HomeMy WebLinkAboutA-020-BASEMENT-FLOOR-COMPOSITE-PLAN-Rev.0INFECTION CONTROL NOTES
FIRST FLOOR PHASING PLAN
1/8" =
1'-0"
NORTH
I L, A A A A A A A ALL V A A A A A
PHARMACY OPEN: 24 Hours / 7 Days\\
PKG AREA
BW0081
232 SF
FRZ REF REF7
S \
m STERILE
HOOD
BWao74
-- - -- 107 SF
m
PAS
i
HAZ HOOD
BWOW6
134 SF
1
UD
I PAai
`_1HF4
ENERAL
\RO
\\\NOTE: ALL\\\\XI�lV SHALL BE \% GDRUG PRODUCTS
MOVED BY OWNER PRIOR TO ANY COMMENCEMENT
F WORK PHASE. ANY SHELVING FOR CONTRACTOR
\ V AREMOVALWILL BEEMI \Vvk
��
z
N
3.0 I
OR I I
TEMPORARY CONSTRUCTION WALL
WITH DOOR. COORDINATE EXTENT OF
TEMPORARY PROTECTION WITH
q HOSPITAL'S ICRA AGENT.
L3��jM1 HOSPITAL TO PROVIDE INTERIM LIFE
SAFETY FOR CONTRACTOR STORAGE.
17=
r-- :- --
I -�
I
LANTEIWORK
RM
swoon t
149 SF
I I -� BW0069
I
PAsl:li I I
_ _ _ rHBw -
FRZ
— TEMPORARY CONSTRUCTION
WALL COORDINATE EXTENT OF
TEMPORARY PROTECTION WITH
HOSPITAL'S ICRA AGENT.
i/r TJI — — — — — — — —
MAINTAIN ACCESS TO PRODUCT
STORAGE AREA FOR OWNER
DURING CONSTRUCTION.
COORDINATE SHUT DOWN OF
AREA FOR ABOVE CEILING
WORK AND INSTALLATION OF
NEW SHELVING BY OFFICE
WORKS. CONFIRM EXTENT OF
REQUIRED ICRA PROTECTION
MEASURES DURING THIS WORK.
SUPPLY
9W0075
344 SF
RELEASED FOR CONSTRUCTION C
Subject tocompliance d Local all regulations :NT PHASING PLAN
Id Sete and Local Codes
City of Carmel
lt"aoi
DATE: 09/04/19
LOCATION FOR TEMPORARY HOOD,
CONFIRM TEMPORARY
OWNER TO
TEMPORARYHC
8' HOOD IS COVERED AND
STORED ELSEWHERE AND
BROUGHT BACK INOT THE SPI
WHEN PHASE 1 IS COMPLETE.
STORAGE
STERILE
HOOD L _
BW0074
INFECTION CONTROL AND NEGATIVE AIR PRESSURE
1.1 NEGATIVE PRESSURE
PROJECT PHASING AND WORKING REQUIREMENTS
Contractors to refer to specifcabons Section 01501 -Temporary Wall Construction for requirements on construction temporary walls
The renovation work may be completed during normal working hours. The surrounding area is an Occupied space. Access
to assist in creating the required negative pressure.
to adjacent rooms will be limited and must be scheduled in advance.
Negative air pressure relationships: The construction area (nev Construction or renovations) shall be maintained under negative
All demolition debris must be placed in wheeled carts with Covers and transported down the staff based elevators. The
pressure relative to the occupied areas within the building. This shall be accomplished by reducing supply air to the construction area
hospital will grant access to the restricted elevators for contractor use. Access to the dumpster located in the loading dock.
to a minimum and maintaining full returNexhaust quantities from the construction area in renovation projects. f the construction project
Once a load of material is dumped, the contractor will be required to dean the cart prior to going back to the construction
is a new addition to an existing building, penetrations into the existing building shall be kept to a minimum until final Connections
site.
