HomeMy WebLinkAboutP401 Plumbing SpecsSPECIFICATIONS
GENERAL NOTES
IDO - 6EERAL
IDI DESCRIPTION OF WORK
Fentsh all lobar, materials, equipment and services required far and/or reasonably Mcldantal to the completion of the following work.
A. Sanitary waste ad vent pphg system Including connections to Willing sewer as shore.
B. Domestic hot ad cold water systems Including water heater, ad related accessories ad controls. Connection to bulldlrg water as
Mason
C. Plural fixtures, brain and aressor BS Including Installation and support.
D. Posting end sm bling of roof and exterior wall penetrations for water tlghtress.
E. Cwll and sealing a floor ad wall teretratlons ends formed short penetrations.
F. Backing far securing flxtres, trim ad ns".
6. Access doors where shawl an required by code.
H. Hangers, supports, and cusses.
I. Cleanup a debris ad fiml cleanup of tralre, Flztres ad equipment.
J. Record travlrgs and operating manuals.
K. Llceres, permlEs and msoclated fees.
L. Getting, c lniaj ad patching far all surfaces In relation W ph" Al
M. Condensate tralre from WAC equipment, ad gas piping
ID2 RELATED WORK INCLUDED USER OTHER SECTIONS
A. H vAC ad ElecMdal Hark 5500 ad 16000
B. Fire Protection Hal I530DO Of spelicabb)
ID3 EXAMINATION OF SITE
A. Visit site before suor log bid and check location a all exeatinhg conditions
MYh will affect this work, verify dlmenslaw and locatlas shorn all drawings ad
cover all casts. Contractor shall assume reasanable vanlatlons an minor emission
and shall complete proposed Hark Hall additional cost. Fall" W vblt all
Hill rot Ioesen respandblltty or entltie additional conpersotbn for work halt
Included In proposal.
B. Visit site of the work compare It with the drawings ad specifications as W the condition under which work Is to be performed,
ascertain and check all condltWhs and elevations ad take all measurements which may affect the work No allowance doll
Mtrsequetly be mole for any extra expense or claims due to failure or neglect under thb requirement to make such exankgltion,
well examination of restricted working cadlions an such other difficulties visually observed arrlrrgg sake vel Contractor Is
responaide far becoming completely Familiar with the architectural ad structural conditions ad INni I= Mich will exist In the au larg
and to provide all Teal tools and materials required W produce a canpbtelj concealed Irekallatbn as hdiookad all the plans,
specifications, and required by the code.
ID4 DRAYiIN65
The acampaying trawirgs shall be considered part of these specifications. Work and nests l5 shown on the &a "and not mentioned
In the speclficatuo s and vice versa Mall be executed as If specifically mentioned an dawn In both. The areal shall be considered as
sdhendk In nature and maker nhodlfkatlane of the wok to comply with the structure as found shall is made.
IDS RLLE5 AND REWLATIONS
A. All work ad material shall be In full accordance AM the latest Nies and regulations of to State Fine Marshal and other applicable
State ad local rules ad regulations. Nothtg h these ararirgs an specifications Mall be construed to permit Nal hat conforl to
These codes.
B. Fumble without Any extra all ay adelloral materbl ad labor wan required to comply with these lows, ordInaree and codes
regardless a Well show an mentioned in thhese specifications OF drawings.
C. All mark and material Mall be In accordance with the Landlord's MecNElect. Design Criteria. All cea raters Mall cbttln a copy from
the Lidbrd5 Tenant Coordinator an hall 0 c ll mager ad nbecomefanllbr KIM the requkements contdred mHhh
prior to adding the Job. Where Landladhs requirements conflict AMh Codes an Ordlrnes the strictest Interpretation shall apply.
IDS SUBMITTALS
A. Submit Far review to tho Owner a conflate and all-InclusNe list of agell ad materials proposed far use (6 copies), acconpaned
Wb1 maxdaturer's cats sleets. Data shall be fanwa'ded In a angle paekage written 15 days after award of contract. Secret six
b(axklane prints ad one reproducrole Map trams g showing proposed plumcarg hsociatbn. Includes saxes, locations and other required
hformakion to coordinate Installation with other trades.
B. Nthln 5 dogs after award of contract, Sual 6 copies of a latter shading ay IMterbls that LmtfatM well W substitute, to the
Owner far approval. Include such TMo mabn as rrhannFahrer5 nary, type of material, certified ratings, overall Npearommah ad
necessary Information to explain function ad operation of material. All proposed substitutions Man be equal In quality, design, still ad
appearance to material, equipment an meted specified.
