HomeMy WebLinkAboutGeneral Building Notes - A001floor plan for wall
rL
New or existing
window mullion
Black neoprene seal
adhered to face of mullion
and sill cap at all exposed
surfaces adjacent to
aluminum channel.
77 Aluminum brake metal
channel w/ edges
returned (color to match
window framing system).
------ Edge of sill below.
Wall construction (referto floor
plan) center on window mullion
Note: Provide tight fit where wall
is coped around anywindow sill
construction.
Well offset, it required, shall be
located to allow access to
building services such as blinds,
rollershades, HVAC diffusers or
return air etc. Coordinate final
dimension in field, no less than 8"
between the new partition and
the exterior wall.
Refer to floor plan for
wall types.
Metal stud blocking
between vertical studs
Semi -recessed fire extinguis
cabinet. Refertoflooror
code plans far locations.
Anchor cabinet to double
studs at jambs.
Wood blocking as required
Wood shims as req
sill and jambs.
L
m
—M
a
c
So
o
c
AR
n
c
0
0
m
E0
a
oa
_o
b p
o
n
0
0
Note: Coordinate minimum required wall thickness with fire
extinguisher cabinet manufacturer prior to purchase. Size and type
of extinguisher must meet all applicable code requirements.
Contractor shall ensure of new and existing fire extinguishers are
installed according to NFPA standards. Coordinate with
Owner/Landlord regarding extinguisher type and housing required.
types,
between vertical studs
Recessed fire extinguisher
cabinet. Refertoflooror
code plans for locations.
Anchor cabinet to double
studs at jambs.
Wood Shims as required at
sill and jambs.
Note: Coordinate minimum required wall thickness with
fire extinguisher cabinet manufacturer prior to purchase.
Size and type of extinguisher must meet all local and state
code requirements.
3 TYYPICAL WALL ALIGNMENT AT MULLION 2 VaERTICAL SECTION SEMI -RECESSED FEC 1 VaERTICAL SECTION FULLY RECESSED FEC
CIL
existing glazing
I
face of brake metal to
Aluminum brake metal
channel w/ edges
returned (color to match
window framing system).
Edge of sill below.
Wall construction (refer to floor
plan) center on window mullion
Note: Provide tight fit where wall
is coped around any window sill
construction.
4 TYPICAL WALL ALIGNMENT WITHOUT MULLION
1:1
Existing construction
(wall, column wrap,
etc.) to remain (typ.) Existing construction
(wall, column wrap,
�l etc.) to remain (typ.)
All face of any new
construction w/ face of
adjacent existing
All face of any new
construction to remain
construction w/ face of
unless otherwise indicated.
adjacent existing
construction to remain
unless otherwise
Proposed intenorwall
indicated.
OX construction. Refer to floor
plans forwall type.
5 TYPICAL WALL ALIGNMENT DETAIL
NO SCALE
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel (�
�VTI�IIa+�arJaL
DATE: \ 09/04/19
Match new wall type with
existing wall construction
to remain.
Existing construction
(wall, column wrap,
etc.) to remain (typ.)
All face of any new
construction w/ face of
adjacent existing
construction to remain
unless otherwise indicated.
construction. Refertofloor
plans for wall type.
Fire strobe (where applicable)
/
Typical Signage Location. Signs be Building
Standard. Signage to include room number,
room, name and Braille lettering. Signage
shall comply with notes on Sheet A002 and
applicable accessibility standards for Signage.
6" 6"
Contractorto provide samples for Owner and
Architect approval prior to ordering.
�
4" I
Swfch(es), Cardreaders, Pushbuttons,
i
Thermostats - Multiple switches shall be
/
111
ganged togetherundera single faceplate
nfe
unless otherwise indicated.
r r
Thermostats shall be located 6" from the
L5
center of the adjacent switch device. In
the event of a switch gang larger than
shown, adjust thermostat location
proportionally.
d
Door and hardware as
scheduled
to
y -
Outlets - If within V-6"horizontally
'
of doorjamb, align with switch
\
and/or other devices
Notes:
150_
I. Provide blocking on studs to align
\
CL
centers of back boxes.
