Loading...
HomeMy WebLinkAboutGradex/Eng/CO #6/3,314.62/126th Street from Range Line Road to Keystone Parkway – Project #16-ENG-04 City of Carmel Project 16- ENG-04 126th Street from Range Line Road to Keystone Parkway CHANGE ORDER#6 Balancing change order to close out project. Contract Price prior to this Change Order $4,557,076.13 Contract Price will be increased by this Change Order $3,314.62 New Contract Price including this Change Order $4,560,390.75 Amount Adjusted Contract Cumulative%Change Price from Original Contract Original Contract $3,873,423.36 N/A N/A CO1 $29,790.36 $3,903,213.72 0.8% CO2 $3,624.11 $3,906,837.83 0.9% CO3 $389,932.12 $4,296,769.95 10.9% C04 $272,548.33 $4,569,318.28 18.0% C05 ($12,242.15) $4,557,076.13 17.6% C06 $3,314.62 $4,560,390.75 17.7% Qv 101, CITY OF CARMEL 741 t; toCI+ TO: Jeremy Kashman CONTRACT CHANGE ORDER NO.: 6 City Engineer DATE: August 14, 2019 City of Carmel Indiana PROJECT NAME: 126th Street Improvements One Civic Square CITY REQ. NO.: Cannel, IN 46032 CITY PO NO.: 16-ENG-04 CITY PO DATE: I. You are directed to make the following changes in this Contract: Balancing of all pay items to close out the project. SCHEDULED ADJUSTMENT ITEM AMOUNT (+)OR( -) DAYS II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C.NO.: N/A Other. Attached list of pay items which are being balanced. The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 4,557,076.13 Contract Price will be increased/decreased by this Change Order $ 3,314.62 New Contract Price including this Change Order $ 4,560,390.75 Contract Time prior to this Change Order Days 6/1/2018 Completion Date Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order 0 Days 6/1/2018 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Accepted Approved Recommended American Structurepoint,Inc. Gradex,Inc. _ / ike S-r4 7 ENGINEER CONTRACTOR . i.: Brat May. . i 7260 Shadeland Station 12900 N.Meridian St,Suite 120 �� L,t _ Address Address � ber ary ,� � . .� . Indianapolis,IN 46256 Carmel, IN 46032 MI:, City/State/Zip City/Statc/Zip Lori W• �t ember By: I • LoilBy: �� Jere � P ,City Engin /.....7 Phone: WI - Z81-g s63 Phone: 3\-1-220-3457 �a-' , __ U 'stine S.Paule , I -Treasurer Date: 6- 14 - l Q l Date: Z-15 -\ck Date: /7// 9 j■ STRUCTUREPOINT American Structurepoint, Inc. • Change Order Details 126th Street Improvements Description: 126th Street from Rangeline Road to Keystone Parkway Change Order: 6 Date Created: 08/14/2019 Status: Pending Approval Date Approved: Type: Summary: Change Order #6 Change Order Description: Balancing of all pay items to close out the project. Awarded Project Amount: $3,873,423.36 Authorized Project Amount: $4,557,076.13 Change Order Amount: $3,314.62 Revised Project Amount: $4,560,390.75 Increases/Decreases Line Number Item Unit Unit Price Current Change Revised Quantity Amount Quantity Amount Quantity Amount Section: 1 - Default