HomeMy WebLinkAbout18-840.01 A803 FINISH SCHEDULES-A803N4a4:14ki14 W11►I
I. FURNISHED BY OWNER, INSTALLED BY OWNER'
MILLWORK, TOOLS, CARTS, WORKBENCHES, OL LINES, FURNITURE,
BREAKROOM SEATING, PARTS BINS, AIR COMPRESSOR, AIR UNE5, BULK
OL TANKS, WATER/AIR/OIL REELS, EXTERIOR SIGNAGE, INTERIOR SIGNAGE,
VENDING MACHINES, APPLIANCES (EXCEPT GARBAGE DISPOSAL) G KEY
MACHINES. CONTRACTOR TO INSTALL UTILITIES SERVING OWNER PROVIDED
EQUIPMENT
2. LIFTS INSTALLED BY OWNER - BLOCK OUT FOR CASSETTE S ELECTRICAL
HOOK-UPS BY GENERAL CONTRACTOR.
3. WATER ONES AT SERVICE AREA INSTALLED BY GENERAL CONTRACTOR.
WATER LINES SHALL TERMINATE WITH HOSE BIBS BY GC. FINAL HOOK-UP OF
EQUIPMENT INSTALLATION AND REELS BY OWNER.
4. MILLWORK AT BREAK ROOM5, CUSTOMER COUNTERS G TOILETS TO BE HC
ACCESSIBLE. MAX HEIGHT OF COUNTERS ABOVE FLOOR TO BE 34 INCHES.
5. INTERIOR SIGNAGE, FOR INDIVIDUAL ROOM IDENTIFICATION TO BE MOUNTED AT
41 AFF TO CENTER OF SIGN W/ BRAILLE CHARACTERS, IS PROVIDED AND
INSTALLED BY OWNER.
6. MIN, 5% OF TABLES IN BREAK ROOMS, WITH A MINMUM OF ONE, SHALL HAVE
TOPS AT ACCESSIBLE HT, BETWEEN 28" AND 34" AFF. COUNTERTOPS OF BASE
CABINETS IN BREAK ROOMS TO BE AT 34" AFF,
1. FURNISH AND INSTALL 'KNOX BOX" PER COUNTY OR CITY REQUIREMENT'S AT
LOCATION TE D.
8. DURING CONSTRUCTION, BUILDING AND SITE TO BE KEPT IN VERY CLEAN AND
ORDERLY CONDITION AT ALL TIMES. PROJECT CONSTRUCTION SIGN TO BE
LIMITED TO (1) 4 FT X 5 FT SIGN,
S. GO TO INSTALL LIGHTING AND SPRINKLER HEADS FOR BOTH LEVELS.
10. SEE A503 FOR CORNER GUARD DETAIL SEE A503 FOR WALL GUARD DETAIL
II. I HR RATED CONSTRUCTION INDICATED BY DASHED UNE:
I HR RATED METAL STUD CONSTRUCTION PER UL DESIGN U41%
I HR RATED MASONRY CONSTRUCTION PER UL DESIGN US05.
11 INSTALL ACCESS PANELS IN CMU UTILITY CHASES IN SERVICE SHOP, EQUAL TO
ACUDOR UF-5000. PAINT Iii
11 REFER TO CIVIL DRAWINGS FOR INFORMATION ON CONCRETE WALKS, PATTERN
CONCRETE AND PAVING AROUND THE BUILDING. ALL SITE WORK IS
RESPONSIBIUTY OF OVIL DRAWINGS,
14. UTERATURE DISPLAY RACKS BY OWNER'S MILLWORK VENDOR.
15. INSTALL CORNER GUARDS PER DETAIL A803 WHERE INDICATED BY `GG'.
16. PROVIDE BLOCKING IN WALLS FOR ALL OWNER PROVIDED MILLWORK.
TYPICALLY OFFICES AND SNUBS HAVE ONE UPPER CABINET. MILLWORK AT
BREAK ROOMS AND WORK ROOMS WILL HAVE BASE AND UPPER CABINETS.
Il KEY MACHINES LOCATED IN WORK ROOM AND ALIGNMENT EQUIP TO BE
PROVIDED AND INSTALLED BY THE OWNER. GC TO PROVIDE POWER AND
DATA CONNECTIONS.
18. HONDA TO PROVIDE AND INSTALLED BY OWNER. GC TO PROVIDE
FOUNDATIONS AND ELECTRICAL CONNECTIONS TO PORTALS FOR SIGNAGE. SEE
A 401, EXTERIOR ELEVATIONS FOR LOCATIONS.
15, ALL EXTERIOR BUILDING SIGNAGE PROVIDED AND INSTALLED BY OWNER, GC
TO PROVIDE ELECTRICAL CONNECTIONS TO SIGNS. SEE A401, EXTERIOR
ELEVATIONS FOR LOCATIONS,
20. PROVIDE GARBAGE DISPOSALS AT BREAK ROOM SINKS. SEE PLU INC.
21, WHERE THERMOSTATS AND WALL SWITCHES OCCUR SIDE BY SIDE, MOUNT
DEVICES AT 48" AFF WHERE THERE IS NO WALL GUARD IF WALL GUARD IS AT
SAME LOCATION, MOUNT DEVICES AT 54" AFF.
