Loading...
HomeMy WebLinkAboutLandscape Plans Stamped Approved 08-27-19RETENTION BASIN EMERGENCY SPILLWAY 851 850849848847846845844843 852853854 855856 857 858859 860 861862 8658658658 6 5 8668668668668 6 6866 866 866867867867 8 6 6 8 6 6 8678658668668678 6 6 8 6 7 8 6 8 8 6 8 869 8 69 865865 870 866 866 867 868 869 871 872 8708688698 6 6 8 67 8668678688688688 6 6 86786 8 868 8 6 9 8668658668678688678 6 5 Existing 10" Hickory Refer to LD100 Existing Multi-leader Hackberry 6" + 6" Refer to LD100 Existing 6" Hickory Refer to LD100 Existing 3" Cherry Refer to LD100 Existing 8" Hickory Refer to LD100 Existing 10" Hackberry Refer to LD100 Existing 12" Hickory Refer to LD100 Existing 10" Hickory Refer to LD100 Existing 12" Hickory Refer to LD100 Existing 12" Hackberry Refer to LD100 Existing Sapling Sweet Gum Refer to LD100 Existing 4" Linden Refer to LD100 Existing 15" Hackberry Refer to LD100 FHVFHVTS&V Lat Lat Lat Lat Lat Lat LatT FHVDOMFIREP Lat Lat Lat Lat Lat Lat Lat Lat Lat Lat Lat Lat Lat Lat Lat Lat LatC.O. S C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. D D D D D D C.O.C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O.OHUOHUOHUOHUOHU OHU OHU OHU W W W W W W W WW W W W W W W WWOHU OHUOHU OHU OHUOHUOHU OHUOHUOHU OHU OHU OHUOHU OHU OHU OHUOHU OHU OHU OHU OHUOHU OHU OHUOHUOHU OHUOHUOHUOHUW W W W W W W WWW W W W W W W W W W W W W W W W W W WWW W W W W W W W W W W W W W W W W W WWW W W W W W W WG G G G G G G G G G G G G G G G GGG GGGGG G G G G G G G G G G G G G G GGGG G G GGG G GGGGGE(A) E(A)OHU OHU OHU OHU OHU OHU OHU OHU OHUE E E E E E E E E E E E E E E E E E E E E E E E E E E EEEEOHU OHU OHU OHU OHU OHUOHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHUOHU OHU OHUOHU OHU OHUOHU OHU OHUOHUOHU OHUOHU OHU OHU OHUOHUOHUNO PARKINGNO PA RKI NG NO P A RK INGNO PARKING'A' 'A' 'A' 'A' 'A' 'A' 'A' 'A' 'C' 'C' 'C' 'C' 'C' 'C' 'C' 'A' 'A' 'A''A' 'A' 'B' 'B' 'B' 'B' 'B' 'B' 'B' 'B' 'B' 'B' 'B' 'B' 'B' 'C' 'C' 'B' 'FL''FL' 'FL' 0 Scale 1" = 100'-0" 200'100' 50' North L401 L402 L403 L404 L405 L406 1. Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to Plant Schedule and Planting Details for additional information. 2. All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architect to inspect all plant locations and plant bed conditions prior to installation. On-site adjustments may be required. 3. Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT. 4. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved, specified material. 5. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i.e., spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as governed by plant spacing per schedule. Plant material quantities shown on plan are minimum quantities. Additional material may be needed to meet spacing requirements and field conditions. 6. Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, planting bed, or sod treatment. 7. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications. Contractor shall coordinate quantity and placement of topsoil. Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specifications for topsoil source and placement requirements) 8. All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by the Landscape Architect. Any plant material installed in an incorrect location, by the judgment of the Landscape Architect, shall be reinstalled at the Contractor's expense. 9. All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless otherwise noted). 10. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner's satisfaction at no additional cost. 11. The Contractor shall maintain all plant material and lawns until the project is fully accepted by the Landscape Architect, unless otherwise noted. 12. All workmanship and materials shall be guaranteed by the Contractor for a period of one calendar year after Final Acceptance. 13. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work. 14. Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hours shall be installed using tree pit drainage. 15. Tree Protection Fencing is the responsibility of the Contractor. Minimum protected area shall include the full drip line of the canopy. NO construction activities, material storage, etc. may occur within that area. The Contractor shall ensure that no soil compaction or tree damage occurs in any Protected areas, at any time during the construction process. 16. Trees shall be matched in groups unless otherwise noted. 17. LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS ON SHEET L410 - SEE PLANTING DETAILS. GENERAL LANDSCAPE AND PLANTING NOTES ORDINANCE CHART Lawn Seed Mix Refer to Specification 32 92 00. PLANTING LEGEND ZONING: S1 - INSTITUTIONAL / PUD BUFFER REQUIREMENTS: Level A: 5' width (front yard); 4 shade/evergreen + 10 shrubs / 100 l.f. Level D: 30' width; 8 shade/evergreen + (30% min. evergreen) + 2 ornamental + 20 shrubs / 100 l.f. Substitutions: 3 shrubs / 1 evergreen Open Space Afforestation: “Planting shall occur per the Urban Forester based on best practices and intent of bufferyard standards” Per Urban Forester: afforestation with staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. PROPOSED: North West: 554 l.f. @ Level D; 63' existing wooded area to be protected and maintained Required: 44 shade / evergreen (of those min. 16 evergreen) + 11 ornamental + 111 shrubs Provided: 48 shade/evergreen+ 11 ornamental + 81 shrubs 24 Existing shade trees + 4 new shade + 16 evergreen +10 evergreen (substitution 3 shrubs/1 evergreen) = 54 total shade/evergreen Shrub for Evergreen replacement (3x1): 111 required - 81 proposed = 30 shrubs = 10 additional evergreens North East: 926 l.f. @ Level D Required: 74 shade /evergreen + 19 ornamental + 185 shrubs Provided: Maintain existing wooded buffer East: 754 l.f. @ Level D Required: 61 shade /evergreen + 15 ornamental + 151 shrubs Provided: maintain existing wooded buffer South (West section): 906 l.f. @ Level D/ Afforestation Required: staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. Afforestation: 906 / 10 (10'off center) = 90 shade trees Provided: 91 Shade trees South (Center section): 124 l.f. @ Level D/ Afforestation Required: staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. Afforestation: 124 / 10 (10'off center) = 12 shade trees Provided: 12 Shade South (East section): 369 l.f. @ Level D Required: 37 shade / evergreen + 11 ornamental + 92 shrubs Provided: maintain existing wooded buffer West: 1278 l.f. @ Level A Required: 51 shade/ evergreen + 128 shrubs Provided: 51 shade + 23 evergreen + 59 shrubs Shrub for Evergreen replacement (3x1): 128 required - 59 proposed = 69/3= 23 additional evergreens PARKING REQUIREMENTS: INTERNAL PARKING: 1 shade + 5 shrubs / 10 parking spaces & no parking space farther than 66 ft. from shade tree Interior Parking: 148 parking spaces Required: 15 shade tree + 74 shrubs Provided: 15 Shade + 74 shrubs FOUNDATION REQUIREMENTS: Planting beds min 5 ft. width except at driveways, courtyards, plazas, and pedestrian access; cover 75% of planting area; foundation shrub spacing shall not exceed 5 ft. intervals Required: (989 l.f. x 5 ft) = 4945 sq. ft. x 0.75 = 3708 sq. ft minimum coverage Provided: 4576 sq. ft SIGNAGE FOUNDATION REQUIREMENTS: Planting bed to match sign face sq. ft. Required: 63 sq. ft. x 2 sides = 126 sq. ft. Provided: 126 sq. ft. Prarie Seed Mix Refer to Specification 32 92 00. Native Basin Edge Plugs Refer to Specification 32 92 16. Native Basin Seed Mix Refer to Specification 32 92 16. Domi no Dri veClay Center Road8/27/2019 Daren Mindham (4) Pic-a (1) Abi-c (1) Pic-a (3) Abi-c(6) Cel-o (7) Tax-a (9) Bet-n(7) Ulm-x (9) Cel-o (6) Lir-t (2) Lir-t WW W W W W W WW W W WW W WWWE EE EEDOMI NO DRIV E Matchline - Refer to Sheet L402Matchline - Refer to Sheet L402 Matchline - Refer to Sheet L404Matchline - Refer to Sheet L404 Existing Wooded Area to Remain Refer to Sheet LD100 for Tree Protection and Removal Plan Evergreens to be located in the field, by Landscape Architect, to provide gap coverage. 