Loading...
HomeMy WebLinkAboutA010.0UP R R R R R RGFCI GFCI R R R R GFCI R R SD DW GD R M O 33 23'-5 1/4" 13'-1"12'-6"12'-5" 3'-10 1/4"3'-9 1/2" 4'-2 1/2" 2'-5" 3'-3" 3'-4 1/4" 6'-8" 8'-1 7/8"5'-0"4'-4 3/8" 4'-5" 18'-4 3/4" SINK C.L. 1 64 SQ FT 1 30 SQ FT 292 SQ FT 20 SQ FT 21 4 SQ FT 254 SQ FT 54 SQ FT 33 SQ FT KITCHEN DINING LIVING FAMILY LAUNDRY ENTRY POWDER BATH PANTRY R/H DOOR HARDWARE & HINGES R/H DOOR HARDWARE & HINGES R/H DOOR HARDWARE & HINGES R/H WINDOW & CASING R/H WINDOW & CASING R/H DOOR HARDWARE & HINGES R/H DOOR HARDWARE & HINGES #1 of 12 Date: 06.05.19 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications. FINAL DRAWINGS DATE: 08.23.19 INITIALS: KK Gee ResidenceKitchen RemodelDoug & Lisa Gee3742 Carwinion WayCarmel, Indiana 46032Approved By: Date: Jessica Seljan Project Developer jseljan@caseindy.com EXISTING/DEMOLITION PLAN D101 FINAL Katie Kramer Designer kkramer@caseindy.com SCALE: 1/4" = 1' #2 07.10.19 #3 07.12.19 #4 07.15.19 #5 07.26.19 09/03/19 Mike Sheeks