HomeMy WebLinkAboutA000.1072
it M.D. ARCHITECTS, PC
9084 TECHNOLOGY DRIVE
FISHEIRSJN2 6
8038
31755822 .28 FAX
11 77 3 FAX'31.558.2027
4,-0" A7.1 N7 COFFEE AREA 2 2 winemdarchrecls cam
1
I I I 4
5 17 4 9
I I I
HALLWAY v
4'-03/4" 4'-1112" 4'-1112" 4'-1112" 4' 0314'
L/
ELEVATION - HALLWAY TO COFFEE AREA - WALL MOUNTED NAME TAG RAIL ELEVATION, HALLWAY TO NARTHEX 0
A6.1 3/8"= V-DP
ARCHITECTURAL KEYNOTES
8" g" 23'-1DAN,+ 7
1. EXISTING BRICK ARCHWAY. Z
1n 1''± 2 NEW GYPSUM BULKHEAD CEILING. PAINTED TO MATCH EXISTING. O
EXISTING TRUSS
BEARING 3 EXISTING ACOUSTIC CEILING TILE (TO Be ADJUSTED TO ACCOMODATE Co Q
REVISED PLAN LAYOUT). W
PATCH AS AND
REQUIRED
2 O
WALL AS REQUIRED 6.1. 4. WATER POINT FOR PLUMBED COFFEE MACHINE INSTALL MOISTURE (D
4-1"+ RESISTANT BOARD IN LIEU OF GYPSUM WALL BOARD IN THIS AREA. Q Q
DEMO WALL INSTALL 5/8" CEMENT BOARD (DUROCK OR EQUAL).
OPENING Q LL/
HEIGHT 5 SOLID SURFACE COUNTER TOP & SPLASHBACK z Ll_I
LL
6. NEW ACOUSTIC CEILING TILE TO MATCH EXISTING. 0 O
7. NEW GWB WRAPPED 5114"X 51/4"PARALAM COLUMNS WITH PSL z Z (�
imam
COLUMN CAP.
BEENMEN
J06
awwwww
8HIMENEEN. EXISTING COLUMN TO REMAIN, ADD(2) 2X6 BEARING STUDS ON FACE OF uJ }
00100011 COLUMN AND WRAP WITH OWE
HIMENEEN
IPA Ir
9. NEW WALL CABINETS
10. NEW BASE CABINETS U J
J
11. BUILT-IN NAME TAG RACK IN WOOD FINISH TO MATCH EXISTING WOOD Q
DOORS (OPTIONAL). L~ S
12 EXISTING BULKHEAD, PATCH AND REPAIR AND REFINISH AS REQUIRED LLIJ U)
DUE TO RENOVATION. z
13 INFILL EXISTING OPENING WITH WOOD FRAMING AND GYPSUM WALL Q
BOARD, FINISH SURFACE TO BE FLUSH AND MATCH EXISTING. J
DOOR BASE CASEWORK AND 14. NEW 5'A" x 1 PM PAAALLAM HEADER X 24'6" LONG, VERIFY IN FIELD. Q
BEYOND WITH SOLID SURFACE CO
0 COFFEE AREA CROSS SECTION COUNTERTOP BEYOND 15 REINSTALL EXISTING 2X4 LIGHT FIXTURE. N W
IN WELCOME CENTER � COFFEE AREA LONGITUNAL SECTION 16. ADD(2) 2X6 BEARING STUDS TO FACE OF STUD WALL AND WRAP WITH c T C7
A6.1 3/8"=1'-0" GWB, IL
17. EXISTING DOOR TO REMAIN. 5 D Q
1& REMOVE ONE PAIR OF FOLDING WALL PANELS TO MODIFY FOR NEW G � z
FOLDING PARTITION RUN. LLI
r /�^1
v !
J71A5
IS
VISION TO MOVEABLE PADISTANCE DEPENDING ON INAL RTITIIXJS. -�011...... ,
EXISTING CONFERENCE AREA O4014°C"""��G `
13
1F-0112" 25'-4"
V.I.F. V.I.F.
17
HALLWAY
3
2T-8 3/4"
EDGEOF V.I.F. 77
r
BULKHEAD r m
ABOVE z
o LL
o r
w G
2 = y
�1 ZEA6 6
A6.1 4
4 www
jLL<
NEW COFFEE AREA G a �
6U
W!
1'�0314"± 8'-5314"+ 8'-2" 10'-0" �L _ ¢3
V.LF. W a
z coo
wi
1 1 7 1 0 3
RELEASED FOR CONSTRUCTION 9112"i 1/2" ]'-]12'v 8" 7-6" 8" 7- Go -2" ¢io3 �2o ey
Subject to compliance with all regulations 5 �.1a 70 wo
d Stile and local Codes AB1 i <aw wtz
awaw 3w a3�
City of caimel �1 COFFEE AREA MILLWORK a ARCHITECTURAL PLAN -HALLWAY & COFFEE AREA _''° os3 �aa
ow
�ql 1=o
R• • �
J
rNBE
6 �
2
6
A7.1 7.1
4'-8"
4
3'-0" 3'-0" 1'-73I4" 4'-fi1/4"
II
I
�
7
A7.1A].1 A].1
3'-0"d'-fi"
1'-8"
I;� ..III•
� IIIIIIIII
� �I11111111
irT
DATE: VU/Vu/-I`J
DATE: VU/Vu/-I`J