Section 0060 6 CYS $34.000 7,196.00 $244,664.00 347.61 $11,818.74 7,543.61 $256,482.74 EXCAVATION COMMON Reason: Balancing Change Order 0070 7 EA $185.000 79.00 $14,615.00 -19.00 -$3,515.00 60.00 $11,100.00 TEMPORARY INLET PROTECTION Reason: Balancing Change Order 0080 8 EA $195.000 14.00 $2,730.00 -14.00 -$2,730.00 0.00 $0.00 TEMPORARY CULVERT PIPE PROTECTION Reason: Balancing Change Order 0090 9 LFT $1.400 6,385.00 $8,939.00 -1,001.00 -$1,401.40 5,384.00 $7,537.60 TEMPORARY SILT FENCE Reason: Balancing Change Order 0100 10 TON $20.000 100.00 $2,000.00 -80.59 -$1,611.80 19.41 $388.20 NO. 2 STONE Reason: Balancing Change Order 0110 11 SYS $8.580 1,887.00 $16,190.46 -299.80 -$2,572.28 1,587.20 $13,618.18 SUBGRADE TREATMENT,TYPE II Reason: Balancing Change Order Change Order Details: 126th Street Page 1 of 8 08/14/2019 Improvements Line Number Item Unit Unit Price Current Change Revised Quantity Amount Quantity Amount Quantity Amount 0120 12 SYS $6.000 20,309.00 $121,854.00 -3,866.60 -$23,199.60 16,442.40 $98,654.40 SUBGRADE TREATMENT TYPE IB Reason: Balancing Change Order 0130 13 CYS $28.500 4,138.00 $117,933.00 -421.74 -$12,019.59 3,716.26 $105,913.41 STRUCTURE BACKFILL,TYPE I Reason: Balancing Change Order 0140 14 CYS $83.000 100.00 $8,300.00 -84.50 -$7,013.50 15.50 $1,286.50 FLOWABLE FILL-UNDISTRIBUTED Reason: Balancing Change Order 0144 CO-DOL DOL -$40,000.000 1.00 -$40,000.00 0.04 -$1,600.00 1.04 -$41,600.00 Change Order Item "DOL"Adjustment to CO #4 -Escalation Charges Reason: Balancing Change Order 0150 15 TON $20.000 1,785.00 $35,700.00 1,434.50 $28,690.00 3,219.50 $64,390.00 COMPACTED AGGREGATE, NO. 53 (10% UNDISTRIBUTED) Reason: Balancing Change Order 0160 16 TON $75.000 1,118.00 $83,850.00 23.60 $1,770.00 1,141.60 $85,620.00 HMA SURFACE,TYPE 'C', 9.5mm Reason: Balancing Change Order 0170 17 TON $67.600 1,861.00 $125,803.60 -81.10 -$5,482.36 1,779.90 $120,321.24 HMA INTERMEDIATE,TYPE 'C', 19.0mm Reason: Balancing Change Order 0180 18 TON $54.000 4,835.00 $261,090.00 1.24 $66.96 4,836.24 $261,156.96 HMA BASE,TYPE 'C', 25.0mm Reason: Balancing Change Order 0190 19 TON $54.000 2,640.00 $142,560.00 -655.43 -$35,393.22 1,984.57 $107,166.78 HMA INTERMEDIATE,TYPE 'C', OG 19.0mm Reason: Balancing Change Order 0200 20 TON $104.000 348.00 $36,192.00 -2.30 -$239.20 345.70 $35,952.80 HMA SURFACE,TYPE 'B' Reason: Balancing Change Order 0210 21 TON $78.000 579.00 $45,162.00 67.86 $5,293.08 646.86 $50,455.08 HMA INTERMEDIATE, TYPE 'B' Reason: Balancing Change Order 0220 22 SYS $10.500 127.00 $1,333.50 253.40 $2,660.70 380.40 $3,994.20 PATCHING Reason: Balancing Change Order 0230 23 TON $104.000 105.00 $10,920.00 137.13 $14,261.52 242.13 $25,181.52 HMA FOR TEMPORARY PAVEMENT,TYPE 'C' Reason: Balancing Change Order 0240 24 SYS $73.000 185.00 $13,505.00 -14.58 -$1,064.34 170.42 $12,440.66 PCCP, 7 IN Reason: Balancing Change Order 0250 25 LFT $26.000 128.00 $3,328.00 -128.00 -$3,328.00 0.00 $0.00 D-1 CONTRACTION JOINT Reason: Balancing Change Order Change Order Details: 126th Street Page 2 of 8 08/14/2019 Improvements Line Number Item Unit Unit Price Current Change Revised Quantity Amount Quantity Amount Quantity Amount 0260 26 SYS $45.000 391.00 $17,595.00 43.50 $1,957.50 434.50 $19,552.50 SIDEWALK, CONCRETE Reason: Balancing Change Order 0270 27 SYS $140.000 392.00 $54,880.00 -72.90 -$10,206.00 319.10 $44,674.00 CURB RAMP, CONCRETE Reason: Balancing Change Order 0280 28 LFT $18.750 4,736.00 $88,800.00 -259.70 -$4,869.37 4,476.30 $83,930.63 CURB, CONCRETE Reason: Balancing Change Order 0290 29 SYS $175.000 173.00 $30,275.00 -25.50 -$4,462.50 147.50 $25,812.50 CENTER CURB, D, CONCRETE Reason: Balancing Change Order 0300 30 LFT $15.600 6,706.00 $104,613.60 -101.20 -$1,578.72 6,604.80 $103,034.88 COMBINED CURB AND GUTTER, CONCRETE,TYPE II Reason: Balancing Change Order 0310 31 LFT $31.000 236.00 $7,316.00 -5.00 -$155.00 231.00 $7,161.00 ROLLED CURB &GUTTER, CONCRETE, MODIFIED Reason: Balancing Change Order 0320 32 SYS $45.000 1,459.00 $65,655.00 -163.70 -$7,366.50 1,295.30 $58,288.50 PCCP FOR APPROACHES, 6 IN Reason: Balancing Change Order 0330 33 SYS $52.000 428.00 $22,256.00 -136.10 -$7,077.20 291.90 $15,178.80 PCCP FOR APPROACHES, 8 IN Reason: Balancing Change Order 0340 34 EA $208.000 21.00 $4,368.00 -21.00 -$4,368.00 0.00 $0.00 MAILBOX ASSEMBLY, SINGLE, RESET Reason: Balancing Change Order 0350 35 EA $365.000 1.00 $365.00 -1.00 -$365.00 0.00 $0.00 MAILBOX ASSEMBLY, DOUBLE, RESET Reason: Balancing Change Order 0370 37 SYS $0.480 2,000.00 $960.00 8,925.70 $4,284.34 10,925.70 $5,244.34 SEED MIXTURE,T(UNDISTRIBUTED) Reason: Balancing Change Order 0380 38 SYS $0.830 4,093.00 $3,397.19 2,304.00 $1,912.32 6,397.00 $5,309.51 MULCHED SEEDING Reason: Balancing Change Order 0390 39 SYS $4.000 4,904.00 $19,616.00 3,257.00 $13,028.00 8,161.00 $32,644.00 SODDING Reason: Balancing Change Order 0400 40 LFT $6.250 6,110.00 $38,187.50 -245.00 -$1,531.25 5,865.00 $36,656.25 PIPE,TYPE 4 CIRCULAR 6 IN Reason: Balancing Change Order 0410 41 LFT $42.000 1,768.00 $74,256.00 -45.85 -$1,925.70 1,722.15 $72,330.30 PIPE, RCP CIRCULAR, 12 IN. Reason: Balancing Change Order Change Order Details: 126th Street Page 3 of 8 08/14/2019 Improvements Line Number Item Unit Unit Price Current Change Revised Quantity Amount Quantity Amount Quantity Amount 0420 42 LFT $45.000 529.00 $23,805.00 -12.84 -$577.80 516.16 $23,227.20 PIPE, RCP CIRCULAR, 15 IN. Reason: Balancing Change Order 0430 43 LFT $53.000 22.00 $1,166.00 14.00 $742.00 36.00 $1,908.00 PIPE, RCP CIRCULAR, 18 IN. Reason: Balancing Change Order 0440 44 LFT $66.000 153.00 $10,098.00 -1.27 -$83.82 151.73 $10,014.18 PIPE, RCP CIRCULAR, 24 IN. Reason: Balancing Change Order 0450 45 LFT $87.000 486.00 $42,282.00 1.00 $87.00 487.00 $42,369.00 PIPE, RCP CIRCULAR, 30 IN. Reason: Balancing