0 Scale 1" = 30'-0" 60'30' 15' North Existing Wooded Area to Remain Refer to Sheet LD100 for Tree Protection and Removal Plan Existing Wooded Area to Remain Refer to Sheet LD100 for Tree Protection and Removal Plan Existing Tree Out of Project Scope 1. Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to Plant Schedule and Planting Details for additional information. 2. All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architect to inspect all plant locations and plant bed conditions prior to installation. On-site adjustments may be required. 3. Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT. 4. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved, specified material. 5. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i.e., spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as governed by plant spacing per schedule. Plant material quantities shown on plan are minimum quantities. Additional material may be needed to meet spacing requirements and field conditions. 6. Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, planting bed, or sod treatment. 7. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications. Contractor shall coordinate quantity and placement of topsoil. Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specifications for topsoil source and placement requirements) 8. All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by the Landscape Architect. Any plant material installed in an incorrect location, by the judgment of the Landscape Architect, shall be reinstalled at the Contractor's expense. 9. All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless otherwise noted). 10. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner's satisfaction at no additional cost. 11. The Contractor shall maintain all plant material and lawns until the project is fully accepted by the Landscape Architect, unless otherwise noted. 12. All workmanship and materials shall be guaranteed by the Contractor for a period of one calendar year after Final Acceptance. 13. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work. 14. Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hours shall be installed using tree pit drainage. 15. Tree Protection Fencing is the responsibility of the Contractor. Minimum protected area shall include the full drip line of the canopy. NO construction activities, material storage, etc. may occur within that area. The Contractor shall ensure that no soil compaction or tree damage occurs in any Protected areas, at any time during the construction process. 16. Trees shall be matched in groups unless otherwise noted. 17. LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS ON SHEET L410 - SEE PLANTING DETAILS. GENERAL LANDSCAPE AND PLANTING NOTES ORDINANCE CHART Lawn Seed Mix Refer to Specification 32 92 00. PLANTING LEGEND ZONING: S1 - INSTITUTIONAL / PUD BUFFER REQUIREMENTS: Level A: 5' width (front yard); 4 shade/evergreen + 10 shrubs / 100 l.f. Level D: 30' width; 8 shade/evergreen + (30% min. evergreen) + 2 ornamental + 20 shrubs / 100 l.f. Substitutions: 3 shrubs / 1 evergreen Open Space Afforestation: “Planting shall occur per the Urban Forester based on best practices and intent of bufferyard standards” Per Urban Forester: afforestation with staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. PROPOSED: North West: 554 l.f. @ Level D; 63' existing wooded area to be protected and maintained Required: 44 shade / evergreen (of those min. 16 evergreen) + 11 ornamental + 111 shrubs Provided: 48 shade/evergreen+ 11 ornamental + 81 shrubs 24 Existing shade trees + 4 new shade + 16 evergreen +10 evergreen (substitution 3 shrubs/1 evergreen) = 54 total shade/evergreen Shrub for Evergreen replacement (3x1): 111 required - 81 proposed = 30 shrubs = 10 additional evergreens North East: 926 l.f. @ Level D Required: 74 shade /evergreen + 19 ornamental + 185 shrubs Provided: Maintain existing wooded buffer East: 754 l.f. @ Level D Required: 61 shade /evergreen + 15 ornamental + 151 shrubs Provided: maintain existing wooded buffer South (West section): 906 l.f. @ Level D/ Afforestation Required: staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. Afforestation: 906 / 10 (10'off center) = 90 shade trees Provided: 91 Shade trees South (Center section): 124 l.f. @ Level D/ Afforestation Required: staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. Afforestation: 124 / 10 (10'off center) = 12 shade trees Provided: 12 Shade South (East section): 369 l.f. @ Level D Required: 37 shade / evergreen + 11 ornamental + 92 shrubs Provided: maintain existing wooded buffer West: 1278 l.f. @ Level A Required: 51 shade/ evergreen + 128 shrubs Provided: 51 shade + 23 evergreen + 59 shrubs Shrub for Evergreen replacement (3x1): 128 required - 59 proposed = 69/3= 23 additional evergreens PARKING REQUIREMENTS: INTERNAL PARKING: 1 shade + 5 shrubs / 10 parking spaces & no parking space farther than 66 ft. from shade tree Interior Parking: 148 parking spaces Required: 15 shade tree + 74 shrubs Provided: 15 Shade + 74 shrubs FOUNDATION REQUIREMENTS: Planting beds min 5 ft. width except at driveways, courtyards, plazas, and pedestrian access; cover 75% of planting area; foundation shrub spacing shall not exceed 5 ft. intervals Required: (989 l.f. x 5 ft) = 4945 sq. ft. x 0.75 = 3708 sq. ft minimum coverage Provided: 4576 sq. ft SIGNAGE FOUNDATION REQUIREMENTS: Planting bed to match sign face sq. ft. Required: 63 sq. ft. x 2 sides = 126 sq. ft. Provided: 126 sq. ft. Prarie Seed Mix Refer to Specification 32 92 00. Native Basin Edge Plugs Refer to Specification 32 92 16. Native Basin Seed Mix Refer to Specification 32 92 16. 8/27/2019 Daren Mindham 865866867868867'B' 'B' 'B' 'B' Matchline - Refer to Sheet L403Matchline - Refer to Sheet L403 Matchline - Refer to Sheet L405Matchline - Refer to Sheet L405 Matchline - Refer to Sheet L401Matchline - Refer to Sheet L401 Existing Wooded Area to Remain Refer to Sheet LD100 for Tree Protection and Removal Plan 0 Scale 1" = 30'-0" 60'30' 15' North Existing Wooded Area to Remain Refer to Sheet LD100 for Tree Protection and Removal Plan Existing Wooded Area to Remain Refer to Sheet LD100 for Tree Protection and Removal Plan 1. Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to Plant Schedule and Planting Details for additional information. 2. All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architect to inspect all plant locations and plant bed conditions prior to installation. On-site adjustments may be required. 3. Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT. 4. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved, specified material. 5. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i.e., spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as governed by plant spacing per schedule. Plant material quantities shown on plan are minimum quantities. Additional material may be needed to meet spacing requirements and field conditions. 6. Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, planting bed, or sod treatment. 7. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications. Contractor shall coordinate quantity and placement of topsoil. Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specifications for topsoil source and placement requirements) 8. All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by the Landscape Architect. Any plant material installed in an incorrect location, by the judgment of the Landscape Architect, shall be reinstalled at the Contractor's expense. 9. All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless otherwise noted). 10. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner's satisfaction at no additional cost. 11. The Contractor shall maintain all plant material and lawns until the project is fully accepted by the Landscape Architect, unless otherwise noted. 12. All workmanship and materials shall be guaranteed by the Contractor for a period of one calendar year after Final Acceptance. 13. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work. 14. Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hours shall be installed using tree pit drainage. 15. Tree Protection Fencing is the responsibility of the Contractor. Minimum protected area shall include the full drip line of the canopy. NO construction activities, material storage, etc. may occur within that area. The Contractor shall ensure that no soil compaction or tree damage occurs in any Protected areas, at any time during the construction process. 16. Trees shall be matched in groups unless otherwise noted. 17. LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS ON SHEET L410 - SEE PLANTING DETAILS. GENERAL LANDSCAPE AND PLANTING NOTES ORDINANCE CHART Lawn Seed Mix Refer to Specification 32 92 00. PLANTING LEGEND ZONING: S1 - INSTITUTIONAL / PUD BUFFER REQUIREMENTS: Level A: 5' width (front yard); 4 shade/evergreen + 10 shrubs / 100 l.f. Level D: 30' width; 8 shade/evergreen + (30% min. evergreen) + 2 ornamental + 20 shrubs / 100 l.f. Substitutions: 3 shrubs / 1 evergreen Open Space Afforestation: “Planting shall occur per the Urban Forester based on best practices and intent of bufferyard standards” Per Urban Forester: afforestation with staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. PROPOSED: North West: 554 l.f. @ Level D; 63' existing wooded area to be protected and maintained Required: 44 shade / evergreen (of those min. 16 evergreen) + 11 ornamental + 111 shrubs Provided: 48 shade/evergreen+ 11 ornamental + 81 shrubs 24 Existing shade trees + 4 new shade + 16 evergreen +10 evergreen (substitution 3 shrubs/1 evergreen) = 54 total shade/evergreen Shrub for Evergreen replacement (3x1): 111 required - 81 proposed = 30 shrubs = 10 additional evergreens North East: 926 l.f. @ Level D Required: 74 shade /evergreen + 19 ornamental + 185 shrubs Provided: Maintain existing wooded buffer East: 754 l.f. @ Level D Required: 61 shade /evergreen + 15 ornamental + 151 shrubs Provided: maintain existing wooded buffer South (West section): 906 l.f. @ Level D/ Afforestation Required: staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. Afforestation: 906 / 10 (10'off center) = 90 shade trees Provided: 91 Shade trees South (Center section): 124 l.f. @ Level D/ Afforestation Required: staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. Afforestation: 124 / 10 (10'off center) = 12 shade trees Provided: 12 Shade South (East section): 369 l.f. @ Level D Required: 37 shade / evergreen + 11 ornamental + 92 shrubs Provided: maintain existing wooded buffer West: 1278 l.f. @ Level A Required: 51 shade/ evergreen + 128 shrubs Provided: 51 shade + 23 evergreen + 59 shrubs Shrub for Evergreen replacement (3x1): 128 required - 59 proposed = 69/3= 23 additional evergreens PARKING REQUIREMENTS: INTERNAL PARKING: 1 shade + 5 shrubs / 10 parking spaces & no parking space farther than 66 ft. from shade tree Interior Parking: 148 parking spaces Required: 15 shade tree + 74 shrubs Provided: 15 Shade + 74 shrubs FOUNDATION REQUIREMENTS: Planting beds min 5 ft. width except at driveways, courtyards, plazas, and pedestrian access; cover 75% of planting area; foundation shrub spacing shall not exceed 5 ft. intervals Required: (989 l.f. x 5 ft) = 4945 sq. ft. x 0.75 = 3708 sq. ft minimum coverage Provided: 4576 sq. ft SIGNAGE FOUNDATION REQUIREMENTS: Planting bed to match sign face sq. ft. Required: 63 sq. ft. x 2 sides = 126 sq. ft. Provided: 126 sq. ft. Prarie Seed Mix Refer to Specification 32 92 00. Native Basin Edge Plugs Refer to Specification 32 92 16. Native Basin Seed Mix Refer to Specification 32 92 16. 8/27/2019 Daren Mindham Matchline - Refer to Sheet L406Matchline - Refer to Sheet L402Matchline - Refer to Sheet L402 Existing Wooded Area to Remain Refer to Sheet LD100 for Tree Protection and Removal Plan 0 Scale 1" = 30'-0" 60'30' 15' North 1. Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to Plant Schedule and Planting Details for additional information. 2. All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architect to inspect all plant locations and plant bed conditions prior to installation. On-site adjustments may be required. 3. Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT. 4. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved, specified material. 5. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i.e., spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as governed by plant spacing per schedule. Plant material quantities shown on plan are minimum quantities. Additional material may be needed to meet spacing requirements and field conditions. 6. Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, planting bed, or sod treatment. 7. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications. Contractor shall coordinate quantity and placement of topsoil. Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specifications for topsoil source and placement requirements) 8. All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by the Landscape Architect. Any plant material installed in an incorrect location, by the judgment of the Landscape Architect, shall be reinstalled at the Contractor's expense. 9. All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless otherwise noted). 10. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner's satisfaction at no additional cost. 11. The Contractor shall maintain all plant material and lawns until the project is fully accepted by the Landscape Architect, unless otherwise noted. 12. All workmanship and materials shall be guaranteed by the Contractor for a period of one calendar year after Final Acceptance. 13. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work. 14. Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hours shall be installed using tree pit drainage. 15. Tree Protection Fencing is the responsibility of the Contractor. Minimum protected area shall include the full drip line of the canopy. NO construction activities, material storage, etc. may occur within that area. The Contractor shall ensure that no soil compaction or tree damage occurs in any Protected areas, at any time during the construction process. 16. Trees shall be matched in groups unless otherwise noted. 17. LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS ON SHEET L410 - SEE PLANTING DETAILS. GENERAL LANDSCAPE AND PLANTING NOTES ORDINANCE CHART Lawn Seed Mix Refer to Specification 32 92 00. PLANTING LEGEND ZONING: S1 - INSTITUTIONAL / PUD BUFFER REQUIREMENTS: Level A: 5' width (front yard); 4 shade/evergreen + 10 shrubs / 100 l.f. Level D: 30' width; 8 shade/evergreen + (30% min. evergreen) + 2 ornamental + 20 shrubs / 100 l.f. Substitutions: 3 shrubs / 1 evergreen Open Space Afforestation: “Planting shall occur per the Urban Forester based on best practices and intent of bufferyard standards” Per Urban Forester: afforestation with staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. PROPOSED: North West: 554 l.f. @ Level D; 63' existing wooded area to be protected and maintained Required: 44 shade / evergreen (of those min. 16 evergreen) + 11 ornamental + 111 shrubs Provided: 48 shade/evergreen+ 11 ornamental + 81 shrubs 24 Existing shade trees + 4 new shade + 16 evergreen +10 evergreen (substitution 3 shrubs/1 evergreen) = 54 total shade/evergreen Shrub for Evergreen replacement (3x1): 111 required - 81 proposed = 30 shrubs = 10 additional evergreens North East: 926 l.f. @ Level D Required: 74 shade /evergreen + 19 ornamental + 185 shrubs Provided: Maintain existing wooded buffer East: 754 l.f. @ Level D Required: 61 shade /evergreen + 15 ornamental + 151 shrubs Provided: maintain existing wooded buffer South (West section): 906 l.f. @ Level D/ Afforestation Required: staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. Afforestation: 906 / 10 (10'off center) = 90 shade trees Provided: 91 Shade trees South (Center section): 124 l.f. @ Level D/ Afforestation Required: staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. Afforestation: 124 / 10 (10'off center) = 12 shade trees Provided: 12 Shade South (East section): 369 l.f. @ Level D Required: 37 shade / evergreen + 11 ornamental + 92 shrubs Provided: maintain existing wooded buffer West: 1278 l.f. @ Level A Required: 51 shade/ evergreen + 128 shrubs Provided: 51 shade + 23 evergreen + 59 shrubs Shrub for Evergreen replacement (3x1): 128 required - 59 proposed = 69/3= 23 additional evergreens PARKING REQUIREMENTS: INTERNAL PARKING: 1 shade + 5 shrubs / 10 parking spaces & no parking space farther than 66 ft. from shade tree Interior Parking: 148 parking spaces Required: 15 shade tree + 74 shrubs Provided: 15 Shade + 74 shrubs FOUNDATION REQUIREMENTS: Planting beds min 5 ft. width except at driveways, courtyards, plazas, and pedestrian access; cover 75% of planting area; foundation shrub spacing shall not exceed 5 ft. intervals Required: (989 l.f. x 5 ft) = 4945 sq. ft. x 0.75 = 3708 sq. ft minimum coverage Provided: 4576 sq. ft SIGNAGE FOUNDATION REQUIREMENTS: Planting bed to match sign face sq. ft. Required: 63 sq. ft. x 2 sides = 126 sq. ft. Provided: 126 sq. ft. Prarie Seed Mix Refer to Specification 32 92 00. NO WORK THIS SHEET Native Basin Edge Plugs Refer to Specification 32 92 16. Native Basin Seed Mix Refer to Specification 32 92 16. 8/27/2019 Daren Mindham 8658658658 6 5 8668668668 6 6 8 6 6 866866 8 6 6 8678 6 7 8 6 7 8 6 6 8 6 6 867 8658668668678 6 5 (3) Lir-t (3) Jun-e (1) Que-r (2) Que-r (5) Pic-a (3) Zel-s (1) Pla-x (8) Bet-n (7) Que-r (11) Tax-a(9) Lir-t (9) Bet-n(6) Cel-o (7) Ulm-x (6) Lir-t (3) Zel-s (4) Lir-t (5) Pic-a Lat Lat Lat Lat Lat LatLatC.O. C.O. C.O.OHUOHUOHUOHUOHU OHU OHU OHU OHU OHU OHU OHU OHUOHU OHUOHU OHUG GGGGGG G GW W W W W W W W W W W W W W W W W W W W WWG G G GGG G G GG G G GGGGGGGG GE(A) E(A)OHU OHU OHUOHU OHU OHU OHU OHU OHUE E E E E E E E E E E E E E E E E E E E E E E E E E E EOHU OHU OHU OHU OHUOHU OHU OHUOHU OHUCLAY CENTER ROADPROPOSED BUILDING AREA: 1640 SF PROPOSED BUILDING AREA: 697 SF FUTURE SPORTS FIELD AREA Matchline - Refer to Sheet L405Matchline - Refer to Sheet L405 0 Scale 1" = 30'-0" 60'30' 15' North (3) Existing Trees to Remain Refer to Sheet LD100 for Tree Protection and Removal Plan 1. Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to Plant Schedule and Planting Details for additional information. 2. All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architect to inspect all plant locations and plant bed conditions prior to installation. On-site adjustments may be required. 3. Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT. 4. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved, specified material. 5. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i.e., spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as governed by plant spacing per schedule. Plant material quantities shown on plan are minimum quantities. Additional material may be needed to meet spacing requirements and field conditions. 6. Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, planting bed, or sod treatment. 7. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications. Contractor shall coordinate quantity and placement of topsoil. Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specifications for topsoil source and placement requirements) 8. All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by the Landscape Architect. Any plant material installed in an incorrect location, by the judgment of the Landscape Architect, shall be reinstalled at the Contractor's expense. 9. All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless otherwise noted). 10. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner's satisfaction at no additional cost. 11. The Contractor shall maintain all plant material and lawns until the project is fully accepted by the Landscape Architect, unless otherwise noted. 