Loading...
HomeMy WebLinkAboutGeneral Building Notes - A001floor plan for wall rL New or existing window mullion Black neoprene seal adhered to face of mullion and sill cap at all exposed surfaces adjacent to aluminum channel. 77 Aluminum brake metal channel w/ edges returned (color to match window framing system). ------ Edge of sill below. Wall construction (referto floor plan) center on window mullion Note: Provide tight fit where wall is coped around anywindow sill construction. Well offset, it required, shall be located to allow access to building services such as blinds, rollershades, HVAC diffusers or return air etc. Coordinate final dimension in field, no less than 8" between the new partition and the exterior wall. Refer to floor plan for wall types. Metal stud blocking between vertical studs Semi -recessed fire extinguis cabinet. Refertoflooror code plans far locations. Anchor cabinet to double studs at jambs. Wood blocking as required Wood shims as req sill and jambs. L m —M a c So o c AR n c 0 0 m E0 a oa _o b p o n 0 0 Note: Coordinate minimum required wall thickness with fire extinguisher cabinet manufacturer prior to purchase. Size and type of extinguisher must meet all applicable code requirements. Contractor shall ensure of new and existing fire extinguishers are installed according to NFPA standards. Coordinate with Owner/Landlord regarding extinguisher type and housing required. types, between vertical studs Recessed fire extinguisher cabinet. Refertoflooror code plans for locations. Anchor cabinet to double studs at jambs. Wood Shims as required at sill and jambs. Note: Coordinate minimum required wall thickness with fire extinguisher cabinet manufacturer prior to purchase. Size and type of extinguisher must meet all local and state code requirements. 3 TYYPICAL WALL ALIGNMENT AT MULLION 2 VaERTICAL SECTION SEMI -RECESSED FEC 1 VaERTICAL SECTION FULLY RECESSED FEC CIL existing glazing I face of brake metal to Aluminum brake metal channel w/ edges returned (color to match window framing system). Edge of sill below. Wall construction (refer to floor plan) center on window mullion Note: Provide tight fit where wall is coped around any window sill construction. 4 TYPICAL WALL ALIGNMENT WITHOUT MULLION 1:1 Existing construction (wall, column wrap, etc.) to remain (typ.) Existing construction (wall, column wrap, �l etc.) to remain (typ.) All face of any new construction w/ face of adjacent existing All face of any new construction to remain construction w/ face of unless otherwise indicated. adjacent existing construction to remain unless otherwise Proposed intenorwall indicated. OX construction. Refer to floor plans forwall type. 5 TYPICAL WALL ALIGNMENT DETAIL NO SCALE RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel (� �VTI�IIa+�arJaL DATE: \ 09/04/19 Match new wall type with existing wall construction to remain. Existing construction (wall, column wrap, etc.) to remain (typ.) All face of any new construction w/ face of adjacent existing construction to remain unless otherwise indicated. construction. Refertofloor plans for wall type. Fire strobe (where applicable) / Typical Signage Location. Signs be Building Standard. Signage to include room number, room, name and Braille lettering. Signage shall comply with notes on Sheet A002 and applicable accessibility standards for Signage. 6" 6" Contractorto provide samples for Owner and Architect approval prior to ordering. � 4" I Swfch(es), Cardreaders, Pushbuttons, i Thermostats - Multiple switches shall be / 111 ganged togetherundera single faceplate nfe unless otherwise indicated. r r Thermostats shall be located 6" from the L5 center of the adjacent switch device. In the event of a switch gang larger than shown, adjust thermostat location proportionally. d Door and hardware as scheduled to y - Outlets - If within V-6"horizontally ' of doorjamb, align with switch \ and/or other devices Notes: 150_ I. Provide blocking on studs to align \ CL centers of back boxes. 2. Refer to Architectural Specifications or Project Standards sheet for all device and coverplate styles & colors. If applicable, refer to electrical drawings & specifications for additional information. 6 TYPICAL ALIGNMENTS yP=TU BUILDING NOTES ABBREVIATIONS A.F.F./AFF Above Finished Floor 010000 General Contractor is to request the full set of Contractor Rules and Regulations from the Landlord upon receipt of drawings and become familiar ACT Acoustical Ceiling Tile with additional information pertaining to the building not covered in the drawing set. APPROX. Approximate 010000 The Building Notes Listed below shall be used for pricing purposes only, and where conflicts arise, they shall be superceded by information provided B.O. Bottom of In the drawings and specifications. The notes represent the Owner/Landlord/Architect's best understanding of existing building components and BLKG Blocking systems and shall be verified in the field by a qualified contractor and any discrepancies shall be brought to the attention of all parties far resolution prior to formal bids are submitted for the scope of work, SOT Bottom 015000 The Contractor shall carefully protect all doors (to all elevators, mechanical/electrical rooms, stairways, janitorial closets, restrooms, hall doors, etc.) CAB Cabinet