EDT AS -BUILT DRAWINGS
A set of pludcrg Il will he Permeated W beef Contractor an All he shall Indicate the Installation 'asHaIlt' an the wak progresses.
Upon completion of the wank, a set an referoducbee trowakgs salt be obWlred from the Owns at cast, and all charges, a noted an to
record set of prints May be Incorporated !arson. ThIs set of reproducble, along wit ore set of blueprints, Mall as delivered to the
Owner upon corryleton ad offers feat acceptance of to project.
IDS WAIRANfEE
The Contractor shall leave the eta Installation A cal working order Free from any defective materbl, Horkmawhp or finis. He
sell g'a'a'tee to repair an replace, KItant change, defects due to Fatty wankmashp an mate l for a pereod
of ores year Foam the cafe of filing of the Notice of Gompletlan.
1109 OPERATION MANUALS AND OVER INSTRUCTIONS
A. Provide complete operation ad moIntdimGe notable comhaing all Mustang systems ad equipment tat have been Installed. Mee (3)
copies of the naval Mall be band h haaack binders.
B. Fronde Instructions W ovner as to operation of all equpmmt. Instruction pabd to cbnnrience far mInhum of (2) Fags and shall be
schedule at ovner's cortvmence.
1.10 CUTTING AND PATCHING
A. The contractor doll do all cutting, trilling and patching whkh may he required Far the ImMallaltbn of the wank Mal this Section of the
Specifications.
B. Patching Mail he of the same wa-kmaehip, mentioned, and finish and shall match accurately all surrounding construction in a moaner
saisfatay W the Owner. No cutting of the structure Mall be permitted without written approval of the Owner.
2,00 - MATERIALS
2,01 PIPING
Belong trap ad vent plpakg materials Moll comply with the local at orMy he" Jurisdiction.
An santay system materials shall he listed bl an approved list" agent'.
A. Interior Underground Sol and Pate Piping : SCHEDULE 10PWVPVC,
B. Iterla Suspended Sanitary and Vent PIP SOEWIF 40DWVPVL
C. Interim Donni Haler Pining:
3- and Sheller - Type L had tempered copper AM solder end Fittings. 16-5 tin ad anthamg solder JoMakg (leatl-free). Use Type K
Fan tdercyourd piping. Hot Hater pptig Mall a Insalated AM l/ ' that Armstrong Areal an approved equal, ad sectias butted
Firmly together, PEX and 5-40 cpvc ace"le.
D. OvId" Nwve Shand Domestic Water Piping;
3' and smaller - Ty�L had tempered copper AM solar end Fittings. 46-5 tin and atherg sober Joining Dead -Free). Piping Mail a
Insulated with-1/2' rhiok Armstrong Area lez or approved equal, and sections butted firmly fngar. rr.
E. Cordersake Drain Piping,
Copper water butte A5TM 5l Tyyppoa M', solder HIM 4" sober, Imd4name type. Gandersxte train piping Mall a ad w ulakolth 1/2'
tag Anneal ArmAnneal and wMe bRkec All to9atler.
F. bans Piping: Galva lxed steel, Sch 40 ad fittings fa outeobr. Black steel, Soh 40 and fittings far Inbpor nave grand. Use
approved Polyethylenes yellow piping (PE) far all outdoor underground pip" with 14 gage tracer mire.
2,02 PIPE FLASNIY
4 Ins. sad HIM cbuMeHlashrg dreg by 6erco, 5tarhenan Erngnembring an approved equal.
2D3 VALvE5
A. Gate Valves: Red a Wxc 204 or equal, 3• and smaller.
B. Chock Valves: Red a HAW 23B an equal, 30 ad smalls.
2.0,1 PLLl FIXTURES AND TRIM:
Rental Fixtures W be furnished and he holled user thea contra[. See pluenal Mixtures scheeule.
2.05 PIPE KWEFF25 AND 5UPPORT5
A. 5uperauut, 6raknoll, an approved aqua.
B. Installation per mandaWer's reconnnerdctiars.
L. Pipe forgers shall have norrmetathc Felt or elastamerlc firer an was applied W the pipe for electrolyte protection Mere hangers
ad supports ore used W support copper tubing or ppe. The Inner or wrap Mall as designed W allow expansion or contraction of the
piping
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations g trough concrete adaorry AlAAnnular betweena spaces between sleeves ad pipes Mall ce felled or
I 0la spaces between sleeves ad pipes In fireresbtacerated assermblies shall as Filled an tightly
of State and local Comes g code.
af, CiityGF Camel
IVT�tJtBnC�DMK
DATE: \ 09/13/19
2D7 TEMPERATURE AMID PRESSURE RELIEF VALVE
Twiterahre a pressure hall valve shall dlx.Irrge full h e ate W an approved waste receptor direugh an cer gap a IMlwted
an plans or 6" maxim m.
