Loading...
HomeMy WebLinkAboutP001 - PLUMBING SYMBOLS AND ABBREVIATIONSr RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 08/23/19 ABBREVIATIONS A AIR AAP AREA ALARM PANEL ADJ ADJUSTABLE AFF ABOVE FINISHED FLOOR ALT ALTERNATE AP ACCESSPANEL AV ACID VENT AW ACID WASTE BAS BUILDING AUTOMATION SYSTEM BHP BRAKE HORSEPOWER BOP BOTTOM OF PIPE ELEVATION BOT BOTTOM BTU BRITISH THERMAL UNIT BTUH BRITISH THERMAL UNITS PER HOUR CA COMPRESSED AIR CFM CUBIC FEET PER MINUTE CLG CEILING CO CLEANOUT CO2 CARBON DIOXIDE CTR CENTER D DRAIN LINE DCW DOMESTIC COLD WATER DIET DETAIL DFU DRAINAGE FIXTURE UNIT DHR DOMESTIC HOT WATER RETURN DHW DOMESTIC HOT WATER DIA DIAMETER DIM DIMENSION DIN DOWN EA EACH EW EYEWASH EFF EFFICIENCY EJ EXPANSION JOINT ELEC ELECTRICAL ELEV ELEVATION EQUIP EQUIPMENT ET EXPANSION TANK ES EMERGENCVSHOWER EWC ELECTRIC WATER COOLER EWT ENTERING WATER TEMPERATURE EXT EXTERIOR FCO FLOOR CLEANOUT FD FLOOR DRAIN FLA FULL LOAD AMPERES FLR FLOOR FPM FEET PER MINUTE FT FEET FTHD FEET HEAD FTG FOOTING G GAS GA GAUGE GAL GALLON GPH GALLONS PER HOUR GPM GALLONS PER MINUTE HB HOSE BIBB HD HUB DRAIN HP HORSEPOWER HT HEATTRACE HTR HEATER GENERAL PLUMBING DEMOLITION NOTES 1. THE PLUMBING DEMOLITION DRAWINGS SHOW EXISTING EQUIPMENT AND DEVICES WHICH ARE INTENDED TO BE REMOVED. THESE DRAWINGS INDICATE THE REQUIRED SCOPE OF WORKAND ARE NOT INTENDED TO REFER TO EVERY PIECE OF EQUIPMENT OR PIPE THAT MUST BE REMOVED IN ORDER TO COMPLETE THE WORK. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE AND VERIFY THE CURRENT INSTALLATION BEFORE SUBMITTING A BID FOR THE MECHANICAL WORK. 2. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE CONDITION OF ALL EXISTING EQUIPMENT. EXACT SIZES OF EXISTING PIPING, ETC. BEFORE DEMOLITION WORK IS BEGUN. REPORTANY DISCREPANCIES BETWEEN PLANS AND ACTUAL FIELD CONDITIONS TO ARCHITECT AND ENGINEER PRIOR TO THE COMMENCEMENT OF DEMOLITION WORK. 3. WHERE DEMOLITION WORK WILL INTERRUPT PLUMBING SERVICE TO AREAS OF THE FACILITY THAT ARE TO REMAIN IN OPERATION, COORDINATE ANY INTERRUPTIONS WITH THE OWNER AT LEAST TWO WEEKS PRIOR AND ACCOMMODATE THE OWNER'S NEEDS ARE REQUIRED. 4. REMOVE THE INDICATED PLUMBING ITEMS AS SHOWN ON PLANS. THIS INCLUDES ALL HANGERS, STRAPS, AND RELATED MATERIAL. 5. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING AND PATCHING OF EXISTING CONSTRUCTION UNLESS OTHERWISE NOTED ON PLANS. NO CUTTING OF STRUCTURAL MEMBERS OR STRUCTURE WHICH WILL DETERIORATE THE INTEGRITY AND STRENGTH OF THE BUILDING WILL BE ALLOWED WITHOUT THE WRITTEN APPROVAL FROM THE STRUCTURAL ENGINEER. 6. PATCH AND REPAIR OPENINGS THROUGH WALLS AND FLOORS WHERE PIPES WERE REMOVED TO MATCH EXISTING AND TO MAINTAIN FIRE RATINGS. 7. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE ROUTING OF NEW PIPING BEFORE FABRICATION BEGINS AS RISES AND DROPS MAY BE NECESSARY DUE TO EXISTING FIELD CONDITIONS. ABBREVIATIONS PIPING ANNOTATION VALVES GENERAL SYMBOLS ID INSIDE DIAMETER —DCW— DOMESTIC COLD WATER GASSHUTOFFVALVE e EQUIPMENTTAG IE INVERTELEVATION IN INCHES IN WC Me INCHES WATER COLUMN INDIRECTWASTE —DHW— DOMESTIC HOT WATER —pd— GATE VALVE r' ) v KEYNOTE LA LABORATORYAIR LAV LAVATORY —DHR— DOMESTIC HOT WATER RETURN BALL VALVE POINT OF NEW CONNECTION TO EXISTING WHEN ON DEMO SHEET: END POINT OF DEMO LV LABORATORY VACUUM LWT MAP LEAVING WATER TEMPERATURE MASTER ALARM PANEL DI DEIONIZEDWATER BUTTERFLVVALVE $ ELEVATION SYMBOL MB MOP BASIN w MBH ONE THOUSAND BTUH MFR MH MANUFACTURER MANHOLE LA LAB COMPRESSED AIR I BALANCING VALVE I DETAIL REFERENCE (TOP=DETAIL NUMBER, BOTTOM=DRAWING NUMBER) —X. 1010. MEDICAL COMPRESSED AIR --- CHECK VALVE NIC NPSH NOT IN CONTRACT NET POSITIVE SUCTION HEAD NPT NATIONAL PIPE THREAD VAC— LABVACUUM PRESSURE REDUCING VALVE REFER PLAN CONTINUATION REFERENCE NTS OC NOTTOSCALE ON CENTER OD OUTSIDE DIAMETER (BOTTOM=DRAWING NUMBER) OFD OVERFLOW DRAIN —fdV— MEDICAL VACUUM SOLENOID VALVE P PUMP SECTION DESIGNATION PH PHASE PRV PSF PRESSURE REDUCING VALVE POUNDS PER SQUARE FOOT —SAN— SANITARY WASTE LINE �� PRESSURE RELIEF VALVE (TOP=SECTION NUMBER, BOTTOM=DRAWING NUMBER) PSI POUNDS PER SQUARE INCH PSIG RD POUNDS PER SQUARE INCH GAUGE ROOF DRAIN —STRM— STORM THERMOSTATIC MIXING VALVE FITTINGS RPM RV REVOLUTIONS PER MINUTE RELIEF VALVE —OD— OVERFLOW DRAIN LINE �IVTI� REDUCED PRESSURE BACKFLOW PREVENTER FLANGE S STORM —IW— INDIRECTWASTE STRAINER UNION SAN SCH SANITARY SCHEDULE SD SUBSOILDRAIN SF SQUAREFEET —AW— ACIDWASTE PIPE FLEXIBLE CONNECTION ANCHOR SH SHOWER S/S STAINLESS STEEL STD STANDARD —V — VENT LINE GAS REGULATOR PIPE GUIDE STM STORM TO TRENCH DRAIN TDH TOTAL DYNAMIC HEAD —LV— LAB VENT THERMOMETER PIPE SLEEVE TEMP TEMPERATURE TMV THERMOSTATIC MIXING VALVE TP TRAP PRIMER —112— HYDROGEN y J ELBOW DOWN TVP TYPICAL PRESSURE GAUGE UR V URINAL VENT _02_ OXYGEN ELBOW UP VAC VACUUM FHB WALL HYDRANTMOSE BIBB VFD VARIABLE FREQUENCY DRIVE —N2— NITROGEN ] PIPE CAP VTR VENT THRU ROOF FILTER W WASTENVATER WAGD WASTE ANESTHETIC GAS DISPOSAL LNG— NATURAL GAS WC WATER CLOSET WATER METER DRAINS ANDCLEANOUTS WCO WH WALL CLEANOUT WALL HYDRANT ZVB ZONE VALVE BOX � FLOOR SINK VACUUM BREAKER PIPING OR EQUIPMENT TO BE DEMOLISHED On) FLOOR DRAIN ORD ROOF DRAIN GENERAL NOTES: 1. THE CONTRACTORS WORK SHALL CONFORM TO THE OWNERS POLICIES ON CONSTRUCTION PROCEDURES. OC PIPE TRAP 2. COORDINATE WITH THE OWNE R FOR ANY EQUIP MENT ' CLEANOUT REMOVED THAT NEEDS TO BE RETURNED TO THE OW NE R. 3. COORDINATE WITH OWNER FOR ANY TEMPORARY SYSTEM FLOOR CLEANOUT SHUTDOWNS NECESSARY TO COMPLETE THE WORK. FCO 4. RE -INSULATE AND PATCH PIPING RISERS AS REQUIRED. 5. COORDINATE WITH OWNER FOR ANY FLOOR CORING WORK THAT IS REQUIRED. SP-NGA spin a strength • yoga VIRTUAL GIVLIC\71 SOLUTIONS 33 E. OGDEN AVE. SUITE 304 LA GRANGE IL, 60525 312.583.7023 W W W.VESCHICAGO.COM #AA26003751 �0 N M M> W C) U L W C r � U C � _ Q U Cf) r E r LO � M � U r i 4PP G15TEq`?:o PE11SO0637 w '? STATE OF :',R VES project number: 190301 sheet title: PLUMBING SYMBOLS AND ABBREVIATIONS sheet number: P001 02018 Virtual Energy Solutions, Inc.