between the buildings must occur. The new addition shall be kept under negative pressure to ensure that air within the new addition
does net travel into the existing building. Monitoring of negative pressure an a daily basis during the renovation and new construction
Project material and equipment deliveries will be by way of the loading dock Refer to the floor plans for the scope of
project is a requirement of fhia specifications sections. Daily documentation is required.
renovation areas within the facility. The Contractor must coordinate size of materials to the site based on the proposed
access route to the project. No material or equipment deliveries will be accepted by hospital personal. The contractor must
Temporary duct work may be required to properly exhaust the construction site and shall be included in the contractors bid if required.
have a person at the dock to sign for ell deliveries and promptly move the material or equipment off the dock
Negative air requirements shall be maintained until the owners infection Control representative signs of on the new
constructionhenovation space.
All contractors will be required to have identification badges on when working in the hospital.
Negative air pressure does net have to be maintained in the new building addition as long as all the opening between the new and
existing buildings are sealed. At the point when the openings into theousfing building are created, negative pressure will be required.
Contractor to coordinate a minimum of l week in advance for any Utility shut downs, activities that will cause excessive
vibrate a False.
The mechanical contractor will be required to cap and seal W all openings in supply ducts stated to remain during construction.
Capping of of ductwork shall occur prior to the start of any demoltion work.
Contractor shall keep the construction site clean and free of tlebris Buildup during construction. Limited storage of materials
will be an issue with the small construction site. Coordinate storage trader staging on site With the owner.
The Mechanical Contractor to provide filter media over all duct outlets and inlets in the construction area that will remain active during
Construction. Filter media must be changed every 48 hours by the contractor or as required to maintain required air flow.
The GC shall provide and maintain the required temporary construction barriers during the duration of the project
The General Contractor shall supply the air scubbers or exhaust fan units (power by E.C.). When access to an exterior window is
Contractor to protect existing finishes noted to remain as required due to Construction activities.
available, negative air pressure relationships may Be achieved by the temporary installation of an exhaust fan of appropriate size in an
exterior window a opening. The opening must be protect from the infiltration of Past, rain etc. into the building. All exhausted air must
pass thru a HEPA filter prior to exiting the building.
HEPA filters to be maintained by the General Contractor.
COMPOSITE PLAN NOTES
In order to ensure that the construction area is in negative pressure relative to the surrounding occupied areas, the mechanical prime
contractor shall install a magnahelic gauge to monitor the pressure variance between the construction areas and the public occupied
areas of the building. The gage shall be installed and maintained by the Mechanical prime contractor.
COMPOSITE PLAN GENERAL NOTES:
The magnahelic gauge shall be installed and certified by a certified test and balance contractor. The mechanical contractor shall read
1. CONTRACTOR TO COORDINATE LOCATION OF DUMPSTER WITH
the gauge and sign a sheet indicating negative pressure in the construction site is achieved. The gauge shall be read at the start and
THE OWNER ON SITE.
end of the work day. Copies of the reading log shall be forwarded to the contractor hospitalrbuilding and architect.
2. THE DELIVERY OF MATERIALS AND SUPPLIES SHALL
INFECTION CONTROL MEASURES
COORDINATED WITH THE OWNER. THE AREA AROUNDTHE
CONSTRUCTION SITE WILL BE ACTIVE. PATIENTS, FAMILY, AND
All ducbwrk, water piping medical gas piping etc stored in the construction site shall be covered to avoid dust contamination inside the
STAFF WILL BE WALKING IN THE CORRIDORS AROUND THE
materials.
CONSTRUCTION AREA DELIVERIES MAY NEED TO OCCUR AT OFF
HOURS TO ENSURE THE SAFETY OF BUILDING OCCUPANTS.
All exposed/open ends of ductwork water piping medical gas piping etc installed in the construction site shall be covered to avoid dust
contamination inside the materials.
Ductwork, water piping medical gas piping etc shall not be installed in the new construction site until the building is water tight and
PHASING
exterior walls/sheathing is installed to avoid contamination inside the materials.
