Loading...
HomeMy WebLinkAboutA000.4b RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Cannel 1"IC, f0 � • a �� 1 • 1/Niv/ 7k314"i I WORK AREA 1 - DAYCARE • 1 � 7 V 1 I I • A BO • I I • • I I OFF I II I I SWORK AREA 2 - HALLWAY & NEW COFFEE AREA . DI • 1XD V 1010T I /O I— — — — — — ' — — — — — — — — — = 4 « d a' • 3 I O 6 0 FF WORK AREA 3 - NARTH LIBRARY, KITCHEN i I I 1 I a I a I u DEMOLITION GENERAL NOTES A. THE DEMOLITION DRAWINGS SHOWN AS PART OF THIS SET ARE INTENDED TO SHOW THE GENERAL SCOPE AND EXISTING CONDITIONS OF THE PROJECT AND THE GENERAL EXTENTS OF THE DEMOLITION. IT IS NOTTHE INTENT OFTHE DRAWINGS TO BE ALL INCLUSIVE OF ALL DEMOLITION NECESSARY FOR NEW CONSTRUCTION AND ARE MEANTTO AID THE CONTRACTOR IN EVALUATION OF THE EXTENT OF DEMOLITION. THE GONTRACTOR(S) ARE RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS, COORDINATING ALL NECESSARY REQUIREMENTS AND PERFORMING ALL DEMOLITION REQUIRED FOR NEW CONSTRUCTION WHETHER SHOWN OR NOT, B. FIELD INSPECT DEMOLITION SCOPE PRIOR TO REMOVAL. INSURE REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITYOF EXISTING STRUCTURE TO REMAIN. IF FIELD INSPECTION INDICATES STRUCTURAL INTEGRITY MAY BE IMPAIRED, CONTRACTOR(S) SHALL NOTIFY ARCHITECT / STRUCTURAL ENGINEER AND OWNER IMMEDIATELY AND TAKE IMMEDIATE ACTION TO ENSURE SAFETY OF STRUCTURE WHILE PERMANENT SOLUTION IS DEVELOPED. C. DO NOT SCALE ANY DRAWINGS. FIELD VERIFY ALL EXISTING CONDITIONS. REPORTANY DISCREPANCIES TO THE ARCHITECT FOR RESOLUTION. D. GENERAL CONTRACTOR TO COORDINATE ALL DEMOLITION WORK AMONG ALL TRADES. E. VERIFY ALL EXISTING WALL, FLOOR,CEILING, AND ROOF CONSTRUCT ION TO DETERMINE EXTENT AND METHODS OF DEMOLITION REQUIRED FOR NEW CONSTRUCTION. F. VERIFY LOCATION OF EXISTING UTILITIES AND UNDERGROUND CONDUITS, CHASES, AND SOIL CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION G. MAINTAIN ALL EXISTING EXITS AND EGRESS FOR THE DURATION OF THE CONSTRUCTION. H. EXISTING BUILDING SHALL BE MAINTAINED WATER TIGHT AND DUST FREE THROUGHOUT ENTIRE PROJECT. PORTIONS OFTHE BUILDING WILL REMAIN OCCUPIED AND IN OPERATION DURING CONSTRUCTION PROCESS. I. IF HAZARDOUS MATERIALS ARE UNCOVERED DURING DEMOLITION OR CONSTRUCTION NOTIFY THE ARCHITECT AND OWNER IMMEDIATELY J. OWNER WILL REMOVE FURNISHINGS AND LOOSE EQUIPMENT PRIOR TO DEMOLITION. K. REMOVE AND/OR DEMOLISH ITEMS INDICATED. THE OWNER HAS THE RIGHT OF FIRST REFUSAL ON EXISTING MATERIALS AND EQUIPMENT REMOVED FROM THE SITE. VERIFY WITH OWNER ALL EXISTING MATERIAL, CASEWORK EQUIPMENT, LIGHT FIXTURES, SYSTEM FURNISHINGS, DOORS, OR FRAMES WHICH SHALL BE SALVAGED PRIOR TO REMOVAL. TURN OVER SALVAGE MATERIALS TO OWNER AND/OR STORE ON SITE AS INDICATED BY THE OWNER. CONTRACTOR SHALL PROPERLY DISPOSE OF REMAINING ITEMS AND REMOVE FROM THE SITE IMMEDIATELY. L. REFER TO MECHANICAL,ELECTRICAL,PLUMBING, AND STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION, DEMOLITION WORK, AND COORDINATION REQUIREMENTS. DEMOLITION KEYNOTES 1. DEMOLISH PORTION OF EXISTING WALL. COORDINATE EXTENT OF DEMOLITION WITH NEW CONSTRUCTION SHOWN ON ARCHITECTURAL PLAN. 2 DEMOLISH WALL IN ITS ENTIRETY. 3. REMOVE EXISTING EQUIPMENT; PATCH AND REPAIR. 4, REMOVE EXISTING CASEWORK IN ITS ENTIRETY PATCH AND REPAIR. 5 REMOVE EXISTING DOOR& DOOR FRAME COMPLETELY 6. REMOVE PLUMBING FIXTURE AND SALVAGE TO INSTALL IN NEW PLUMBING LOCATION. 7. DEMOLISH A PORTION OF THE WALL TO CREATE NEW DOOR OPENING. COORDINATE EXTE AT OF DEMOLITION WITH NEW DOOR. 8. REMOVE CASEWORK FOR REPOSITIONING ON ADJACENT WALL. PATCH AND REPAI R. g CHOIR STEPS TO BE DEMOLISHED AND FLOOR MADE LEVEL AND READY TO RECEIVE NEW FLOOR FINISH, 10 REMOVE AND SALVAGE DOOR AND FRAME FOR RE -USE IN NEW LOCATION, WHICH WILL BE DENOTED BY CORRESPONDING LETTERS ON RELATED ENLARGED PLANS. THAT IS, FOR DOOR A - SEE SHEET N A50, DOORS B & C SEE SHEET N A62; FOR DOORS D E,& F, SEE SHEET N A63 11, REMOVE AND SALVAGE EXISTING ACT CEILING SYSTEM, LIGHT FIXTURES, SUPPLY DIFFUSER AND RETURN GRILLS TO BE REINSTALLED AT THIS LOCATION. 12 OWNER TO REMOVE FILE CABINETS AND STORAGE BOXES. REMOVE ALL SHELVING AND SUPPORT IN THIS SPACE COMPLETELY. REPAIR ALL WALLS FROM SHELVING DEMOLITION. 13, REMOVE AND SALVAGE SEMI- RECESSED FIRE EXTINGUISHER CABINET(FECT TO BE REINSTALL ED IN NEW WALL AT THIS LOCATION. DEMOLITION SYMBOL LEGEND EXISTING WALLS TO BE DEMOLISHED ANNEENIN EXISTING WALLS TO REMAIN *a M.D. ARCHITECTS, PC 9084 TECHNOLOGY DRIVE FISHERS, IN 48038 TEL.317558.2822 FAX 317.558.2827 www.mdarchm"cam m C') CD z Q Z J LLI 2 1E Q U LLI ```� � p. rcEryS T F EXISTING DOOR TO BE DEMOLISHED :oVQ i G,NSjTE No. 19gomo - — - ; �— — - •a\� EXISTING DOOR TO REMAIN - — 11� SDI N,: pr E� � ,2 z �' 10 ^\ �\ F �y F 7G \ \O \ROOM'\ WORK AREA 4 - CHO12 DEMOLITION PLAN I I DATE: vu/vu/-I`J