HomeMy WebLinkAboutP101 Plumbing WasteDBE
N
FLOOR PLAN - WASTE
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and meal Codes
City of Camel
�VT�J'�B*x41WML
DATE: \ 09/13/19
® PLAN NOTES:
I.
INSTALL GREASE INTERCEPTOR. INTERCEPTOR SHALL
13E 1000 GALLON MINIMUM PER CARMEL STANDARDS.
2.
ROUTE 3 COMPARTMENT SINK HASTE TO GREASE
INTERCEPTOR.
G.O.
3.
CONNECT WASTE TO EXISTING WASTE. AS REQUIRED.
..0. AT
4.
EX15TINO SINK TO REMAIN, CONNECT NEW KA5TE TO
,RARE
GREASE LINE AS 5HOWN.
5.
PIPE LOCATED IN EXISTING TRENCHES.
6.
INSTALL A 2" AIR GAP ON 3-COMPARTMENT SINK
DISCHARGE AND ON THE TWO SINKS INTO THE FLOOR
DRAIN.
DESIGN-MAE ENGINEERING, INC
2707 Rana Road Indianapolis, In 46241
voice: 317464-9090 fax 317464-9393
�w w.daengineering.com
Mechanical, Electrical, &
Energy Engineering
mill
C
cc
a
8
O
N
W
M
Cc
W
O
y
=
�aa
=�z
�
3
WWC
O
G
or�Q
�oO nGN m800,
ztE (y
16277 /0NAL 4.N §
P2"
''G SNRI
wwJ
aai
y
W
_v
W
N
h
W
�
v
Z
�
Z
O
Z
H
C
_
CS
LU
W
Z
CS
m
Cm
Q
^
z
19076
07/03/2019
PROJECTPHASE
ORAWNBY
MV
SHEETCONTENTS
FLOOR PLAN - WASTE
P=101