walls, carpets, floors, furniture and fixtures and shall repair or replace damaged property without cost to the Owner. Contractor shall maintain a CJ Control Joint weather tight condition to the existing building throughout the construction period. Contractor shall repairany damage caused by construction CL Center Line operations. CMU Concrete Masonry Unit 019200 The General Contractor will be held responsible formaintaining the integrity of the Building Life Safety System in areas under his construction and COL Column within his control. NI stairwell doors shall remain closed at all times. Contractors shall comply with all OSHA regulations. In the event that smoke GONG Concrete detectors are covered, this should be coordinated on a dolly basis with Property Management. The job supervisor must ensure that covers are CONST Construction removed and the life safes s tern is . operational at the end of each da Y YS p y CPT Carpet 024100 The Contractor shall notify Landlord48 hours prior to commencement work necessary sanding, make suchnoming, on Landlord may orange for atltlitiChad filtering capacity on the affected HVAC equipment, if necessary. Failure to make such notification will result In ri Ceramic Tile the Contractor absorbing the costs to return the equipment to proper condition. It will be the responsibility of the General Contractor to supply and CW Cold Water change return air filters during construction, and after construction is complete if air is raw during construction. The Contractor must also provide DET Detail protection for smoke sensing devices in order to prevent contamination of heads and fire system false alarms. if false alarms occur, fines will be DF Drinking Fountain imposed and are due and payable upon receipt to the Landlord. DIM Dimension 024100 Anyand all materials removed and not reused in the construction, except as directed by the Landlord, shall be disposed of by the Contractor as DP Deep/Depth waste or unwanted materials. The renovator shall fellow all construction waste management requirements established h the Protect Notes relateds to rechannel and recycling. Theremoval Fiat be dwasteeposited sitedIIn the biking s trash r sh lumpshall ers. Damage elevatdumporwith Properly Management's DWG Drawing cause byth l.ISCsed of construction noised be billed in thebuilding Contractor. s. Damal Contractor will b responsible or additional hauls E.T.R. Existing to Remain caused by This disposal of mnsimction debris will be billed to the General ronfractor. the General Coniractorwill be responsible for maintaining EA Each separate hash d umber to be located in an area desig noted by Property Ma mg ement. The Cum foster a rea shall be kepi clea n and all materials El FS Prisoner Insulation Finis in System contained within the durrader. In the event an area is not kepi clean and in respectable condition, Property Management will cause the area to EJ Expansion Joint be cleaned by building personnel without prior notice to the General Contractor, who will subsequently be billed for the clean up. EL gevation 087100 cloor sers and smoke shall match finish and at rated eof dassmbli standards. Provide sInll carry he appropriabull te stops and ersey labl, Interchangeable cores. ELEV gevation closers and smoke seals as required at rated assemblies. All rated doors shall carry the appropriate Warnock -Hersey label. 087150 All keying and re -keying ofc find ers s hall be coordinated with Landlord or or to work Comm ending. Allc ind ers shall be keyed accordingto the EWC Hectric Water Cool er y g y, y p g yl Y EXIST brisling building keying system. 104400 Smoke, Heat and Duct Detectors shall match building standard and be compatible with the existing fire all control system. EXISTG Existing 104400 Audible/Visual Devices shall match the building standard make model and color unless approved by the Landlord. EXP Expansion or Exposed 104400 The General Contractor shall verify the make and model of the existing fire alarm control panel. All work to tie new devices into the existing system EXT Exterior shall be performed by the vendor preauihorized by the Landlord, F Fabric/Textile 122000 Blindsot exleriorwindows shall match building standard: Levolor"Riviera"blindswith 1" aluminum slats. Finish shall be Mark-L clearanodized. Review FD Hear Drain condition of existing blinds with Landlord prior to start of construction activities. FE Fire Extinguisher 211300 Fire sprinkler heads shall match building standard type and finish, as appropriate for similar ceiling types. FEC Fire bating us her Cabinet 224000 Water Heaters shall comply with existing building Standard make and model range. Verify Infield with Landlord. FIN Finish 230000 Thermostats shall match the existing building standard. FLR Poor 230000 Supplemental air conditioning units (serving areas which exceed the base building allowable loads) shall be approved by the Landlord, with FT Feet condenser mounted on the roof in location approved by the Landlord, Supplemental AC usage shall be metered with a building standard tenant GA Gauge electric meter. GB Grab Bar 233000 All air terminal devices shall match This existing building standard make and model. Devices shall be installed per building standard details GL Architectural Glass (Art Glass) appropriate for a