HomeMy WebLinkAbout18.840.01 D101-102 DEMOLITION PLAN-D101GENERAL DEMOLITION NOTES: I. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS WITHIN AREA OF WORK BEFORE PROCEEDING WITH WORK. 2. CONTRACTOR SHALL COORDINATE PHASING OF TRADES DURING COURSE OF WORK, 3. CARE TO BE GIVEN TO EXISTING RUSHES, RXTURE9, FURNISHINGS AND MATERIALS TO PREVENT DAMAGE DURING ALL STAGES OF DEMOLITION. ALL EXISTING SURFACES AFFECTED BY DEMOLITION SHALL BE PATCHED, REPAIRED AND FINISHED AS REQUIRED TO MATCH ADJACENT CONDITION OR AS REQUIRED TO BE PREPARED FOR PROPOSED CONSTRUCTION. 4, EXTENT OF BULDNG AND SITE DEMOLITION IS INDICATED ON THE DRAWNG9, IT 15 THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE AND COORDINATE WITH THE CANER; DEMOLITION PROCEDURES AND SEQUENCE, AND TO INSURE THE STABILITY AND SAFETY OF THE STRUCTURE AND ITS COMPONENT PARTS. 5. THE DEMOLITION CONTRACTOR SHALL BE LICENSED BY THE STATE OF INDIANA AND BY LOCAL GOVERNING AUTHORITIES AS MAY BE REQUIRED, 6. THE CONTRACTOR SHALL PROCURE ALL PERMITS AND RELEASES NECESSARY TO EXECUTE THE CONTRACT WORK. T UPON COMPLETION OF THE DEMOLITION OPERATIONS THE CONTRACTOR SHALL SECURE CERTIFICATION OF COMPLETION FROM ALL GOVERNING AUTHORITIES AND FORWARD ONE COPY OF EACH TO THE ARCHITECT/OWNER REPRESENTATIVE. 8. CONDUCT DEMOLITION TO MNMZE INTERFERENCE WITH ADJACENT STRUCTURES, MAINTAIN TEMPORARY PROTECTED EGRESS AND ACCESS AT ALL TIMES. S. PROVIDE APPROPRIATE BARRICADES, SIGNAGE, AND OTHER SAFETY PRECAUTIONS 60 AS TO PROTECT VISITORS, TRADESMAN, AND EXISTING REMAINING CONSTRUCTION, IBA CONDUCT OPERATIONS WITH MINIMUM INTERFERENCE TO PUBUC OR PRIVATE THOROUGHFARES. IL DO NOT CLOSE OR OBSTRUCT ROADWAY AND/OR 61DEIOALK6 W THOUT PERMITS, 12, NOTIFY ADJACENT PROPERTY OWNERS OF WORK WHICH MAY AFFECT THEIR PROPERTY OF POTENTIAL NOSE OR DISRUPTION. 13. LOCATE, DISCONNECT, REMOVE AND/OR CAP ALL EXISTING UTILITY LINES BY MEANS APPROVED BY THE RESPECTIVE UTILITY COMPANY AND GOVERNING AUTHORITIES. RECORD UTILITY AND CAP LOCATIONS ON CONTRACTOR 5 "AS -BUILT" DOCUMENTS. 14, DEMOUSH INDICATED STRUCTURES IN AN ORDERLY AND RESPONSIBLE MANNER. 15. VERIFY ALL CONDITIONS GOVERNING OR AFFECTING THE STRUCTURAL DEMOUTION WORK AND REPORT ALL CONDITIONS WHICH MAY INTERFERE OR AFFECT THE WORK. 16. WHERE EXISTING CONSTRUCTION IS TO BE ALTERED, PROVIDE TEMPORARY BRACING AND/OR SHORING AS REQUIRED UNTIL THE WORK IS SAFELY COMPLETED. IF THE STABILITY OF ADJACENT STRUCTURES APPEARS THREATENED OR IN DOUBT, CEASE OPERATIONS AND NOTIFY ARCHITECT/OWNER IMMEDIATELY, DO NOT RESUME OPERATIONS UNTIL CORRECTIVE MEA5URE5 HAVE BEEN TAKEN. IT. CUT MEMBERS BY METHODS LEAST LIKELY TO DAMAGE THE MEMBERS TO BE RETAINED AND WORK ADJOINING. EXISTING CONSTRUCTION NOT UNDERGOING ALTERATION IS TO REMAIN UNDISTURBED AND PROTECTED FROM DAMAGE. WHERE SUCH CONSTRUCTION 18 DISTURBED AS A RESULT OF THE OPERATIONS OF THIS CONTRACT, IT SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AS REQUIRED AND TO THE SATISFACTION OF THE OWNER. IS, PROVIDE TEMPORARY PROTECTION TO PREVENT DAMAGE FROM THE WEATHER OR VANDALISM, A$ WELL A$ PROTECTION FOR THE GENERAL PUBLIC 50 THAT THE OWNER'S BUSINESS OPERATIONS ARE MINIMALLY O6TURBED. IN ADDITION, PROVIDE TEMPORARY PROTECTION OF EASING EQUIPMENT DURING EXECUTION OF WORK, IS, THE CONTRACTOR SHALL VERFY THE EXISTENCE, LOCATION AND ELEVATION OF EASING UTILITY LINES IN DEMOLITION AREA$ BEFORE PROCEEDING WTH THE WORK. ANY INTERFERENCE'S WITH DEMOLITION WORK SHALL BE REPORTED TO THE ARCHITECT/OWNER'S REPRESENTATIVE. 