCRIPTION RATE/HR HR TOTAL($) LABORER $62.60 7.0 $93.90 SKID STEER LOADER $55.00 $0.00 FINISHER $4$0.00 BACKHOE $66.60 $100.20 $0.00 $72.00 8.0 $576.00 DRIVER $71.10 $106.60 I.T.28 LOADER or EQUIV. $88.00 $0.00 MECHANIC $74.20 $0.00 I.T.38 LOADER or EQUIV. $105.00 $0.00 $117.70 $0.00 OPERATOR $78.50 $117.70 $0.00 EXCAVATOR-320 or EQUIV. $154.00 $0.00 FOREMAN $83.80 7.0 EXCAVATOR-330 or EQUIV. $187.00 $125.70 $586.60 $0.00 SUPT. $90.10 2.0 $135.20 $180.20 EXCAVATOR-345 or EQUIV. $209.00 $0.00 SCRAPER-621 $226.00 $0.00 MATERIALS &SUPPLIES QTY. UNIT PRICE($) TOTAL- SCRAPER-627 $264.00 $0.00 D2-S-150-8 Straw Blanket DOZER-D4 $94.00 $0.00 400 SF $0.45 $160.00 00 $0.00 DOZER-D5 $110.00 EA. $0.00 DOZER-D6 $149.00 $0.00 EA $0.00 _ DOZER-D7 $165.00 EA. $0.00 DOZER-D8 $0.00 EA. $209.00 $0.00 $0.00 GRADER-FA65 or EQUIV. _ EA. $0.00 _ $95.00 $0.00 EA. $0.00 GRADER-12G or EQUIV. $116.00 $0.00 MARKUP OF 10%OF MATERIAL GRADER-16G or EQUIV. $143.00 $0.00 $18.00 TRACK LOADER-963 or EQUIV. $138.00 $0.00 OFF ROAD TK.-350 or EQUIV. $171.00 $0.00 PRICE($) TOTAL OFF ROAD TK.-400 or EQUIV. $193.00 $0.00 ROLLER,VIB.ASPHALT $gg 00 $0.00 $0.00 $0.00 ROLLER,VIB.DIRT $110.00 $0.00 ROLLER,WALK BEHIND $61.00 $0.00 MARKUP OF 10%OF Sub $0.00 $0.00 COMPACTOR-815 $138.00. $0.00 LOWBOY TRACTOR&TRAILER $127.00 $0.00 MATERIAL TAX WATER TRUCK $110.00 PRICE$0.00 Tax Tax Exempt $0.00.00 SINGLE AXLE FLATBED $64.00 $0.00 PICKUP TRUCK $39.00 $0.00 POWER BROOM $83.00 $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY,AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR ANY UTILITY TRUCK W/TOOLS $50.00 $0.00 EQUIPMENT REQUIRING MOBILIZATION ASPHALT PAVER $187.00 $0.00 CONCRETE SAW ALL MATERIALS WILL BE BILLED AT COST PLUS 15% $44.00 $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% AIR COMPRESSOR $55.00 $0.00 ALL WORK ON SATURDAYS ARE TIME•1/2,ALL WORK ON SUNDAYS ARE DOUBLE TIME RATES SHOWN ARE FOR DAY TRI-AXLE $127.00 $O.oO SHIFT ONLY RENTAL EQUIP. MINIMUM CHARGES MAYBE REQUIRED TOTAL: $1,979.00 Crider&Crider Inc. Authorizing Party By: 4r eke,flir(abs By: ram_ Printed: Anthony Aiduks Printed: I -- Title: Superintendent Title: THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND IS ABOVE AND BEYOND THE SCOPE OF WORK FOR ANY CURRENT CONTRACTS WITH CRIDER&CRIDER INC AND IS TO BE PAID FOR BASED UPON THE RATES AND THE TERMS AND CONDITIONS PROVIDED HEREIN. OFFICE COPY.WHITE OWNER COPY-YELLOW SUPERINTENDANT COPY-PINK c'RIDER& c'RIDER TIME & MATERIAL WORK AGREEMENT '•. CUSTOMER: C7 , p- ( f i&i / DATE: 6-f(/-/f D SC IPTION OF WORK PERFOR D: , P iv/ I S JOB#: Ibot EFFECTIVE DATES: January 1,2018 to December 31,2018 EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL Straight Tine Time+1/2 EQUIPMENT(OPERATOR NOT INCLUDED) LABOR RATE HRS RATE HRS TOTAL DESCRIPTION RATE 1 HR HR TOTAL($) LABORER $62.60 '1 $93.90 $0.00 SKID STEER LOADER $55.00 $0.00 FINISHER $66.80 $100.20 $0.00 