2C6 SCALD WARD PROTECTION
Provide e d Install low" scald protection for waste piping and hot water piping.
2D9 DOMESTIC PIP146 INSUI ATION
A Provide and Install 'hwlatbn protection shield' far piping with Foam or Fiberglass Insulation.
B. Insulate all hot water piping and Indoor above goad stain train with I" thick Fiberglass Nhsulatlon.
C. Insulate, all horizontal caste piping (Poona) with HU2" thick Fberglass Insulation.
D. Insulate all domestic water piping outside the Wilding an an roof.
2.10 LLEANQJF
A. Accesslole cleanout shall be promised at the bane of eaM waste stack and roakuwoter leaders. Additional cleanest shall be
provided In a trainage lane for each halence l change of erection exceed tp 135 degrees. Cleanest must Lre provided on a
Iz=I boxes lane exceeding Bt or more in length serving sesks an urinals. An approves type of 2-Hoy uecnart fitting shall be
Mtallecl outside of a IIundesg at she lower end af a Wlldakg bah ad extended to grade.
2.11 WATER HEATER
A. Provide endars ad straps W resKt horizontal displacement isle to earthquake motion.
B. Strapping Mall a Iocalets tipper 0 ad lower I9 a Its vertical conversions. Straps Mall as a minimum 2"Ab gage properly
secured to wall studs. Elevate water healer ad; Teat 4" minimum above the finbhad floc^ AM am M base. Provide a 22
gage Haler tight train pan, corrosion resistant, at the bottom a the water healer. Drain pan dal e a 3/4" train line W be
discharged Into an approved receptor it means of an air can. A properly sized dermal expansion tank shall be provded at
the Hater Ieder. Hot water supply Fa the IwaWrles and hard sinks shall rot exceed 110•F twrperahre.
2.12 TREFIci
A. All trenches deeper than the footYq of ay alldirg an structure and paralleling the
same Mall be at least mill degrees tFlareerom.
3.00 - INSTALLATION AND EXEGRION
5,01 GENERAL
A. 5gport L.I. soil piping at 5 Feeenter m t am caxhum and each creditorJointcreditoranell Support lam al 3/4' plplrg of 6 feet
Con maimum. Support I' to -U2' along at B feet an centers. Support 2' and lager piping at 10 feet on center maxhpm.
Steel piping 4• and lager sag be supported at 12 Feet an center maximum except far vIcissi fitted piping which shall W
epported at 10 Feet on center maximum.
3D2 SPECIAL REWIREMENTS, RESPONSIBILITIES AND TSTIN5
A. Instal piping general)y level, free of taps and umecessay bends, to conform HIM adding requirements. Ppe to be free a
defects, ad installeTto wold any possible galvanic action by Isolating dlssamlor metals.
B. Test and record wallakele domestic water pressure In stdic and dlarmc, sanctions Par dynal testing record pressure and
flow rate In gallons per mince. Traemlt this foe m on be the engineer before proceeding HIM the work.
L. Provide all uses specified arerhaFter ad as Wlarwise required. Provide all test equipment, Including cost pumps, gages.
Instruments ad other equipment required. Presswe gauges exists Mail be graduated in Increments not greater than 5 ponds
per square Inch.. No pitmol or anhage system an part thereof Mail be covered, concealed, or put Into use finless It has been
specified. Conduct all tests In the presence of the Owner's represenGztNe, and cartoon the necessary Jwlsdktioral arthority
"actual
D. Apply a water test to the waste and vent systems Another In Its entirety an In sections; if applied to the entire system, tightly
close all openings In the plphg except the highest opening, and fill the system with Hater to the point of werflow. IF the system
6 tested in sections, to 19 pplug each opening except for the highest opei i of the section hinder test, and fill each section HIM
water, but test with He less tFah a IO' head of water. In testing sueeessNe sections, test at least the upper 10' of the next
preceding section so tat me Joint ar pipe In to Wilding (e�cepk to uppermost 10' af the system) shall have Rem secnitted W
a test of lose than a 10' head of water. Keep water In the system or In to Mallon under test For at least 24 hours Were
Inspection stilts, with hems system tight at all poste.
