Loading...
HomeMy WebLinkAboutA-020-BASEMENT-FLOOR-COMPOSITE-PLAN-Rev.0INFECTION CONTROL NOTES FIRST FLOOR PHASING PLAN 1/8" = 1'-0" NORTH I L, A A A A A A A ALL V A A A A A PHARMACY OPEN: 24 Hours / 7 Days\\ PKG AREA BW0081 232 SF FRZ REF REF7 S \ m STERILE HOOD BWao74 -- - -- 107 SF m PAS i HAZ HOOD BWOW6 134 SF 1 UD I PAai `_1HF4 ENERAL \RO \\\NOTE: ALL\\\\XI�lV SHALL BE \% GDRUG PRODUCTS MOVED BY OWNER PRIOR TO ANY COMMENCEMENT F WORK PHASE. ANY SHELVING FOR CONTRACTOR \ V AREMOVALWILL BEEMI \Vvk �� z N 3.0 I OR I I TEMPORARY CONSTRUCTION WALL WITH DOOR. COORDINATE EXTENT OF TEMPORARY PROTECTION WITH q HOSPITAL'S ICRA AGENT. L3��jM1 HOSPITAL TO PROVIDE INTERIM LIFE SAFETY FOR CONTRACTOR STORAGE. 17= r-- :- -- I -� I LANTEIWORK RM swoon t 149 SF I I -� BW0069 I PAsl:li I I _ _ _ rHBw - FRZ — TEMPORARY CONSTRUCTION WALL COORDINATE EXTENT OF TEMPORARY PROTECTION WITH HOSPITAL'S ICRA AGENT. i/r TJI — — — — — — — — MAINTAIN ACCESS TO PRODUCT STORAGE AREA FOR OWNER DURING CONSTRUCTION. COORDINATE SHUT DOWN OF AREA FOR ABOVE CEILING WORK AND INSTALLATION OF NEW SHELVING BY OFFICE WORKS. CONFIRM EXTENT OF REQUIRED ICRA PROTECTION MEASURES DURING THIS WORK. SUPPLY 9W0075 344 SF RELEASED FOR CONSTRUCTION C Subject tocompliance d Local all regulations :NT PHASING PLAN Id Sete and Local Codes City of Carmel lt"aoi DATE: 09/04/19 LOCATION FOR TEMPORARY HOOD, CONFIRM TEMPORARY OWNER TO TEMPORARYHC 8' HOOD IS COVERED AND STORED ELSEWHERE AND BROUGHT BACK INOT THE SPI WHEN PHASE 1 IS COMPLETE. STORAGE STERILE HOOD L _ BW0074 INFECTION CONTROL AND NEGATIVE AIR PRESSURE 1.1 NEGATIVE PRESSURE PROJECT PHASING AND WORKING REQUIREMENTS Contractors to refer to specifcabons Section 01501 -Temporary Wall Construction for requirements on construction temporary walls The renovation work may be completed during normal working hours. The surrounding area is an Occupied space. Access to assist in creating the required negative pressure. to adjacent rooms will be limited and must be scheduled in advance. Negative air pressure relationships: The construction area (nev Construction or renovations) shall be maintained under negative All demolition debris must be placed in wheeled carts with Covers and transported down the staff based elevators. The pressure relative to the occupied areas within the building. This shall be accomplished by reducing supply air to the construction area hospital will grant access to the restricted elevators for contractor use. Access to the dumpster located in the loading dock. to a minimum and maintaining full returNexhaust quantities from the construction area in renovation projects. f the construction project Once a load of material is dumped, the contractor will be required to dean the cart prior to going back to the construction is a new addition to an existing building, penetrations into the existing building shall be kept to a minimum until final Connections site. between the buildings must occur. The new addition shall be kept under negative pressure to ensure that air within the new addition does net travel into the existing building. Monitoring of negative pressure an a daily basis during the renovation and new construction Project material and equipment deliveries will be by way of the loading dock Refer to the floor plans for the scope of project is a requirement of fhia specifications sections. Daily documentation is required. renovation areas within the facility. The Contractor must coordinate size of materials to the site based on the proposed access route to the project. No material or equipment deliveries will be accepted by hospital personal. The contractor must Temporary duct work may be required to properly exhaust the construction site and shall be included in the contractors bid if required. have a person at the dock to sign for ell deliveries and promptly move the material or equipment off the dock Negative air requirements shall be maintained until the owners infection Control representative signs of on the new constructionhenovation space. All contractors will be required to have identification badges on when working in the hospital. Negative air pressure does net have to be maintained in the new building addition as long as all the opening between the new and existing buildings are sealed. At the point when the openings into theousfing building are created, negative pressure will be required. Contractor to coordinate a minimum of l week in advance for any Utility shut