Loading...
HomeMy WebLinkAboutConstruction CostsProject:Schafer Powder Coating ExpansionLocation:4518 W 99th Street, Carmel, INDate:1.00 PUBLIC EROSION CONTROLQUANTITY UNITS PRICE COST1.01Silt Fence Installation225LF4.00$ 900.00$ 1.02Inlet Filter Baskets3EA360.00$ 1,080.00$ 1.03Street Sweeping & Dust Control1Allowance2,500.00$ 2,500.00$ Subtotal Private Erosion Control 4,480.00$ 2.00 PUBLIC MULTI-USE PATH CONSTRUCTIONQUANTITY UNITS PRICE COST2.01 1.5" HMA Surface21 TON 135.00$ 2,894.51$ 2.02 2.5" HMA Intermediate36 TON 70.00$ 2,501.43$ 2.036" #53 Stone100TON60.00$ 6,000.00$ Subtotal Public Driveway Construction 11,395.94$ 1.00PUBLIC EROSION CONTROL4,480.00$ 2.00PUBLIC MULTI-USE PATH CONSTRUCTION11,395.94$ TOTAL15,875.94$ Notes:1This estimate excludes building costs.2This estimate excludes retaining and screen walls.3This estimate excludes survey construction layout.4This estimate does not include any permit fees, roadway impact fees and/or connection fees for any utility or city services5This estimate excludes off-site roadway or utility improvement costs6This estimate does not include soft cost fees.7This estimate excludes General ConditionsENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTPUBLIC COSTSAugust 14, 2019This Engineer's Opinion of Probable Construction Cost is based upon the Final Engineering Plans prepared by KHA dated 01/11/17. The Engineer has no control over the cost of labor, materials, equipment, or over the SUMMARY250 east 96th Street,Suite 580Indianapolis, Indiana 46240