BACKHOE $7200 % $0.00 DRIVER $71.10 $106.60 $0.00 I.T.28 LOADER or EQUIV. $88.00 $0.00 MECHANIC $74.20 $111.30 $0.00 I.T.38 LOADER or EQUIV. $105.00 $0.00 OPERATOR $78.50 $117.70 $0.00 EXCAVATOR-320 or EQUIV. $154.00 $0.00 FOREMAN $83.80 1 $125.70 $0.00 EXCAVATOR-330 or EQUIV. $187.00 $0.00 SUPT. $90.10 $135.20 $0.00 EXCAVATOR-345 or EQUIV. $209.00 $0.00 SCRAPER-621 $226.00 $0.00 MATERIALS& SUPPLIES QTY. UNIT PRICE($) TOTAL SCRAPER-627 $264.00 $0.00 14 DOZER-D4 $94.00 $0.00 5 Y�► Mort /04t•- $00 $0.00 DOZER-D5 $110.00 $0.00 $0.00 DOZER-D6 $149.00 $0.00 $0.00 DOZER-D7 $165.00 $0.00 $0.00 DOZER-D8 $209.00 $0.00 $0.00 GRADER-FA65 or EQUIV. $95.00 $0.00 $0.00 GRADER-12G or EQUIV. $116.00 $0.00 MARKUP OF 10%OF MATERIAL f D,4fd $0.00 GRADER-16G or EQUIV. $143.00 $0.00 TRACK LOADER-963 or EQUIV. $138.00 $0.00 TRUCKING CO. HRS. #TRUCKS PRICE($) TOTAL OFF ROAD TK.-350 or EQUIV. $171.00 $0.00 $0.00 OFF ROAD TK.-400 or EQUIV. $193.00 $0.00 $0.00 ROLLER,VIB.ASPHALT $99.00 $0.00 $0.00 ROLLER,VIB.DIRT $110.00 $0.00 $0.00 ROLLER,WALK BEHIND $61.00 $0.00 MARKUP OF 10%OF TRUCKING $0.00 COMPACTOR-815 $138.00 $0.00 LOWBOY TRACTOR&TRAILER $127.00 $0.00 SUBCONTRACTORS WORK PERFORMED QTY PRICE($) WATER TRUCK $110.00 $0.00 SINGLE AXLE FLATBED $64.00 $0.00 PICKUP TRUCK $39.00 $0.00 MARKUP OF 10%OF SUBS $0.00 POWER BROOM $83.00 $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY.AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR UTILITY TRUCK W/TOOLS $50.00 $0.00 ANY EQUIPMENT REQUIRING MOBILIZATION ASPHALT PAVER $187.00 $0.00 ALL MATERIALS WILL BE BILLED AT COST PLUS 10% CONCRETE SAW $44.00 $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% AIR COMPRESSOR $55.00 $0.00 ALL WORK ON SATURDAYS ARE TIME.12.ALL WORK ON SUNDAYS ARE DOUBLE TIME.RATES SHOWN ARE=OR DAY TRI-AXLE $127.00 $0.00 SHIFT ONLY RENTAL EQUIP. MINIMUM CHARGES MAYBE REQUIRED TOTAL: 4 (!( 2 /,D Crider&Crider Inc. Authorizing Party By: �it �� By: (-- -1.------;?; Et____, Printed: hen y 4)C/I/ j Printed: �{�U1�Cjy7, Title: �i /j1/,t/n Title: ---1 K- THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND IS ABOVE AND BEYOND THE SCOPE OF WORK FOR ANY CURRENT CONTRACTS WITH CRIDER&CRIDER INC AND IS TO BE PAID FOR BASED UPON THE RATES AND THE TERMS AND CONDITIONS PROVIDED HEREIN. OFFICE COPY-WHITE OWNER COPY-YELLOW SUPERINTENDANT COPY-PINK A e �`l`T R� TIME & MATERIAL WORK AGREEMENT ( RIDER & (-RIDER] ':,,;r tµ: CUSTOMER: City of Carmel DATE: 6-13/14-19 DESCRIPTION OF WORK PERFORMED: Hand dug ditch for downspout drain at 10941 Timbver In,completed drain and performed spotwork for drainage bore at 2023 E. 110th St. JOB#: 1802 Jordan Woods EFFECTIVE DATES: January 1,2015 to December 31,2019 EQUIPMENT RATES DO NOT APPLY TO SNOW REMOVAL Straight Time Time+1/2 EQUIPMENT(OPERATOR NOT INCLUDED) LABOR RATE HRS RATE - HRS TOTAL DESCRIPTION RATE/HR HR TOTAL($) LABORER $62.60 8.5 $93.90 $532.10 SKID STEER