12. All workmanship and materials shall be guaranteed by the Contractor for a period of one calendar year after Final Acceptance. 13. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work. 14. Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hours shall be installed using tree pit drainage. 15. Tree Protection Fencing is the responsibility of the Contractor. Minimum protected area shall include the full drip line of the canopy. NO construction activities, material storage, etc. may occur within that area. The Contractor shall ensure that no soil compaction or tree damage occurs in any Protected areas, at any time during the construction process. 16. Trees shall be matched in groups unless otherwise noted. 17. LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS ON SHEET L410 - SEE PLANTING DETAILS. GENERAL LANDSCAPE AND PLANTING NOTES ORDINANCE CHART Lawn Seed Mix Refer to Specification 32 92 00. PLANTING LEGEND ZONING: S1 - INSTITUTIONAL / PUD BUFFER REQUIREMENTS: Level A: 5' width (front yard); 4 shade/evergreen + 10 shrubs / 100 l.f. Level D: 30' width; 8 shade/evergreen + (30% min. evergreen) + 2 ornamental + 20 shrubs / 100 l.f. Substitutions: 3 shrubs / 1 evergreen Open Space Afforestation: “Planting shall occur per the Urban Forester based on best practices and intent of bufferyard standards” Per Urban Forester: afforestation with staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. PROPOSED: North West: 554 l.f. @ Level D; 63' existing wooded area to be protected and maintained Required: 44 shade / evergreen (of those min. 16 evergreen) + 11 ornamental + 111 shrubs Provided: 48 shade/evergreen+ 11 ornamental + 81 shrubs 24 Existing shade trees + 4 new shade + 16 evergreen +10 evergreen (substitution 3 shrubs/1 evergreen) = 54 total shade/evergreen Shrub for Evergreen replacement (3x1): 111 required - 81 proposed = 30 shrubs = 10 additional evergreens North East: 926 l.f. @ Level D Required: 74 shade /evergreen + 19 ornamental + 185 shrubs Provided: Maintain existing wooded buffer East: 754 l.f. @ Level D Required: 61 shade /evergreen + 15 ornamental + 151 shrubs Provided: maintain existing wooded buffer South (West section): 906 l.f. @ Level D/ Afforestation Required: staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. Afforestation: 906 / 10 (10'off center) = 90 shade trees Provided: 91 Shade trees South (Center section): 124 l.f. @ Level D/ Afforestation Required: staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. Afforestation: 124 / 10 (10'off center) = 12 shade trees Provided: 12 Shade South (East section): 369 l.f. @ Level D Required: 37 shade / evergreen + 11 ornamental + 92 shrubs Provided: maintain existing wooded buffer West: 1278 l.f. @ Level A Required: 51 shade/ evergreen + 128 shrubs Provided: 51 shade + 23 evergreen + 59 shrubs Shrub for Evergreen replacement (3x1): 128 required - 59 proposed = 69/3= 23 additional evergreens PARKING REQUIREMENTS: INTERNAL PARKING: 1 shade + 5 shrubs / 10 parking spaces & no parking space farther than 66 ft. from shade tree Interior Parking: 148 parking spaces Required: 15 shade tree + 74 shrubs Provided: 15 Shade + 74 shrubs FOUNDATION REQUIREMENTS: Planting beds min 5 ft. width except at driveways, courtyards, plazas, and pedestrian access; cover 75% of planting area; foundation shrub spacing shall not exceed 5 ft. intervals Required: (989 l.f. x 5 ft) = 4945 sq. ft. x 0.75 = 3708 sq. ft minimum coverage Provided: 4576 sq. ft SIGNAGE FOUNDATION REQUIREMENTS: Planting bed to match sign face sq. ft. Required: 63 sq. ft. x 2 sides = 126 sq. ft. Provided: 126 sq. ft. Prarie Seed Mix Refer to Specification 32 92 00. Native Basin Edge Plugs Refer to Specification 32 92 16. Native Basin Seed Mix Refer to Specification 32 92 16. 8/27/2019 Daren Mindham 8708688698 6 6 8 6 7 8668678688688688 6 6 86786 8 868 8 6 9 866(1) Zel-s (1) Pla-a (1) Pla-a (1) Que-r(1) Que-r (1) Que-r (1) Ulm-x (2) Ulm-x (3) Phy-d (7) Pan-h(9) Pan-h (1) Syr-r (1) Syr-r (1) Lir-t (8) Tax-x(1) Zel-s (1) Ulm-x (1) Bet-n (8) Aro-a (1) Ulm-x (1) Zel-s (4) Aro-a (1) Lir-t (1) Que-r (8) Vib-x (1) Lir-t (4) Vib-x (1) Lir-t (5) Pan-h (5) Pan-h (3) Phy-d (3) Phy-d (5) Pan-h (5) Pan-h (3) Phy-d (12) Tax-x (3) AME-X (10) Pan-h (11) Pan-h (1) Syr-r (5) Vib-x (7) Ite-v (5) Vib-x (1) AME-X (3) Vib-x (8) Ite-v (5) Vib-x (1) AME-X (4) AME-X (8) Vib-x (8) Ite-v (6) Vib-x (6) Vib-x (8) Ite-v (6) Vib-x (2) Jun-o (3) Jun-o (1) Syr-r(1) Syr-r (1) Syr-r (2) Jun-o (3) Jun-o (5) Ite-v (5) Ite-v (1) Que-r (2) Bet-n (3) Gin-p (2) Zel-s (13) Bux-g (2) Ulm-x (3) Bet-n (3) Jun-e (3) Abi-c (12) Cor-a (4) Zel-s (1) Lir-t (5) Jun-o (3) Myr-p (6) Cor-a (3) Myr-p (5) Cor-a (3) Myr-p (5) Jun-o (1) Que-r(1) Ulm-x (1) Ulm-x (1) Zel-s (7) Jun-o (3) Myr-p (1) Abi-c (1) Abi-c (3) Lir-t (1) Zel-s (1) Zel-s (12) Cor-a (1) Que-r (2) Que-r (3) Abi-c (1) Abi-c (1) Abi-c (5) Pic-a (13) Cor-a (13) Cor-a (2) Syr-r (21) Vib-x (1) Syr-r FHVFHVFDCLat LatFHVP WLat Lat Lat Lat Lat Lat Lat Lat Lat Lat Lat Lat Lat Lat Lat Lat LatC.O. S C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. D D D D D D C.O.C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O. C.O.OHU OHU OHU OHU OHU OHUOHU OHU OHU OHU OHU OHUOHU OHU OHUOHUOHU OHU OHU OHU OHUGGG G GG GGGG GW W W W W W W W W W WW W W W W W W W W W W W W W W WGG G G G G G GGG G G G G G GGG GG GG GGGG GOHU OHU OHU OHU OHU OHU OHUOHU OHU OHU OHU OHU OHUOHU OHU OHUOHU OHU OHU OHUOHUOHUOHU OHU OHUNO PARKINGNO PARKI NG NO PARKI NGNO PARKING'A' 'A' 'A' 'A' 'A' 'A' 'A' 'A' 'C' 'C' 'C' 'C' 'C' 'C' 'C' 'A' 'A''A' 'A' 'B' 'B' 'B' 'B' 'B' 'B' 'B' 'B' 'B' 'C' 'B' 'FL''FL' 'FL' CLAY CENTER ROADPROPOSED BUILDING AREA: 111802 SF FFE: 868.5 Matchline - Refer to Sheet L406Matchline - Refer to Sheet L406 Matchline - Refer to Sheet L404Matchline - Refer to Sheet L404 Wooded Area : Refer to Sheet LD100 for Tree Protection and Removal Plan 0 Scale 1" = 30'-0" 60'30' 15' North 1. Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to Plant Schedule and Planting Details for additional information. 2. All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architect to inspect all plant locations and plant bed conditions prior to installation. On-site adjustments may be required. 3. Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT. 4. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved, specified material. 5. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i.e., spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as governed by plant spacing per schedule. Plant material quantities shown on plan are minimum quantities. Additional material may be needed to meet spacing requirements and field conditions. 6. Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, planting bed, or sod treatment. 7. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications. Contractor shall coordinate quantity and placement of topsoil. Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specifications for topsoil source and placement requirements) 8. All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by the Landscape Architect. Any plant material installed in an incorrect location, by the judgment of the Landscape Architect, shall be reinstalled at the Contractor's expense. 9. All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless otherwise noted). 10. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner's satisfaction at no additional cost. 11. The Contractor shall maintain all plant material and lawns until the project is fully accepted by the Landscape Architect, unless otherwise noted. 12. All workmanship and materials shall be guaranteed by the Contractor for a period of one calendar year after Final Acceptance. 13. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work. 14. Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hours shall be installed using tree pit drainage. 15. Tree Protection Fencing is the responsibility of the Contractor. Minimum protected area shall include the full drip line of the canopy. NO construction activities, material storage, etc. may occur within that area. The Contractor shall ensure that no soil compaction or tree damage occurs in any Protected areas, at any time during the construction process. 16. Trees shall be matched in groups unless otherwise noted. 17. LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS ON SHEET L410 - SEE PLANTING DETAILS. GENERAL LANDSCAPE AND PLANTING NOTES ORDINANCE CHART Lawn Seed Mix Refer to Specification 32 92 00. PLANTING LEGEND ZONING: S1 - INSTITUTIONAL / PUD BUFFER REQUIREMENTS: Level A: 5' width (front yard); 4 shade/evergreen + 10 shrubs / 100 l.f. Level D: 30' width; 8 shade/evergreen + (30% min. evergreen) + 2 ornamental + 20 shrubs / 100 l.f. Substitutions: 3 shrubs / 1 evergreen Open Space Afforestation: “Planting shall occur per the Urban Forester based on best practices and intent of bufferyard standards” Per Urban Forester: afforestation with staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. PROPOSED: North West: 554 l.f. @ Level D; 63' existing wooded area to be protected and maintained Required: 44 shade / evergreen (of those min. 16 evergreen) + 11 ornamental + 111 shrubs Provided: 48 shade/evergreen+ 11 ornamental + 81 shrubs 24 Existing shade trees + 4 new shade + 16 evergreen +10 evergreen (substitution 3 shrubs/1 evergreen) = 54 total shade/evergreen Shrub for Evergreen replacement (3x1): 111 required - 81 proposed = 30 shrubs = 10 additional evergreens North East: 926 l.f. @ Level D Required: 74 shade /evergreen + 19 ornamental + 185 shrubs Provided: Maintain existing wooded buffer East: 754 l.f. @ Level D Required: 61 shade /evergreen + 15 ornamental + 151 shrubs Provided: maintain existing wooded buffer South (West section): 906 l.f. @ Level D/ Afforestation Required: staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. Afforestation: 906 / 10 (10'off center) = 90 shade trees Provided: 91 Shade trees South (Center section): 124 l.f. @ Level D/ Afforestation Required: staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. Afforestation: 124 / 10 (10'off center) = 12 shade trees Provided: 12 Shade South (East section): 369 l.f. @ Level D Required: 37 shade / evergreen + 11 ornamental + 92 shrubs Provided: maintain existing wooded buffer West: 1278 l.f. @ Level A Required: 51 shade/ evergreen + 128 shrubs Provided: 51 shade + 23 evergreen + 59 shrubs Shrub for Evergreen replacement (3x1): 128 required - 59 proposed = 69/3= 23 additional evergreens PARKING REQUIREMENTS: INTERNAL PARKING: 1 shade + 5 shrubs / 10 parking spaces & no parking space farther than 66 ft. from shade tree Interior Parking: 148 parking spaces Required: 15 shade tree + 74 shrubs Provided: 15 Shade + 74 shrubs FOUNDATION REQUIREMENTS: Planting beds min 5 ft. width except at driveways, courtyards, plazas, and pedestrian access; cover 75% of planting area; foundation shrub spacing shall not exceed 5 ft. intervals Required: (989 l.f. x 5 ft) = 4945 sq. ft. x 0.75 = 3708 sq. ft minimum coverage Provided: 4576 sq. ft SIGNAGE FOUNDATION REQUIREMENTS: Planting bed to match sign face sq. ft. Required: 63 sq. ft. x 2 sides = 126 sq. ft. Provided: 126 sq. ft. Prarie Seed Mix Refer to Specification 32 92 00. Native Basin Edge Plugs Refer to Specification 32 92 16. Native Basin Seed Mix Refer to Specification 32 92 16. 8/27/2019 Daren Mindham 866 867 868 868 869 869865865 870 866 8 66 867 868 869 871 872 (4) Phy-d (4) Pic-a (3) Phy-d (2) Pic-a (3) Jun-e (1) Pic-a (3) Pic-a(3) Pic-a Existing 10" Hickory Refer to LD100 Existing Multi-leader Hackberry 6" + 6" Refer to LD100 Existing 6" Hickory Refer to LD100 Existing 3" Cherry Refer to LD100 Existing 8" Hickory Refer to LD100 Existing 10" Hackberry Refer to LD100 Existing 12" Hickory Refer to LD100 Existing 10" Hickory Refer to LD100 Existing 12" Hickory Refer to LD100 Existing 12" Hackberry Refer to LD100 Existing Sapling Sweet Gum Refer to LD100 Existing 4" Linden Refer to LD100 (2) Jun-e (3) Abi-c (5) Jun-o (3) Myr-p (6) Cor-a (3) Myr-p (5) Cor-a (3) Myr-p (5) Jun-o (4) Gin-p (3) Myr-p (2) Abi-c(3) Myr-p (3) Syr-r (3) Abi-c (2) Syr-r (4) Jun-o (3) Aro-a (3) Aro-a (3) Aro-a (6) Jun-o(3) AME-X (3) Syr-r (6) Aro-a (11) Jun-o (6) Aro-a (7) Jun-o Existing 15" Hackberry Refer to LD100 (1) Bet-n(1) Bet-n OHUOHUOHUOHUG GW W W W W W W W WWG G G G GGOHU OHU OHUOHUNO'A' 'C' 'C'CLAY CENTER ROADMatchline - Refer to Sheet L405Matchline - Refer to Sheet L405 0 Scale 1" = 30'-0" 60'30' 15' North Existing Wooded Area : Refer to Sheet LD100 for Tree Protection and Removal Plan 1. Refer to Project Manual for Planting Specifications and Topsoil requirements. Refer to Plant Schedule and Planting Details for additional information. 2. All materials are subject to the approval of the Landscape Architect and Owner at any time. Landscape Architect to inspect all plant locations and plant bed conditions prior to installation. On-site adjustments may be required. 3. Rootballs shall meet or exceed size standards as set forth in 'American Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL REMAIN INTACT. 4. Remove from the site any plant material that turns brown or defoliates within five (5) days after planting. Replace immediately with approved, specified material. 5. Plant counts indicated on drawings are for Landscape Architect's use only. Contractor shall make own plant quantity takeoffs using drawings, specifications, and plant schedule requirements (i.e., spacing), unless otherwise directed by Landscape Architect. Contractor to verify bed measurements and install appropriate quantities as governed by plant spacing per schedule. Plant material quantities shown on plan are minimum quantities. Additional material may be needed to meet spacing requirements and field conditions. 6. Seed all areas disturbed by construction activities that are not otherwise noted to receive pavement, planting bed, or sod treatment. 