Loading...
HomeMy WebLinkAboutD101 Demolition PlanII II II II I� II II II II II II II II II II II � IIII � IIII � IIII � IIII � I II 1 II II \ II II \ II II \ ILd III 1 I� II REMOVE WALLS B DOORS AS SHOWN L RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel DATE: 09/04/19 DEMOLITION NOTES: • REMOVE EXISTING FLOOR COVERING. • REMOVE EXISTING WALLS AND DOORS AS SHOWN • REMOVE CEILING THROUGHOUT ELECTRICAL DEMOLITION NOTES: • REMOVE ALL ELECTRICAL LIGHTING, OUTLETS, CONDUITS AND WIRING THROUGHOUT SPACE. nULI I lVIN NV I InR FLOOR AS REQUIRED TO PROVIDE Y TO LOCATIONS SHOWN ON P101. II II II II II II II II I II II II �II REMOVE WALLS &DOORS AS SHOWN I I II II II II II II I II II II II II II II u In II II I REMOVE WALLS B DOORS AS SHOWN II II II II II II II II II u rT� DEMOLITION FLOOR PLAN D101 SCALE: 3/16" = V-0" U J J C 75 rn C O U c t] F S.E.95123om i m N M U O t6 OCID i N � Z co Z) a) U E 06 U I L J 0 v 00SI DATE ISSUED FOR: 0625/2019 Construction C�NNRRmRgH2 'o P�o�siegFQ. AR11000167 `: CHITEG„ THIS DRAWING IS THE SOLE PROPERTY OF RETAIL DESIGN CONSULTANTS LLC AND IS A COPYRIGHTED DOCUMENT AND IS NOT TO BE USED OR REPRODUCED WITHOUT WRITTEN CONSENT. D101