specific ceiling assembly. GWB Gypsum Wall Board 233000 All supply ductwork within insulated ceiling plenums shall be externally insulated sheetmetal with l-inch thickness R 4 fiberglass duct wrap with HDWR Hardware kraH-scrim-foil vapor banierjacket. On ducts over 18" wide, apply weldclips or stickclips to bottom of duct spaced 18" on center each way maximum. Seal all longitudinal and transverse seams and all punctures caused b weltldi s with 2" wide SMACNA tabled duct tape and mastic. HM Hollow Metal 9 P Y P P 233000 All return ductwork within insulated ceiling plenums shall be internally lined sheet metal with l-inch thickness 1.5 pcf density R-4 fiberglass duct liner. HORIZ Horizontal Airstream surface coating shall contain an Immobilized EPALegisteretl, antimicrobial agent so it will not support microbial growth, as tested in HVAC Heating, Ventilation and Air Conditioning accordance with ATSM GPI and G22. Duct liner shall be fastened with stickclips or weldclips spaced 184nches on center each way maximum.Just HW Hot Water before sections of ductwork are hung, coat end laps of duct liner with insulation cement and hang. LIST Joist 233000 All flexible duct used within insulated ceiling plenums shall be minimum or R4 insulation value, Flex duct shall be factory fabricated assembly JT Joint consisting of a zinc -coated spring steel or spiral aluminum helix, seamless liner shall be CPE film mechanically locked to helix without adhesives, KIT Kitchen Insulation shall be factory wrapped fiberglass blanket, vapor bonier shall be fire retardant reinforced aluminum material. Flex duct shall berated for 4000fpmvelocity, 64nchw.g.positiveworking pressure,14nchnegativeworkiTg pressure. Flexducishall be UL class l duct with flame spread of not LAM Laminate over 25 and a smoke development rate of not over 50. Where flexible duct length exceeds 72-inches, horizontal support is required. Ducishollbe LAV Lavatory suspended on 36-inch centers with a mini mum 3/4" wide band strap and a minimum 6-inch wide sheet metal protective saddle. Nljointsand LF Laminate Flooring connections of flexible duct shall be made by installing"panduiYstraps on innerjackei, sealing outer jacket with 2 wraps of SMACNA approved cut LLH Long Leg Horizontal tape, and installing onadditional"panduit" stopover the duct tape. LLV Long Leg Vertical 233000 All new HVAC equipment shall match existing building standards or receive explicit approval from the Landlord. M Metal 233300 Dampers shall match building standard make and model, and shall fail closed and be Interlocked wtih base building fire alarm system. M.O. Masonry Opening 233723 General Contractor shall update bind ing EMS system which includes providing new gra phic to be entered in to system. Contractor may utilize MANUF Manufacturer subcontractor of choice to complete associated work, but shall utilize the Landlord's vendor for actual uploading into the building's system. MAS Masonry 260000 All elecfrical equipment (pa nelboards, breakers, meters, transformers etc.) shall match existing building donee ds. MAX Maximum 261000 Electrical nor lighting d evices shall match existing building banda rd make, model and color, unless ap proved explicitly by the La ndlord. MIS Marker Boa rd 261000 Floor mounted power and data receptacles shall be approved, fire rated assemblies, Wiremold/Legrarid models with a minimum of(4)Cai5e jacks MECH Mechanical and 1 1 /2" conduit, and (2) duplex receptacles. 265100 Fluorescent lamps and ballasts s hall match building do heard ma nufa cturer a nd typ e. MHz Mezzanine MFG Manufacturer MIN Minimum N.I.C. Not in Contract O TOO Out to Out SYMBOL LEGEND O.H. Opposite Hand OD Outside Diameter O OPNG Opening - Keyed Note. Refer to Keyed Note Schedule on some OPP Opposite PL Plastic Laminate 101 - Door PLAM Plastic Laminate PLWD Plywood Room Name PS Projection Screen 101 Room Name, Size and PT Paint R Riser RA Return Air Elevation FEE Reference Sheet BEER Refrigerator A101 REG'D Required Section RE Rubber Flooring RO Rough Opening SIM SA Supply Air 1 SC Sealed Concrete Af Of Sheet SCHED Schedule Detail SEC Section SIM SF Square Foot 1 0 SIM Similar Sheet SPECS Specifications SS Solid Suface ST Stone Enlarged Plan or� Detail I STD Standard _ _ J STL Steel SUSP Suspended Revision T Tread T.O. Top Of TB Tack Board Elevation TEL telephone TMPR Tempered Alignment Notation - text may TR Trim (Includes stair heads, nosings, be abbreviated for clarity on transition strips, comer guards, etc.) sheet, or omitted entirely TV Television TYP Typical TZ Terrazzo UNO Unless Noted Otherwise UR Urinal V.I.F. Verify in Field VCT Vinyl Composition File VERT Vertical VT Vinyl Tie VWC Wallcovering W/ With W/O Without WB Wall Base WD Wood WE Wood Flooring WH Water Heater WKP Working Point WP Wall Protection XXX-0 Indicates finish to be determined XXX-E Indicates existing finish to remain 3 ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317,843,5975 SOUTHWEST 12301 Research Blvd Bldg IV - Suite 130 Austin, TX 78759 Tel 512.977.0520 Fax 512.977.0384 - arsondesign.com Z a a a U • Q W i = U o h } a H 00 y/ W C7 STAMP: 06.07.19 ISSUE: �. Permit Set 06.07.19 DRAWING TITLE: General Information and Standard Details JOB NO. 11827705 DATE: 06.07.19 SHEET NUMBER: A001 COPYRIGNI Al 5 CARSON DESIGN AlmaATS