HomeMy WebLinkAboutM100_Mechanical Notes Symbols and SchedulesGENERAL NOTES EXISTING GAS/ELECTRIC ROOFTOP UNIT SCHEDULE MECHANICAL SYMBOLS 1. Materials, equipment, and systems shall meet all pertinent requirements of the Underwriters Laboratory (UL), the 2012 Indiana Mechanical Nom Tot CIg Sens Clg AIR Heating Heating Heating Supply ® Duct section up, positive pressure Code with local amendments, the 2012 Indiana Plumbing code with local amendments, the 2010 Indiana Energy Conservation Code with m Duct section up, negative ASHRAE 90.1-2007 in lieu of Chapter 4, American Society of Heating, Refrigeration and Air -Conditioning Engineers (ASHRAE), Sheet Metal and ff ID MModel Tons MBH MBH (S)EER MBKin ER Stages CFM ESP OA than WQIbs) Dimensions pressure Air Conditioning Contractors National Association (SMACNA), American Gas Association (AGA), National Fire Protection Association (NFPA), ® Duct section down, positive pressure and other nationally recognized agencies as well as applicable local codes. R U-1 Trans YHCO92 7-1/2 93.7 70.7 12.6 150 80% 2 3200 0.50" 350 1300 S9" x 54" x 47"h Duct section down, negative pressure RTU-2 Trans YHCO60 5 63.5 47.3 15.0 80 80% 1 2000 0.50" 225 1150 89" x 53" x 41"h 2. Bidders shall be licensed contractors in accordance with local and state laws. _ Galvanized steel duct, 1st number is 12/6 3. Bidders shall thoroughly acquaint themselves with the conditions under which the work is to be performed. They shall examine all services, ID Voli Fan Motor Drive kW MCA MOP Rehlg Accessories SONGS side shown (in inches). equipment, surfaces, etc., which this work is in any way dependent upon, and bring any discrepancies determined or omissions found in the drawings to the owner's attention before submitting bid. Verify all dimensions by field measurements. R U-1 20813 2.75 Hp Direct 7.06 42 A 50 A R410A 1,2,3,4,5 Sales 6110 Galvanized steel round duct; flexible RTU-2 208/3 1.00 Hp Direct 4.67 30 A 45 A R-410A 1,2,3,4,5 Back Areas ducts may be used where permittedper 4. The systems shown on the drawings shall be provided ro serve all fixtures, equipment, and areas within the Contract Limit Lines as se[ forth General Notes on this sheet. by the Architectural solution forthe project. The bidding and contract requirements, general requirements, and general provisions shall apply to this section. Systems shall include all equipment, appurtenances, safety devices, and controls necessary for the intended service. Noles(all units) Manual volume damper 1 Install level on mfr 14"h insulated mof cult. Verify mof slope infield. Co 5. All permits and fees required for this work shall be secured and paid for by the mechanical contractor and included in bid price. 275 Supply diffuser, CFM as noted 2 Provide and install pleated disposable MERV-8 filters, change fillers poor to turnover to tenant. 6. Anything drawn or specified on these plans shall not be construed to conflict with any local, municipal or state law, regulation or ordinance 3 All outside air dampers shall fully close in unoccupied mode. 2 5� Return or exhaust grille, CFM as noted which governs the installation of any mechanical or related work. Where any portion of the systems is not installed as in accordance with 4 Units come with temporary thermostatic control for initial startup and operation. applicable laws, ordinances, regulations and codes, this contractor shall make all changes required by the enforcing authorities in a manner Accessories Turning vanes, extended in direction approved by the owner and without additional cost to the owner. Where plan requirements are more stringent than code, the installation shall of Flow and located 2" on center 1 Provide unit with economizer with differential erehalpy controls, barometric relief, and weatherhood. be in accordance with the plans. 2 Phase loss protection. UON Unless otherwise noted 7. Where job conditions require changes from the contract documents that do not change the scope of installation or nature of work required, 3 Drain pan ovenlow switch the contractor shall make such changes without additional cost to the owner. No other changes may be made without written permission of U C Undercut door / the owner. 