7. The Contractor shall install and/or amend topsoil in all proposed bed areas to meet Specifications. Contractor shall coordinate quantity and placement of topsoil. Landscaper shall verify depth of topsoil prior to plant installation. (Refer to specifications for topsoil source and placement requirements) 8. All tree locations shall be marked with 2x2" stakes prior to planting for review and approval by the Landscape Architect. Any plant material installed in an incorrect location, by the judgment of the Landscape Architect, shall be reinstalled at the Contractor's expense. 9. All plant beds shall receive 3" minimum of shredded hardwood bark mulch (unless otherwise noted). 10. Verify all utility locations in the field prior to beginning work. Repair all damaged utilities to Owner's satisfaction at no additional cost. 11. The Contractor shall maintain all plant material and lawns until the project is fully accepted by the Landscape Architect, unless otherwise noted. 12. All workmanship and materials shall be guaranteed by the Contractor for a period of one calendar year after Final Acceptance. 13. Install all plant material in accordance with all local codes and ordinances. Coordinate with the Owner to obtain any required permits necessary to complete work. 14. Contractor shall test all tree pits for drainage. Any tree pit that holds water for more than 24 hours shall be installed using tree pit drainage. 15. Tree Protection Fencing is the responsibility of the Contractor. Minimum protected area shall include the full drip line of the canopy. NO construction activities, material storage, etc. may occur within that area. The Contractor shall ensure that no soil compaction or tree damage occurs in any Protected areas, at any time during the construction process. 16. Trees shall be matched in groups unless otherwise noted. 17. LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS ON SHEET L410 - SEE PLANTING DETAILS. GENERAL LANDSCAPE AND PLANTING NOTES ORDINANCE CHART Lawn Seed Mix Refer to Specification 32 92 00. PLANTING LEGEND ZONING: S1 - INSTITUTIONAL / PUD BUFFER REQUIREMENTS: Level A: 5' width (front yard); 4 shade/evergreen + 10 shrubs / 100 l.f. Level D: 30' width; 8 shade/evergreen + (30% min. evergreen) + 2 ornamental + 20 shrubs / 100 l.f. Substitutions: 3 shrubs / 1 evergreen Open Space Afforestation: “Planting shall occur per the Urban Forester based on best practices and intent of bufferyard standards” Per Urban Forester: afforestation with staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. PROPOSED: North West: 554 l.f. @ Level D; 63' existing wooded area to be protected and maintained Required: 44 shade / evergreen (of those min. 16 evergreen) + 11 ornamental + 111 shrubs Provided: 48 shade/evergreen+ 11 ornamental + 81 shrubs 24 Existing shade trees + 4 new shade + 16 evergreen +10 evergreen (substitution 3 shrubs/1 evergreen) = 54 total shade/evergreen Shrub for Evergreen replacement (3x1): 111 required - 81 proposed = 30 shrubs = 10 additional evergreens North East: 926 l.f. @ Level D Required: 74 shade /evergreen + 19 ornamental + 185 shrubs Provided: Maintain existing wooded buffer East: 754 l.f. @ Level D Required: 61 shade /evergreen + 15 ornamental + 151 shrubs Provided: maintain existing wooded buffer South (West section): 906 l.f. @ Level D/ Afforestation Required: staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. Afforestation: 906 / 10 (10'off center) = 90 shade trees Provided: 91 Shade trees South (Center section): 124 l.f. @ Level D/ Afforestation Required: staggered row of native shade trees@10' o.c. Mature canopy to extend 30' width. Afforestation: 124 / 10 (10'off center) = 12 shade trees Provided: 12 Shade South (East section): 369 l.f. @ Level D Required: 37 shade / evergreen + 11 ornamental + 92 shrubs Provided: maintain existing wooded buffer West: 1278 l.f. @ Level A Required: 51 shade/ evergreen + 128 shrubs Provided: 51 shade + 23 evergreen + 59 shrubs Shrub for Evergreen replacement (3x1): 128 required - 59 proposed = 69/3= 23 additional evergreens PARKING REQUIREMENTS: INTERNAL PARKING: 1 shade + 5 shrubs / 10 parking spaces & no parking space farther than 66 ft. from shade tree Interior Parking: 148 parking spaces Required: 15 shade tree + 74 shrubs Provided: 15 Shade + 74 shrubs FOUNDATION REQUIREMENTS: Planting beds min 5 ft. width except at driveways, courtyards, plazas, and pedestrian access; cover 75% of planting area; foundation shrub spacing shall not exceed 5 ft. intervals Required: (989 l.f. x 5 ft) = 4945 sq. ft. x 0.75 = 3708 sq. ft minimum coverage Provided: 4576 sq. ft SIGNAGE FOUNDATION REQUIREMENTS: Planting bed to match sign face sq. ft. Required: 63 sq. ft. x 2 sides = 126 sq. ft. Provided: 126 sq. ft. Prarie Seed Mix Refer to Specification 32 92 00. Native Basin Edge Plugs Refer to Specification 32 92 16. Native Basin Seed Mix Refer to Specification 32 92 16. 8/27/2019 Daren Mindham TREES QTY BOTANICAL NAME COMMON NAME CONT CAL REMARKS Bet-n 34 Betula nigra River Birch B & B min. 2.5" cal. full, strong central leader, matched Cel-o 21 Celtis occidentalis Common Hackberry B & B min. 2.5" cal. full, strong central leader, matched Gin-p 7 Ginkgo biloba `Princeton Sentry` Princeton Sentry Ginkgo B & B min. 2.5" cal. full, strong central leader, matched Lir-t 32 Liriodendron tulipifera Tulip Tree B & B min. 2.5" cal. full, strong central leader, matched Pla-a 2 Platanus x acerifolia `Bloodgood` London Plane Tree B & B min. 2.5" cal. full, strong central leader, matched Pla-x 1 Platanus x acerifolia `Columbia` Columbia London Plane Tree B & B min. 2.5" cal. full, strong central leader, matched Que-r 18 Quercus rubra Red Oak B & B min. 2.5" cal. spring dug, full, strong central leader, matched Tax-a 18 Taxodium distichum `Autumn Gold` Autumn Gold Bald Cypress B & B 2.5"Cal Ulm-x 23 Ulmus x americana `Libertas` Liberty Elm B & B min. 2.5" cal. full, strong central leader, matched Zel-s 18 Zelkova serrata `Green Vase` Green Vase Sawleaf Zelkova B & B min. 2.5" cal. full, strong central leader, matched EVERGREEN TREES QTY BOTANICAL NAME COMMON NAME CONT CAL REMARKS Abi-c 22 Abies concolor White Fir B & B min. 6` ht. full, strong central leader, matched, symmetrical Jun-e 11 Juniperus virginiana Eastern Red Cedar B & B min. 6` ht. full, strong central leader, matched, symmetrical Pic-a 28 Picea abies Norway Spruce B & B min. 6` ht. full, strong central leader, matched, symmetrical ORNAMENTAL TREES QTY BOTANICAL NAME COMMON NAME CONT CAL REMARKS AME-X 12 Amelanchier x grandiflora `Autumn Brilliance` Autumn Brilliance Serviceberry B & B min. 1.5" cal. multi-trunk; matched Syr-r 17 Syringa reticulata `Ivory Silk` Ivory Silk Japanese Tree Lilac B & B min. 1.5" cal. full, strong central leader, matched SHRUBS QTY BOTANICAL NAME COMMON NAME SIZE HEIGHT REMARKS Aro-a 33 Aronia arbutifolia `Brilliantissima` Brilliant Red Chokeberry Container 18" space @ 3`-0" o.c. Bux-g 13 Buxus x `Green Velvet` Boxwood container 18" space @ 2`-6" o.c. Cor-a 49 Cornus alba `Bailhalo` Ivory Halo Variagated Red-twig Dogwood Container 18" space @ 4`-0" o.c. Ite-v 41 Itea virginica `Henry`s Garnet` Henry`s Garnet Sweetspire Container 18" space @ 3`-0" o.c. Jun-o 55 Juniperus virginiana `Grey Owl` Grey Owl Juniper Container 18" space @3`-0" o.c. Myr-p 18 Myrica pensylvanica `Morton` Silver Sprite Bayberry Container 18" space @ 5`-0" o.c. Pan-h 57 Panicum virgatum `Heavy Metal` Heavy Metal Switch Grass container #2 space @ 3`-0" o.c. Phy-d 20 Physocarpus opulifolius `Diablo` Diablo Ninebark container 18" space @ 4`-0" o.co. Tax-x 20 Taxus x media `Ward` Ward Yew container 18" space @ 4`-0" o.c., allow to mass Vib-x 73 Viburnum x juddii Judd Viburnum container 18" space @ 5`-0" o.c. PLANT SCHEDULE GROUNDCOVER PLANTING Not to Scale Note: All groundcover beds shall be planted using triangular planting scheme. Refer to Planting Schedule for On-Center planting dimension. Refer to Plans for Finish Grade. 