E. Damesty Haber system Mall a taxied ad pored tight under a p•eesure a not less Nan 120 P il. Piping must stand the rest
for a period of 24 hours without Zeal
F. chlorination of this domestic cold came hot waler piping systems In accordance HID standard resting procedures and local health
deportment requIreenents. Testing by a film such as Berne! -Moan an equal. Summit certifeate of satisfactory test results.
6. Upon completion of testing, oseLley to the Architect. in rrfli tM. to spethed tests have den performed and That the
retaliation complies with to specified requirements.
H. Gas pplrg system doll he tested with 10 P516 ar Far eight haws.
3D3 PIPING INSTALLATION
A. Make changes In size of ppe AM reducing finings; bushnge will net be permitted except Fan bell 9" copper lvM9rgs.
B. baton dialectrlo insulating unions h Niter piping teem copper piping and ferrous piping an equipment - Epee, or equal.
C. Install exposed polished cfronne canectbns From flxbwes an equipment AM specal core. Show no tool marks an tosses a;
fittings.
D. Lap open=1 In construction.piping during construction.
E. PrevostB9k red Frans pipe UPS, In connection to fauxets, flush valves, hose bobs or similar Itms re uriny rigid piping. Extend
lams pipe from fixture to point where piping can as securely fastened W Wildesg construction. All apposed ppng ad stop
valves In comactbn to flxtures Mall be chrome plated brass.
F. Irntall Micro Val to valves and where necessary to FacllRote dlso-psembly of piping.
0.1 FI exposed pipes passing through flocs, walls or cohIngz with
escukhems. Manufacture special sties of escutcnoore From steel ad prime coat sane. Cut In rand, rectagula an square
space to provide a clean appearance acceptable to the Aviceffect.
H. Spport piping independently of equipment W which It b connected.
. Make coppr solder (IClete with 955 solder, or silos; clean surfaces to as Joined free OF oil, grease, rest an oxides and apply
Flux to each Joint before hooting assembly.
J. "He and max final connections to all oter equipment furnished under other DlVealore, requiring pluming connections.
3D4 BB5TIMION5
A. One an more makes a materbls and methods nog have been specified to estoolsh the standard of quall worhrashp, Finish
ad design required, but oter materials an methods equal an better In MIT , Hahnmshp, fa lsh, design and guaranteed
performance, may he shbmitted Far renew and approval as su estawh All to ukims cars saki W review and approval by
Architect, Engheer, and Owner.
B. SubstltAlas sa11 as requested h a wlttm Form ad Mail be accompanied HIM a signed statement tat proposed susstlrutlon b
equal, an better than specified. Additional alocamentatbn W sdbsrmtlbted proposed substitution may be required by Owner,
Archltat, ad Engineer. Cantata' flail xbnit as drated.
C. contratar shall accompany request far sulhtltutbn letter HIM a camplal 051 5dAtWklon Farm tell the corrpalson for
fallowing:
I. Performance, Data
2. Denerslons
3. costs and Delivery Schedule
4. Listed and Approved
D. A written signed statement From to Beam Cartratan shall auorrymy ovestlGution request form assuring that:
I. Dimensions Fin been veripled HIM project candttbre and has coordinated with other trades. 5bsklfukkbn does rot affect
dmerelons Mow an cicwkgs.
2. He shall pay and beden to coats Pan changes to the project escliell redesign, reerglne ring and review of a lemeMlon.
Only ohe "Allariag review time Is allowed far a(Yh product sabettullm. contracts- Mall as matchable Fan additional
review the ad shall pay Archirect ad Bgineerb time at ter professional rate schedule.
3. He has corUlnned tat the proposed suhetlbeion will have no adverse affect on other trades, the creetructbn scleedue,
an specil warranty requreme di s.
4. He has confirmed tat maintenance ad service pats will be locally callable far the proposed substitution.
E. Cost swirgs resulting From substitution shall M rxtuned W the contract an the Owner If Was substitution Is permitted.
F. No Rork Involving materials succeeded far substitution shall proceed until written acceptance Is received! from the Owner. The
Owner Is tie final Judge of acce"lilty a preferred subStlWtlons.
SOS COORDINATION
A coordbbte work with other tides W woe codex anal W provide caret[ rough -in cnd connection Fa equipment Furnished
under other trades tat require plumbing carecklans. Item cantatas of other trades of the required access W ad
clea•ares around equipment W mal serve al ad code conpiiance.
B. Verly equipment dimensions ad requirements with provisaas specified order this Section. Check actual Job conotiane afore
Fabricating Aork. Report necessary changes h the W prevent needless, wok Changes an additions, subject W additional
compensation, which are made AMhest written authorization ad an agreed pries, sholl be at the Cantratanb risk and expense.
