Loading...
HomeMy WebLinkAboutE101 Electrical PlanDBE PANEL:'A' (EXIST.) VOLTS: 120/208 MTG: SURFACE AMPS: 150 PHASE: 1 • - INDICATES CKTS: 30 WIRE: 3 NEW CIRCUIT LOCATION: KITCHEN LUGS: MCB FEED: BOTTOM BREAKER REMARKS <LOAD> POLE CIR. NO. ClR N P E <LOAD> REMARKS 0A 08 0A 0 EXIST. LOAD 2 15 3 15 EXIST. LOAD 20 5 15 EXIST. LOAD 20 7 15 EXIST. LOAD 20 9 10 20 qEXPRESSO DEXIST. LOAD 20 11 12 20 EXIST. LOAD 20 13 14 20 L30 LOAD 2 15 16 20 LEXIST. 17 18 20 1.0 CH. EXIST. LOAD 0 19 20 20 0.5 U.C. RE IG EXIST. LOAD 0 21 22 20 0.5 P.O.S I.C. CASE 1.0 0 23 24 20 1.0 PLAIN COFFEE REWER I.C. CASE 1.0 0 25 26 20 1.0 PLAIN COFFEE REWER DISP. CASE 1.0 0 27 28 20 1.0 CHOCOLATE ELTER DISP. CASE 1.0 0 29 30 20 1.0 1 CHOCOLATE ELTER PANEL: 'B' (NEW) LOCATION: KITCHEN VOLTS: 120/208 MTG: SURFACE MPS: 100 PHASE: 1 KTS: 30 WIRE: 3 UGS: MCB FEED: BOTTOM REMARKS <LOAD> CIR. 0. CIR. NO. POLE <LOAD> REMAR OA 08 6A EXIST. LOAD 2 4 20 EXIST. LOAD EXIST. LOAD 20 3 EXIST. LOAD 30 5 6 20 EXIST. LOAD EXIST. LOAD 30 2 7 8 20 EXIST. LOAD 9 10 20 EXIST. LOAD EXIST. LOAD 20 11 12 20 1.0 CHOCOLATE CASE ICE MAKER 1.0 20 13 14 20 1.0 1 CHOCOLATE CASE PREP STATION 1.0 1 20 15 16 20 1 C BLDG SIGNAGE PREP STATION 1.0 20 17 18 20 0.7 GEN. RECEPTS SOUP WARMERS 1.0 20 19 20 20 1.0 TIME CLOCK U.C. I0.5 20 21 22 20 0.4 SHOW RECEPTS SPARE 20 23 24 20 CA SHOW RECEPTS SPARE 20 25 25 20 SPARE SPARE 20 27 28 30 2 2.3 PANINI MAKER SPARE 20 29 30 1 2.3 12 i1VKa^;Sea.e11111:00 145 6ND IN A'0. FIRST FLOOR ELECTRICAL PLAN 6GALE: IIV= 1-01 IOOA �� IOOA P 2P EXTEND EXISTING BRANGH GIRCI IT5 TO NEW PANEL V EXIST P6AIFI NEW PANEL B' ONE -LINE DIAGRAI"I NO 5GALE: RELEASED FOR CONSTRUCTION Subject to compliance with all regulalions of State and meal Codes City M Camel �VT�J'�B*x41WML DATE: \ 09/13/19 GENERAL PLAN NOTES: I. VERIFY ALL KITCHEN CONNECTIONS WITH EQUIPMENT SUPPLIERS PRIOR TO ROUGHING IN. 2. CONTRACTOR SHALL CHANNEL AND PATCH EXI5TING FLOOR AS NECESSARY FOR INSTALLATION OF NEW FLOOR OUTLETS. 3. ALL NEW FLOOR OUTLETS SHALL BE SIMILAR TO 'HUBBELL' SYSTEM ONE DEVICE. 