4 Hinged access panels Q � Numbered Note 5 Unit shall come with ni smoke detectors installed in return duct and shall shut off the unit in the event of fire. S. All equipment shall be new and unused, UON, and shall bear the label of an approved agency. All equipment shall be installed in strict Remote audiohdsual indicators a key stations shall be prodded. If key stations are prodded they shall be located in an area where MC Mechanical Contractor conformance to manufacturer's instructions, except where these specifications require a higher quality installation than recommended by they can be readily seen and heard. manufacturer. All mechanical equipment shall be provided with installation instructions, which shall be made available at the job site. GC General Contractor 9. All installed systems, devices and related items shall be tested in place on site. Replace any and all contractor -supplied defective devices, EC Electrical Contractor items orsystems at contractor's own expense before completion of the project. Report any problems with existing to remain (ETR) items to DIFFUSER AND GRILLE SCHEDULE PC Plumbing Contractor owner for resolution. Thermostat 10. Contractor shall guarantee all work for which materials are furnished, fabricated or field erected, all factory assembled equipment for which no specific manufacturer's guarantee is furnished, and all work in connection with installing manufacturer's guaranteed equipment. This ID Type Milt Model Description Overall Neck CFM NC max Mounting Material DR TR FD EF Exhaust Fan contractor's guarantee shall exist for a period of one (1) year from the data of final owner acceptance of the work and shall apply to defects in material and to defective workmanship of any kind. OA Outside Air CD -A S Titus PAS Perforated Face 24x 24 6/6 0-175 25 T-bar god Steel YES NO NO AFF Above Finished Floor 11. Contractor shall replace at contractor's own expense any contractor -supplied materials, equipment, and related items that fail or are found to CD-B S Titus PAS Perforated Face 24 x 24 8" 180-250 25 T-bar god Steel YES NO NO be defective within the guarantee period. CD-C S Titus PAS Perforated Face 24x 24 10" 255-325 25 T-bar god Steel YES NO NO (E),ETR Existing TO Remain 12. Arrange for chases, slots, and openings in other building components to allow for mechanical installations. Coordinate the installation of (R),REL Relocate/extend and reconnect required supporting devices and sleeves to be set in poured in place concrete and other structural components, as they are constructed. CG-A R Titus PXP Perforated Face 24 x 24 =_ __ _= T-bar grid Steel NO NO NO Coordinate the cutting and patching of building components to accommodate installation of mechanical equipment and materials. CGB R Titus PAR Perforated Face 24x 24 22x 22 75D-1425 20 T-bar grid Steel NO NO NO EXH Exhaust 13. Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. CD Ceiling Diffuser Abbreviations 14. Coordinate mechanical equipment and materials installation with other building components. Coordinate the installation of mechanical NIC Not In Contract R- Volume damper materials and equipment above ceilings with suspension system, light fixtures, and other installations. RTU Roof Top Unit TR - Square to round neck transition. 15. Equipment locations, roof & wall openings are approximate: verify size and coordinate with G.C., equipment supplier, and owner. Provide FD- Fire damper assembly with radiation blanket W-e Point of connection to existing steel framing wound mat opening(s) where required and around wall opening(s) where required. S -Supply v /� Remove and dispose of 16. Do not endanger or damage installed Work through procedures and processes of cutting and patching. Arrange for repairs required to restore R- Return or transfer other work, because of damage caused as a result of mechanical installations. 17. Where mounting heights are not detailed or dimensioned, install mechanical services and overhead equipment to provide the maximum EXHAUST FAN SCHEDULE headroom possible. ID Mfr Type Model CFM ESP RPM Drive Sones Motor Volt?h Dimensions Wt(Ibs) Serves 18. Install mechanical equipment to facilitate maintenance and repair or replacement of equipment components. