HomeMy WebLinkAbout18-840.01 A601-602 DETAILS-A601111
1 X 8 CAP WRAPED WITH
PANELING
FILL W/ PANELING ON 5/8" PLY
WOOD ON 6` IS GA METAL STUDS
a 16, cc.
3 HALFWALL DETAIL
A601 IA.162 SCALE: 1"=1'-0"
101
( 1 NEW COLUMN BASE PLAN
A601 A103 SCALE: 1 1/2"=1'-0"
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
DATE: 08i27/19
LINE OF STONE SILL
CAP ABOVE
4` SPLIT FACE CMU ON EXISTING
CONC.- TYP. ALL C0.'9 - WHERE
CONTROL JOINTS EAST, SAW -CUT B
PROVIDE NEW CONC. BA5E
9TL CO- EXISTING
EXISTING MTL STUDS
EXISTING SHEATHING
LINE OF STONE SILL
CAP ABOVE
LINE OF STONE SILL
CAP ABOVE
EXISTING EI.F.5.
i 4` SPLIT FACE CMU
BELOW GAP
5%COL EXI5TING
i
EXISTING FRAME
I
LINE OF STONE SILL
GAP ABODE
NEW COLUMN BASE PLAN
2 SCALE: 1 1/2"=1'-0"
I/3" X 6° LONG SECURED W/
EPDXY
6 X 6 X I/i PLATE
1 X 1 X 1/4" TUBE COLUMN
4S° TALL
SECURE STUDS TO COLUMN
END RUN OF CMU WALL
E DBL MLLN05E BLOCK
IE OF PRE -CAST CAP ABOVE
AEN OCCURS)
4 HALFWALL SECTION END DETAIL - INTERIOR CMU END WALLS TYP.
A601 IA106 SCALE: 1 1/2"=1'-0" A601 A103 SCALE: 1 1/2"=1'-0"
101
31124 ISGA MTL STUDS P 164 OC.
- FRAME TO DECK FOR
GLAZING WALL HEAD
CONTINUOS,
118" TO APEX OF ARCH
\ - ENDS AT ./-5"
HD -II
g GYP BD W/J BEAD
GL-T
HD-Il
WD,
WD. SHIM AS NEEDED
3 #" MTL STUDS -
16-GA P 16` O.G.
MT-2
m
10
LOUNGE
PARTITION
SECTION
A601
A103
SCALE: 1 1/2"=1'-0"
SUSPENDED GRID AND ACT
CEU14G
; GTP BD ON 3 I@" 22GA MTL
STUDS Q 24" O.G. - FRAME TO
DECK - EXTEND GTP BD 6'
ABOVE GRID
L7
12 PARAPET DETAIL
A601 A103 SCALE: 1 1/2"=1'-0"
lUQ1j
vLL
BU
a
a
Q
�
m
�
�
m
on
U1
ry
W�
mWI
3
=Z
REPAIR - EXTEND ROOFING
AS NEEDED UNDER NEW
COFMNG
ALPOLIC PARAPET CAP
FILL IN AND FRAME AS
NEEDED FOR NEW
ALPOIJC SYSTEM
FACADE
BUILT UP E.I. F.9. SYSTEM
(W/NO NEW REVEALS) TO MATCH B
ALIGN WITH EXISTING BELOW
EXISTING FRAMING B ROOF
FRAMING SHALL REMAIN
m�
-m
ua
L
duL
•�
uLL
s
Vo
haq
Y
NN
Q
i
ad
�m
xm
OQ
m�
no
TDGArchitects.com
PEE
Automotive
W
(L
_U
>
Z)
O
Q)
W
Q)
N
w
o0
.r
=
Cc
W0
W
V
_
cOc
G
CL
cc
G
a��
O@�,
N
W
(3)v
Q
NZ
LUHCC
Q
Lu
—
Y
Uj
N
w
a)Z
LGE
_
Z`no
L
Lo
REVISION SCHEDULE
DATE
DESCRIPTION
10-OS-18
BZA NGNAGE
IB-08-18
BULLETIN NO. 5
10-IS-18
BZA NGNAGE - REVISE
IB-35-18
BULLETIN NO. 6
11-06-16
BULLETIN NO. l
IY14-18
BULLETIN NO. 9
11-IS-18
BULLETIN NO. IB
1-4-19
BULLETIN NO. II
1-13-IS
BULLETIN NO. 11
Y4-19
BULLETIN NO. 13
DRAWN BY: MEH
CHECKED BY: BSG
a
�p
E0
lJ
U)
$%
s
.J
3
W
f�
m
o`
@
�x
Protect Number
17=811a1
Drawing Number
A 601