LOADER $55.00 $0.00 FINISHER $66.80 $100.20 $0.00 BACKHOE $72.00 2.5 $180.00 DRIVER $71.10 $106.60 $0.00 I T.28 LOADER or EQUIV. $88.00 $0.00 MECHANIC $74.20 $111.30 $0.00 I.T.38 LOADER or EQUIV. $105.00 $0.00 OPERATOR $78.50 2.5 $117.70 $196.25 EXCAVATOR-320 or EQUIV. $154.00 $0.00 FOREMAN $83.80 8.5 $125.70 $712.30 EXCAVATOR-330 or EQUIV. $187.00 $0.00 SUPT. $90.10 $135.20 $0.00 EXCAVATOR-345 or EQUIV. $209.00 $0.00 SCRAPER-621 $226.00 $0.00 MATERIALS&SUPPLIES QTY. UNIT PRICE($) TOTAL SCRAPER-627 $264.00 $0.00 SF $0.00 DOZER-D4 $94.00 $0.00 EA. $0.00 DOZER-D5 $110.00 $0.00 EA. $0.00 DOZER-D6 $149.00 $0.00 EA. $0.00 DOZER-D7 $165.00 $0.00 EA. $0.00 DOZER-D8 $209.00 $0.00 EA. $0.00 GRADER-FA65 or EQUIV. $95.00 $0.00 EA. $0.00 GRADER-12G or EQUIV. $116.00 $0.00 MARKUP OF 100/0 OF MATERIAL $0.00 GRADER-16G or EQUIV. $143.00 $0.00 TRACK LOADER-963 or EQUIV. $138.00 $0.00 PRICE($) TOTAL OFF ROAD TK.-350 or EQUIV. $171.00 $0.00 OFF ROAD TK.-400 or EQUIV. $193.00 $0.00 $0.00 ROLLER,VIB.ASPHALT $99.00 $0.00 $0.00 ROLLER,VIB.DIRT $110.00 _ $0.00 $0.00 ROLLER,WALK BEHIND $61.00 $0.00 MARKUP OF 10%OF Sub $0.00 COMPACTOR-815 $138.00 $0.00 LOWBOY TRACTOR&TRAILER $127.00 $0.00 MATERIAL TAX PRICE($) WATER TRUCK $110.00 $0.00 Tax Tax Exempt $0.00 SINGLE AXLE FLATBED $64.00 $0.00 PICKUP TRUCK $39.00 $0.00 POWER BROOM $83.00 $0.00 EQUIPMENT RATES APPLY TO EQUIPMENT ON SITE ONLY.AN ADDITIONAL MOBILIZATION CHARGE WILL BE ADDED FOR ANY UTILITY TRUCK W/TOOLS $50.00 8.5 $425.00 EQUIPMENT REQUIRING MOBILIZATION ASPHALT PAVER $187.00 $0.00 ALL MATERIALS WILL BE BILLED AT COST PLUS 15% CONCRETE SAW $44.00 $0.00 ALL SUBCONTRACTORS WILL BE BILLED AT COST PLUS 10% AIR COMPRESSOR $55.00 $0.00 TRI-AXLE ALL WORK ON SATURDAYS ARE TIME,1a,ALL WORK ON SUNDAYS ARE DOUBLE TIME.RATES SHOWN ARE FOR DAY $127.00 $0.00 SHIFT ONLY RENTAL EQUIP. MINIMUM CHARGES MAYBE REQUIRED TOTAL: $2,045.65 Crider&Crider Inc_ Authorizing Party By: Atfwrf 4irra s By: �� %-_-..- Printed: Anthony Aiduks Printed: a," (4G Title: Superintendent Title: z THE AUTHORIZING PARTY ABOVE AGREES THAT THIS WORK WAS PERFORMED AS DIRECTED AND IS ABOVE AND BEYOND THE SCOPE OF WORK FOR ANY CURRENT CONTRACTS WITH CRIDER&CRIDER INC AND IS TO BE PAID FOR BASED UPON THE RATES AND THE TERMS AND CONDITIONS PROVIDED HEREIN. OFFICE COPY-WHITE OWNER COPY-YELLOW SUPERINTENOANT COPY-PINK City of Carmel Project 15-16 Jordan Woods Drainage Project CHANGE ORDER #3 Emergency replacement of a failing culvert on Hamilton Lane, additional T&M Work Contract Price Prior to This Change Order $1,297,485.73 Contract Price Will Be Increased By This Change Order $151,194.52 New Contract Price Including This Change Order $1,490,789.91 Amount Adjusted Contract Cumulative %Change Price from Original Contract Original Contract $1,297,485.73 CO#1 $7,423.14 $1,304,908.87 +0.57% CO#2 $34,686.52 $1,339,595.39 +3.25% CO#3 $151,194.52 $1,490,789.91 +14.9%