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. EF-1 Grenheck Ceiling SP-B110 75 0.5" 804 Direct 1.5 BOW 115/1 14"x13"x7"h 12 106- Restroom 19. For all airsystems: adjust fans, supply register dampers, and duct volume dampers as needed to balance all systems to match listed airflows EF-2 Grenheck Ceiling SP-B110 75 0.5" 804 Direct 1.5 80 W 115/1 14"x13'x7"h 12 121 - Restroom (+/- 30%), and provide a written summary report. Replace fan drive if required to achieve design airflows. Summary report shall include design, preliminary and final airflow data, and shall include a list of deficiencies. Notes 20. The entire installation, including the gauges of ductwork, shall be in strict compliance with SMACNA standards, except where these 1 All fans with integral grayly backdraft damper. specifications require a stricter installation standard. System is 1" pressure class, UON. All ducts shall be sealed to meet SMACNA Class A 2 Control all fans ua timeclock. Run continuously during all hours of operation. requirements, and shall be supported at intervals not exceeding 10'. Sealant shall be UL-181A or IBIS certified. 3 Provide and install all fans with mfrs disconnect switch and speed controller at fan, for balancing. 21. All 90 degree turns in supply and return ductwork shall be mitered elbows with single wall turning vanes at 2" spacing extended in the direction of airflow, or smooth radius elbows with a radius -to -width ratio of 1.0 or greater. Mitered elbows without turning vanes, OUTSIDE AIR CALCULATIONS square -throat mdiused-heel elbows, and mdiused-throat square -heel elbows are NOT acceptable. All duct transitions shall be smooth (30 degree taper maximum), not abrupt. 22. All supply and return and outside air ducts inside the building thermal envelope shall be insulated with 1.5" fiberglass duct insulation. All RTU-I Zone Description Zone Area Area OA Area OA Occupant Occupant Occupant Occupant Breathing Zone Air Zone Zone OA zone Vent supply and return ductwork outside the building thermal envelope shall be insulated with 3" fiberglass duct Insulation (minimum R-e "installed" value). Insulation shall be fiberglass wrap with scrim -reinforced foil backing. Seal all joints and punctures to preserve vapor barrier. Rate Lead Rate Load OA Rate OA Zone OA Dist Be OA Supply Air Fraction Efficiency Az Ra Az x Ra Pz RIP Rip Pz Vbz Ez Voz Vpz Zp Evz ` 23. Duct smoke detectors and accessories shall be UL tested and listed. Equipment and installation shall meet all pertinent requirements of the (sq.ft.) (cfin/sq.ftJ (cfm) (pplil(l so (people) (cfm/pers) (cfim) (cfm) (cfin) firm) mechanical code and NFPA 72. Duct smoke detectors located more than 10 ft above the finished floor, or located such that the detector's alarm indicator is not visible to responding personnel, shall be provided with remote alarm indicators. Each remote indicator shall be clearly 100-Optical 1308 0.12 157 15 20 75 150 307 O.B 384 272D 0.141 Cl labeled as to function and air handling unit served, with an acrylic engraved nameplate. 101 - Reception 193 0.06 12 5 1 5.0 5 17 0.8 21 480 0.043 1.058 24. All curtain -type fire dampers shall be UL 555 listed and dynamic rated, except that static rated fire dampers shall be permitted where the air TOTAL 1501 169 21 155 324 404 320D 0.141 0.960 handling system is automatically shut down in the event of fire. Provide and install duct access panel with acrylic engraved nameplate for each fire damper. Occupant Diversity D 1.00 25. All diffusers and grilles shall be factory finished white, unless otherwise noted. Uncorrected OA Vou 324 0 x E all zones RpPz + F all zones AzRa Average OA Fraction As 0.101 Per ASHRAE 62.1-2013 Appendix A 26. All mechanical equipment shall have vibration isolators, as well as flexible duct connectors. Flexible connectors shall be UL 181 tested and Ventilation Efficiency ` Ev 0.96 From 62.1-2013 Appendix A equation A3, or 1.00 from Table 403.3.2.3.2 labeled, and shall not exceed 14' in length. Mechanical fasteners and sealants shall be used to connect ducts to mechanical equipment. Ventilation Eff. Used Ev 1.00 Select the largest of the two Ev values above 27. All duct coverings, linings, tape and vibration isolation connectors shall have a maximum flame spread rating of 25, and a maximum smoke TOTAL REQUIRED OA Vat 324 than generation rating of 50. 