Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MV101 - MECHANICAL FIRST FLOOR VENTILATION PLAN
r: N S U W RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 08/23/19 = IMM �� �� NUIL: ABSOLUTE MINIMUM HEIGHT OF THE BOTTOM OF THE DUCTWORK SHALL BE 10'-Y. TRACK LIGHTING WILL BE INSTALLED BETWEEN 10'-V AND 12'-0", BELOW THE BOTTOM OF THE DUCTWORK. DUCTWORK SHOULD BE INSTALLED TIGHT TO THE BOTTOM OF THE BAR JOISTS (WITHIN INCHES), WHERE POSSIBLE. MECHANICAL KEYNOTES NUMBER KEYNOTE 1 REMOVE EXISTING RTU. PLAC E NEW UNIT I N APPROXIMATE LOCATION. MECHANICAL CONTRACTOR TO REPAIR AND MODIFY CURB AS NECESSARY TO ACCEPT NEW RTU. 2 LOCATION OF NEW RTU. PROVIDE ROOF CURB PER MECHANICAL DETAILS. 3 AROMA THERAPY SUP PLIED BY OWNER AND INSTALL BY MECHANICAL CONTRACTOR SP-NGA spin a strength • yoga . r VIRTUAL Alit SOLUTIONS 6252 W 59th STREET, CHICAGO, IL 60638 312.583.7023 W W W.VESCHICAGO.COM #AA26003751 -0 N M CD O U �p L W C ~ U � U U L � U r ..ST... qy0 !. PE11600637 St. STATE OF i ,¢ Date VES project number: 190301 sheet title: MECHANICAL FIRST FLOOR VENTILATION PLAN sheet number: MV101 © 2018 Virtual Energy Solutions, Inc.