PLAN NOTES
The contractors shall supply portable HEPA filters to be used within the construction area. The contractor shall make sure these units
run 24 hours a day thru the course of construction. The contractor shall be responsible for supplying and changing the pre -filters on a
PHASING PLAN GENERAL NOTES:
regular basis.
1. SMOKE DETECTOR HEADS TO REMAIN ACTIVE. TEMPORARY SHUTDOWN OF
At all entranceslexits to the construction zone, the contractor shall provide tacky mats. Provide large enough mats so that both feet
INDIVIDUAL HEADS IS PERMITTED WITH ONE WEEK ADVANCED NOTICE TO
make contact with the mat while walking thru the entry. The mats will be supplied by the general contractor.
THE OWNER. HEADS SHALL BE RE -ACTIVATED AT THE END OF EACH SHIFT
OF WORK.
Temporary vestibules shall be constructed at the point the contractors enter and exit the construction site.
2. ROOM IS TO BE UNDER NEGATIVE PRESSURE FOR THE DURATION OF
During construction, if there are corridors that materials or workmen will use, the carpet shall be protected to prevent damage to the
CONSTRUCTION.
carpet and protect the carpet from dug and debris. All hand surface fleas must be demead/mopped on a daily basis to prevent dust
and foot prints. GC shall monitor the hallways and exit passages.
3. FIRE SUPPRESSION SYSTEM IS TO REMAIN ACTIVE. IF SYSTEM NEEDS TO BE
DRAINED TO MOVE SPRINKLER HEAD, NOTIFY OWNER (2) WEEKS IN
Contractors will be restricted in the corridors that they may use to remove demolition material and bring in new supplies. Comdors that
ADVANCE. SYSTEM CANNOT BE DOWN FOR MORE THAN FOUR (4) HOURS
are used by the contractors shall be kept in a neat and clean fashion. The contractor will be responsible for cleaning the corridor at the
WITHOUT A FIRE WATCH.
end of each work day. If deemed necessary by the hospitalrbuildirg owner or the architect, the contractor shall clean the floors at
various intervals tr.-out the day to coincide with construction activities-i.e. removal of demolition materials and/or during the time
4. ANY PARTITION BETWEEN CONSTRUCTION SPACE AN D ADJACENT SPACES
when drywall work is occurring.
THAT DOSE NOT HAVE GYPSUM BOARD EXTENDING TO DECK ABOVE SHALL
HAVE TEMPORARY PARTITION CONSTRUCTION BETWEEN TOP OF GYPSUM
All construction debris leaving the enclosed walls of the construction area shall be bagged or covered with plastic to prevent the
BOARD AND DECK ABOVE. SEE ICRA NOTES FOR PARTITION
migration of construction dust into the patient areas. The plastic sheet used to cover the carts shall only be used once to eliminate the
REQUIREMENTS.
possibility of dust buildup on the film. Carts used to transport new materials or demolition materials shall be cleaned on a regular basis
to reduce the transmission of dust.
The preliminary Infection Control Risk Assessment Will need to be completed by the Contractor and the hospital prior to the start of
construction. The GC shall hang a copy of the ICRA report in the construction area.
wozo w010
BC0060 EQUIP_$TOR DATA_PROC
ELEC_RM TAUB
S
KY WE 160 00 STAIR
T T_ STF BC 2 B
C ONSTRUCTION TRAFFIC PATH. CONTRACTOR CARTS nr Pu
SHALLBE COVERED MILE TRANSPORTING MATERIAL
IN AND OUT THROUGH THE BUILDING.
T M
ELEV E
BCEno BcsE9E Euv_EQ
T LOCKERS ® LOCKERS BC0040
E01 CIRCPUB
A R
IRCPUBBW0000
xr,.n,,.l ]
EL SAT
BEN BW0069
L
BW0073
T �
BASEMENT COMPOSITE PLAN
1" = 10'-0"
NORTH
WAR
BCEESx
LOSET
C ART WASH
E] DECQUTAM V
tl W00d0 — C-1 wA
L
L' J J
BC00
B W0066 WORKAREA
CART_ STAGE
1
J
LLLLLL
OTHEROTHERSU
BR BURP O1
1-7—T- i T- r11 LINEN
RECEIVING/
BREAKDOWN
BW0002
BC0190
STORAGE
RCo00]
C IRO PUB
CONSTRUCTION TRAFFIC PATH. CONTRACTOR CARTS
SHALL BE COVERED WHILE TRANSPORTING MATERIAL
IN AND OUT THROUGH THE BUILDING.