3D5 MARKING AND IDENTIFICATION
A. All deal cold water, hot water, sanitary sewer, sanitary vent, cordeaate trash, and FaGral gas pplrg shall have
visible permanent Ideas at every 20 Feet, the drectbn of normal flow shall Ina clearly shown, at least once pper room, ad
shall be viable from the floor level. The minimum size of the letters sawn an table b-I below. Valves shall be Ideled AIN staalled an
stacped metal tags hearing the name of the system they wry.
TABLE 6-1
PPE 51M (INCHES) SIZE OF LETTER flG )
A-1$ A
1K-2 %
2)5-6 1YH
6-10 2)5
I PLUMBING CONTRACT DRAWINGS ARE IN PART DIAGRAMMATIC, COVERING THE SLOPE OF WORK AND
6EXERAL ARRAN&EFENT OF THE EWIPT ENT, PIPING, ETC„ AND THE APPROXIMATE SIZE OF EQUIPMENT AND MATERIALS. THE
CONTRACTOR SHALL FOLLOW THESE DRAWIIYS IN LAYING OUT THE PLUMi WORK. PLU-BINS CONTRACTOR 5HALL LONBULT
EEERAL, 5PRIFK1ER HEATt /ME14TIL.ATINS/AIR CONDITIONING CONTRACT AND ELECTRICAL DRAWINGS TO FAMILIARIZE HIMSELF
WITH THAT WORK AND TO VERIFY THE SPACES IN WHICH THE PLLM INS WORK WILL BE INSTALLED.
2 BECAUSE OF THE NATURE AND SCALE OF THE DRAWINGS, CERTAIN BASIC PLUMBING ITEMS SUCH AS UNIONS, FITTINGS, 1150166,
ETC., MAY NOT BE SHCHN. WHERE SUCH ITEMS ARE REWIRED BY OTHER SECTIONS OF TE SPECIFICATIONS, OR KIH2E THEY ARE
REWIRED BY THE NATURE OF TIE WORK OR BY CODES AND RC-61.LAT10%,, THEY SHALL SE RM15WD AND INSTALLED AT W
ADDITIONAL LOST TO THE ON TER. THE DRAWINGS INDICATE 6PNERAL LOCATIONS OF PlPIN6, EWIPMEM, DUCTWORK AND
SIMILAR THE EXACT LOCATION TO BE DETERMINED BY TIE CONTRACTOR TO BEST FIT THE LAYOUT OF THE JOB.
3 ALL E611PFEN1-' BE TIGHTLY COVERED AND PROTECTED KAMT DIRT, WATER, AND CHEMICAL OR hELHANILAL INJURY
OR REFT. RUMBIN6 FIXTURES SHALL BE COVERED WITH HEAVY PAPER LOVE IN5<i WTEt INSTALLATION AND 54ALL BE
THORDLIa Y CLEARED AFTER COMPLETION OF THE FROJEGT.
4 ALL MATERIALS SUCH AS VALVES, FITTINGS, PPIN6, ENUIPMENT, RUMPS, COILS, ETC„ SHALL BE
PROPERLY PROTECTED, AND ALL PPIN6 OPENR55 SHALL BE TEMPORARILY CLOSED BY TE CONTRACTOR FOR THE WORK
TINDER HI5 CHARGE, ON A DAILY BASIS, AT THE END OF EALN WORKING DAY, SO A5 TO F FPFVENT OBSTRUCTION AND DAMAGE
THE ABOVE RECUIREMENfS ARE MANDATORY.
5 THE CONTRACTOR 5HALL SEE THAT ALL MATERIALS, INSTALLATION AND H9WAAN6H1P 15 PERFORMED IN ACCORDANCE KITH THE
LATEST EDITION OF ALL APPLICABLE CODES, LAMS, OR ORDINANCES OF THE STATE OF [PRO -ELT STATEL. AND COUNTY AND
LOCAL CODES, CITY OF PRD.EGT OTY] LAWS OR ORDINANCES, IFICAIDIN6 [PRD.ECT STATE] OR LOCAL BOARD OF HEALTH,
FEDERAL AND STATE ENVIRONMENTAL PROTECTION REWLATIONS, STATE ENERGY LODES AND UTILITY REWLATORY AGENCIES.
