Loading...
HomeMy WebLinkAbout30 C203 Site General SpecificationsA. SCOPE OF WORK 1. The work required under this section Includes all exterior concrete and bituminous paving and related items necessary to compete Me work indicated on drawings and described in Me specifications, imposing but not limited to: NI hives, parking areas within contract limit Curbs and gamble Sidewalks, concrete gabs, exterior steps B. MATERIALS L Compact Concrete shall be ready -mixed and small be a mix of propermaned fine and coaree aggregates with Portland comet and water. Minimum cement content shall be 6 begs per cubic yard of concrete and maximum water content shall be 5.5 U.S. gallons per sack of cement including maslure in Me aggregate. Slump far normal weight concrete shall be a maximum of 4 inches and a minimum of 2 Inches. The slump of machine placed concrete shall be no less Man 1-114 inches or more Man 3 inches. Standard test ASTM G143 shall be used to measure slump. Minimum compressive strength of ennoble at 28 days shall be 4000 psi. All extenor ennoble shall have air eMainmentof 5% b 8% by volume per ASTM C-260. Re-tmpedng of boosted concrete shall not be damaged. Concrete small be composed of a. Porklandicment onnformingto ASTMG154TyyelAortypellik In. Aggregates'. conformitgto ASTMG33. a Woar'. Shall be dear and free tam inNnous amount of als, ears, alkalies organic materials or 2. Pre -molded Joint Filler'. Shall benon-vtrudlg type meeting ASTA D-544, except that premolded joint filler used in conorat walk unsW ction may be either non-exnutling or resilient. 3. Banummous Pavement Materials'. All materials proposed far Me conservation of btumarmus pavements small comply with the Indiana Department of Tmrmp0gati0n Standard Specifications, latest revisions. 4. Demanded Aggregate Subbase: • If a certain type of aggregate is specified and labeled per Me plans and/or detils, Mai Mat aggregate al l meet and be in accordance with the INGOT Standard Specifications. • If the aggregate is not spdcified or labeled than it small be crushed stone or grand meeting the following requirements. Crashed gravel shall be a minimum of 35% crushed makers. Fines Men be limited to a maximum of 8% of Me total. Material shall be tree from an excess of flat elongated, thinly laminated soft or disintegrated pieces, and shall be free from fragments coaled with curb Comported sggregoke shall have a gradation as presented below. SIEVE SIZE %PASSING 1-t2" 100 1" eo-10o TO-90 1. 1055-e0 #4 #4 3 0 #8 25 #30 2-30-30 moo silo C. APPLICATION 1. Grading: Do any necessary gentling in addition b that performed in appearance with EARTHWORK Section, to bring subgrades, after final compaction, to Me required grades and sections for see improvement 2. Prepamtien of Sub-gradi Remove spongy and otherwise unsuitable material and replace with stable material. No traffic shall be allowed on prepared sub -grade prior to paving. 3. CompactioneSub-grade: ReerWSenon2D7of Me INDOTStandwd Specification Manus. 4. Utility Structures: Check for caret deviation of all manhole covers, inlets, wove boxes and similar structures locoed within areas to be paved and mark, or have made any necessary adjustment to such structures. 5. Placing Concrete: a. Sub -grade '. Place concrete only on a moist crimina tl subgrade of base free front lease methanol. No coneret shall be placed on a muddy or happen subgretle. E. Forms: An fortis shall be free from warp, tight enough to prevent leakage and substantial enough 0 maintain Moir shape and position without springing or adding men concrete is placed Fortes shell be dean and smooth immediately before concreting. c Plating Concrete: Concrete shall be deposited so as to require as India handling as prachceble. When concrete is to be placed at an atmospheric temperature of 35 degrees (F) or less, Me Indiana Gestational Transportation Standard Specifications, latest revision shall befollowed. 6. Concrete Curb and Gutter: a. Expansion Jant: Shall be 112 inch Mick preanoulded at ends of all returns and a maximum spacing of 100 feet b. Conmadlan Joints: Unless otherwise provided, contraction joint shall be joints spaced 10 feet on cent! c Finish: Tamp and spread concrete as soon as placed, and fill any honeycombed paces. Finish square comers b 114 inch radius or as otherwise required. T. Concrete Walksand Exterior Steps: a. Stapes: Provide 114 inch per fool cross slope. Contractor shall make field adjustment in slopes at walk intersections as necessary to provide proper drainage. b. Dimensions: Walks and steps shall be one cembe construction and of widths and thickness shown on the drawings. a Finish: Spread canoret and trowel win a deal trowel b a ham dense surface after surface water has disappeared. Apply medium broom finish and scribe control joint at 6 foot sparing. Provide 12 inch expansion joints where sidewalks intersect and A a maximum spacing of 48 tat along walks. 