CONTRACTOR TO PROVIDE CONSTRUCTION MATERIAL
ONLY DUMPSTER. DUMPSTER TO BE SET NEXT TO
RETAINING WALL BY HOSPITAL DUMPSTER. CONFIRM
PLACEMENT LOCATION WITH OWNER PRIOR TO
SETTING.
CONTRACTOR TO PARK AT WEST END OF CAMPUS,
CONFIRM LOCATION WITH OWNER.
LINEN
LINEN
000I
C IRO PU9
0360
ELEC _ RM
Fa
OFF"IC E
0
MORGUE
MORGUE
B BIOHAZARD
I�
MKM
architecture + design
119 West Wayne Street
Fort Wayne, Indiana 46802
1260.422.0783
f 260.426.4561
www.MKMdesian.com
iM AMf2a6fis1
sTwall
KW Ran
Ixo¢nrED DESIGNS
r THls DRAWNG Rae OWNED By Me
THE PROPERTY OF MKM ARCHITECTURE ♦ DESIGN,
PNO WERE CREATED AND DEVELOPED FOR USE ON,
AMID IN CONNECTION NTH THIS SPECIFIC PROJECT
HONE OF THEM DESIGNS. ARRANGEMENTS OR
PLANS SHALL BE USED BY OR DISCLOSED TO ANY
PERSON. M OR CORPORATION FOR ANY
FURPOSE WAATSOEaR NTHODT THE WHITNEY
PERMISSION GF MKM ARCHITECTURE • C N.
THE OMER SHALL BE PERM17ED TO RETAIN
CORES FOR INFORMATION AND REFERENCE IN
CONNECTION NTH THIS PROJECT Wamm
DIMENSIONS ON THESE CANNABIS SHALL HAVE
PRECEDENCE OVER SCALE DIMENS'ONS.
CONrRACORS SHALL V ERWYPND BE RESPONSIBLE
FOR NL DIMENSIONS AHD CONDITIONS ON THE JOB
AMID THIS CHASE MUST BE NOTIFIED OF ANY
IATION FRasTHEDNENSIONSANDCONDmoas
SHOWN BV THESE DRAMINGS. SHOP DRANNCS
MOtt BE SUBMITTED TO THIS OFFICE FOR RENEW
BEFORE PROCEEDING WTNI FIBNWTION ANWOR
INSTALLATION. THE WORK SHOWN ON THIS
DOCUMENT, AND THE CORRESPONDING
srecirIGPOHs, INTERFACES NTH WORK SHOWN
ON OTHER DOCUMENTS INCLUDING VARK TO BE
PERFORMED BY OTHER CONTRACTORS OR
SUBCONTRACTORS. EACH CONTRACTOR OR
SUBCONTRACTOR SHALL BE FAMILIAR NTH THE
WORK OF OTHER CONTRACTORS OR
SUBCONTRACTORS, WHETHER OR NOT SHOWN ON
THIS DOCUMENT WHICH IMPACTS THE SONY
IMPACTS THE WORK SHOWN HMON AND SHALL
COORDINATE SUCH WORK W AS TO PF IN
CAMPL W ICEWTHTHEINTENTUn1LTHEPMECT
DOCUMENTS.
I=
St. Vincent
Carmel Hospital
Carmel Pharmacy 797 800
13500 N Meridian Street
REVtpH
DRAWING CONTENTS:
BASEMENT FLOOR
COMPOSITE PLAN
ISSUEDATE'. PROJECT NO.
04/26/2019 MKM'. 17107
ASCENSION. W286
DRAwwG NO.
A-020