6 ALL WORK SHALL BE FURTHER PERFORMED IN ACCORDANCE WITH THE NATIONAL BOARD OF FIRE
IINDERkdRITERS, THE F-BHB1% AND B1hDUN6 LODES, NATIONAL ELECTRICAL LODE, THE
OCOIPATION& SAFETY AND HEALTH ACT, THE AMERCAN GAS ASSOCIATION, AND ALL SUCH OTHER
SPECIFIC L0DE5 AS MAY BE REFERRED TO IN THE INDIVIDUAL SECTIONS OF THE SFELIFILATIONS.
T PIPE 512E5 51k)AN ON THE DRAJNIN65 ARE THE MINIMUM SIBS ALLOYED PL6ARDLE55 OF THE CODE MINIMUM, EXCEPT WEN THE
CODE MINIMUM SIZE 15 LARGER THAN THAT 51-011N.
5 THE CONTRACTOIR SHALL MAINTAIN A CURRENT SET OF CONTRACT PRINTS ON THE cONSTRULTION SITE AT ALL TIMES, ON MICE
HE 514ALL ACCURATELY RECORD THE ACTUAL INSTALLATION OF ALL RUPBIN6 WORK AS WORK PR06RE55E5, MARK OHAN
MADE W&TIER RESATIM FROM JOB CONDITIONS, ADDENI FORMAL GRANGE ORDERS OR OTHER 115T UCTIOS ISSUED Bf THE
ENGINEER.
4 THE PLUMBMK CONTRACTOR SHALL INDICATE PROSRE55 BY COLORING IN VARIOUS PIPES, FIXTURES, ARID A'60LIATED
APPURTENANCES EXACTLY AS THEY ARE ERECTED AND INSTALLED.
10 MARK ALL PIPE 51ZE5 AND LOCATIONS DURING CONSTRIKTION. ALSO, MARK LOCATIONS OF ALL VALVES AND VARIOUS
EQUIPMENT, APPARATUS, AND A IATD APRIRTNANLF5 AS FRECTD eEEKLY Poll CONSTRUCTION.
II AT THE COMPLETION OF THE JOB THESE PRINTS, INCORPORATING CHANNE5, ADDENDA AND ADDED DATA NOTED ON MPRl
PRINTS INCLUDING DIMENSIONED LOCATION5 OF MVER6RQMD PIPING BEYOND LIMPS OF BtIDIN6, SHALL BE SUBMITTED TO THE
ENGINEER FOR FINAL REVIEW AND COMMENT. THE PRINT5 WILL BE RETURNED Hi APPROPRIATE COMMENTS AND
RECOMMENDATIONS. THESE CONNECTED PRINTS TOGETHER KITH COR149.ATED PRINTS INDICATING ALL THE REV1510I5,
ADDITIONS AND DELETIONS OF WORK, SHALL FORM 'THE BASIS FOR PREPARING A SET OF RECORD ORANN65.
12 WERE PIP%, AND OTHER PLIU INS APPURTENANCES PAY TIRW6HH FIRE PARTITIONS, FIRE WALLS, OR FLOORS, INSTALL A
FIRE-51`01F THAT PROVIDES AN EFFECTIVE BARRIER A6AIWT THE SPREAD OF FIRE, SMOKE AND 5A5E5. FIRE6TOP MATERIAL
FMALL BE UL APPROVED, PACKED T16NT AND COMPLETELY FILL CLEARAWPS BEIYEBN RACEWAYS AND OPENINGS. FLOOR,
EXTERIOR WALL, AND RDOF SEALS SHALL ALSO BE MADE KATER1I61HT AS APPROVED BY THE ADMINISTRATIVE AUTHORITY.
13 ARRANGE AND INSTALL PPIN5 APPROXIMATELY AS INDICAT P. STRAIGHT, PJMB AND AS DIRECT AS
POSSIBLE. FORM W6Hf ANGLES OR PARALLEL LINES WITH BUILDING WALL5. KEEP PIPES CLOSE TO WALL5, PARTITIONS AND
CEILINGS, OFiSETTIN5 ONLY WHERE W6E55ARY TO FOLLOW WALLS AND AVOID INITERFERENLE HT H OTHER MECHANICAL ITM.
LOCATE GROWS OF PIPS PARALLEL TO EKUH OTHER SPACE TEN AT A DISTANCE TO PERMIT ACCESS FOR SERVICING
VALVES.