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel
DATE: 08i27i19
y1►11;�MEN ►[Q1*01
I. JONTS AT TILE BASE TO ALIGN all JONTS AT FLOOR TILE.
2. PRIOR TO LAYING TILE AROUND RECEPTION DESK, VERIFY
EXACT PLAN OF RECEPTION DESK WITH ARCHITECT G
MILLWORK SUPPLIER.
3. GENERAL CONTRACTOR TO PROVIDE AND INSTALL BASE
AT ALL OWNER SUPPLIED MILLWORK.
4. VERIFY LOCATION OF FLOOR BOXES W/ OWNER OR
ARCHITECT PRIOR TO INSTALLATION. VERIFY W/
ELECTRICAL POWER S SIGNAL PLAN.
5 VERIFY LOCATION COMMUNICATION PLATFORM PRIOR TO
INSTALLATION OF FLOOR TILE AND OUTLET BOXES.
S. CONCRETE POLISHING S STAINING PROVIDED AND
INSTALLED BY OWNER G.C. TO COORDINATE SCHEDULING
W/ OWNER.
1. INSTALL 3W' STAINLESS STEEL DIAMOND PLATE X 45" H TO
CM LOW WALLS AND TO DRYWALL PARTITIONS UP TO WALL
GUARD, U.N.O.
B. INSTALL CORNER GUARDS PER DETAIL A503 AT OUTSIDE
CORNERS AT AREAS INDICATED III
9 INSTALL TACK BOARD PANELS AT SIDE WALLS OF TRAINING
ROOM PER A803.
10, AT PARTS SHOP 125, PARTS DELIVERY, PARTS 201, BODY
SHOP 123, INSTALL 5/5" IMPACT RESISTANT GYP. BD UP TO
8 FT AFF THEN 5/8" GYP. BD TO DECK ABOVE
11, AT STAIRS, PAINT GUARD RAILS AND HAND RAILS P-5,
5WT065 IRON ORE,
12, REAR WALL OF ALL OFFICES TO GET ACCENT COLOR, P-1,
WC-2 OR WC-3, PER OWNER'S DIRECTION
13. CONTRACTOR TO PAINT ALL EXTERIOR LIGHT POLES.
DARK COLOR BASE UP TO 60", THEN WHITE ABOVE TO
TOP
14. APPLY CEMENT PLASTER SKIM COAT OVER CMU WALL
(EXCLUDE FURRED WALLS), UP TO JUST ABOVE CEILING OR
UNDERSIDE OF JOST W/ARDEX RI SMOOTH FINISH COAT TO
HIDE MORTAR JONTS S CMU TEXTURE. PAINT PER WALL
SCHEME NOTED IN SCHEDULE.
15. WHERE APPLICABLE, ALL TILE BASE GROUT LINES SHALL
ALIGN WITH FLOOR GROUT LINES.
TYPICAL EXTERIOR METAL STUD
CONNECTION NOTES
I. a" THICK FIRE RETARDANT TREATED PLYWOOD SHEATHING,
PROVIDE N8 - I g' 6-12 ROCK -ON SCREWS AT 8" I
ALONG STUD SPAN FOR PLYWOOD TO METAL STUD FLANGE
CONNECTION.
2. (4) w10 TEKS FOR METAL STUD TO METAL STUD
CONNECTION.
3. PROVIDE 16GA. CLIP ANGLES W/(4) #10 TEKS FOR CLIP TO
METAL STUD WEB CONNECTION $ (4) 12 - 24 X 1 y' TEKS FOR
CUP TO STEEL MEMBER CONNECTIONS MAKE CUP ANGLE
FULL WIDTH/HEIGHT OF METAL STUDS.
4. PROVIDE 16GA. CUP ANGLES W/(4) #10 TEKS FOR CUP TO
METAL STUD WEB CONNECTIONS $ (4) q' 0 X I I" TAPCONS
FOR CUP TO CMU WALL CONNECTIONS. MAKE CUP ANGLE
FULL WIDTH/HEIGHT OF METAL STUDS.
5 ALL EXTERIOR METAL STUD FRAMING TO BE Iei STUDS
(OR AS SPECIFIED IN STRUCTURAL DRAWINGS B SECTIONS)
S SPACED AT 16" OC. U.N.O. IN THESE DRAWINGS.
INTERIOR FRAMING NOTES
I. ALL INTERIOR METAL STUD FRAMING SHALL BE MIN. 25GA.
STUDS SPACED A W' O C. U.KOO IN THESE DRAWINGS.
2. ALL INTERIOR METAL STUD BRACING SHALL BE MIN. 25GA.
STUDS SPACED A 32" O.C. OR 48" OC. A5 REQUIRED FOR
APPLICATION.