8. Curing Concrete: Except as onewiee specified onre all ennoble by one of Me methods described in Me Indiana Departmentof Transportation Standard Specifications, laid revision. 9. Bituminous Pavement Hat asphalt concrete pavernent shall be as specified in Me Indiana Department of Transportation Standard Specifications, latest twosome. Paving will net be dominated during unfavorable weather or when the temperature is 40 degre s(F) or below and falling. 10. Compacted Aggregate Subbase'. The thickness shown on Me drawings is Me minimum thickness of Me fully compacted sub -base: Compaction shall be accomplished by rolling with a Meant managed roller weighing 810 10 tons. Compact W 95% compaction using Standard Testing Procedures. Along bonds, Beatles and walls and at all places not accessible to Me roller, the aggregate matord shall be temped with mechanical tampers. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Canned �VT�tJ'�D*141WML DATE: 09/10/19 EARTHWORK A. SCOPEOFWORK 1, Export The work required under his section consists of all excavating, filling, rough grating and related items necessary to compete Me work indicated on Me drawings and described in the specifications. The Contractor shall notify in wn6ng de Owners and de Engineer of any changes, enure, or omissions found on de pans or in the figs before work is started or resumed. a. In general Me Items of work to be performed under this section shall include Gearing and grubbing, removal of trees and stamps (where required), protection of trees b remain, strippng and storage of broad, fill, compaction and rough grating of entire site as indicated on Me drawings. b Excavated material that is suitable may be used for fill. All unsuitable makinal and all surplus excavated makenal not required shall be removed from the site by the Contractor. The location of sump and length of haul Shall be the Commodore responeibtiily. c. Provide and place any summeral fill makers! fron off Me site as may be necessary to pmduca this gentles required. Fill obtained from affiit shall be of Kind and quality as Marfiatl heron, and as approved by Me Engineers Owner. 2. The Contractor shall accept Ma site as he finds it and Shall remove all kra9n, rubbish and debns from Me site prior b strong excavation. 3. Work net member. The foilaving items of reated work are Method and incurred in other sections of Mesa specificalione. a. Excavation, grading and badfilling far bdity, lines. E. SMrm c airman systems. c. Sanitary sewer systems. d. Water supply systems. e. Drives and paving. B. BENCHMARKS 1. Nordan carefully all bench marks, monument and other reference pants. If distundatl or destroyed replace as directed by Me Engineer. C. REMOVALOFTREES 1. Remove all trees and stumps from area to be attempted by maxi and surfaced areas. Removal of trees outside Mesa areas shall only be doe as noted on drawings cr approved by Me Owner. 2. All brush, stamps, aided and other ri from the trees smell be removed from the site or burned with proper pertnes (where applicable). D. PROTECTION OF TREES 1. General Protection'. ha CantadorshAlbemsponsiblefor Mepratectianofbps,trunksmdr sofexiow"es on the projectsit that ere to remain. Existing trees subjectfo construction damage shall be boxed fencdc or otherwise prompted before any work is staked, do not stockpile within branch spread Remove interfering branches without injury to stocks and cover scars Wth tree paint. E. STRIPPING OF TOPSOIL 1. Remove topsoil to a depth of 6 inches (or as indicated by Owners Geokecbnical Engineer) from the areas to be occaped by roads, walks, buildings, and panting areas. Pile and store logical at a location where it rill net interfere with construction operaions. Top soil shall be reasonably free from subsoil, debris and sones larger than 2 inches. F. DISPOSITION OF UTILITIES 1. Rules and regulations governing Me respective utilities shall be observed in executing all wok under his section. 