downs, activities that will cause excessive vibrate a False. The mechanical contractor will be required to cap and seal W all openings in supply ducts stated to remain during construction. Capping of of ductwork shall occur prior to the start of any demoltion work. Contractor shall keep the construction site clean and free of tlebris Buildup during construction. Limited storage of materials will be an issue with the small construction site. Coordinate storage trader staging on site With the owner. The Mechanical Contractor to provide filter media over all duct outlets and inlets in the construction area that will remain active during Construction. Filter media must be changed every 48 hours by the contractor or as required to maintain required air flow. The GC shall provide and maintain the required temporary construction barriers during the duration of the project The General Contractor shall supply the air scubbers or exhaust fan units (power by E.C.). When access to an exterior window is Contractor to protect existing finishes noted to remain as required due to Construction activities. available, negative air pressure relationships may Be achieved by the temporary installation of an exhaust fan of appropriate size in an exterior window a opening. The opening must be protect from the infiltration of Past, rain etc. into the building. All exhausted air must pass thru a HEPA filter prior to exiting the building. HEPA filters to be maintained by the General Contractor. COMPOSITE PLAN NOTES In order to ensure that the construction area is in negative pressure relative to the surrounding occupied areas, the mechanical prime contractor shall install a magnahelic gauge to monitor the pressure variance between the construction areas and the public occupied areas of the building. The gage shall be installed and maintained by the Mechanical prime contractor. COMPOSITE PLAN GENERAL NOTES: The magnahelic gauge shall be installed and certified by a certified test and balance contractor. The mechanical contractor shall read 1. CONTRACTOR TO COORDINATE LOCATION OF DUMPSTER WITH the gauge and sign a sheet indicating negative pressure in the construction site is achieved. The gauge shall be read at the start and THE OWNER ON SITE. end of the work day. Copies of the reading log shall be forwarded to the contractor hospitalrbuilding and architect. 2. THE DELIVERY OF MATERIALS AND SUPPLIES SHALL INFECTION CONTROL MEASURES COORDINATED WITH THE OWNER. THE AREA AROUNDTHE CONSTRUCTION SITE WILL BE ACTIVE. PATIENTS, FAMILY, AND All ducbwrk, water piping medical gas piping etc stored in the construction site shall be covered to avoid dust contamination inside the STAFF WILL BE WALKING IN THE CORRIDORS AROUND THE materials. CONSTRUCTION AREA DELIVERIES MAY NEED TO OCCUR AT OFF HOURS TO ENSURE THE SAFETY OF BUILDING OCCUPANTS. All exposed/open ends of ductwork water piping medical gas piping etc installed in the construction site shall be covered to avoid dust contamination inside the materials. Ductwork, water piping medical gas piping etc shall not be installed in the new construction site until the building is water tight and PHASING exterior walls/sheathing is installed to avoid contamination inside the materials. PLAN NOTES The contractors shall supply portable HEPA filters to be used within the construction area. The contractor shall make sure these units run 24 hours a day thru the course of construction. The contractor shall be responsible for supplying and changing the pre -filters on a PHASING PLAN GENERAL NOTES: regular basis. 1. SMOKE DETECTOR HEADS TO REMAIN ACTIVE. TEMPORARY SHUTDOWN OF At all entranceslexits to the construction zone, the contractor shall provide tacky mats. Provide large enough mats so that both feet INDIVIDUAL HEADS IS PERMITTED WITH ONE WEEK ADVANCED NOTICE TO make contact with the mat while walking thru the entry. The mats will be supplied by the general contractor. THE OWNER. HEADS SHALL BE RE -ACTIVATED AT THE END OF EACH SHIFT OF WORK. Temporary vestibules shall be constructed at the point the contractors enter and exit the construction site. 2. ROOM IS TO BE UNDER NEGATIVE PRESSURE FOR THE DURATION OF During construction, if there are corridors that materials or workmen will use, the carpet shall be protected to prevent damage to the CONSTRUCTION. carpet and protect the carpet from dug and debris. All hand surface fleas must be demead/mopped on a daily basis to prevent dust and foot prints. GC shall monitor the hallways and exit passages. 