20. PROVIDE FIRE WATCH DURING FIELD CUTTING AND WELDING OPERATIONS. EMPLOY ONLY SKILLED TRADESMEN TO PERFORM DEMOLITION WORK. DO NOT USE CUTTING TORCHES FOR REMOVAL OF WORK UNTIL WORK AREA 18 CLEARED OF FLAMMABLE MATERIALS. 21, ALL DEMOUTION MATERIAL TO BE DISPOSED OF SHALL BE REMOVED BY THE CONTRACTOR FROM THE SITE AND DISPOSED OF IN A PROPER AND LEGAL MANNER. THE SELECTION OF THE DUMP SITE AND LEGAL DISPOSAL OF MATERIAL 16 THE RESPONSIBILITY OF THE CONTRACTOR. 22. DO NOT BURN OR BURY MATERIAL ON THE SITE. 23. ADJACENT STREET$ AND DRIVES SHALL BE KEPT FREE OF WASTE MATERIALS RESULTING FROM TRUCKING, TRUCK BEDS SHALL BE TIGHT AND TRIMMED TO INSURE MINIMUM SPILLAGE. STREETS AND DRIVES SHALL BE CLEANED AS REQUIRED TO ELIMINATE ANY DEBRIS DEPOSITED. 24. BACK FILL AREAS EXCAVATED, OPEN PITS, HOLES, AND TRENCHES THAT ARE A RESULT OF DEMOU TON WTH ENGINEERED FILL. BACK FILL MATERIAL SHALL BE GRANULAR MATERIAL WTH NO MORE THAT 15 PERCENT SILT AND CLAY COMBINED. 25. ENGINEERED FILL COMPACT FILL TO S5 PERCENT OF MAXIMUM DRY DENSITY AS DETERMINED BY STM-155T (MOD PROCTOR) PLACE BACK FILL AND FILL MATERIALS IN LAYERS NOT MORE THAN 9 INCHES IN LOOSE DEPTH FOR MATERIALS COMPACTED BY HEAVY CONSTRUCTION EQUIPMENT, AND NOT MORE THAN 41NCHES IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HAND -OPERATED TAMPERS. 26, DEMOUTION CONTRACTORS SHALL MAKE ARRANGEMENTS TO WALK THROUGH EASING STRUCTURES PRIOR TO SUBMITTING BID TO GENERAL CONTRACTOR. NO EXTRAS SHALL BE ALLOWED FOR DEMOLITION WORK. 21. ELECTRCAL CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND LIGHTING COORDINATE WITH GENERAL CONTRACTOR. 28. DO NOT USE EXPLOSIVES OR UNSAFE DEMOUTON METHODS. 29. COORDINATE SALVAGEABLE ITEMS WITH OUNE11'6 REPRESENTATIVE INCLUDING BUT NOT LIMITED TO CABINETS, LIGHTS, DOORS, ETC. STORE SALVAGEABLE ITEMS WTHIN DESIGNATED AREAS. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 08i27/19 DEMOLITION KEYED NOTES OREMOVE ALL WALL5 INDICATED WTH HIDDEN 1 LINES. SHORE B BRACE A5 NEEDED ALL WALLS B FLOORS. OREMOVE ALL DOORS, FRAMES AND ALL ASSOCIATED HARDWARE 3OREMOVE EXISTING PLUMBING FIXTURES. CAP AND ABANDON EXISTING WATER SUPPLY AND SANITARY LINES BACK TO PANT APPROPRIATE FOR NEW FIXTURE LOCATIONS OR CAP BELOW FLOOR. OREMOVE ALL EXISTING DISPLAYS, SHELVING, 4 COUNTERS, ELECTRICAL AND P.O.S. DEVICES, HALF WALLS ETC. FROM AREA. OEXISTING STOREFRONT CONSTRUCTION TO BE REMOVED. EXISTING WALL TO BE INRLL SEE ARCHITECTURAL DRAWINGS FOR MORE INFORMATION. OSAW -CUT $ REMOVE NON -BEARING CMU WALL OREMOVE ROUND CANOPY AND ALL ITS 7 STRUCTURAL B NON-STRUCTURAL ELEMENTS. OREMOVE S DISCARD ALL FINISH CBUNG S 3 CEILING FRAMING ELEMENTS UNLESS REQUIRED FOR BUILDING STRUCTURAL INTEGRITY. SEE STRUCTURAL NOTES. OREMOVE EXISTING CONCRETE STEPS FOR NEW VESTIBULE AND STEP$. 