2. Refer to Architectural Specifications or
Project Standards sheet for all device and
coverplate styles & colors. If applicable,
refer to electrical drawings & specifications
for additional information.
6 TYPICAL ALIGNMENTS
yP=TU
BUILDING NOTES ABBREVIATIONS
A.F.F./AFF Above Finished Floor
010000 General Contractor is to request the full set of Contractor Rules and Regulations from the Landlord upon receipt of drawings and become familiar ACT Acoustical Ceiling Tile
with additional information pertaining to the building not covered in the drawing set. APPROX. Approximate
010000 The Building Notes Listed below shall be used for pricing purposes only, and where conflicts arise, they shall be superceded by information provided B.O. Bottom of
In the drawings and specifications. The notes represent the Owner/Landlord/Architect's best understanding of existing building components and BLKG Blocking
systems and shall be verified in the field by a qualified contractor and any discrepancies shall be brought to the attention of all parties far resolution
prior to formal bids are submitted for the scope of work, SOT Bottom
015000 The Contractor shall carefully protect all doors (to all elevators, mechanical/electrical rooms, stairways, janitorial closets, restrooms, hall doors, etc.) CAB Cabinet
walls, carpets, floors, furniture and fixtures and shall repair or replace damaged property without cost to the Owner. Contractor shall maintain a CJ Control Joint
weather tight condition to the existing building throughout the construction period. Contractor shall repairany damage caused by construction CL Center Line
operations. CMU Concrete Masonry Unit
019200 The General Contractor will be held responsible formaintaining the integrity of the Building Life Safety System in areas under his construction and COL Column
within his control. NI stairwell doors shall remain closed at all times. Contractors shall comply with all OSHA regulations. In the event that smoke GONG Concrete
detectors are covered, this should be coordinated on a dolly basis with Property Management. The job supervisor must ensure that covers are CONST Construction
removed and the life safes s tern is . operational at the end of each da
Y YS p y CPT Carpet
024100 The Contractor shall notify Landlord48 hours prior to commencement work necessary sanding, make suchnoming, on
Landlord may orange for atltlitiChad filtering capacity on the affected HVAC equipment, if necessary. Failure to make such notification will result In ri Ceramic Tile
the Contractor absorbing the costs to return the equipment to proper condition. It will be the responsibility of the General Contractor to supply and CW Cold Water
change return air filters during construction, and after construction is complete if air is raw during construction. The Contractor must also provide DET Detail
protection for smoke sensing devices in order to prevent contamination of heads and fire system false alarms. if false alarms occur, fines will be DF Drinking Fountain
imposed and are due and payable upon receipt to the Landlord.
DIM Dimension
024100 Anyand all materials removed and not reused in the construction, except as directed by the Landlord, shall be disposed of by the Contractor as DP Deep/Depth
waste or unwanted materials. The renovator shall fellow all construction waste management requirements established h the Protect Notes relateds
to rechannel and recycling. Theremoval
Fiat be dwasteeposited
sitedIIn the biking s trash
r sh lumpshall ers. Damage
elevatdumporwith Properly Management's DWG Drawing
cause byth l.ISCsed of construction
noised be billed in thebuilding
Contractor.
s. Damal Contractor
will b responsible
or additional hauls E.T.R. Existing to Remain
caused by This disposal of mnsimction debris will be billed to the General ronfractor. the General Coniractorwill be responsible for maintaining EA Each
separate hash d umber to be located in an area desig noted by Property Ma mg ement. The Cum foster a rea shall be kepi clea n and all materials El FS Prisoner Insulation Finis in System
contained within the durrader. In the event an area is not kepi clean and in respectable condition, Property Management will cause the area to EJ Expansion Joint
be cleaned by building personnel without prior notice to the General Contractor, who will subsequently be billed for the clean up.
