HomeMy WebLinkAboutWSB 087 - Sewer10701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco
Residential SANITARY SEWER PERMIT 999913371
Permit Type Final Subdivision Woods at Shelborne
Project WO
Project Name
Project Developer
Lift Station
Treatment Plant
Parcel Acreage
EDU in Gallons
ENG842014 Section Number
Woods at Shelborne Sec 1 Lot Number
HHM Enterprises, LLC Address Number
16 Zionsville Presbyterian Station Address 2
CTRWD WWTP Street
Local Sewer Charge - District Contribution
Plan Review and Inspection
Application Fee
EDU Fee
Interceptor Fee
Other Fees
Fees Due
Invoice Number
0.34 City
310 Zip Code
County
0.00 Builder
0.00
150.00 Phone Number
1908.00 Owner
0.00 Phone Number
0.00
2058.00 Occupant
Phone Number
1
87
3376
Shelborne Woods Parkway
Carmel
46032
Hamilton
Pulte Group
317-575-2350
PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see
reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench"
phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no
liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be
responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and
the like; caused by construction activity on the building site which is the subject of this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in
advance. All new construction will be placed on billing two months after connection has been made or when water is
connected, whichever comes first.
The building has:
Grease Trap
Grease Interceptor
Grit Interceptor
Grinder Station
Main ID:
Slab Foundation usMH
Crawl Space Manhole IDs
Basement YES Lid Elevation
First Floor Elevation
Water Service City of Carmel I Basement Elevation
Calculation is based on both Manhole Lid Elevations and the elevation of the First Floor
Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by:
WAS705-WAS704
WAS-705 WAS-704 DSMH
/
902.53 J
906.40 V
903.5 `�
906.40 ✓/
896.60 ,/
896.60 v
3.87
2.86� Ft
Ejector Pump Only
TriCo currently requires that an AI inspection is performed and a Certificate of Compliance is issued prior to occupancy /
sale of a properrty. Please review attached 1/1 Permit.
Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner.
The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure.
e terms of the conditional permit, if any, are listed below.
_ Plans have been submitted.
_ All fees have been paid.
_ No certificate of insurance required.
_ No additional permits required.
_ No manhole core permit required.
The facility is not classified as a FOG facility.
(Notes)
By signing below, I attest that I am
Builder / Owner Signature
Printed
Approved By
Ryan
specifications and agree to accept responsibility for ailLyyork done under this permit.
S ^ - Phone Number
Permit is valid [or ONE]YEAR from the date issued. Permit valid only with TriCo