Change Order 0460 46 LFT $106.000 34.00 $3,604.00 -10.50 -$1,113.00 23.50 $2,491.00 PIPE, RCP CIRCULAR, 36 IN. Reason: Balancing Change Order 0470 47 LFT $143.000 141.00 $20,163.00 2.00 $286.00 143.00 $20,449.00 PIPE, RCP CIRCULAR, 42 IN. Reason: Balancing Change Order 0480 48 LFT $148.000 719.00 $106,412.00 0.66 $97.68 719.66 $106,509.68 PIPE, RCP CIRCULAR, 48 IN. Reason: Balancing Change Order 0490 49 LFT $80.000 15.00 $1,200.00 13.50 $1,080.00 28.50 $2,280.00 PIPE, PLASTIC CIRCULAR, 12 IN. Reason: Balancing Change Order 0500 50 LFT $114.000 267.00 $30,438.00 11.00 $1,254.00 278.00 $31,692.00 PIPE, RCP ELLIPITICAL, 30 IN.X 18 IN. Reason: Balancing Change Order 0520 52 LFT $193.000 439.00 $84,727.00 -13.00 -$2,509.00 426.00 $82,218.00 PIPE, RCP ELLIPITICAL, 45 IN.X 29 IN. Reason: Balancing Change Order 0540 54 SYS $1.120 4,583.00 $5,132.96 61.41 $68.78 4,644.41 $5,201.74 GEOTEXTILES FOR UNDERDRAIN Reason: Balancing Change Order 0590 59 EA $5,000.000 2.00 $10,000.00 1.00 $5,000.00 3.00 $15,000.00 MANHOLE,J8 Reason: Balancing Change Order 0600 60 EA $4,800.000 17.00 $81,600.00 -1.00 -$4,800.00 16.00 $76,800.00 MANHOLE, K4 Reason: Balancing Change Order 0640 64 EA $1,125.000 11.00 $12,375.00 2.00 $2,250.00 13.00 $14,625.00 CASTING,ADJUST TO GRADE, SANITARY Reason: Balancing Change Order 0660 66 EA $1,900.000 3.00 $5,700.00 1.00 $1,900.00 4.00 $7,600.00 INLET, F7 Reason: Balancing Change Order Change Order Details: 126th Street Page 4 of 8 08/14/2019 Improvements Line Number Item Unit Unit Price Current Change Revised Quantity Amount Quantity Amount Quantity Amount 0680 68 EA $2,100.000 21.00 $44,100.00 1.00 $2,100.00 22.00 $46,200.00 INLET, B15 Reason: Balancing Change Order 0690 69 EA $2,100.000 27.00 $56,700.00 1.00 $2,100.00 28.00 $58,800.00 INLET, C15 Reason: Balancing Change Order 0700 70 EA $1,350.000 51.00 $68,850.00 -51.00 -$68,850.00 0.00 $0.00 INLET FILTERS Reason: Balancing Change Order 0710 71 EA $228.000 8.00 $1,824.00 13.00 $2,964.00 21.00 $4,788.00 ROAD CLOSURE SIGN ASSEMBLY Reason: Balancing Change Order 0720 72 EA $128.000 15.00 $1,920.00 15.00 $1,920.00 30.00 $3,840.00 DETOUR ROUTE MARKER ASSEMBLY Reason: Balancing Change Order 0730 73 EA $149.000 20.00 $2,980.00 8.00 $1,192.00 28.00 $4,172.00 CONSTRUCTION SIGN,A Reason: Balancing Change Order 0740 74 LFT $13.500 250.00 $3,375.00 554.00 $7,479.00 804.00 $10,854.00 BARRICADE, III-A Reason: Balancing Change Order 0750 75 LFT $1.150 8,257.00 $9,495.55 -3,222.50 -$3,705.87 5,034.50 $5,789.68 TEMPORARY PAVEMENT MARKING, REMOVABLE, 4 IN Reason: Balancing Change Order 0760 76 LFT $35.000 605.00 $21,175.00 1,004.00 $35,140.00 1,609.00 $56,315.00 TEMPORARY TRAFFIC BARRIER,TYPE 2 Reason: Balancing Change Order 0820 82 SFT $23.000 10.00 $230.00 -0.42 -$9.66 9.58 $220.34 SIGN, SHEET,WITH LEGEND, 0.125 IN. Reason: Balancing Change Order 0830 83 EA $700.000 3.00 $2,100.00 1.00 $700.00 4.00 $2,800.00 HANDHOLE, STREET LIGHTING Reason: Balancing Change Order 0840 84 LFT $19.000 179.00 $3,401.00 4.00 $76.00 183.00 $3,477.00 CONDUIT STEEL GALVANIZED 2 IN Reason: Balancing Change Order 0850 85 LFT $11.000 1,383.00 $15,213.00 223.00 $2,453.00 1,606.00 $17,666.00 4-1c NO. 4 Cu CONDUCTOR IN PLASTIC DUCT Reason: Balancing Change Order 0900 90 EA $1,300.000 10.00 $13,000.00 7.00 $9,100.00 17.00 $22,100.00 HANDHOLE, FOR INTERCONNECT Reason: Balancing Change Order 0910 91 LFT $10.000 3,315.00 $33,150.00 27.00 $270.00 3,342.00 $33,420.00 PVC SCHEDULE 40-4" Reason: Balancing Change Order Change Order Details: 126th Street Page 5 of 8 08/14/2019 Improvements Line Number Itemm Unit Unit Price Current Change Revised Quantity Amount Quantity Amount Quantity Amount 0920 92 LFT $11.500 3,315.00 $38,122.50 27.00 $310.50 3,342.00 $38,433.00 PVC SCHEDULE 40-4" INTERDUCT Reason: Balancing Change Order 0930 93 LFT $15.000 303.00 $4,545.00 739.66 $11,094.90 1,042.66 $15,639.90 PVC SCHEDULE 80-4" Reason: Balancing Change Order 0940 94 LFT $17.000 303.00 $5,151.00 738.66 $12,557.22 1,041.66 $17,708.22 PVC SCHEDULE 80-4" INTERDUCT Reason: Balancing Change Order 0950 95 LFT $2.300 98.00 $225.40 2.00 $4.60 100.00 $230.00 LINE,THERMOPLASTIC, BROKEN,YELLOW, 4 IN. Reason: Balancing Change Order 0960 96 LFT $0.850 494.00 $419.90 34.00 $28.90 528.00 $448.80 LINE,THERMOPLASTIC, SOLID, WHITE, 4 IN. Reason: Balancing Change Order 0970 97 LFT $3.650 46.00 $167.90 30.00 $109.50 76.00 $277.40 LINE,THERMOPLASTIC, DOTTED, WHITE, 8 IN. Reason: Balancing Change Order 0980 98 LFT $0.850 5,559.00 $4,725.15 599.00 $509.15 6,158.00 $5,234.30 LINE,THERMOPLASTIC, SOLID,YELLOW, 4 IN. Reason: Balancing Change Order 0990 99 LFT $6.450 95.00 $612.75 -33.00 -$212.85 62.00 $399.90 TRANSVERSE MARKING,THERMOPLASTIC, STOP LINE, 24 IN. Reason: Balancing Change Order 1010 101 EA $125.000 8.00 $1,000.00 1.00 $125.00 9.00 $1,125.00 PAVEMENT MESSAGE MARKING,THERMOPLASTIC, LANE INDICATION ARROW Reason: Balancing Change Order 1020 102 EA $166.000 6.00 $996.00 -1.00 -$166.00 5.00 $830.00 PAVEMENT MESSAGE MARKING,THERMOPLASTIC, ONLY Reason: Balancing Change Order 1030 103 LFT $14.000 62.00 $868.00 -3.00 -$42.00 59.00 $826.00 YIELD LINE TRIANGLE, THERMOPLASTIC Reason: Balancing Change Order 1040 104 LFT $2.300 72.00 $165.60 -72.00 -$165.60 0.00 $0.00 LINE,THERMOPLASTIC, BROKEN,WHITE,4 IN. Reason: Balancing Change Order 1050 105 LFT $1.600 503.00 $804.80 -28.00 -$44.80 475.00 $760.00 TRANSEVERSE MARKING,THERMOPLASTIC, CROSSWALK,WHITE 6 IN. Reason: Balancing Change Order 1060 106 EA $104.000 8.00 $832.00 -2.00 -$208.00 6.00 $624.00 SNOWPLOWABLE RAISED PAVEMENT MARKING (BLUE) Reason: Balancing Change Order 1070 107 LFT $70.000 3,200.00 $224,000.00 -20.10 -$1,407.00 3,179.90 $222,593.00 16" DUCTILE IRON WATER MAIN Reason: Balancing Change Order Change Order Details: 126th Street Page 6 of 8 08/14/2019 Improvements