EL gevation
087100 cloor sers and smoke
shall match finish and at rated
eof dassmbli standards. Provide sInll carry he appropriabull te
stops and ersey labl, Interchangeable cores. ELEV gevation
closers and smoke seals as required at rated assemblies. All rated doors shall carry the appropriate Warnock -Hersey label.
087150 All keying and re -keying ofc find ers s hall be coordinated with Landlord or or to work Comm ending. Allc ind ers shall be keyed accordingto the EWC Hectric Water Cool er
y g y, y p g yl Y EXIST brisling
building keying system.
104400 Smoke, Heat and Duct Detectors shall match building standard and be compatible with the existing fire all control system. EXISTG Existing
104400 Audible/Visual Devices shall match the building standard make model and color unless approved by the Landlord. EXP Expansion or Exposed
104400 The General Contractor shall verify the make and model of the existing fire alarm control panel. All work to tie new devices into the existing system EXT Exterior
shall be performed by the vendor preauihorized by the Landlord, F Fabric/Textile
122000 Blindsot exleriorwindows shall match building standard: Levolor"Riviera"blindswith 1" aluminum slats. Finish shall be Mark-L clearanodized. Review FD Hear Drain
condition of existing blinds with Landlord prior to start of construction activities. FE Fire Extinguisher
211300 Fire sprinkler heads shall match building standard type and finish, as appropriate for similar ceiling types. FEC Fire bating us her Cabinet
224000 Water Heaters shall comply with existing building Standard make and model range. Verify Infield with Landlord. FIN Finish
230000 Thermostats shall match the existing building standard. FLR Poor
230000 Supplemental air conditioning units (serving areas which exceed the base building allowable loads) shall be approved by the Landlord, with FT Feet
condenser mounted on the roof in location approved by the Landlord, Supplemental AC usage shall be metered with a building standard tenant GA Gauge
electric meter.
GB Grab Bar
233000 All air terminal devices shall match This existing building standard make and model. Devices shall be installed per building standard details GL Architectural Glass (Art Glass)
appropriate for a specific ceiling assembly. GWB Gypsum Wall Board
233000 All supply ductwork within insulated ceiling plenums shall be externally insulated sheetmetal with l-inch thickness R 4 fiberglass duct wrap with HDWR Hardware
kraH-scrim-foil vapor banierjacket. On ducts over 18" wide, apply weldclips or stickclips to bottom of duct spaced 18" on center each way
maximum. Seal all longitudinal and transverse seams and all punctures caused b weltldi s with 2" wide SMACNA tabled duct tape and mastic.
HM Hollow Metal
9 P Y P P
233000 All return ductwork within insulated ceiling plenums shall be internally lined sheet metal with l-inch thickness 1.5 pcf density R-4 fiberglass duct liner. HORIZ Horizontal
Airstream surface coating shall contain an Immobilized EPALegisteretl, antimicrobial agent so it will not support microbial growth, as tested in HVAC Heating, Ventilation and Air Conditioning
accordance with ATSM GPI and G22. Duct liner shall be fastened with stickclips or weldclips spaced 184nches on center each way maximum.Just HW Hot Water
before sections of ductwork are hung, coat end laps of duct liner with insulation cement and hang. LIST Joist
233000 All flexible duct used within insulated ceiling plenums shall be minimum or R4 insulation value, Flex duct shall be factory fabricated assembly JT Joint
consisting of a zinc -coated spring steel or spiral aluminum helix, seamless liner shall be CPE film mechanically locked to helix without adhesives, KIT Kitchen