10 REMOVE EXISTING PLYWOOD DIVIDER AND SLOPED CONCRETE CAP. 11 REMOVE CONCRETE SLAB AS REQUIRED FOR NEW WORK. RREMOVE EXISTING HANDRAILS. 13 REMOVE ALL FLOOR COVERING, CLEAN G PREP CONO. FLOOR TO RECEIVE NEW FLOOR COVERING. 14 REMOVE GYP BD UNDERSIDE OF HEADER AS NEEDED TO ATTACH NEW FEATURE WALL CONSTRUCTION. 16 REMOVE ALL METAL R145H FROM "WAVE' CANOPY OVERHEAD 16 REMOVE ALL WALL COVERING THIS AREA - PREP FOR HALF -WALL CON5T. ELECTRICAL DEMOLITION NOTES I. THIS DRAWING 15 ONLY A GRAPHIC REPRESENTATION AND 16 NOT INTENDED TO BE SCALED FOR THE PURPOSE OF CONSTRUCTION, QUANTITY OR AREA, 2, ELECTRICAL TRADES CONTRACTOR IS RESPONSIBLE FOR MAINTA KING CIRCUIT INTEGRITY TO ALL EXISTING LIGHTING, SWITCHES, RECEPTACLES, TELEPHONE, DATA, CLOCKS, SPEAKERS, EQUIPMENT, ETC., THAT 18 TO REMAIN. 3. REPAIR/REPLACE ANY CONSTRUCTION DAMAGED DURING DEMOLITION (CPI CONSTRUCTION) TO ITS ORIGINAL LEVEL OF FINISH OR QUALITY (AS ACCEPTABLE TO ARCHITECT/DESIGNER) 4. DISCONNECT AND REMOVE EXISTING LIGHT SWITCHES, RECEPTACLES, TELEPHONE, DATA, CONDUIT AND BRANCH CIRCUITING IN WALLS THAT ARE TO BE DEMOLISHED. ABANDON CONDUIT IN FLOORS AND WALLA WHERE POSSIBLE CUT FLUSH AND CAP. PROVIDE BLANK COVER PLATES AS REQUIRED FOR UNUSED BOX OPIll"i a PARTS BOUTIQUE 126 MECHANICAL DEMOLITION NOTES I. REMOVE ALL PLUMBING AND PIPING TO INCLUDE BUT NOT UMTED TO DOMESTIC, WATER\ DISTRIBUTION, NATURAL GAS DISTRIBUTION, ABOVE GROUND SANTARY, ABOVE GROUND STORM/RAIN CONDUCTORS, ELT. THAT WILL NOT BE REUSED. 2, REMOVE MECHANICAL HVAC SYSTEMS THAT ARE NOT BEING REUSED. 3. CAP ALL SANITARY NOT BBNG REUSED TO BELOW FLOOR SEE PLUMBING PLANS FOR MORE INFORMATION. STAIR MENNS QUIET ROOM SVC SPT SERVICE WRITE UP 124 SERVICE RECEPTION 123 SVC SERVICE 1pg MECHANICAL 127 x G Q p11 1 IIII lgp�1 DEMOLITION PLAN SCALE: 1/16"=1'-0" F&I 222 F&I 121 F&I 20 STAIR 11 12 13 14 I II II II I F--T till 3fb-laIlli CUSTOMER'S ~ NG 117 0 g I � I ----------------------- ------III F&I VEHICLE MANAGER DISPLAY 109 102 - - OF&I 116 I ® 007 II VEHICLE DISPLAY_ CA M O O O I II I47 I GG �1 r� uN tiLL W s Ua L Q a >v cn wm ma D ry na TDGArchitects.com IfflMmyArl Automotive O N � a Z J - W Z 0 0 O W a N () O W % 0 Co Co Q I- � U O s - d � Q� 03 W = � O .N Z N O _ Q N a Q W W a) Z Q o c� Ln E oO WN.� Z� o a 2 OvU aC\I�Ico INFORMATION CENTER 106 COVERED OUTDOOR DISPLAY 000 REVISION SCHEDULE DATE DESCRIPTION 1214115 CLIENT REVIEW 12/28/18 HONDA REVIEW 4/5/19 REVEW FOR PERMIT 6/26/19 PERMITS — IF �\�--- I — F.2 O11I I 8 7� G. / IIII AFTER DEMO INSPECT B PREP AREA FOR NEW SUPPORT i IIII STRUCTURE - NOTIFY ARCH. OF ADVERSE CONDITIONS b EXISTING STRUCTURAL — t I —_ SUPPORT ARMS THIS AREA SHALL REMAIN - III VERIFY 7" — — — — — COVE NOTE UN.O - GENERAL SCOPE OF DEMOLITION WORK IS TO REMOVE EXISTING LIGHTING, LAY -IN C19UNGS AND FLOORING TO BE REPLACED WITH NEW, CONTRACTORS INVOLVED SHALL ATTEND PRE -CON' MEETING TO COORDINATE PHASED CONSTRUCTION AS NECESSARY. O 0F\ P N � S , � G i� goo• ("'•.. 'sue :: pEG181EgFQ, ;Na. AR10400217: w`% STATE OF 3�X % DRAWN Br MEH CHE BAJ a i 0 o =u 4j J ba o Z g8 c) n c e$ O SS Protect Number 18=840w01 Dmwinq Number D 101