2. It shall be Me responsibility of each contractor to verify all existing utilities and conditions pertaining to his phase of Me work. It Mail be Me contractor's responsibility to contact Me owners of Me various utilities before work is started. The contractor shall notify in wiling the owners or Me engines of any changes, errors or omissions found on these plans, and/or in the field before work Is started or resumes. 3. Where active utilities are encountered but not shown on Me drawings, Me Contractor shall notify Me Utility Company, Owner and Engineer prior to proceeding with any wort An appropeake course of action shall be agreed upon by Me UMIty Company, Owner and Engineer prior b work commencing. 4. Inactive and abandoned utilities encountered in excavating and gracing operations shall be relearned to Me Engineer. They shall be removed, plugged or topped as direded by Me Engineer andi Udity Company. G. SITEGRADING 1. Grades: Perform all wring, filling, onnnewmag of fills and rough Morning required to bring enure project area In integrable as shown on Me Meanings. Underoulopen areas 4" for lopsal, 2. Rough groping: Me instance for barred areas aball not exceed 0.10 feet above established subgrede. All other areas shall rot exceed 0.10 feet plus or minus Me estblished Brads. Provide roundings at by and bouan of banks and other breaks in More. All open areas shall be graded a minimum of 0,5% and a maximum of 311:1 V edge. 3. Sub -grade shall be pros mind with suitable apartment and all spongy and otherwise unsuitable moenal shall be removed and replaced won sortable metnal. contractor shall roommate the proof roll procedure with Me agency lomengjudeddion to ensure proper represenhilon is in aftendance fen the lest. 4. Sub -grade for building eras shall be compacted to a minimum compaction of 95% Modified Procter Density or per Me Arc eWt all5tructural Construction Plans far Me corresponang buildng area. The ArcmatctualStrucWrel plans snail govern. 5. Subgrade for street and pavetl areas- Sea PAVEMENT speaficauons. 6. See PAVEMENT sectianfor additional information. All fill material shall be formed from soil free of cadences material. Prior 0 placement of fill, a sample of the proposed maternal shall be amounted to Me Owner's Geotehnieal Engineer for approve. The fill maternal shall be placed in layers net to exceed 8" in lease thickness and all be spread and compacted at Me proper maslure content. 8. All fill martial in areas outside of building and pavement areas shall he wmpad d unholy with each lift and produced farm erosion. Areas of building construction shall have suitable fill material placed and compeated in accoarance with Me Sails Engineer's report and per su-sabbon 4 described above in his Section. 9, The Contractor small verity all earthwork quantities prior to the shirt of consumption. The Contractor al l notify Me Owner and Engineer in wiiking if excess or shortage of earth quantities is encountered and verify requirements for stockpiling, removal or impoming earth. Owner and Engineer hereby reserve Me right to allow minor adjustments in proposed grades 0 reduce an earth quanbly, dsparily, H. SEEDING PREPARATION 1. Contractor shall resolve any surface or subsurhace drainage problems and cunsWd permanent erosion control structures. 2. Remove all rocks, rooks or other materials that may interfere with seedbed preparation. 3. Perform Me major filling, shapng and smoothing of Bullied or severely eroded areas. 4. Have still tested to check p1 and fertility levels. Apply lime at rake succeed in sddhn9 specifications on the plans. 5. Work all lime and fordlizer Into Me sea 0 a depth of 2-3 inches with a small disk, harrow or rake operated across Me slope as much as possible. 6. Firth the sal bed where possible. Do not over pack the soil to ensure demanding Does not restrict water and rook penetration into Me soil. "IT'S THE LAW" • Know whaPs below. Call before you dig. 2 WORKING BAYS BEFORE YOU DIG, 0 Cooler Design Architecture. Planning and Interior Design 905 N. Mardlan Street sulte A3 Matra argi IN 46260 R13ll816.1144 WW W.<OOWIOe51gM1r4T MaRgagAND In MasivxKRT'ormorq Wv LL[rIM SWLLNOieEI1FVNWXkpW WIYM£pIWWpI BYMIYMNl4 ME[WNCIIOP BE[R(WK Wr11 nIERNIE4 wATEMCWIFN(Or C0.YFa LtlSGN 4[ comWaxrmu u`- 4//,o it 4EG\sTfgfo _! No. Z o gvPE10707583,o\ STATE OF / ���q/fx^TrQQ 2�.MDIANA kk LL dc �N/volfifilli DID 8/5/20I9 PLAN NORTH m (PROJECT AREA SHOWN SHADED) N ICU Z U ❑ K ❑ w US 0 of � U c O Q U Q �L U uji Z 0 Q Of Z CI❑ VJ Z O I- U_ LL c� U Z Q Z �LW�L VJ O W U 2 J Be Q LLI O L W W 0Be U `Q% W W W 0 LJ ..0 w z Q W �^ Cl) a 0) C203 SHEET NO.