Insulation shall be factory wrapped fiberglass blanket, vapor bonier shall be fire retardant reinforced aluminum material. Flex duct shall berated for
4000fpmvelocity, 64nchw.g.positiveworking pressure,14nchnegativeworkiTg pressure. Flexducishall be UL class l duct with flame spread of not LAM Laminate
over 25 and a smoke development rate of not over 50. Where flexible duct length exceeds 72-inches, horizontal support is required. Ducishollbe LAV Lavatory
suspended on 36-inch centers with a mini mum 3/4" wide band strap and a minimum 6-inch wide sheet metal protective saddle. Nljointsand LF Laminate Flooring
connections of flexible duct shall be made by installing"panduiYstraps on innerjackei, sealing outer jacket with 2 wraps of SMACNA approved cut LLH Long Leg Horizontal
tape, and installing onadditional"panduit" stopover the duct tape. LLV Long Leg Vertical
233000 All new HVAC equipment shall match existing building standards or receive explicit approval from the Landlord. M Metal
233300 Dampers shall match building standard make and model, and shall fail closed and be Interlocked wtih base building fire alarm system. M.O. Masonry Opening
233723 General Contractor shall update bind ing EMS system which includes providing new gra phic to be entered in to system. Contractor may utilize MANUF Manufacturer
subcontractor of choice to complete associated work, but shall utilize the Landlord's vendor for actual uploading into the building's system. MAS Masonry
260000 All elecfrical equipment (pa nelboards, breakers, meters, transformers etc.) shall match existing building donee ds. MAX Maximum
261000 Electrical nor lighting d evices shall match existing building banda rd make, model and color, unless ap proved explicitly by the La ndlord. MIS Marker Boa rd
261000 Floor mounted power and data receptacles shall be approved, fire rated assemblies, Wiremold/Legrarid models with a minimum of(4)Cai5e jacks MECH Mechanical
and 1 1 /2" conduit, and (2) duplex receptacles.
265100 Fluorescent lamps and ballasts s hall match building do heard ma nufa cturer a nd typ e. MHz Mezzanine
MFG Manufacturer
MIN Minimum
N.I.C. Not in Contract
O TOO Out to Out
SYMBOL LEGEND O.H. Opposite Hand
OD Outside Diameter
O OPNG Opening
- Keyed Note. Refer to Keyed Note Schedule on some OPP Opposite
PL Plastic Laminate
101 - Door PLAM Plastic Laminate
PLWD Plywood
Room Name PS Projection Screen
101 Room Name, Size and PT Paint
R Riser
RA Return Air
Elevation FEE Reference
Sheet BEER Refrigerator
A101 REG'D Required
Section RE Rubber Flooring
RO Rough Opening
SIM SA Supply Air
1 SC Sealed Concrete
Af Of Sheet SCHED Schedule
Detail SEC Section
SIM SF Square Foot
1 0 SIM Similar
Sheet SPECS Specifications
SS Solid Suface
ST Stone
Enlarged Plan or�
Detail I STD Standard
_ _ J STL Steel
SUSP Suspended
Revision T Tread
T.O. Top Of
TB Tack Board
Elevation TEL telephone
TMPR Tempered
Alignment Notation - text may TR Trim (Includes stair heads, nosings,
be abbreviated for clarity on transition strips, comer guards, etc.)
sheet, or omitted entirely TV Television
TYP Typical
TZ Terrazzo
UNO Unless Noted Otherwise
UR Urinal
V.I.F. Verify in Field
VCT Vinyl Composition File
VERT Vertical
VT Vinyl Tie
VWC Wallcovering
W/ With
W/O Without
WB Wall Base
WD Wood
WE Wood Flooring
WH Water Heater
WKP Working Point
WP Wall Protection
XXX-0 Indicates finish to be determined
XXX-E Indicates existing finish to remain
3
;ARSON
DESIGN
ASSOCIATES
MIDWEST
9229 Delegates Row
Suite 250
Indianapolis, IN 46240
Tel 317.843.5979 Fax 317,843,5975
SOUTHWEST
12301 Research Blvd
Bldg IV - Suite 130
Austin, TX 78759
Tel 512.977.0520 Fax 512.977.0384
- arsondesign.com
Z
a
a
a
U
•
Q
W
i
=
U
o
h
}
a
H
00
y/
W
C7
STAMP:
06.07.19
ISSUE: �.
Permit Set 06.07.19
DRAWING TITLE:
General Information
and Standard Details
JOB NO.
11827705
DATE:
06.07.19
SHEET NUMBER:
A001