3. FIRE SUPPRESSION SYSTEM IS TO REMAIN ACTIVE. IF SYSTEM NEEDS TO BE DRAINED TO MOVE SPRINKLER HEAD, NOTIFY OWNER (2) WEEKS IN Contractors will be restricted in the corridors that they may use to remove demolition material and bring in new supplies. Comdors that ADVANCE. SYSTEM CANNOT BE DOWN FOR MORE THAN FOUR (4) HOURS are used by the contractors shall be kept in a neat and clean fashion. The contractor will be responsible for cleaning the corridor at the WITHOUT A FIRE WATCH. end of each work day. If deemed necessary by the hospitalrbuildirg owner or the architect, the contractor shall clean the floors at various intervals tr.-out the day to coincide with construction activities-i.e. removal of demolition materials and/or during the time 4. ANY PARTITION BETWEEN CONSTRUCTION SPACE AN D ADJACENT SPACES when drywall work is occurring. THAT DOSE NOT HAVE GYPSUM BOARD EXTENDING TO DECK ABOVE SHALL HAVE TEMPORARY PARTITION CONSTRUCTION BETWEEN TOP OF GYPSUM All construction debris leaving the enclosed walls of the construction area shall be bagged or covered with plastic to prevent the BOARD AND DECK ABOVE. SEE ICRA NOTES FOR PARTITION migration of construction dust into the patient areas. The plastic sheet used to cover the carts shall only be used once to eliminate the REQUIREMENTS. possibility of dust buildup on the film. Carts used to transport new materials or demolition materials shall be cleaned on a regular basis to reduce the transmission of dust. The preliminary Infection Control Risk Assessment Will need to be completed by the Contractor and the hospital prior to the start of construction. The GC shall hang a copy of the ICRA report in the construction area. wozo w010 BC0060 EQUIP_$TOR DATA_PROC ELEC_RM TAUB S KY WE 160 00 STAIR T T_ STF BC 2 B C ONSTRUCTION TRAFFIC PATH. CONTRACTOR CARTS nr Pu SHALLBE COVERED MILE TRANSPORTING MATERIAL IN AND OUT THROUGH THE BUILDING. T M ELEV E BCEno BcsE9E Euv_EQ T LOCKERS ® LOCKERS BC0040 E01 CIRCPUB A R IRCPUBBW0000 xr,.n,,.l ] EL SAT BEN BW0069 L BW0073 T � BASEMENT COMPOSITE PLAN 1" = 10'-0" NORTH WAR BCEESx LOSET C ART WASH E] DECQUTAM V tl W00d0 — C-1 wA L L' J J BC00 B W0066 WORKAREA CART_ STAGE 1 J LLLLLL OTHEROTHERSU BR BURP O1 1-7—T- i T- r11 LINEN RECEIVING/ BREAKDOWN BW0002 BC0190 STORAGE RCo00] C IRO PUB CONSTRUCTION TRAFFIC PATH. CONTRACTOR CARTS SHALL BE COVERED WHILE TRANSPORTING MATERIAL IN AND OUT THROUGH THE BUILDING. CONTRACTOR TO PROVIDE CONSTRUCTION MATERIAL ONLY DUMPSTER. DUMPSTER TO BE SET NEXT TO RETAINING WALL BY HOSPITAL DUMPSTER. CONFIRM PLACEMENT LOCATION WITH OWNER PRIOR TO SETTING. CONTRACTOR TO PARK AT WEST END OF CAMPUS, CONFIRM LOCATION WITH OWNER. LINEN LINEN 000I C IRO PU9 0360 ELEC _ RM Fa OFF"IC E 0 MORGUE MORGUE B BIOHAZARD I� MKM architecture + design 119 West Wayne Street Fort Wayne, Indiana 46802 1260.422.0783 f 260.426.4561 www.MKMdesian.com iM AMf2a6fis1 sTwall KW Ran Ixo¢nrED DESIGNS r THls DRAWNG Rae OWNED By Me THE PROPERTY OF MKM ARCHITECTURE ♦ DESIGN, PNO WERE CREATED AND DEVELOPED FOR USE ON, AMID IN CONNECTION NTH THIS SPECIFIC PROJECT HONE OF THEM DESIGNS. ARRANGEMENTS OR PLANS SHALL BE USED BY OR DISCLOSED TO ANY PERSON. M OR CORPORATION FOR ANY FURPOSE WAATSOEaR NTHODT THE WHITNEY PERMISSION GF MKM ARCHITECTURE • C N. THE OMER SHALL BE PERM17ED TO RETAIN CORES FOR INFORMATION AND REFERENCE IN CONNECTION NTH THIS PROJECT Wamm DIMENSIONS ON THESE CANNABIS SHALL HAVE PRECEDENCE OVER SCALE DIMENS'ONS. CONrRACORS SHALL V ERWYPND BE RESPONSIBLE FOR NL DIMENSIONS AHD CONDITIONS ON THE JOB AMID THIS CHASE MUST BE NOTIFIED OF ANY IATION FRasTHEDNENSIONSANDCONDmoas SHOWN BV THESE DRAMINGS. SHOP DRANNCS MOtt BE SUBMITTED TO THIS OFFICE FOR RENEW BEFORE PROCEEDING WTNI FIBNWTION ANWOR INSTALLATION. THE WORK SHOWN ON THIS DOCUMENT, AND THE CORRESPONDING srecirIGPOHs, INTERFACES NTH WORK SHOWN ON OTHER DOCUMENTS INCLUDING VARK TO BE PERFORMED BY OTHER CONTRACTORS OR SUBCONTRACTORS. EACH CONTRACTOR OR SUBCONTRACTOR SHALL BE FAMILIAR NTH THE WORK OF OTHER CONTRACTORS OR SUBCONTRACTORS, WHETHER OR NOT SHOWN ON THIS DOCUMENT WHICH IMPACTS THE SONY IMPACTS THE WORK SHOWN HMON AND SHALL COORDINATE SUCH WORK W AS TO PF IN CAMPL W ICEWTHTHEINTENTUn1LTHEPMECT DOCUMENTS. I= St. Vincent Carmel Hospital Carmel Pharmacy 797 800 13500 N Meridian Street REVtpH DRAWING CONTENTS: BASEMENT FLOOR COMPOSITE PLAN ISSUEDATE'. PROJECT NO. 04/26/2019 MKM'. 17107 ASCENSION. W286 DRAwwG NO. A-020