4. CONTRACTOR SHALL UPDATE PANEL DIRECTORY FOR EXISTING PANEL 'A' AFTER NEW WORK 15 COMPLETE. ALSO PROVIDE NEW PANEL DIRECTORY FOR NEW PANEL 'B'. ® PLAN NOTES: I. DEDICATED FLUSH -MOUNTED FLOOR OUTLET FOR CHOCOLATE CASE. 2. DEDICATED FLUSH -MOUNTED FLOOR OUTLET FOR DISPLAY CASE. 3. DEDICATED FLUSH -MOUNTED FLOOR OUTLET FOR UNDERCOUNTER REFRIGERATOR. 4. DEDICATED FLUSH -MOUNTED FLOOR OUTLET FOR ESPRESSO MACHINE. 5. FLUSH -MOUNTED FLOOR OUTLET FOR P.O.5. OUTLET SHALL HAVE (1) DEDICATED RECEPTACLE AND (I) TELE/DATA OUTLET. b. DEDICATED RECEPTACLE FOR ICE MAKER. 1. DEDICATED RECEPTACLE FOR CHOCOLATE MELTER. 8. DEDICATED RECEPTACLE FOR TWIN COFFEE BREWER. 9. DEDICATED FLUSH -MOUNTED FLOOR OUTLET FOR ICE CREAM CASE. 10. DEDICATED RECEPTACLE FOR REFRIGERATED PREP STATION. 11. 301 208V-I(P OUTLET FOR PANINI MAKER. INSTALL 2410, 1410 5ND IN A 3/4"1 12. DEDICATED RECEPTACLE FOR UNDERGOUNTER REFRIGERATOR. 13. DEDICATED RECEPTACLE FOR SOUP WARMERS. 14. 2OA, 1201 CONNECTION FOR BUILDING 516NAGE. VERIFY HE16HT OF CONNECTION WITH OWNER AND PROVIDE DISCONNECT INSIDE BUILDIN6. 15. REMOVE EXISTING PANEL. CONTRACTOR SHALL SPLICE EXISTING PANEL FEEDER AT CEILING, INSTALL PULL BOX, AND EXTEND NEW FEEDER TO NEW PANEL 'B'. SEE ONE -LINE DIAGRAM. RELOCATE ALL EXISTING CIRCUITS TO NEW PANEL 'B'. 16. RELOCATE EXISTING TIME CLOCK ABOVE PANEL TO NEW LOCATION ADJACENT TO NEW PANEL 'B'. TIME CLOCK SHALL CONTROL SAME CIRCUITS THAT ARE CURRENTLY BEING CONTROLLED. IT. INSTALL ELEVEN (II) 201 CIRCUIT BREAKERS IN EXISTING PANEL 'A' FOR FEEDS TO NEW KITCHEN EQUIPMENT. NEW BREAKERS SHALL BE COMPATIBLE WITH 'SIEMEN5LOAD CENTER. 15. JUNCTION BOX AT GEILIN6 FOR L16HT FIXTURE BY OWNER. CONNECT TO EXISTING LIGHTING CIRCUIT. 19. 20A, 1201 MOTOR CONNECTION FOR NEW EXHAUST FAN. CONNECT TO EXISTING LIGHTING CIRCUIT AND CONTROL WITH LIGHTS. 20. INSTALL NEW LI6HT 5WITG0 FOR NEW RE5TROOM. 21. RECEPTACLE FOR 'SHOW' WINDOW. MOUNT HI6H ON WALL ABOVE WINDOW. DESIGN-A/RE ENGINEERING, INC 2707 Rana Road Indianapolis, In 46241 voice: 3174649090 fax 317464-9393 �w w.daengineenng.com Mechanical, Electrical, & Energy Engineering cc a O N W M Cc W O y = G Z m � W � � m or�Q W me Pad wwJ a� y W W N h m Clfl � � Z � Z O _ C LLA W Z cz m cm Q ^ z 19076 07/03/2019 PROJECTPHASE ORAWNBY MV SHEETCONTENTS ELECTRICAL PLAN E=101