Loading...
HomeMy WebLinkAboutStructural - Demolition, P.1GENERAL NOTES - DEMOLITION RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel (� �VT�'lmnr)Aal�.�L DATE: \ 09/04/19 1 DEMOLITION RCP PLAN PLAN B 4 ° B ° 4e'=1'-0" 1/8"= 1'-0" A. REFER TO GENERAL NOTES AND REFERENCE SPECIFICATIONS IN AO SERIES SHEETS FOR SPECIFICATIONS REGARDING DEMOLITION AND EXISTING CONDITIONS. B. Dashed lines indicate existing items to be removed unless otherwise indicated. Contractor shall be responsible for the off -site disposal of all demolition items. C. Following above ceiling demolition activity, the Contractor shall return the existing suspended ceiling system to remain to its original condition. This shall include repair to the ceiling grid and replacement of damaged ceiling panels. D. Refer to Demolition Plan for additional notes and demolition information. E. Dimensions shown for existing constructionto be demolished are approximate and are Intended to give a general scope of work to be removed ortemporonly removed to accomodate new construction. Coordinate demolition work with design intent of new construction to provide adequate area far this work. F. If applicable, refer to structural, mechanical, elechica 1, and plumbing documents for additional demolition information. G. Remove and reinstall all equipmentor construction on walls receiving new finishes. Coordinate with architectural finish plan and/or schedule. H. Contractor shall verify any ductwork, piping or abroad penetrations through existing wall construction. If penetrations occur where items are to be removed, opening shall be filled flush with the some material as the surrounding wall. The contractor shall maintain the integrity of rated wall construction. J. The Contract or sho ll verify floor elevations on either side of wo Its being removed. Floors shall be patched and filled with leveling compound where required for a Ievel floor condition. K. Contractor shall remove existing floor finishes as indicated or as required for new construction work. Remove floor finish adhesive and prepare slab as required to receive new finish. L. Ceiling grid and tiles to remain as existing. Patch and repair as required. M. Salvage and reuse all doors, door frames, and hardware as possible. Repair all doors, doorframes, and hardware to like new condition. DEMOLITION RCP LEGEND Note: All items shown will be existing to remain unless noted otherwise. Ter Existing Building Standard it l uminated exit light to remain. Solid area denotes direction of face plate. Existing Building Standard 2x2 fluorescent light fixture to remain. Existing Recessed Downlight Fixture to remain. o Existing Recessed Downlight Fixture to remain. &isting Building Standard 2x4 fluorescent light fixture to remain. Indicates existing light fixture to be removed. Note: Fixture may be re -used. Refer to reflected ceiling plan for possible new location use only best condition fixtures for this purpose. Fixtures must be cleaned and inspected prior to re- installation. E-Indicates existing diffuserisi to be removed. 2?y Coordinate with HVAC contractor for possible re- use and/or locations of required new HVAC equipment. Indicates existing 2X4 ceiling grid to be removed. _T _Y Indicates existing ceiling grid to be remain. ■ Indicates area not in contract Relerto floor plans for additional information. KEYED NOTES - DEMOLITION RCP DR1 Remove downlights. DR2 Remove pendant lights and bulkhead construction .3 ;ARSON DESIGN ASSOCIATES MIDWEST 9229 Delegates Row Suite 250 Indianapolis, IN 46240 Tel 317.843.5979 Fax 317,843,5975 SOUTHWEST 12301 Research Blvd Bldg IVSuite130 Austin, TX 78759 Tel S12977.0520 Fax 512.977.0384 -orsondesign.com Z ^, W i 0 Q i3 U R N 5� O o } }U N 00 O0 V IL Y ca O O C7 STAMP: ``xOTv1TM\CH ur4iii �( ° xxvpi ��p'k�EGISTE 9 v F -' DIA pxiygRUHI E`xTpO 06.07.19 ISSUE: i Permit Set 06.07.19 DRAWING TITLE: Demolition RCP Plan JOB NO. 11827705 DATE: 06.07.19 SHEET NUMBER: caPYRIGMDrO cMSaN DESIGN ASVJauES