Line Number Item Unit Unit Price Current Change Revised Quantity Amount Quantity Amount Quantity Amount 1080 108 LFT $62.000 30.00 $1,860.00 26.63 $1,651.06 56.63 $3,511.06 10" DUCTILE IRON WATER MAIN Reason: Balancing Change Order 1090 109 LFT $50.000 10.00 $500.00 -7.00 -$350.00 3.00 $150.00 8" DUCTILE IRON WATER MAIN Reason: Balancing Change Order 1100 110 LFT $42.000 245.00 $10,290.00 2.30 $96.60 247.30 $10,386.60 6" DUCTILE IRON WATER MAIN Reason: Balancing Change Order 1110 111 CYS $30.000 2,400.00 $72,000.00 -137.01 -$4,110.30 2,262.99 $67,889.70 STRUCTURE BACKFILL-WATER MAIN Reason: Balancing Change Order 1130 113 EA $1,300.000 1.00 $1,300.00 1.00 $1,300.00 2.00 $2,600.00 8" GATE VALVE Reason: Balancing Change Order 1150 115 EA $3,400.000 19.00 $64,600.00 1.00 $3,400.00 20.00 $68,000.00 16" BUTTERFLY VALVE Reason: Balancing Change Order 1170 117 EA $5,000.000 8.00 $40,000.00 -1.00 -$5,000.00 7.00 $35,000.00 COMPLETE HYDRANT ASSEMBLY Reason: Balancing Change Order 1190 119 EA $1,600.000 1.00 $1,600.00 1.00 $1,600.00 2.00 $3,200.00 8" CONNECTION (8-1) Reason: Balancing Change Order 1230 123 EA $1,500.000 7.00 $10,500.00 7.00 $10,500.00 14.00 $21,000.00 SHORT SIDE SERVICE Reason: Balancing Change Order 1240 124 EA $2,600.000 1.00 $2,600.00 24.00 $62,400.00 25.00 $65,000.00 REPLACE METER PIT Reason: Balancing Change Order 1250 125 EA $800.000 1.00 $800.00 10.00 $8,000.00 11.00 $8,800.00 ADJUST VALVE TO GRADE Reason: Balancing Change Order 1260 126 EA $325.000 19.00 $6,175.00 -1.00 -$325.00 18.00 $5,850.00 VALVE RETIREMENT Reason: Balancing Change Order 1280 128 EA $3,000.000 1.00 $3,000.00 1.00 $3,000.00 2.00 $6,000.00 CONCRETE WASHOUT Reason: Balancing Change Order 1290 129 SYS $21.000 50.00 $1,050.00 -50.00 -$1,050.00 0.00 $0.00 TRANSITION MILLING (UNDISTRIBUTED) Reason: Balancing Change Order 1300 130 EA $149.000 7.00 $1,043.00 -7.00 -$1,043.00 0.00 $0.00 CONSTRUCTION LANE RESTRICTION SIGNS Reason: Balancing Change Order Change Order Details: 126th Street Page 7 of 8 08/14/2019 Improvements Line Number Item Unit Unit Price Current Change Revised Quantity Amount Quantity Amount Quantity Amount 1310 131 LS $2,000.000 1.00 $2,000.00 -1.00 -$2,000.00 0.00 $0.00 MAINTAINING TRAFFIC SIGNAL Reason:Balancing Change Order 1320 132 TON $185.000 100.00 $18,500.00 -100.00 -$18,500.00 0.00 $0.00 CHEMICAL STABILIZATION(UNDISTRIBUTED) Reason: Balancing Change Order 1330 133 SYS $16.500 602.00 $9,933.00 -122.80 -$2,026.20 479.20 $7,906.80 SUBGRADE TREATMENT,TYPE IC Reason: Balancing Change Order 1340 134 EA $7,000.000 2.00 $14,000.00 -2.00 -$14,000.00 0.00 $0.00 INSERTION VALVE(UNDISTRIBUTED) Reason: Balancing Change Order (100 Items) 'Ibtals $3,049,813.36 $3,314.62 $3,053,127.98 ALL 3- (S - Gradex, Inc. Date aN4.30A.p. b—t¢— let American Structurepoint, Inc. Date City of Carmel Date Change Order Details: 126th Street Page 8 of 8 08/14/2019 Improvements