14 PIPING SHALL BE PITCHED TO POINTS OF ORNNA6E NTH CONSTANT UNIFORM SLOPE.
15 INSTALL HORIZONTAL PIPING A5 HIGH AS POSSIBLE WITiQR SASS OR ERNS.
16 GRADE WATER PIPING AS SPECIFIED. GRADE DRAINAGE AT UNIFORM SLOPE OF NOT LESS THAN 1/4' PER FOOT TOWARD THE
POINT OF DISPOSAL, WHL APPROVED BY ADMINISTRATIVE AIRHIORITY, PIPE 51ZE 4• AND LARGER MAY HAVE A SLOPE OF NOT
LE55 THAN I/ a PER FOOT.
IT Nfi2E CHAINi IN PIPE SIZES OCCUR USE ONLY REDUON6 FITTINGS.
15 FOR DRAINAGE PIPING CHANSE5 IN DIRECTION USE LONG SHEEP WERE P0561 , OTH RAISE, SHORT SYBF 1/4 BEDS, OR
COMBINATION WYE AND 1/8 SENOS,USE SANITARY TEE BRANCHES ONLY FOR HORIZONTAL BRANCHES DISCHARGING TO STACKS.
14 INSTALL SECTIONALIZINS VALVES AND ON EACH BRAINI LINE TO KULTI-FIXTRE GROUP`.
LOCATE VALVES IN A READILY PLCiIBLE LOCATION DO NOT CONGEAL. DO NOT LOCATE
VALVE SYSTEMS BELOW HORIZONTAL UNLE55 INDICATED ON PANS.
20 HILLER 51RPLY TO ALL FIXTURES AND BE
EITHER SMALL BE SO INSTALLED AS TO PREVENT P0551BF BALK l THEA6E aF
POLLUTED HATER, B ALL SUPPLIES SWV.I. BE EITHER MB RE THE ROOD RIM OF THE FIXTURE OR SEPARATED FROM THE
DRAINAGE BD BY MEANS OF AN APPROVED VACUUM BREAKERS.
21 PROVIDE PIPING AND FIXTUl TRAPS. CONFECT TO FIXTURES AND OTHER EWIPHNT INDICATED OR
SPECIFIED AS RE-GUIRN6 SOIL, Al DRAIN AND VENT FACILI ME5.
M LAY ALLPIPING TRUE TO LUE AND GRADE, FIT RIDS T06ETHHR, MATCH 50 THAT SEYER OR DRAIN ALLHAVE SMOOTH AND
UNIFORM INSERT. FOLLOW LOCATIONS AND ELEVATION5 AT SITE. A5 THE PIPE LAYING PRO51fe £5, CLEAR PIPE INTERIOR OF
CEMENT, DIRT, AND OTHER FOREIGN MATERIALS. DURING WORK STOPPAGE PERIODS, PROVIDE EFFECTIVE PLY OR COVERS
FOR OPEN EID5 OF PIPE AND DRAINS.
23 PROVIDE CLEANOJTS WERE INDICAT P AND AT INTERVALS OF IW' OR AS REWIRED BY LOCAL PLUM 131% CODE AND WERE
RC -WIRED AT CHANGES OF DIRECTIONS OF SOIL AND WASTE STACKS. INSTPLL CLEANOUTS SO AS TO BE ACCESSIBLE FOR EASY
REMOVAL AND TO PROVIDE CLEARANCE FOR RODDIN6. CLEANOIRS SMALL BE THE SAME SIZE AS PIPE SERVED EXCEPT THAT
W CLEANOUT NEED BE LARGER TRAIN FOUR fl O .
24 EMEND VENT PIPES 12 INCHES ABOVE ROOF AND IOFT MINIMUM AWAY FROM ANY HASH AIR INTAKES.
25 SANITARY VENT PIPING SHALL BE GRADED SO THAT THE AIRFLOW TO THE OUTSIDE HILL W LONTIrel Y UPWARD AND SO
THAT NO LOW POINTS WILL BE DRAINED.
26 MAKE TIGHT CONNECTION BETYffN WATER CLOSET FLAW -CS AND EARTIHNKARE FIXTURE BY Mil OF AN APPROVED MOLDED
MAX RINK OR SETTIN6 COMPOUND AND BOLTING.
21 VENTS: PROVIDE FIASHI% FOR STACKS PASSING THRd16H ROOF. MAKE WATER-TI61-hT AT ROOF WITH 4 LB. SHEET LEAD;
EXTEND INTO ROOFING FEL15 AT LEAST 24• FROM PIPES. EXTEND LEAD COLLAR UP AROUND OUTSIDE AND TURN DOM INSIDE
VENTS AT THE TOP. LOCATE VENT THIROI6H ROOF IOFT MINIMUM MAY FROM ANY FRESH AIR INTAKE.
