Loading...
HomeMy WebLinkAboutP101 Plumbing WasteDBE N FLOOR PLAN - WASTE RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and meal Codes City of Camel �VT�J'�B*x41WML DATE: \ 09/13/19 ® PLAN NOTES: I. INSTALL GREASE INTERCEPTOR. INTERCEPTOR SHALL 13E 1000 GALLON MINIMUM PER CARMEL STANDARDS. 2. ROUTE 3 COMPARTMENT SINK HASTE TO GREASE INTERCEPTOR. G.O. 3. CONNECT WASTE TO EXISTING WASTE. AS REQUIRED. ..0. AT 4. EX15TINO SINK TO REMAIN, CONNECT NEW KA5TE TO ,RARE GREASE LINE AS 5HOWN. 5. PIPE LOCATED IN EXISTING TRENCHES. 6. INSTALL A 2" AIR GAP ON 3-COMPARTMENT SINK DISCHARGE AND ON THE TWO SINKS INTO THE FLOOR DRAIN. DESIGN-MAE ENGINEERING, INC 2707 Rana Road Indianapolis, In 46241 voice: 317464-9090 fax 317464-9393 �w w.daengineering.com Mechanical, Electrical, & Energy Engineering mill C cc a 8 O N W M Cc W O y = �aa =�z � 3 WWC O G or�Q �oO nGN m800, ztE (y 16277 /0NAL 4.N § P2" ''G SNRI wwJ aai y W _v W N h W � v Z � Z O Z H C _ CS LU W Z CS m Cm Q ^ z 19076 07/03/2019 PROJECTPHASE ORAWNBY MV SHEETCONTENTS FLOOR PLAN - WASTE P=101