SCHEME F SCHEME F SCHEME F SCHEME F
ROOM FINISH SCHEDULE
ROOT
NUMBER
ROOM NAME
FLOOR
BASE
WALL SCHEMES,
CEILING
REMARKS
NORTH
SOUTH
EAST
WEST
lea
VESTIBULE
CPT-4, CT-2
101
RECEPTION
CT-2
CTB-2
SCHEME F
SCHEME F
SCHEME F
SCHEME F
ACT-1
let
VEHICLE DISPLAY
OT-1
CET -I
SCHEME F
SCHEME F
SCHEME F
SCHEME F
ACT-1
103
CONSULTATION AREA
CT-2
CTB-2
SCHEME F
SCHEME F
SCHEME F
SCHEME F
ACT-1
104
FEATURE VEHICLE
OT-2
CTB-2
SCHEME F
SCHEME F
SCHEME F
SCHEME F
ley
CONSULTATION AREA
OPT-2
Iii
SCHEME B
SCHEME B
SCHEME a
SCHEME B
ACT-1
106
INFORMATION CENTER
CPT -I
Iii
SCHEME B
SCHEME B
SCHEME B
SCHEME B
ACT-1
101
FBI
OPT -I
III
SCHEME B
SCHEME B
SCHEME a
SCHEME 6
ACT-1
105
SALES MANAGER
CT-2
CTB-2
SCHEME K
SCHEME K
SCHEME K
SCHEME K
ACT-1
10S
F Q 1 MANAGER
OPT-1
FBI
SCHEME B
SCHEME B
SCHEME B
SCHEME 6
ACT-1
110
GENERAL MANAGER
CPT -I
FISH
SCHEME B
SCHEME B
SCHEME B
SCHEME B
ACT-1
III
JAN. ROOM
CT-5
CIE-6
SCHEME A
SCHEME A
SCHEME A
SCHEME A
ACT-1
112
UTNTY ROOM
CT-5
GT H5
SCHEME A
SCHEME A
SCHEME A
SCHEME A
ACT-1
113
WOMENS
CT-5
CIE-6
SCHEME A
SCHEME A
SCHEME A
SCHEME A
ACT-1
114
HENS
CT-5
GT H5
SCHEME A
SCHEME A
SCHEME A
SCHEME A
ACT-1
115
HALL
CT -I
GTE-1
SCHEME E
SCHEME E
SCHEI-E E
SCHEME E
ACT-1
116
HALL
CT -I
CTB-I
SCHENE E
SCHEME E
SCHENE E
SCHEME E
ACT-1
In
CUSTOMERS WAITING
GPT-I
Iii
SCHEME E
SCHEME E
SCHENE E
SCHEME E
ACT-1
116
BDC
CPT-2
FISH
SCHENE 3
SCHEME B
SCHENE B
SCHEME B
ACT-1
115
HALL
CT-1
Cli
5CHEME E
SCHEME E
SCHEME E
SCHEME E
ACT-1
120
Fill
GPT-I
RBM
SCHEME B
SCHEME B
SCHENE B
SCHEME B
'ACT-1
121
F Q I
CPT-1
FISH
SCHEME B
SCHEME B
SCHENE n
SCHEME B
ACT-1
122
Fill
CPT -I
RBM
SCHEME B
SCHEME B
SGHEME B
SCHEME B
'ACT-1
123
SERVICE RECEPTION
GT-14, CT-15
CT-14
SCHEME G
SCHEME C
SCHEME C
SCHEME C
ACT-1
124
SERVICE WRITE UP
CT-14, CT-15
CT-14
SCHEME C
SCHEME C
SCHEME C
SCHEME C
ACT-1
125
SVC SPT
SPT-2
III
SCHEME B
SCHEME B
SCHEME B
SCHEME B
ACT-1
12 ,
SVC SPT
SPT-2
FISH
SCHEME B
SCHEME B
SCHEME B
SCHEME B
ACT-1
121
MECHANICAL
CT-14, CT-15
CT-14
6GHEME C
SCHEME C
SCHEME C
SCHEME C
ACT-1
128
PARTS BOUTIQUE
CT-14, CT-15
CT-14
SCHEME C
SCHEME C
SCHEME C
SCHEME C
ACT-1
FOR WALL SCHEMES DETAILED SEE SWEET A 804. AL50, SEE SHEET A 801 FINISH PLAN FOR WALL SCHEME LOCATIONS CALLED OUT.
mn
s�
V�
o
a
Q
d
co
iv
a�
`mw
10a
Q ry
m '-
nLL
TDGArchitects.com
PIEWS71W
Automotive
0
It
N
T9
EL
J Z D
W
d
0
of
O
ca
-0
N
IX
W
i
C )
QLi
a)
0
qJ
W
=
N
Q
LL
Tn
Q
N
i-
L)
W
a)Wm
9)zQoCZL0o
o
O
W
v=
W
LO
o
a
Z
0
v U
a
N
m
REVISION SCHEDULE
DATE
DESCRIPTION
12/4118
CLEINT RENEW
12/28/18
HCNDA REVIEW
4/5/I5
REVIEW FOR PERMIT
6/26/I5
PERMITS
STATE OF
DRAWN BY: MEH
CHECKED BY: BSJ
a
`E
z
2
s
VJ
f
fy
a
ws
E�
J
'3
m U)
LIJ
cc
Z
3
o U.
F
Project Number
18=840w01
Drawing Number
A 803