2B ALL PUMBIN6 FIXTURES AND PIPING 15 TO BE LISTED BY AN APPROVED LISTING AND 1E511% AGENCY AND PROPERLY
LABELED.
2 COORDINATE ALL LOCATI015, 51ZES AND ELEVATION5 OF ALL SLEEVE5 T RO16H HALLS, BEAMS, SLABL AND FOOTING ATIH
STRUGTRAL AND ARCHITECTURAL DRAWINGS. ALL PIPS SLMVIN6 THROWN FOOTINGS SHALL HAVE A SLEEVE DIAMETER OF
TNO PPE 5I7FS OVER THE PIPE PA551M THROUGH THE FOOTING. ND PIPE TO BE PLACED THROUSH FOOTING UNLESS APPROVED
BY THE STRUCTURAL EN51NffiL
30 ALL PIPES SHALL BE PROTECTED AT THE POINT THEY CROSS BUIL IPP46 EXPANSION JOINT,
EITHER LATH AN EXPANSION FITTIY OR IN ANOTHER MANNER ACCEPTABLE TO THE EN61NEER.
31 M-B`51 b CONTRACTOR SHALL LONNI ALL 6A5 PIPING TO ALL GAS RELATED UNITS PER PLAN WITH L15TD AND
APPROVED GAS SHlT-OFF VALVE, SEDIMENT TRAP, AND UNION.
32 FAU6ET CONTROLS SHALL BE OPERABLE WITH ONE HAND AND SHALL NOT REWIRE TIFUTT 51RA5PIN6, PINCHING, OR TNISTIN5 OF
THE YRIST. THE FORCE REWIRED TO ACTIVATE CONTROLS SHALL BE NO 6REATER THAN 5 POUNDS.
33 PENETRATION OF FLOOR/CEILIN6 A'fiE4 3LIES AND ASSEMBLIES REWIRED TO HAVE A PRE-RESISTAWE RATIN5 SHALL BE
PROTECTED IN ACCORDANCE LATH THE EUILDIN6 CODE.
34 WERE WATER PRESSURE ATHIN A BUILDING EXCEED` W PN, AN APPROVED HATER-PRES'! RE REDUCING VALVE LOIffOR,11%
TO A55E 1003 WITH STRAINER 5AALL BE INSTALLED TO REDUCE THE PRESSURE IN THE BUILDING HATER D15TRBUTION PIFT%
TO bO P51 STATIC OR LESS.
35 DISINFECTION OF POTABLE WATER SYSTEM SHALL COMPLY WITH THE LOCAL AND THE [XXX] PL1i CODE.
35 PROPER AGCEY MST BE PROVIDED FORTE T ST% AND MAINTENANCE OF THE BACKFLOW PREVETNTE R IF THE IF THE
BPCKFLOW PREVENTBt IS INSTALLED MORE TAN 5'4" ABOVE TE ROOR SPECIAL PROVISIONS MST BE MADE.
31 N1N5 will PIPING SHALL BE STa6TRALLY SUPPORTED A5 T1514 A5 PO55113.E BELOW THE STRUCTURAL BEAM5 TO GAIN
MORE HEAD SPACE AS IT PITCH TOWARDS THE LOHI POINT TO KEEP WASTE PIPING WITHIN THE CEILING 5PACE.
315 P.1thl CONTRACTOR TO PROVIDE LABOR COST AND MATERIAL FOR PIPE EXTENSION TO THE CIVIL POINT -OF -CONNECTION
HITHIN 20 FEET.
3N PLASTIC PIPS ARE NOT PERMITTED TO BE IN5TALLED WITHIN THE AIR P-BI M SPACE.
40 PROVIDE AND INSTALLA SINGLE 6AS ISOLATION VALVE FORTE MULTIPLE 6A5 METER BANKS FORTE ENTIRE BLW.
41 SANITARY 5B'ER PIPING SHALLM 5LOPED AT A MINIMUM OF 296.
DBE
DESIGN-A/RE ENGINEERING, INC
2707 Rand Road Indianapolis, In 4E241
voke: 317464-9090 fax 317464-9393
Www.daengineering.com
Mechanical, Electrical, &
Energy Engineering
I�
cc
a
O
N
w
M
Cc
O
y
=
G
Z
�
,ar��aT��
YV
CWC
C
fail
or�Q
4
0
all
W
W
N
h
W
OZ
CZ
w=
v
LU
Z
,W���nntt
IaaF
moan
Q
^
z
19076
07/03/2019
PROJECTPHASE
ORAWNBY
MV
SHEETCOWE
PLUMBING
SPECIFICATIONS
P=401