HomeMy WebLinkAboutStructural - Demolition, P.1GENERAL NOTES - DEMOLITION
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel (�
�VT�'lmnr)Aal�.�L
DATE: \ 09/04/19
1 DEMOLITION RCP PLAN PLAN B 4 ° B °
4e'=1'-0"
1/8"= 1'-0"
A. REFER TO GENERAL NOTES AND REFERENCE SPECIFICATIONS IN AO SERIES SHEETS FOR
SPECIFICATIONS REGARDING DEMOLITION AND EXISTING CONDITIONS.
B. Dashed lines indicate existing items to be removed unless otherwise indicated.
Contractor shall be responsible for the off -site disposal of all demolition items.
C. Following above ceiling demolition activity, the Contractor shall return the existing
suspended ceiling system to remain to its original condition. This shall include repair to
the ceiling grid and replacement of damaged ceiling panels.
D. Refer to Demolition Plan for additional notes and demolition information.
E. Dimensions shown for existing constructionto be demolished are approximate and are
Intended to give a general scope of work to be removed ortemporonly removed to
accomodate new construction. Coordinate demolition work with design intent of new
construction to provide adequate area far this work.
F. If applicable, refer to structural, mechanical, elechica 1, and plumbing documents for
additional demolition information.
G. Remove and reinstall all equipmentor construction on walls receiving new finishes.
Coordinate with architectural finish plan and/or schedule.
H. Contractor shall verify any ductwork, piping or abroad penetrations through existing wall
construction. If penetrations occur where items are to be removed, opening shall be
filled flush with the some material as the surrounding wall. The contractor shall maintain
the integrity of rated wall construction.
J. The Contract or sho ll verify floor elevations on either side of wo Its being removed. Floors
shall be patched and filled with leveling compound where required for a Ievel floor
condition.
K. Contractor shall remove existing floor finishes as indicated or as required for new
construction work. Remove floor finish adhesive and prepare slab as required to receive
new finish.
L. Ceiling grid and tiles to remain as existing. Patch and repair as required.
M. Salvage and reuse all doors, door frames, and hardware as possible. Repair all doors,
doorframes, and hardware to like new condition.
DEMOLITION RCP LEGEND
Note: All items shown will be existing to remain unless noted otherwise.
Ter Existing Building Standard it l uminated exit light to
remain. Solid area denotes direction of face plate.
Existing Building Standard 2x2 fluorescent light
fixture to remain.
Existing Recessed Downlight Fixture to remain.
o Existing Recessed Downlight Fixture to remain.
&isting Building Standard 2x4 fluorescent light
fixture to remain.
Indicates existing light fixture to be removed. Note:
Fixture may be re -used. Refer to reflected ceiling plan
for possible new location use only best condition
fixtures for this purpose. Fixtures must be cleaned and
inspected prior to re-
installation.
E-Indicates existing diffuserisi to be removed.
2?y Coordinate with HVAC contractor for possible re-
use and/or locations of required new HVAC
equipment.
Indicates existing 2X4 ceiling grid to be removed.
_T _Y
Indicates existing ceiling grid to be remain.
■ Indicates area not in contract Relerto floor plans for
additional information.
KEYED NOTES - DEMOLITION RCP
DR1 Remove downlights.
DR2 Remove pendant lights and bulkhead construction
.3
;ARSON
DESIGN
ASSOCIATES
MIDWEST
9229 Delegates Row
Suite 250
Indianapolis, IN 46240
Tel 317.843.5979 Fax 317,843,5975
SOUTHWEST
12301 Research Blvd
Bldg IVSuite130
Austin, TX 78759
Tel S12977.0520 Fax 512.977.0384
-orsondesign.com
Z
^,
W
i
0
Q
i3
U
R
N
5�
O
o
}
}U
N
00
O0
V
IL
Y
ca
O
O
C7
STAMP:
``xOTv1TM\CH ur4iii
�( ° xxvpi
��p'k�EGISTE
9 v
F -'
DIA
pxiygRUHI E`xTpO
06.07.19
ISSUE: i
Permit Set 06.07.19
DRAWING TITLE:
Demolition RCP Plan
JOB NO. 11827705
DATE: 06.07.19
SHEET NUMBER:
caPYRIGMDrO cMSaN DESIGN ASVJauES