3" Shredded Hardwood Bark Mulch Split Peat Pot 12" Prepared Soil; Refer to Specifications Compacted Subgrade 2"Slope & scarify sides of pit. Excavated soil or topsoil backfill. Set root ball on undisturbed soil cone at bottom of pit. times ball diameter. Width of pit to be two Finish grade 3" shredded hardwood bark mulch 1 2 dia. of root ball MULTI-STEM TREE PLANTING Not to Scale PERENNIAL PLANTING Not to Scale Note: All perennial beds shall be planted using triangular planting scheme. Refer to Planting Schedule for On-Center planting dimension. 3" Shredded Hardwood Bark Mulch Remove Container 12" Prepared Soil; Refer to Specifications Compacted Subgrade Existing Grade SPADE EDGE Not to Scale Existing Grade Area to Receive Hardwood Bark Mulch Topsoil (As Specified)5"3"3"1 NOT TO SCALE CONIFEROUS TREE PLANTING 2 3 4 5 NOT TO SCALE DECIDUOUS TREE PLANTING6 NOT TO SCALE SHRUB PLANTING 78 using triangular planting scheme. Refer to plans for finish grade. 2" black leaf compost Refer to Planting Schedule for On-Center Note: Plugs shall be planted Plugs to be installed level with grade. planting dimension. PLUG INSTALLATION Not to Scale Ensure soil is packed firmly in place around plug. NOTES: 1. Ensure area to be plugged has been sprayed at least two weeks prior to installation 2. Following installation, area to be thoroughly watered to a depth of 4" after installation. 3. Evenly distribute prairie grasses throughout planting. 4. Do not apply fertilizers other than compost. Lawn Seed Mix Refer to Specification 32 92 00. PLANTING LEGEND Prarie Seed Mix Refer to Specification 32 92 00. Native Basin Edge Plugs Refer to Specification 32 92 16. Native Basin Seed Mix Refer to Specification 32 92 16. 8/27/2019 Daren Mindham GG G GGG GG G G G G G G GGGG GGG G G G G G G G G G G G G G G G G G G G G GGG G GGG G G G G GW WWW W W W W W W W W W W W W W W W W W WWW W W W W W W W W W W W W W W W W W WWW W W W W W W W W W W W W WOHU OHUOHU OHU OHUOHUOHU OHU OHU W WW W W W W W W WW WW W W W W WWOHU OHUOHUOHUOHUOHU OHU OHUOHUOHU OHU OHU OHU OHUOHU OHU OHUOHUOHU OHU OHUOHU OHU OHU OHU OHU OHU OHU OHUOHU OHUOHUOHU OHU OHU OHUOHUB C C D E F G H I A J C C D 0 Scale 1" = 100'-0" 200'100' 50' North 1. For more detail on tree protection and fencing refer to specifications. 2. Tree Protection Fencing locations are fixed. Install exactly where shown on these plans. Any adjustments to fencing locations must be approved by the Owner. Damages will be assessed if tree protection fence location is adjusted without Owner approval. Fence deviation from this plan or approved change will be corrected by the General Contractor prior to the start of construction. 3. All tree pruning and limb restraint will be performed under the direct supervision of a Certified Arborist. Contractor shall not prune trees or restrain limbs. 4. No staging, equipment, material storage, or vehicles are allowed on non-paved areas unless indicated otherwise on plan. 5. Abandon all utilities to be removed when located within a Protected Root Zone. 6. Backfill all depressed and void areas with top soil following removal of vegetation. Soil shall be free of debris. Compact soils to ensure settling and sedimentation do not occur. 7. Owner is responsible for transplanting identified trees, as noted. Coordinate with Owner if trees to be transplanted remain on site when mobilization begins. 8. Cleanly cut all roots encountered during construction. Contractor to Air-knife all roots around trees around all indicated as being essential to the campus landscape vocabulary and any tree over 18" in diameter. 9. Coordinate locations of Tree Protection Fencing and Construction Fencing prior to the start of construction activities. In areas where Tree Protection and Construction Fences overlap, the Contractor may elect to install the more restrictive fence type of the two provided that the single fence accommodates the requirements of both fences. 10. Trimming of existing trees shall occur no later than March 15th. All tree trimming shall be under the direct supervision of a certified arborist. 11. If construction fencing limits access to tree area then tree protection fencing is not necessary. TREE PROTECTION GENERAL NOTES TREE PRESERVATION LEGEND Wooded Area to be Protected Trees to be Removed Tree Protection Fence Locations - To be installed PRIOR TO DEMOLITION Tree Protection Fence Refer to detail this sheet. Tree Protection Fence Refer to detail this sheet. TREE PRESERVATION CHART SYMBOL WOODED AREA LOCATION TREATMENT A North Tree Line REFER TO LD101 B North East REMOVE C North East Propertyline SAVE D South East Grouping SAVE E South Center Single Tree SAVE F South Central Grouping SAVE G South Central/ West Grouping SAVE H South West SAVE I South West REMOVE J South West REMOVE 1 NOT TO SCALE TREE PROTECTION FENCING Remove trees tagged by Landscape Architect. Refer to LD101 for detail. 8/27/2019 Daren Mindham 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 22 23 21 AN00°23'36"E 1277.20'N89°33'54"E 497.18'S44°59'34"E 926.14'S00°27'00"W 754.36'B C C D E F G H I A J C C D 0 Scale 1" = 20'-0" 40'20' 10' North TREE PRESERVATION LEGEND Wooded Area to be Protected Trees to be Removed Tree Protection Fence Locations - To be installed PRIOR TO DEMOLITION Existing Wooded Area to Remain Refer to LD100 TREE PRESERVATION CHART Remove trees tagged by Landscape Architect. Refer to LD101 for detail. Note: Contractor to be within the tree protection fencing ONLY for removal of tagged trees. SYMBOL TREE SPECIES CALIPER TREATMENT TREE CREDIT 1 Hackberry 15" SAVE 3 2 Remove - REMOVE 0 3 Hickory 10" SAVE 2 4 Hickory 8" SAVE 2 5 Remove - REMOVE 0 6 Hackberry 10" SAVE 2 7 Hickory 12" SAVE 3 8 Remove - REMOVE 0 9 Remove - REMOVE 0 10 Cedar - REMOVE 0 11 Hackberry (2 leader) 6" + 6" SAVE 2 12 Hickory 10" SAVE 2 13 Hickory 12" SAVE 3 14 Hackberry (damaged) - REMOVE 0 15 Remove - REMOVE 0 16 Hickory 6" SAVE 1 17 Hackberry 12" SAVE 3 18 Cherry 3" SAVE 0 19 Crab Apple - REMOVE 0 20 Crab Apple - REMOVE 0 21 Sweet Gum Sapling SAVE 0 22 Linden 4" SAVE 1 23 Hackberry 12" REMOVE 0 8/27/2019 Daren Mindham