28. All duct dimensions listed on plans are inside clear dimensions. Where internally lined ductwork is specified, adjust sheet metal dimensions to RTU"2 Zone Description Zone Area Area OA Area OA Occupant Occupant Occupant Occupant Breathing Zone Air Zone Zone OA Zone Vent accommodate liner. Rate Load Rate Load OA Rate OA Zone OA Dist EH OA Supply Air Fraction Efficiency 29. Flexible ducts shall not exceed 10' in length, nor shall they be installed where they must be flattened. Flexible ducts shall be UL 181 tested Az Ra Az x Ra Pz Rip Rp x Pz Vbz Ez Voz VPz zp Eve: ` and labeled, and must be fastened per SMACNA standards. If job conditions do not permit proper installation of flexible duct, rectangular (sq.ft.) (ofin/sq.ft.) (ofio) (ppl/1000 SO (people) (cfaripens) (often) (01m) (011111) (1 galvanized steel duct with equal free area shall be used instead. Flexible ducts shall not be used where exposed, or where concealed above drywall or plaster ceilings. 104-Workroom 106 0.06 6 5 1 5 5 11 0.8 14 100 0.142 0.952 30. Provide volume dampers at each branch off of a trunk duct to a supply diffuser. 105/109/112/ Corridor 321 0.06 19 0 0 0 0 19 0.8 24 150 0.161 0.934 106-Restroom 54 0.00 0 0 0 0 0 0 O.8 0 70 0.000 1.D94 31. All air handlers, condensers, control devices and other mechanical apparatus shall be clearly marked for easy identification and safety. Use 110 - Contact Storage 89 0.12 11 0 0 0 0 11 0.8 13 50 0.267 0.827 black plastic or bakelite name plate engraved with white letters 1/4" high. Punched tape is not acceptable. 111- Pretest 56 0.06 3 5 1 5 5 8 0.8 10 70 0,149 0,945 121 - Restroom 68 0.00 0 0 0 0 0 0 O.8 0 70 0.000 1.094 32. Mechanical contractor shall furnish record set of drawings with any deviations marked in red ink, within 90 days of system acceptance. 107 - Pretest 65 0.06 4 5 1 5 5 9 0.8 11 100 0.111 0.983 103-Contact Lens 98 0.06 6 5 1 5 5 11 0.8 14 100 0.136 0958 33. Mechanical contractor shall furnish manuals for all new equipment within 90 days of system acceptance, including, at a minimum: equipment 108- Pretest 74 0.06 4 5 1 5 5 9 0.8 12 70 0.169 0.926 input and output capacity and required maintenance actions, O&M manuals, controls maintenance and calibration information (including wiring 113-Special Testing 52 0.06 3 5 1 5 5 8 0.8 10 70 0.145 0.949 diagrams and controls set points), and a complete written narrative of how each system is intended to operate. Systems shall be tested to 114- Consulting 104 0.06 6 5 1 5 5 11 01 14 100 0.141 0.954 ensure that controls are calibrated, adjusted, and in proper working condition. 115-Consulting 104 0.06 6 5 1 5 5 11 CIA 14 100 0.141 0.954 34. All submittals shall be sent in pdf format, hard copies will not be reviewed. Submittals shall be highlighted or reclined to indicate equipment 116- Consulting 104 0.06 6 5 1 5 5 11 0.8 14 100 0.141 0.954 ID from schedules, model number, performance data, electrical data, dimensions, weights, options and accessories, and shall be emailed to 118-Consulting 104 0.06 6 5 1 5 5 11 0.8 14 100 0.141 0.954 the Architect. 119-Consulting 104 0.06 6 5 1 5 5 11 0.8 14 100 0.141 0.954 120-Consulting 116 0.06 7 5 1 5 5 12 O.8 15 100 0.150 0.945 124 - Office 102 0.12 12 0 0 0 0 12 0.8 15 250 0.061 1.033 123 - Hall 140 0.06 8 0 0 0 0 8 1.8 5 50 0.093 1.001 122-Breakroan 129 0.06 8 5 1 5 5 13 O.8 16 250 0.064 1.031 TOTAL 1990 124 13 65 189 230 200D 0.267 0.827 RELEASED FOR CONSTRUCTION Occupant Diversity D 1.00 Uncorrected OA Vou 189 D x E all zones RpPz + L all zones AzRa Subject to compliance with all regulations Average OA Fraction YS 0.094 Per ASHRAE 62.1-2013 Appendix of State and Local Codes Ventilation Efficiency , Ev 0.83 From 62.1-2013 Appendix A equation A3, or 0.88 ham Table 403.32.3.2 Ventilation Eff. Used Ev 0.88 Select the largest of the two Ev values above I City of Camel 1A, n 1 TOTAL REQUIRED OA Vol 214 often T, , . DATE: 09/17/19 C HA CRAIG BENNETT ASSOCIATES ARCHITECTS TENANT MY EYE DR 1950 OLD GALLOWS RD SUITE 520 VIENNA, VIRGINIA 20182 703-847-8899 FAX 866-414-6476 Contact: Suzanne Berardi -Gould 571-455-8191 ARCHITECT: CBA ARCHITECTS, PC 1239 PINE HILL ROAD McLEAN, VIRGINIA 22101 703-847-6900 FAX 847-6955 www.cba-urchiiecis.com Contact: Craig Bennett cbenneit@cba-architecis.com 703-975-2400 MEP ENGINEER: DWYER ENGINEERING 552 FORT EVANS ROAD NE, #200 LEESBURG, VIRGINIA 20176 703-777-5988 FAX 703-439-2588 www.dwyer.com Contact: Brian Davis BDavis@dwyer.com 703-777-5988 EXT. 110 MY EYE DR SHOPPES ON MAIN SOUTHWEST CORNER OF MAIN ST & GRAND AVE CARMEL, INDIANA For Permit 07/18/19 For Review 07/03/19 ,00, a r II,,, „' vsTEq" No. 11 0 0 y. SA O fill 9W19 ode MECHANICAL NSHED�ADSCUS SHEET M100